BIG CHETAC CHAIN LAKE ASSOCIATION: Alum Dosage Study & Modeling

Purpose

Big Chetac Chain Lakes Association is sponsoring a project to assess the feasibility of an alum treatment for Big Chetac Lake. The final deliverables include a final report documenting the results of the regulations review, sediment cores, alum dosage analysis, and lake response modeling. Specific project tasks include: 1) Sediment core collection; 2) Alum dosage analysis; 3) Lake response modeling; 4) Inventory & review programs & regulations affecting water quality. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-1525-13
2013
Complete
 
Reports and Documents
Phosphorus (P) budget analysis of the 2007 summer limnological data set confirmed that internal P loading, primarily from anaerobic sediments located in the north basin, is the dominant P source driving algal blooms in Big Chetac Lake. Empirical steady-state models predicted that management of internal P loading in the north basin would result in a 47% decrease in mean summer total P concentrations to 0.045 mg/L. Predicted chlorophyll concentrations declined by 60% to 21 μg/L and frequency of nuisance algal blooms (i.e., chlorophyll concentrations > 30 μg/L) decreased from 73% to only 19% of the time during the summer. In contrast, management and reduction of tributary P loads resulted in minor predicted improvements in limnological characteristics because these inputs were low relative to P inputs via internal loads.
 
Activities & Recommendations
Grant Awarded
Big Chetac Chain Lakes Association is sponsoring a project to assess the feasibility of an alum treatment for Big Chetac Lake. The final deliverables include a final report documenting the results of the regulations review, sediment cores, alum dosage analysis, and lake response modeling.
Lakes Planning Grant
Diagnostic/Feasibility Assessment
Alum Feasibility Study
Monitor Water Quality or Sediment
Water Quality Modeling
Project Deliverable
Final Report
 