03-59-220671 Y GO BY
Activity Type / Status Jurisdiction
LUST  CLOSED DNR RR
Location Name County DNR Region
Y GO BY SHAWANO NORTHEAST
Address Municipality
N3215 CTH Y BELLE PLAINE TN
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the NW 1/4 of Sec 28, T26N, R15E 44.7047256 -88.6768319 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
1.9
Facility ID PECFA No. EPA ID Start Date End Date
54929-9148-15 1999-05-14 2019-01-14
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Pecfa Flag Underground Storage Tank Flag
Actions and Documents
Date Code Name File Comment
2019-01-14 11 Activity Closed
2019-01-14 222 Continuing Obligation - Maintain Cap Over Contaminated Area MAINTAIN EXISTING GRAVEL SURFACE
2019-01-14 226 Continuing Obligation - Vapor Intrusion Response
2019-01-14 232 Continuing Obligation - Residual Soil Contamination
2019-01-14 236 Continuing Obligation - Residual GW Contamination
2019-01-14 56 Continuing Obligation(s) Applied Download PDF file
2018-11-29 190 Remaining Actions Needed Requirements Met or Docs Received Download PDF file WELL ABANDONMENT FORMS REC'D
2018-09-20 84 Remaining Actions Needed MONITORING WELL ABANDONMENT
2018-09-10 79 Case Closure Review Request Received AUTO-ENTERED
2018-08-29 700 Database Fee Paid for Groundwater Continuing Obligation(s) LIEN
2018-08-29 710 Database Fee Paid for Soil Continuing Obligation(s)
2018-08-29 779 Case Closure Review Fee Received
2018-07-16 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2018-07-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-06-04 167 Lien Draft Sent Download PDF file
2018-05-29 165 Voluntary Lien Acceptance Document Recieved Download PDF file
2018-05-03 164 Voluntary Lien Acceptance Document Sent Download PDF file
2018-01-17 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2018-01-16 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2017-07-17 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-01-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-12-28 182 Case Closure Review Request Received - Fee Required CLOSURE REQUEST SUBMITTED W/OUT FEE
2016-07-15 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-01-20 505 PECFA Cost Request Approved PECFA COST REQUEST APPROVED
2016-01-19 504 PECFA Cost Request Received PECFA COST REQUEST RECEIVED
2016-01-15 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-08-24 130 DNR Regulatory Reminder Sent Download PDF file PECFA SUNSET LETTER
2015-07-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-04-24 505 PECFA Cost Request Approved $5320.00
2015-03-26 504 PECFA Cost Request Received
2015-01-23 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2015-01-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2014-08-04 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-03-04 99 Miscellaneous CHANGE OF PROJECT MANAGER LETTER SENT - NEW ONE IS VERSTEGEN
2013-10-31 500 PECFA New Cost Cap Established
2013-10-09 99 Miscellaneous PECFA REQUEST FOR SI COST EXCEEDANCE RECEIVED
2013-03-22 35 Site Investigation Workplan (SIWP) Received (non-fee)
2013-03-22 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
2012-03-05 43 Site Activity Status Update Received RP ATTEMPTING TO GET PECFA DEDUCTIBLE REDUCED
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-06-27 99 Miscellaneous MTG W/RP, ENVIRONMENTAL ENFORCEMENT & PROJECT MANAGER
2008-01-14 99 Miscellaneous REQUEST FOR RESULTS OF SITE INVESTIGATION
2004-09-21 99 Miscellaneous DNR REQUESTS RESPONSE
2004-01-28 99 Miscellaneous DNR REQUESTS UPDATE
2002-08-06 4 Enforcement Conference Held
2002-08-06 99 Miscellaneous SENT SUMMARY OF ENFORCEMENT CONFERENCE
2002-07-08 14 Notice of Violation (NOV) Issued ENFORCEMENT CONFERENCE SCHEDULED 07/30/2002
2002-07-08 4 Enforcement Conference Held
2002-06-04 14 Notice of Violation (NOV) Issued ENFORCEMENT CONFERENCE SCHEDULED 06/18/02
2002-04-10 3 Notice of Noncompliance (NON) Issued
2001-08-17 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
1999-10-27 3 Notice of Noncompliance (NON) Issued
1999-05-19 2 Responsible Party (RP) letter sent
1999-05-14 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Volatile Organic Compounds VOC
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
PECFA Total Claims Paid
Payments made from the Petroleum Environmental Cleanup Fund Award
PECFA Site Name: Y Go By Tavern
Max. Reimbursement: $190,000 Total Amount Paid: $41,436.27
Occ No Claim No Audit Date Paid Date Amt Submitted Amt Ineligible Amt Paid
A 1 2013-05-29 2013-06-28 $9,419.45 $.00 $9,419.45
A 2 2013-09-12 2013-11-08 $394.85 $.00 $394.85
A 3 2014-05-16 2014-06-16 $8,177.80 $.00 $8,177.80
A 4 2014-08-05 2014-08-20 $3,982.40 $.00 $3,982.40
A 5 2015-02-03 2015-02-25 $6,958.45 $.00 $6,958.45
A 6 2015-09-04 2015-10-29 $2,460.80 $.00 $2,460.80
A 7 2015-12-18 2016-03-23 $1,150.20 $.00 $1,150.20
A 8 2016-03-21 2016-06-23 $1,374.00 $.00 $1,374.00
A 9 2016-09-28 2016-11-10 $4,344.57 $.00 $4,344.57
A 10 2017-03-13 2017-05-02 $896.70 $.00 $896.70
A 11 2017-09-20 2017-10-12 $750.12 $.00 $750.12
A 12 2018-12-10 2019-01-11 $1,526.93 $.00 $1,526.93
Responsible Party
ARLAND DILLENBURG 215 W DIVISION ST, SHAWANO, WI 54166
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov
220671 | 03-59-220671