2000-06-09
|
11
|
Activity Closed
|
|
LETTER TO RP
|
|
2000-06-09
|
730
|
CO Packet created for Recorded Groundwater Use Restriction
|
|
*** AUTO-POPULATED ***
|
|
2000-06-09
|
56
|
Continuing Obligation(s) Applied
|
|
*** AUTO-POPULATED ***
|
|
2000-06-09
|
236
|
Continuing Obligation - Residual GW Contamination
|
|
*** AUTO-POPULATED ***
|
|
2000-06-09
|
46
|
Impacted Right-of-Way (ROW) Notification
|
|
AUTO-POPULATED 2018-03-20
|
|
2000-02-22
|
99
|
Miscellaneous
|
|
DRAFT GW USE RESTRICTION SENT TO RENVILLE.
|
|
2000-01-31
|
99
|
Miscellaneous
|
|
MW ABANDONMENT FORMS RECD. NOT ALL MWS FOUND.
|
|
1999-11-10
|
48
|
Preventive Action Limit (PAL) NR140 Exemption at Closure
|
|
NAPHTHALENE IN MW-25 AND MW-31
|
|
1999-11-10
|
84
|
Remaining Actions Needed
|
|
DEED RESTRICTION & GW USE RESTRICTION REQ'D
|
|
1999-09-02
|
80
|
Closure Not Recommended
|
|
ASR, DW
|
|
1999-06-28
|
79
|
Case Closure Review Request Received
|
|
$750. WEISTER
|
|
1998-08-05
|
99
|
Miscellaneous
|
|
LETTER CONFIRMED ACTION PLAN
|
|
1998-04-24
|
99
|
Miscellaneous
|
|
FLUID MGMT SENT STATUS RPT
|
|
1995-07-20
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT
|
|
1995-05-09
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT
|
|
1995-05-02
|
99
|
Miscellaneous
|
|
OTHER:DRUM DISPOSAL DOCUMENTS
|
|
1995-04-24
|
99
|
Miscellaneous
|
|
TELEPHONE CONVERSATION:G&M
|
|
1995-04-17
|
99
|
Miscellaneous
|
|
TELEPHONE CONVERSATION
|
|
1995-04-17
|
99
|
Miscellaneous
|
|
MISC. ENFORCEMENT
|
|
1995-03-28
|
99
|
Miscellaneous
|
|
INTER-PROGRAM CONTACT
|
|
1995-03-24
|
99
|
Miscellaneous
|
|
INFORMAL MEETING
|
|
1995-03-07
|
99
|
Miscellaneous
|
|
TELEPHONE CONVERSATION
|
|
1995-01-05
|
40
|
Remedial Action Options Report (RAOR) Approved
|
|
RA WORK PLAN APPV'D
|
|
1994-12-14
|
99
|
Miscellaneous
|
|
LETTER CONTACT:
|
|
1994-12-07
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT:GW RESULTS
|
|
1994-11-21
|
99
|
Miscellaneous
|
|
OTHER:SIGNED CHANGE ORDER #5
|
|
1994-11-15
|
99
|
Miscellaneous
|
|
OTHER:INV #28717
|
|
1994-11-07
|
99
|
Miscellaneous
|
|
TELEPHONE CONVERSATION:CALLS TO START WORK
|
|
1994-11-04
|
99
|
Miscellaneous
|
|
TELEPHONE CONVERSATION:CALLS TO START WORK
|
|
1994-10-24
|
99
|
Miscellaneous
|
|
TELEPHONE CONVERSATION:INV. APPROVED
|
|
1994-10-24
|
99
|
Miscellaneous
|
|
INTER-PROGRAM CONTACT:INV APPROVAL & INVOICE
