02-45-000015
APPLETON WIRE (FORMER)
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / CLOSED | DNR RR |
Location Name | County | DNR Region |
---|---|---|
LUVATA APPLETON LLC | OUTAGAMIE | NORTHEAST |
Address | Municipality |
---|---|
908 N LAWE ST | APPLETON |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
SE 1/4 of the NE 1/4 of Sec 26, T21N, R17E | 44.2693715 | -88.3954818 |
![]() |
![]() |
Additional Location Description |
---|
FORMERLY: 714 E HANCOCK ST (PRIOR TO 1985) & 831 N MEADE ST (1985) |
Additional Activity Details | Acres |
---|---|
4 |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
445035910 | 1985-05-29 | 2022-11-30 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2022-11-30 | 11 | Activity Closed |
![]() |
||
2022-11-30 | 56 | Continuing Obligation(s) Applied |
![]() |
||
2022-11-30 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | |||
2022-11-30 | 226 | Continuing Obligation - Vapor Intrusion Response | |||
2022-11-30 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2022-11-30 | 236 | Continuing Obligation - Residual GW Contamination | |||
2022-11-30 | 334 | Monitoring Well Transferred to Another Site | MONITORING WELLS BEING RETAINED FOR BRRTS #02-45-587658 | ||
2022-11-30 | 66 | Continuing Obligations (COs) Apply at Off-site Property(ies) | 714 E HANCOCK STREET, APPLETON, WI | ||
2022-11-30 | 46 | Impacted Right-of-Way (ROW) Notification | MEADE ST ROW | ||
2022-10-28 | 43 | Site Activity Status Update Received |
![]() |
CONFIRMATION OF INVESTIGATIVE WASTE DISPOSAL | |
2022-10-25 | 199 | Additional Information Received (Fee-Based or Closure) |
![]() |
CLOSURE PACKET REVISIONS RECEIVED | |
2022-10-20 | 198 | Request for Additional Information (Fee-Based or Closure) |
![]() |
CLOSURE PACKET MODIFICATIONS REQUESTED | |
2022-07-22 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-07-07 | 79 | Case Closure Review Request Received |
![]() |
AUTO-ENTERED | |
2022-07-05 | 779 | Case Closure Review Fee Received | |||
2022-07-05 | 700 | Database Fee Paid for Groundwater Continuing Obligation(s) | |||
2022-07-05 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | |||
2022-03-11 | 99 | Miscellaneous | CLARIFICATION ON CAP REQUIREMENTS FOR CLOSURE | ||
2022-03-02 | 43 | Site Activity Status Update Received |
![]() |
SEMI-ANNUAL GW MONITORING STATUS UPDATE | |
2022-01-25 | 43 | Site Activity Status Update Received |
![]() |
OFF-SITE GROUNDWATER ANALYTICAL RESULTS (LUVATA) | |
2022-01-25 | 43 | Site Activity Status Update Received |
![]() |
OFF-SITE GROUNDWATER ANALYTICAL RESULTS (APPVION) | |
2022-01-14 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2021 - 12/31/2021 | |
2021-10-19 | 43 | Site Activity Status Update Received |
![]() |
POST-REMEDIAL GROUNDWATER SAMPLING ANALYTICAL UPDATE | |
2021-08-24 | 43 | Site Activity Status Update Received |
![]() |
SEMI-ANNUAL REMEDIAL PERFORMANCE GROUNDWATER MONITORING REPORT | |
2021-07-16 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2021 - 6/30/2021 | |
2021-04-07 | 99 | Miscellaneous |
![]() |
APPROVAL TO REPLACE SOIL EXCAVATED FROM UTILITY TRENCH | |
2021-04-06 | 130 | DNR Regulatory Reminder Sent |
![]() |
VAPOR INTRUSION AND TCE REMINDER LETTER | |
2021-04-01 | 43 | Site Activity Status Update Received |
![]() |
PFAS ANALYTICAL RESULTS FROM UTILITY TRENCH EXCAVATION | |
2021-03-02 | 43 | Site Activity Status Update Received |
![]() |
2020 SEMI-ANNUAL GROUNDWATER SAMPLING RESULTS FOR CHROMIUM & PFAS | |
2021-02-23 | 43 | Site Activity Status Update Received |
![]() |
LUVATA - OFF-SITE PROPERTY NOTIFICATION | |
2021-02-23 | 43 | Site Activity Status Update Received |
![]() |
