WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
03-38-204911 D & G MOBIL QUIKMART - SL
Activity Type / Status Jurisdiction
LUST  OPEN DNR RR
Location Name County DNR Region
D & G MOBIL QUIKMART MARINETTE NORTHEAST
Address Municipality
125 CTH CP COLEMAN
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SE 1/4 of the SW 1/4 of Sec 14, T30N, R20E 45.0662592 -88.0387646 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
Electronic Only- No Hard File UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
54112-9792-25 1998-11-11
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Pecfa Flag Underground Storage Tank Flag
Site Files
Name File
SITE FILE DOCUMENTATION FOR ACTIVITY. Download PDF Document
SITE FILE DOCUMENTATION FOR ACTIVITY. Download PDF Document
Actions and Documents
Date Code Name File Comment
2022-04-26 43 Site Activity Status Update Received Download PDF file DRAFT GW MONITORING REPORT
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-01-14 43 Site Activity Status Update Received Download PDF file REVISED FIGURE 1 FOR GEI REPORT DATED 02/06/2020
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-02-06 43 Site Activity Status Update Received Download PDF file GROUNDWATER MONITORING STATUS REPORT (FEB 2020)
2020-01-29 23 Referral to Department of Justice (DOJ)
2020-01-23 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2019-10-23 99 Miscellaneous Download PDF file NOTIFICATION LETTERS FOR ON-SITE AND OFF-SITE OCTOBER 2019 GROUNDWATER SAMPLING; STATE LEAD
2019-10-16 99 Miscellaneous Download PDF file EMAIL SUMMARY & RESPONSE TO PHONE CALL FROM VILLAGE OF COLEMAN
2019-10-15 43 Site Activity Status Update Received Download PDF file GROUNDWATER ANALYTICAL RESULTS FROM 10/10/2019 SAMPLLING
2019-10-10 99 Miscellaneous SPECIAL INSPECTION WARRANT
2019-08-16 99 Miscellaneous Download PDF file GROUNDWATER RESULTS NOTIFICATIONS & REQUEST FOR ACCESS
2019-08-06 43 Site Activity Status Update Received Download PDF file GROUNDWATER SAMPLING RESULTS
2019-08-01 99 Miscellaneous SPECIAL INSPECTION WARRANT
2019-07-25 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2019-07-17 99 Miscellaneous Download PDF file REQUEST FOR ACCESS & SOIL SAMPLING RESULTS
2019-07-10 43 Site Activity Status Update Received Download PDF file SOIL ANALYTICAL RESULTS
2019-06-24 99 Miscellaneous Download PDF file MEETING @ OFF-SITE PROPERTY WITH RP
2019-06-20 43 Site Activity Status Update Received Download PDF file PERMISSION TO STAGE IDW DRUMS ON OFF-SITE PROPERTY
2019-06-12 43 Site Activity Status Update Received Download PDF file HEALTH & SAFETY PLAN
2019-06-04 99 Miscellaneous Download PDF file SAMPLING LOCATION UPDATE
2019-05-23 43 Site Activity Status Update Received SIGNED ACCESS AGREEMENTS
2019-05-03 99 Miscellaneous PHONE CALL TO RP
2019-05-02 43 Site Activity Status Update Received Download PDF file RP RESPONSE TO REQUEST FOR PERMISSION TO ACCESS: REQUEST DENIED
2019-04-23 99 Miscellaneous Download PDF file SECOND REQUEST FOR PERMISSION TO ACCESS
2019-04-04 43 Site Activity Status Update Received Download PDF file LETTER FROM CONSULTANT TO RP REGARDING END OF CONTRACT
2019-04-01 99 Miscellaneous Download PDF file FIRST REQUEST FOR PERMISSION TO ACCESS
2019-04-01 99 Miscellaneous Download PDF file NOTICE TO INCUR EXPENSES
2019-01-23 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2018-07-16 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2018-01-16 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2017-07-20 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SI - NOT COMPLETE
2017-07-14 43 Site Activity Status Update Received UPDATE FROM DATCP REGARDING UST COMPLIANCE ON THE SITE