|
|
1994-10-12
|
99
|
Miscellaneous
|
|
TELEPHONE CONVERSATION:RE:NEW SCOPE
|
|
1994-10-10
|
99
|
Miscellaneous
|
|
TELEPHONE CONVERSATION:RE:REVISING CONTRACT
|
|
1994-10-03
|
99
|
Miscellaneous
|
|
LETTER CONTACTnEW QUOTE FOR PROJECT
|
|
1994-08-30
|
99
|
Miscellaneous
|
|
REQUEST COST ESTIMATE
|
|
1994-06-03
|
99
|
Miscellaneous
|
|
LETTER CONTACT - RE: INVOICE REVIEW
|
|
1994-05-20
|
99
|
Miscellaneous
|
|
OTHER - INVOICES
|
|
1994-02-03
|
99
|
Miscellaneous
|
|
LETTER CONTACT - INVOICE
|
|
1993-12-28
|
99
|
Miscellaneous
|
|
INVOICE FROM GERAGHTY & MILLER
|
|
1993-11-16
|
99
|
Miscellaneous
|
|
VITO SOLD THE PROPERTY
|
|
1993-11-15
|
99
|
Miscellaneous
|
|
SCHEDULE FOR GW RECOVERY SYSTEM IMPLEMENTATION
|
|
1993-10-28
|
99
|
Miscellaneous
|
|
CHANGE ORDER#4-SIGNED COPY
|
|
1993-10-14
|
99
|
Miscellaneous
|
|
CHANGE ORDER#4-SENT TO M. GIESFELDT
|
|
1993-10-08
|
99
|
Miscellaneous
|
|
INTER-PROGRAM CONTACT (CHANGE ORDER)
|
|
1993-10-01
|
99
|
Miscellaneous
|
|
CHANGE ORDER#4-SENT TO GERAGHTY & MILLER
|
|
1993-10-01
|
99
|
Miscellaneous
|
|
OTHER - RECEIVED SIGNED CHANGE ORDER
|
|
1993-09-24
|
99
|
Miscellaneous
|
|
NOT A PROPER CONTRACT W/GERAGHTY & MILLER
|
|
1993-09-16
|
99
|
Miscellaneous
|
|
STATUS OF BITINA SENT TO ANTONUK
|
|
1993-09-07
|
99
|
Miscellaneous
|
|
FUNDING FOR 94 ADDRESSED
|
|
1993-08-18
|
99
|
Miscellaneous
|
|
REVISED COSTS FOR GW RECOVERY SYSTEM
|
|
1993-07-01
|
99
|
Miscellaneous
|
|
DRAFT COPY OF CHANGE ORDER#4
|
|
1993-06-30
|
99
|
Miscellaneous
|
|
ESTIMATE COSTS FOR GW RECOVERY SYSTEM
|
|
1993-06-28
|
99
|
Miscellaneous
|
|
REVISED COSTS FOR GW RECOVERY SYSTEM
|
|
1993-06-25
|
99
|
Miscellaneous
|
|
REVISED FUNDING REQUEST
|
|
1993-06-22
|
99
|
Miscellaneous
|
|
REQUEST FOR ADDITIONAL FUNDING
|
|
1993-06-17
|
99
|
Miscellaneous
|
|
MODIFICATION FOR SCOPY OF WORK
|
|
1993-06-10
|
99
|
Miscellaneous
|
|
REVISED COST ESTIMATES FOR GW RECOVERY SYSTEM
|
|
1993-05-20
|
99
|
Miscellaneous
|
|
REQUEST FOR ADDITIONAL FUNDING
|
|
1993-05-18
|
99
|
Miscellaneous
|
|
EQUIPMENT AS SEPARATE BID ITEMS
|
|
1993-05-17
|
99
|
Miscellaneous
|
|
REIMBURSEMENT FOR WDNR EXPENSES
|
|
1993-05-14
|
99
|
Miscellaneous
|
|
NEW PROJECT MANAGER-RUNFA
|
|
1993-05-07
|
99
|
Miscellaneous
|
|
REVIEW OF DENIED CHARGES
|
|
1993-04-27
|
99
|
Miscellaneous
|
|
INMAN-WHAT IS THE STATUS OF BITINAS?
