MINONG FLOWAGE ASSOCIATION: 2012 Whole-lake Point Intercept Plant Survey; Weevil Rearing Support & Residual Testing Project

Purpose

The Minong Flowage Association is sponsoring an AIS prevention & education project to study the flowage prior to the upcoming drawdown. The project includes continued CB/CW inspection/education program; EWM weevil rearing, CLP bed mapping, a point intercept aquatic plant study, and residual herbicide testing. Data collected will be used to update the APM Plan and address wildlife habitat. Deliverables include a comprehensive Report including: 1) a summary of project accomplishments including AIS monitoring results and observations of any detected aquatic invasive species with appropriate maps; 2) CB/CW report including time and number of people reached and survey results; daily results will be entered into SWIMS database; 3) Report on EWM Weevil rearing; 4) Verification of workshops/training such as agendas and attendance lists; 5) Report on CLP bed mapping; 6) Report on warm water point intercept survey; 7) Report on residual herbicide treatment testing; 8) Copies of educational materials paid by this grant; 9) AIS related materials generated or paid for by this grant. Special project conditions: 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance must be followed for point-intercept survey monitoring and/or aquatic plant management plan development; 2) Sponsor shall immediately contact DNR if a new aquatic invasive species is found. This scope summarizes details provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AZIS Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee provide AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the final report

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Aquatic Invasives Grant
Aquatic Invasives Education
AEPP-338-12
2012
Complete
 
Reports and Documents
 
Activities & Recommendations
Grant Awarded
Watercraft Inspections Clean Boats, Clean Waters
Project Deliverable
Final Report
Hold Workshops
Aquatic Plant Management Plan
update
Map Invasive Species
Monitor Invasive Species
Aquatic Plant Monitoring or Survey
Biomonitoring Toxicity Tests
 
Watershed
 
Waters