APPVION - OFF-SITE PROPERTY NOTIFICATION | |
2021-02-17 | 43 | Site Activity Status Update Received |
![]() |
ADDITIONAL PFAS GROUNDWATER DATA | |
2021-01-28 | 99 | Miscellaneous |
![]() |
PFAS CHARACTERIZATION REQUIRED FOR SOIL IN UTILITY TRENCH EXCAVATION | |
2021-01-05 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2020 - 12/31/2020 | |
2020-10-27 | 43 | Site Activity Status Update Received |
![]() |
POST-REMEDIAL GW ANALYTICAL RESULTS | |
2020-10-01 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER & VAPOR SAMPLING RESULTS (PFAS) | |
2020-08-20 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
GROUNDWATER CHROMIUM ANALYTICAL DATA | |
2020-08-17 | 130 | DNR Regulatory Reminder Sent |
![]() |
EMERGING CONTAMINANTS REMINDER LETTER | |
2020-07-17 | 43 | Site Activity Status Update Received |
![]() |
POST REMEDIATION GW SAMPLE RESULTS | |
2020-07-08 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2020 - 6/30/2020 | |
2020-06-19 | 36 | Site Investigation Workplan (SIWP) Approved |
![]() |
PFAS SIWP APPROVAL | |
2020-06-19 | 43 | Site Activity Status Update Received |
![]() |
SOIL AND GROUNDWATER SAMPLING RESULTS TO LUVATA APPLETON, LLC | |
2020-06-19 | 43 | Site Activity Status Update Received |
![]() |
SOIL AND GROUNDWATER SAMPLING RESULTS TO APPVION HOLDING CORP | |
2020-06-19 | 118 | PFAS Sampling Not Required At This Time | PFAS INVESTIGATION BEING CONDUCTED UNDER SEPARATE CASE, BRRTS #02-45-587658 | ||
2020-04-03 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) |
![]() |
NTP VIA EMAIL | |
2020-03-31 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
SIWP FOR CVOCS IN SOIL & GW W/ TEMP WELLS; HPV VI SI FROM 2018 SIWP & POST-RA GW CR MONITORING SCHED | |
2020-03-30 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
PFAS SI WORKPLAN IN GROUNDWATER | |
2020-03-30 | 114 | PFAS Scoping Statement Received | PFAS INVESTIGATED UNDER SEPARATE CASE, BRRTS #02-45-587658 | ||
2020-02-03 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
INJECTION OF REDUCING AGENT; SOIL BLEND W/ ZVI | |
2020-02-03 | 856 | Materials Management Final Documentation Received w/o Fee | SEE AC 151 OF SAME DATE FOR DOCUMENTATION | ||
2020-01-03 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2019 - 12/31/2019 | |
2019-07-31 | 99 | Miscellaneous |
![]() |
INJECTION MODIFICATION REQUEST APPROVAL | |
2019-07-29 | 43 | Site Activity Status Update Received |
![]() |
REMEDIAL INJECTION REQUEST AMEND #2; INJECTION SOLUTION TO USE 3DME AND S-MICRO ZVI IN LEIU OF ABC+ | |
2019-07-16 | 43 | Site Activity Status Update Received |
![]() |
REVISED PUBLIC PARTICIPATION PLAN FOR REMEDIAL ACTION | |
2019-07-01 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2019 - 6/30/2019 | |
2019-06-24 | 99 | Miscellaneous | CONF CALL W/ STAKEHOLDERS FOR CHROME REMEDIATION- LOGISTICS & PLANNING | ||
2019-05-29 | 149 | Remedial Action (RA) Design Report Approved |
![]() |
INJ REDUCING AGENT; SOIL BLEND W/ ZVI; DECOMMISSION GWPT; BACKFILL BASEMENT W/ TREATED SOIL W/IN AOC | |
2019-05-29 | 857 | Materials Management Plan Approved | BACKFILL BASEMENT W/ TREATED SOIL (UP TO 325 CY); SEE AC 149 OF SAME DATE FOR DOC | ||
2019-05-28 | 43 | Site Activity Status Update Received |
![]() |
CONCRETE WITHIN WAREHOUSE PASSED TCLP - NON-HAZARDOUS WASTE | |
2019-05-23 | 43 | Site Activity Status Update Received |
![]() |
LUVATA RESPONSE TO LOGISTICAL ITEMS | |
2019-05-22 | 64 | Inject/Infiltrate Request Approved |
![]() |
||
2019-05-21 | 99 | Miscellaneous |
![]() |
INFO FROM DNR AS FOLLOW-UP FROM 05/20/2019 MEETING | |
2019-05-21 | 99 | Miscellaneous |
![]() |
DNR COMMENTS ON INITIAL PUBLIC PARTICIPATION PLAN | |