|
|
1993-04-22
|
99
|
Miscellaneous
|
|
PAYMENT TO THE DNR
|
|
1993-04-13
|
99
|
Miscellaneous
|
|
LETTER CONTACT - SENT
|
|
1993-03-31
|
99
|
Miscellaneous
|
|
DILHR NOT RECONTRACT FOR BITINAL CASE
|
|
1993-03-25
|
99
|
Miscellaneous
|
|
FORM 4-PROCESS NOT UNDERSTOOD
|
|
1993-03-24
|
99
|
Miscellaneous
|
|
PECFA PRE-QUALIFICATION REVIEW
|
|
1993-03-22
|
99
|
Miscellaneous
|
|
PREQUALIFICATION FOR PECFA DISCUSSED
|
|
1993-03-18
|
99
|
Miscellaneous
|
|
LETTER CONTACT - RECEIVED
|
|
1993-03-17
|
99
|
Miscellaneous
|
|
DISCUSS CONTRACT CUT-OFFS
|
|
1993-03-08
|
99
|
Miscellaneous
|
|
REQUEST FOR PAYMENT FOR DNR EXPENSES
|
|
1993-03-04
|
99
|
Miscellaneous
|
|
BUDGETING COST EXTIMATE FOR GW RECOVERY SYSTEM
|
|
1993-02-24
|
99
|
Miscellaneous
|
|
PHONE CONTACT - MADE
|
|
1993-02-24
|
99
|
Miscellaneous
|
|
COPY OF SCOPY OF WORK DATED 7-5-92
|
|
1993-02-22
|
99
|
Miscellaneous
|
|
PHONE CONTACT -
|
|
1993-01-11
|
99
|
Miscellaneous
|
|
INVOICE FROM GERAGHTY AND MILLER
|
|
1993-01-11
|
99
|
Miscellaneous
|
|
INTER-PROGRAM CONTACT - SENT
|
|
1992-12-21
|
99
|
Miscellaneous
|
|
ROTRON BLOWER IS INSTALLED
|
|
1992-12-08
|
99
|
Miscellaneous
|
|
PHONE CONTACT -
|
|
1992-10-16
|
99
|
Miscellaneous
|
|
INVOICE FROM GERAGHTY & MILLER
|
|
1992-10-16
|
99
|
Miscellaneous
|
|
INVOICES SUBMITTED FOR PAYMENT.
|
|
1992-10-15
|
99
|
Miscellaneous
|
|
SIGNED COPY OF CHANGE ORDER#3
|
|
1992-10-07
|
99
|
Miscellaneous
|
|
INVOICE PAYMENT APPROVED
|
|
1992-10-05
|
99
|
Miscellaneous
|
|
CHANGE ORDER#3 FOR SIGNATURE
|
|
1992-09-22
|
99
|
Miscellaneous
|
|
INVOICES TO SW/3
|
|
1992-09-21
|
99
|
Miscellaneous
|
|
INVOICES FROM GERAGHTY & MILLER
|
|
1992-09-10
|
99
|
Miscellaneous
|
|
ACTIVITIES NO BEGUN UNTIL $ APPROVED
|
|
1992-09-08
|
99
|
Miscellaneous
|
|
PREQUALIFICATION PACKAGE
|
|
1992-07-30
|
99
|
Miscellaneous
|
|
PAYMENT PAST DUE
|
|
1992-07-18
|
99
|
Miscellaneous
|
|
COST ESTIMATE-REPLACE FLUSHMOUNT WELL COVERS
|
|
1992-07-13
|
99
|
Miscellaneous
|
|
MONEY LEFT FOR PROJECT DISCUSSED
|
|
1992-07-10
|
99
|
Miscellaneous
|
|
CHANGE ORDER#3 FAXED TO TOM FASS
|
|
1992-06-09
|
99
|
Miscellaneous
|
|
FOR SELECT WELLS
|
|
1992-05-21
|
99
|
Miscellaneous
|
|
COST EXT. FOR REPAIRING ROTRON BLOWER
|
|
1992-04-30
|
99
|
Miscellaneous
|
|
DEPT. INVESTIGATION INVOICED COSTS
|
|
1992-04-24
|
99
|
Miscellaneous
|
|
STATE INVOICE TOTALS
|
|
1992-04-02
|
99
|
Miscellaneous
|
|
PROVIDE LAWYER W/ ITEMIZED WORK SHEETS
|
|
1992-03-23
|
99
|
Miscellaneous
|
|
UPDATE PROJECT /INVOICE RP
|
|
1992-03-18
|
99
|
Miscellaneous
|
|
PHIL PETERSON REQUEST STATUS FROM P HANZ
|
|
1992-03-06
|
99
|
Miscellaneous
|
|
FAX OF BOULDER JUNCTION MW TO G&M
|
|
1992-02-26
|
99
|
Miscellaneous
|
|
SIGNED CHANGE ORDER#2
|
|
1992-02-26
|
99
|
Miscellaneous
|
|
COST BREAKDOWN REQUESTED
|
|
1992-02-24
|