2017-06-29 43 Site Activity Status Update Received UPDATE FROM DATCP - ORDER FOR TANK CLOSURE
2017-05-02 505 PECFA Cost Request Approved
2017-04-27 504 PECFA Cost Request Received Download PDF file CHANGE ORDER FOR INVESTIGATIVE WASTE DISPOSAL
2017-04-24 43 Site Activity Status Update Received LETTER FROM RP REGARDING PECFA REIMBURSEMENT
2017-04-04 43 Site Activity Status Update Received Download PDF file COLEMAN NO LONGER CONSULTANT
2017-03-13 99 Miscellaneous CONSULTANT IS HOLDING OFF ON REPORT UNTIL PECFA REIMBURSEMENT
2017-01-25 43 Site Activity Status Update Received PHONE CALL FROM VILLAGE REGARDING SITE
2017-01-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-11-15 505 PECFA Cost Request Approved Download PDF file
2016-11-10 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
2016-11-10 99 Miscellaneous PECFA COST APPROVAL UPDATED
2016-11-03 504 PECFA Cost Request Received
2016-11-03 35 Site Investigation Workplan (SIWP) Received (non-fee)
2016-10-17 99 Miscellaneous RP NOTIFIED OF COMPLETED DATCP INSPECTION REQUIREMENTS
2016-07-14 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-06-08 43 Site Activity Status Update Received SITE VISIT
2016-05-17 99 Miscellaneous CHANGE IN PM TO ALEX EDLER
2015-12-09 7 Environmental Consultant Hired COLEMAN ENGINEERING
2015-12-09 99 Miscellaneous SIWP TO BE SUBMITTED IN JANUARY
2015-09-25 200 Push Action Taken Download PDF file PECFA FINAL PUSH LETTER
2015-08-24 130 DNR Regulatory Reminder Sent Download PDF file PECFA SUNSET LETTER
2014-12-09 43 Site Activity Status Update Received VILLAGE VOTED TO BECOME AGENT FOR THIS PROPERTY. CONSULTANT WILL SUBMIT SIWP.
2014-02-03 99 Miscellaneous CONFIRMED HANNAN IS STILL OWNER. DEED FILED
2013-08-05 99 Miscellaneous TRANSFER OF PM LETTER - ERDMAN
2012-09-11 99 Miscellaneous LETTER SENT - PROJECT MANAGER WILL BE BOB KLAUK
2012-04-10 99 Miscellaneous RP STILL OWNS PROPERTY
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-01-05 99 Miscellaneous COUNTY DID NOT FORECLOSE ON PROPERTY
2010-06-25 99 Miscellaneous NOTIFICATION OF FORECLOSURE BY MARINETTE COUNTY FOR DELINQUENT TAXES
2010-04-19 99 Miscellaneous OFFICIAL COPY OF FILED NOTICE OF CONTAMINATION RECEIVED
2010-04-06 53 Deed Affidavit for Contamination (NR 728) Recorded Download PDF file NOTICE OF CONTAMINATION FILED WITH MARINETTE COUNTY REGISTER OF DEEDS
2010-03-17 99 Miscellaneous HANNAN BACK IN COMPLIANCE WITH COMM 10. ELIGIBLE FOR PECFA AGAIN
2010-01-05 99 Miscellaneous NOT ELIGIBLE FOR PECFA AS NEW TANK SYSTEM (ADJACENT PROPERTY) IS "RED TAGGED"
2009-09-15 99 Miscellaneous RESPONSIBLE PARTY DID NOT MEET 09-07-09 DEADLINE TO HIRE A CONSULTANT. DOJ PURSUING CONTEMPT
2009-09-10 43 Site Activity Status Update Received RESPONSIBLE PARTY REQUEST FOR SAMPLE LOCATIONS
2009-08-07 99 Miscellaneous NEW DOJ DEADLINE FOR RP
2009-02-09 43 Site Activity Status Update Received IN THE PROCESS OF OBTAINING INSURANCE & BRANDING
2008-12-12 43 Site Activity Status Update Received RP FOUND AN OIL COMPANY TO BRAND STATION. SEEKING INSURANCE
2008-10-21 43 Site Activity Status Update Received STILL WORKING ON GETTING THE USTS REINSTATED
2008-08-11 43 Site Activity Status Update Received RP PERFORMING ACTIVITIES TO GET TANKS BACK ON-LINE
2008-06-26 43 Site Activity Status Update Received STILL WORKING WITH COMMERCE REGARDING EXISTING UST'S
2008-06-13 43 Site Activity Status Update Received WAITING FOR A RESPONSE FROM THE DEPARTMENT OF COMMERCE
2008-06-02 43 Site Activity Status Update Received RP WAITING FOR A RESPONSE FROM "TANK PEOPLE"
2008-05-15 99 Miscellaneous CONSULTANT INFORMED OF CHANGE IN WORK SCOPE
2008-05-06 43 Site Activity Status Update Received CONSULTANT TO BE RECEIVING PAYMENT FOR PREVIOUS WORK IN THE NEAR FUTURE.
