WASHINGTON LAKE DISTRICT: Washington Lake AIS Control Proj.

Purpose

Washington Lake Management District proposes to manage invasive species on Washington Lake during the period of April 1, 2012- December 31, 2016. The project elements and deliverables are specified within their control grant application dated January 31, 2012. This project requires that the following actions be completed on an annual basis unless otherwise specified: 1) Clean Boats Clean Waters (CBCW), a minimum of 200 hours. All data entered into SWIMS by October 1. 2) Citizen Lake Monitoring Network (CLMN) Early Detection Monitoring for invasive species, a minimum of 50 hours. All data to be entered into SWIMS by October 1. 3) Host/attend one CBCW and CLMN training within the first year of this grant. 4) Hand-pulling of invasive species for minimum of 50 hours. All hours to be recorded on volunteer log worksheet. 5) Conduct pre-/post- treatment surveys according to department protocol. 6) Augmented enforcement with local law enforcement. All hours to be recorded. 7) Planting/stocking of native plants species. Record all data on species success. 8) Biocontrol efforts for Purple Loosestrife. 9) Work with Shawano County AIS Coordinator on installing educational signage on the channel between Washington and Shawano Lake. 10) Conduct herbicide residual monitoring annually. Annual progress reports and a final report summarizing this project is requirement and will be provided to the DNR. Please provide both paper and electronic .pdf copies of the final report along with, or prior to, submission of the grantee\2019s final payment request. If a consultant is to provide the final report, it is recommended that the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making the final payment to the consultant. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand ( partnership details can be found at: http://www.protectyourwaters.org).

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Aquatic Invasives Grant
Aquatic Invasives Control
ACEI-120-12
2012
Complete
 
Activities & Recommendations
Grant Awarded
Watercraft Inspections Clean Boats, Clean Waters
Monitor Invasive Species
Train Volunteers
CBCW Training
APM Mechanical Permit Request
Monitor Pre and Post Treatment
Information and Education
Install Kiosk or Sign
Biomonitoring Toxicity Tests
Project Deliverable
Annual summary reports and final report
 
Watershed
 
Waters