99
|
Miscellaneous
|
|
LETTER TO G&M FROM TOM FASS RE: CHANGE ORDER
|
|
1992-02-13
|
99
|
Miscellaneous
|
|
CHANGE ORDER#2 SENT TO G & MILLER FOR SIGNATURE
|
|
1992-02-06
|
99
|
Miscellaneous
|
|
SCOPE OF WORK DELETIONS
|
|
1992-02-06
|
99
|
Miscellaneous
|
|
TIME TO BEGIN COST RECOVERY
|
|
1992-01-09
|
99
|
Miscellaneous
|
|
CHANGE ORDER #2
|
|
1992-01-08
|
99
|
Miscellaneous
|
|
SAMPLING SELECT MONITORING WELLS
|
|
1992-01-06
|
99
|
Miscellaneous
|
|
CHANGE ORDER FOR SAMPLING SELECT WELLS
|
|
1992-01-03
|
99
|
Miscellaneous
|
|
DISCUSSED ANALYSIS RESULTS-HIGH!!
|
|
1991-10-03
|
99
|
Miscellaneous
|
|
BG REVIEWED DEPOSITION
|
|
1991-06-10
|
99
|
Miscellaneous
|
|
DEB RESUBMITTED INVOICES FOR PAYMENT.
|
|
1991-06-10
|
99
|
Miscellaneous
|
|
APP TO T&D TO PITLIK AND WICK HP2
|
|
1991-02-15
|
99
|
Miscellaneous
|
|
INFO REQUESTED SENT TO SLATTERY & HAUSMAN
|
|
1991-02-14
|
99
|
Miscellaneous
|
|
CHANGE ORDER APPROVED
|
|
1991-02-06
|
99
|
Miscellaneous
|
|
SLATTERY & HAUSMANN REQUEST FOR WATER ANALYSIS
|
|
1991-01-29
|
99
|
Miscellaneous
|
|
SEPT AND OCT IVOICES SUBMITTED TO MADISON
|
|
1991-01-11
|
99
|
Miscellaneous
|
|
AUGUST INVOICE SUBMITTED TO MADISON
|
|
1991-01-11
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-12-21
|
59
|
Environmental Enforcement Action Completed
|
|
COURT JUDGEMENT
|
|
1990-11-29
|
99
|
Miscellaneous
|
|
REIMBURSEMENT BY CHECK
|
|
1990-11-29
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-11-28
|
99
|
Miscellaneous
|
|
FROM INVMAN RE: SOIL DISPOSAL
|
|
1990-11-27
|
99
|
Miscellaneous
|
|
NEW INFO ON LONG AND ELLINGSEN PROPERTIES (G&M)
|
|
1990-11-27
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-09-13
|
99
|
Miscellaneous
|
|
PERIOD ENDING JULY 28,1990 INVOICES RECEIVED
|
|
1990-08-24
|
99
|
Miscellaneous
|
|
PECFA REIMBURSEMENT
|
|
1990-08-24
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-08-22
|
99
|
Miscellaneous
|
|
G&MPROJECT INVOICES FORWARDED TO MADISON
|
|
1990-08-22
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-06-22
|
99
|
Miscellaneous
|
|
ANALYSIS FROM 1989 AND 1990 SENT TO G&M
|
|
1990-06-22
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-06-20
|
41
|
Remedial Action Report Received
|
|
RA REPORT RECV'D
|
|
1990-06-14
|
99
|
Miscellaneous
|
|
PROBLEMS PURCHASING BLOWER FOR SYSTEM
|
|
1990-06-08
|
99
|
Miscellaneous
|
|
COST REIMBURSEMENT INFO
|
|
1990-06-08
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-05-08
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-05-07
|
99
|
Miscellaneous
|
|
ACCESS AGREEMENT BETWEEN JACOBSEN AND INMAN/BITINA
|
|
1990-05-04
|
99
|
Miscellaneous
|
|
VILAS JUDGE DISMISSES BITINAS V. DNR
|
|
1990-05-01
|
99
|
Miscellaneous
|
|
FROM HANZ TO INMAN
|
|
1990-04-24
|
99
|
Miscellaneous
|
|
W/ EGRE-SETTLING THE MATTER WITH EPA?-NO.
|
|
1990-04-24
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-04-20
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-04-13
|
99
|
Miscellaneous
|
|
PROPERTY ACCESS REQUEST FOR MAY,1990
|
|
1990-04-13
|
99
|
Miscellaneous
|
|
OTHER
|
|
1990-04-12
|
99
|
Miscellaneous
|
|
DRAFT COMPLAINT FROM PETERSON TO HANZ FOR REVIEW
|
|
1990-03-27
|
99
|
Miscellaneous
|
|
MILLER ENG. TO BG-DRILLING SCHEDULED APRIL 1-2
|
|
1990-03-14
|
99
|
Miscellaneous
|
|
INMAN TO DILHR-FINANCIAL STATEMENT
|
|
1990-03-07
|
99
|
Miscellaneous
|
|
ASST ATTORNEY GENERAL TO UNIT HEAD-HOLPERIN CALLED
|
|
1990-03-05
|
99
|
Miscellaneous
|
|
FITZ TO RUDER LAW-COST REIMBURSEMENT
|
|
1990-02-27
|
99
|
Miscellaneous
|
|
REVIEW OF PROPOSAL SENT TO G&M
|
|
1990-02-22
|
99
|
Miscellaneous
|
|
COPY TO ORDER #NCD-89-06 FAX'D TO BG
|
|
1990-02-16
|
99
|
Miscellaneous
|
|
RUDER,WARE & MICHLER LAW FIRM REQUESTS FILE COPIES
|
|
1990-02-16
|
99
|
Miscellaneous
|
|
BG TO L EGRE-REVIEW OF G&M PROPOSAL
|
|
1990-02-14
|
99
|
Miscellaneous
|
|
FROM INMAN TO FOLZ CLARIFICATION OF DEPT POSITION
|
|
1990-02-12
|
23
|
Referral to Department of Justice (DOJ)
|
|
|
|
1990-02-09
|
99
|
Miscellaneous
|
|
W/ UNDERWOOD OF DONOHUE
|
|
1990-02-09
|
99
|
Miscellaneous
|
|
STANDARD LANGUAGE SENT TO G&M
|
|
1990-02-06
|
99
|
Miscellaneous
|
|
REVIEW OF DONOHUE WORK PLAN-DEPT R
|
|
1990-02-02
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
DRAFT SCOPE OF WORK FROM G&M
|
|
1990-01-29
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
DONOHUE WORK PLAN
|
|
1990-01-16
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
SCOPE OF WORK FROM DONOHUE
|
|
1990-01-16
|
99
|
Miscellaneous
|
|
CARLSON TO HANZ RE: REIMBURSEMENT & INVOICES
|
|
1990-01-10
|
99
|
Miscellaneous
|
|
UST TRAING INFO SENT TO INMAN
|
|
1990-01-09
|
99
|
Miscellaneous
|
|
DIDIER TO CARLSON RE: $ SPENT
|
|
1990-01-05
|
99
|
Miscellaneous
|
|
P HANZ TO J INMAN
|
|
1990-01-05
|
99
|
Miscellaneous
|
|
MEETING W/ G&M-SCOPE OF WORK
|
|
1989-12-29
|
99
|
Miscellaneous
|
|
DONOHUE CONTRACT-PROCEEDING WITH WORK AND PECFA
|
|
1989-12-21
|
99
|
Miscellaneous
|
|
BG REVIEW OF WORK PLAN-ORDER CRITERIA NOT MET
|
|
1989-12-19
|
99
|