2008-04-29 99 Miscellaneous DOJ REQUEST TO COMPLETE FEB 20, 2008 WORK SCOPE BY MAY 30, 2008
2008-04-24 43 Site Activity Status Update Received RP HAS NOT PROCEEDED WITH WORK OUTLINED IN DNR'S 02-20-08 E-MAIL
2008-04-22 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2008-03-19 59 Environmental Enforcement Action Completed Download PDF file FINAL STIPULATION & ORDER FOR JUDGMENT AND JUDGMENT
2008-02-20 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2008-02-20 140 Site Investigation Report (SIR) Not Approved Download PDF file PERFORM ADDITIONAL SI ACTIVITIES TO DEFINE DEGREE & EXTENT OF CONTAMINATION
2007-12-28 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file WITH CONDITIONS
2007-12-27 43 Site Activity Status Update Received Download PDF file COPY OF MAY 10, 2001 FISCHER REPORT
2007-12-18 43 Site Activity Status Update Received Download PDF file COPY OF JUNE 27, 2002 & DECEMBER 9, 2002 MES REPORTS
2007-12-07 99 Miscellaneous REQUEST FOR 2001 FISCHER & 2002 MES REPORTS
2007-12-05 35 Site Investigation Workplan (SIWP) Received (non-fee)
2007-11-08 43 Site Activity Status Update Received BAY ENVIRONMENTAL HIRED
2007-08-29 99 Miscellaneous REQUEST FOR STATUS UPDATE FROM DOJ
2006-08-11 23 Referral to Department of Justice (DOJ) DNR LETTER TO RP & DOJ
2005-09-21 99 Miscellaneous LAST CHANCE LETTER
2005-05-24 99 Miscellaneous ENFORCEMENT SECTION REQUESTED CASE STATUS UPDATE
2005-03-30 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2004-05-28 99 Miscellaneous Download PDF file RESPONSE TO BIOPILE SPREADING REQUEST. ADDITIONAL SAMPLING NEEDED
2004-05-24 43 Site Activity Status Update Received Download PDF file REQUEST TO SPREAD BIOPILE SOILS
2003-11-26 4 Enforcement Conference Held CONFERENCE SUMMARY HELD 11/26/03
2003-10-23 14 Notice of Violation (NOV) Issued
2003-05-12 43 Site Activity Status Update Received RP RESPONSE TO UPDATE REQUEST
2003-03-20 3 Notice of Noncompliance (NON) Issued
2003-02-04 99 Miscellaneous WDNR REQUESTS STATUS UPDATE
2002-02-13 99 Miscellaneous WDNR STATUS UPDATE LETTER REQUEST TO RP
2000-03-06 33 Tank System Site Assessment (TSSA) Report Received Download PDF file 3 TANKS REMOVED 10/20/99
1998-11-19 2 Responsible Party (RP) letter sent Download PDF file
1998-11-11 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Gasoline - Unleaded and Leaded Petroleum
PECFA Total Claims Paid
Payments made from the Petroleum Environmental Cleanup Fund Award
PECFA Site Name: D & G Mobil & Quik Mart
Max. Reimbursement: $1,000,000 Total Amount Paid: $39,290.65
Occ No Claim No Audit Date Paid Date Amt Submitted Amt Ineligible Amt Paid
A 1 2010-05-19 2010-06-23 $4,668.72 $.00 $4,668.72
A 2 2017-02-08 2017-04-24 $2,496.40 $.03 $2,496.37
A 3 2017-02-22 2017-04-28 $24,041.68 $568.60 $23,473.08
A 4 2017-08-14 2017-09-18 $10,588.61 $1,936.13 $8,652.48
Responsible Party
GEORGE HANNAN W6826 COUNTY RD B, POUND, WI 54161
DNR Project Manager
MAIZIE REIF  maizie.reif@wisconsin.gov
204911 | 03-38-204911
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages