ACTIVITY DETAILS

 
02-60-248337 TWIN BROOK CLEANERS INC
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
TWINBROOK CLEANERS INC SHEBOYGAN SOUTHEAST
Address Municipality
633 EASTERN AVE PLYMOUTH CITY
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SE 1/4 of the SW 1/4 of Sec 22, T15N, R21E 43.747005 -87.9726269 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
.5
Facility ID PECFA No. EPA ID Start Date End Date
460010320 2000-03-21 2012-09-10
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag  
Actions and Documents
Date Code Name File Comment
2024-05-30 99 Miscellaneous Download PDF file DNR REQUESTING PCM REQUEST WITH FEE FOR VMS AND CAP MODIFICATIONS
2020-01-03 43 Site Activity Status Update Received Download PDF file NEW SMOKEHOUSE ADDITION AND ASSOCIATED CONCRETE LOADING PLATFORM; PCM TO BE SUBMITTED
2018-06-11 285 CO Compliance Audit Complete - Vapor Only
2013-02-27 218 DERF - Cost Reimbursement Application Approved FINAL RA REIMBURSEMENT PAID
2012-09-27 218 DERF - Cost Reimbursement Application Approved DC-487 APPROVED, CHECK BEING PROCESSED
2012-09-10 11 Activity Closed
2012-09-10 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2012-09-10 232 Continuing Obligation - Residual Soil Contamination
2012-09-10 56 Continuing Obligation(s) Applied Download PDF file
2012-09-10 236 Continuing Obligation - Residual GW Contamination *** AUTO POPULATED AT FINAL CLOSURE DUE TO 700 ACTION ***
2012-09-10 226 Continuing Obligation - Vapor Intrusion Response SEE VAPOR INTRU OPTIONS
2012-09-07 190 Remaining Actions Needed Requirements Met or Docs Received CONDITIONAL CLOSURE DOCUMENTS RECEIVED (WELL ABANDONMENT FORMS)
2012-08-17 84 Remaining Actions Needed WELL ABANDONMENT REQUIRED
2012-08-14 43 Site Activity Status Update Received AUGUST 2012 GW SAMPLE RESULTS RECEIVED
2012-08-14 179 Case Closure Review Request Received (non-fee) LAB RESULTS RECEIVED VIA EMAIL
2012-08-06 80 Closure Not Recommended REQUEST ANOTHER SAMPLE MW-7, SW EVAL, EXPLAIN CHLOROFORM AND BDCM DETECTS
2012-08-06 43 Site Activity Status Update Received SW EVAL, CHLOROFORM AND BEDCM DETECT EXPLANATION SUBMITTED
2012-07-03 79 Case Closure Review Request Received $1,200 CK1354 FROM MARILYN & THOMAS BERLIN, MT WOODEN WASHTUB
2012-07-03 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2012-07-03 710 Database Fee Paid for Soil Continuing Obligation(s)
2011-12-19 43 Site Activity Status Update Received NOVEMBER 2011 GROUNDWATER SAMPLE DATA RECEIVED
2011-10-31 218 DERF - Cost Reimbursement Application Approved RA 3 DERF CLAIM APPROVED; CHECK BEING PROCESSED
2011-10-21 43 Site Activity Status Update Received SUBSLAB VAPOR SAMPLING COMPLETED
2011-09-27 43 Site Activity Status Update Received VAPOR PROBE INSTALLATION STATUS REPORT
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-06-28 99 Miscellaneous REVISED RA SCOPE OF WORK APPROVED - EMAIL
2011-06-27 43 Site Activity Status Update Received REVISED RA SCOPE OF WORK
2011-04-07 43 Site Activity Status Update Received FEB 2011 GROUNDWATER MONITORING RESULTS RECEIVED
2011-01-18 99 Miscellaneous MEETING WITH OWNERS - DISCUSS FUTURE ACTIVITIES
2010-12-10 99 Miscellaneous NOTIFICATION OF PM CHANGE
2010-07-08 218 DERF - Cost Reimbursement Application Approved AUDIT OF 2ND RA CLAIM (DC-366) COMPLETE, REIMBURSEMENT CHECK TO BE SENT ASAP.
2010-04-05 217 DERF - Cost Reimbursement Application Received DERF SI REIMBURSEMENT CLAIM #3 RECEIVED
2010-03-01 93 Operation & Maintenance (O&M) Report Approved APPROVAL TO PROCEED WITH AEROBIC INJECTION
2010-02-17 92 Operation & Maintenance (O&M) Report Received (non-fee) REMEDIATION MONITORING RESULTS AND RECOMMENDATIONS
2010-02-05 99 Miscellaneous LETTER SENT TO RP-MARILYN BERLIN IDENTIFYING NEW PROJECT MANAGER AND NEW REGION OF RESPONSIBILITY
2008-02-27 99 Miscellaneous DERF RA CONSULTANT SELECTION OKAY
2008-02-18 113 DERF - Bid Review Request Received
2007-10-31 99 Miscellaneous REIMBURSEMENT CHECK FOR PREVIOUSLY AUDITED CLAIM SENT.
2007-09-07 218 DERF - Cost Reimbursement Application Approved AUDIT DONE, FEES PAID. REIMB CHECK NOT SENT - FUNDING ISSUES, WILL BE SENT ASAP
2007-07-25 99 Miscellaneous SIGNED OFF ON REGIONAL PORTION OF REIMBURSEMENT APPLICATION. THEY NEED TO PAY DERP FEE.
2007-05-25 217 DERF - Cost Reimbursement Application Received SI INV PARTIAL #2
2007-01-19 99 Miscellaneous RESULTS OF BORING THRU FLOOR
2006-04-13 99 Miscellaneous DNR ASKS RP TO SUBMIT CHANGE ORDER FOR MORE WORK THEN TO SOLICIT ADDITIONAL BIDS
2006-02-08 217 DERF - Cost Reimbursement Application Received THE AMOUNT OF THE CLAIM IS 47,302.84.
2005-11-07 38 Site Investigation Report (SIR) Approved
2005-09-22 36 Site Investigation Workplan (SIWP) Approved
2005-08-12 37 Site Investigation Report (SIR) Received (non-fee)
2004-05-27 99 Miscellaneous ASKED FOR MORE WORK REGARDING INVESTIGATION
2004-04-19 37 Site Investigation Report (SIR) Received (non-fee) ALSO REQUEST FOR ADDITIONAL SI COSTS
2003-11-06 36 Site Investigation Workplan (SIWP) Approved COST CAP FOR 2 ROUNDS INVESTIGATION IS $25,151
2003-11-03 37 Site Investigation Report (SIR) Received (non-fee) ADDITIONAL SITE INVESTIGATION ALSO PROPOSED
2003-07-09 36 Site Investigation Workplan (SIWP) Approved
2003-06-30 35 Site Investigation Workplan (SIWP) Received (non-fee)
2003-06-23 110 DERF - Potential Claim Form Approved
2003-06-11 99 Miscellaneous FAXED POTENTIAL CLAIM NOTIFICATION TO JEFF SOELLNER
2003-01-06 99 Miscellaneous RP CALL, HIRED ARCADIS
2002-10-02 1 Notification of Hazardous Substance Discharge RP LETTER SENT TO NEW OWNER
2000-04-05 2 Responsible Party (RP) letter sent
2000-03-21 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Chlorinated Solvents VOC
Non-Chlorinated Solvents VOC
Vapor Intrusion Continuing Obligation(s)
(A) Exceedence of Vapor Risk Levels - Vapor Mitigation Required: Vapor mitigation is required due to sub-slab or nearby soil vapor concentrations exceeding vapor risk screening levels.
(D) Site Specific Exposure Assumptions Used - Commercial/Industrial Restriction: Property use restricted to commercial or industrial. Specific vapor inhalation exposure assumptions used (including commercial or industrial use). Notification of DNR required for change in property use. Vapor evaluation is required. Further cleanup may be required.
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
Financial
Category Fiscal Year Amount
DERF Reimbursements:Grant 2007 $37,203
DERF Reimbursements:Grant 2008 $1,919
DERF Reimbursements:Grant 2011 $7,698
DERF Reimbursements:Grant 2012 $4,093
DERF Reimbursements:Grant 2013 $5,182
DERF Reimbursements:Grant 2013 $8,074
Responsible Party
MARILYN BERLIN W2626 MILEY RD, SHEBOYGAN FALLS, WI 53085
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov
248337 | 02-60-248337