Miscellaneous
|
|
PROPOSAL RESPONSE TO INMAN BY 12-22-89
|
|
1989-12-13
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
MILLER ENGINEERS PROPOSAL FOR JEFF LONG PROPERTY
|
|
1989-12-06
|
99
|
Miscellaneous
|
|
DONOHUE AGREEMENT WITH INMAN
|
|
1989-11-21
|
99
|
Miscellaneous
|
|
INMAN AGREEMENT WITH DONOHUE
|
|
1989-11-17
|
99
|
Miscellaneous
|
|
CONSULTANT SELECTION MEETING 11-11-89 NOTE
|
|
1989-11-15
|
99
|
Miscellaneous
|
|
MILES MICKELSON TO INMAN-CANNOT ADVANCE PECFA FUND
|
|
1989-11-14
|
99
|
Miscellaneous
|
|
HANZ TO INMAN-IF PROCEED ON OWN,DNR WILL BACK OFF
|
|
1989-10-05
|
99
|
Miscellaneous
|
|
SPOKE WITH GRAHAM OF DONOHUE-CHO CONTRACTING WITH?
|
|
1989-10-04
|
99
|
Miscellaneous
|
|
JERRY INMAN MAY TAKE OVER POWER OF ATTORNEY
|
|
1989-09-15
|
99
|
Miscellaneous
|
|
HOSCH TO LYNN TRAPP-TANKS FOUND ON PROPERTY
|
|
1989-08-29
|
99
|
Miscellaneous
|
|
MEETING CHANGED TO 9-19-89 AT WAUSAU DNR
|
|
1989-08-24
|
99
|
Miscellaneous
|
|
FITZ TO BG RE: WATER SUPPLY
|
|
1989-08-22
|
99
|
Miscellaneous
|
|
9-7-89 MEETING TALK
|
|
1989-08-07
|
99
|
Miscellaneous
|
|
B GUTNECHT AND DONOHUE
|
|
1989-07-17
|
99
|
Miscellaneous
|
|
BITINAS RETAINED DONOHUE & ASSOCIATES
|
|
1989-06-19
|
99
|
Miscellaneous
|
|
LETTER TO LONG RE:CONSENT ORDER
|
|
1989-06-12
|
18
|
Administrative or Consent Order Issued
|
|
ORDER #NCD-89-06
|
|
1989-04-18
|
38
|
Site Investigation Report (SIR) Approved
|
|
SI REPORT APPV'D
|
|
1989-03-31
|
99
|
Miscellaneous
|
|
COURT INFO FROM BITINAS VS. NORTHWEST PETROLEUM
|
|
1989-03-15
|
99
|
Miscellaneous
|
|
ENFORCEMENT CONFERENCE
|
|
1989-03-14
|
99
|
Miscellaneous
|
|
HANZ TO CARLSON-FOLLOW UP QUESTIONS
|
|
1989-03-07
|
99
|
Miscellaneous
|
|
CONFIRMATION OF 3-10-89 MEETING
|
|
1989-03-06
|
99
|
Miscellaneous
|
|
EXISTING CONDITIONS REPORT
|
|
1989-03-05
|
99
|
Miscellaneous
|
|
SUMMARY OF ACTIVITIES
|
|
1989-03-02
|
99
|
Miscellaneous
|
|
INMAN CALL TO BOB GUTKNECHT
|
|
1989-03-01
|
99
|
Miscellaneous
|
|
GUTKNECHT TO G&M W/ RECOMMENDED CHANGES TO SA
|
|
1989-01-24
|
99
|
Miscellaneous
|
|
HISTORIES OF CASE SENT TO G&M
|
|
1989-01-17
|
99
|
Miscellaneous
|
|
SOIL GAS SURVEYS SENT TO GEORGE STEVENS
|
|
1988-12-22
|
99
|
Miscellaneous
|
|
C. FITZGERALD RECEIVED CHRISTMAS CARD FFOM BITINAS
|
|
1988-12-08
|
99
|
Miscellaneous
|
|
UPDATE ON ACTIONS
|
|
1988-10-14
|
38
|
Site Investigation Report (SIR) Approved
|
|
PHASE 2 INTERIM REPORT FROM G&M
|
|
1988-08-18
|
2
|
Responsible Party (RP) letter sent
|
|
RP LETTER WALT'S PETROLEUM
|
|
1988-08-05
|
99
|
Miscellaneous
|
|
GUTNECHT TO KULIBERT-SUMMARY
|
|
1988-06-24
|
99
|
Miscellaneous
|
|
CALL FROM VICKI BITINAS
|
|
1988-05-30
|
99
|
Miscellaneous
|
|
CALL FROM LORI PENCAK-INVESTIGATION GOING WELL
|
|
1988-05-26
|
99
|
Miscellaneous
|
|
SITE VISIT
|
|
1988-05-25
|
99
|
Miscellaneous
|
|
G&M TO START WORK
|
|
1988-05-23
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
1988-05-23
|
99
|
Miscellaneous
|
|
GUTKNECHT MEMO TO KULIBERT RE:BITINAS PHONE CALL
|
|
1988-05-17
|
99
|
Miscellaneous
|
|
VICKI BITINAS VERY UPSET AND BELIEVES WALT'S PRP
|
|
1988-05-16
|
99
|
Miscellaneous
|
|
POTENTIAL GAS TANKS IN BOULDER JUNCTION
|
|
1988-05-10
|
99
|
Miscellaneous
|
|
BESADNY TO HON. WM. PROXMIRE UPDATE
|
|
1988-05-09
|
99
|
Miscellaneous
|
|
AERIAL PHOTOS OF ANOMALY
|
|
1988-04-06
|
99
|
Miscellaneous
|
|
PROPOSED AFFIDAVIT OF LYMAN WIBLE
|
|
1988-04-06
|
99
|
Miscellaneous
|
|
DIDIE TO BITINAL-SCOPE OF DEPT'S INVESTIGATION
|
|
1988-03-28
|
99
|
Miscellaneous
|
|
REVIEW-PROGRESSING
|
|
1988-03-24
|
99
|
Miscellaneous
|
|
LYMAN WIBLE TO DILHR
|
|
1988-03-22
|
99
|
Miscellaneous
|
|
B GUTKNECHT TO BE LEAD ON CASE
|
|
1988-03-15
|
99
|
Miscellaneous
|
|
FITZGERALD SUMMARY OF CASE
|
|
1988-03-14
|
99
|
Miscellaneous
|
|
FITZGERALD MEMO TO FILE
|
|
1988-03-10
|
99
|
Miscellaneous
|
|
NORTHWEST PETROLEUM VS. BITINAS INSURANCE FILE
|
|
1988-03-01
|
99
|
Miscellaneous
|
|
INMAN TO TOMMY THOMPSON
|
|
1988-02-29
|
99
|
Miscellaneous
|
|
EDWARD THRALL DEPOSITION
|
|
1988-02-16
|
99
|
Miscellaneous
|
|
DILHR TO BITINAS
|
|
1988-02-11
|
99
|
Miscellaneous
|
|
P HANZ TO BITINAS
|
|
1988-01-20
|
99
|
Miscellaneous
|
|
LETTER TO TOBY ROTH
|
|
1988-01-07
|
99
|
Miscellaneous
|
|
CONSENT ORDER UNWARRANTED
|
|
1988-01-06
|
99
|
Miscellaneous
|
|
LETTER TO HOLPRIN
|
|
1987-05-01
|
1
|
Notification of Hazardous Substance Discharge
|
|
|