2019-05-20 | 99 | Miscellaneous | LOGISTICAL MEETING HELD AT SITE W/ LUVATA, ALBANY, DNR & CONSULTANTS | ||
2019-05-17 | 43 | Site Activity Status Update Received |
![]() |
MEETING AGENDA FOR 05/20/2019 W/ LUVATA, ALBANY, DNR & ENVIROFORENSICS | |
2019-05-17 | 43 | Site Activity Status Update Received |
![]() |
AMENDMENT TO INJ REQUEST TO INCL SOIL BLENDING WITH ZERO VALENT IRON | |
2019-05-03 | 43 | Site Activity Status Update Received |
![]() |
REVISED REMEDIATION INJECTION REQUEST | |
2019-05-03 | 43 | Site Activity Status Update Received |
![]() |
AMENDMENT TO THE REMEDIAL ACTION PLAN INITIALLY SUBMITTED APRIL 2019 | |
2019-04-26 | 43 | Site Activity Status Update Received |
![]() |
PUBLIC PARTICIPATION PLAN FOR REMEDIAL ACTION | |
2019-04-15 | 63 | Inject/Infiltrate Request Received (fee) |
![]() |
ANAEROBIC BIOCHEM & ZERO-VALENT IRON PROPOSED TO BEGIN JULY 2019 | |
2019-04-15 | 148 | Remedial Action Design Report Received (fee) |
![]() |
INJ REDUCING REAGENT BELOW WT; SOIL BLENDING; DECOMMISSION GWPT; BACKFILL BASEMENT W/ TREATED SOIL | |
2019-04-15 | 854 | Materials Management Plan Request Recvd with Fee | SOIL MANAGEMENT PLAN FOR ON-SITE REUSE OF SOIL WITHIN BASEMENT COMBINED WITH RAP; SEE AC 148 FOR DOC | ||
2019-03-14 | 98 | Technical Assistance Provided |
![]() |
TECH ASSIST MTG W/ DNR NER CLOSURE/PEER COMMITTEE, RP & CONSULTANT IN ADV OF RAP | |
2019-02-27 | 99 | Miscellaneous | TECH ASSIST MTG RESCHEDULED FOR 03/14/2019 | ||
2019-02-26 | 97 | Technical Assistance Request Received (fee) |
![]() |
||
2019-01-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2018 - 12/31/2018 | |
2018-12-13 | 99 | Miscellaneous |
![]() |
APPROVAL TO MAINTAIN TEMP WELLS (TW-1 - TW-6) THROUGH 2019 | |
2018-10-26 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SUPPLEMENTAL SIR INCLUDING VOC SI | |
2018-08-17 | 43 | Site Activity Status Update Received | NR 716.14 WAC NOTICE OF RESULTS TO LUVATA - JULY 2018 GW DATA | ||
2018-08-02 | 99 | Miscellaneous |
![]() |
DNR INTERPRETATION OF MAY 2018 SOIL DATA FOR HEXAVALENT CHROMIUM | |
2018-07-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2018 - 6/30/2018 | |
2018-06-26 | 43 | Site Activity Status Update Received | NR716.14 WAC NOTICE OF RESULTS TO PROPERTY OWNER, OFF-SITE OWNER & CITY - MAY 2018 SOIL DATA | ||
2018-05-23 | 43 | Site Activity Status Update Received |
![]() |
RESPONSE TO DNR QUESTIONS/COMMENTS TO RAOR | |
2018-05-15 | 99 | Miscellaneous |
![]() |
PHONE LOG FOR INJECTION PILOT STUDY DISCUSSION | |
2018-04-20 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) |
![]() |
NTP VIA EMAIL; NR 141.29 TEMP WELL APPROVAL FOR TW-1 THRU TW-6 | |
2018-04-18 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
GP-29 THRU GP-41, TW-1 THRU TW-6, UB-3 & UB-4 SCHEDULED FOR APRIL 2018 | |
2018-04-12 | 82 | Remedial Action Options Report (RAOR) Not Approved |
![]() |
AREA OF CONTAMINATION & REMEDY BY REDUCTION CONDITIONALLY APPROVED; SUPP INFO REQ BY 6/29/2018 | |
2018-02-09 | 64 | Inject/Infiltrate Request Approved |
![]() |
||
2018-01-30 | 59 | Environmental Enforcement Action Completed | |||
2018-01-29 | 63 | Inject/Infiltrate Request Received (fee) |
![]() |
PILOT INJECTION WITH 3DME & CRS & PILOT WITH PROVECTIRM | |
2018-01-24 | 140 | Site Investigation Report (SIR) Not Approved |
![]() |
ADDT'L SOIL SI NEEDED FOR HEX CHROME & SOIL, GW & VAPOR SI NEEDED FOR CVOCS; LTMP APPROVED | |
2018-01-24 | 27 | Long Term Monitoring Plan Approved | LTMP APPROVAL COMBINED W/RESPONSE TO SIR | ||
2018-01-24 | 140 | Site Investigation Report (SIR) Not Approved | SEE AC 140 ABOVE FOR DOCUMENTATION | ||
2018-01-22 | 143 | Remedial Action Options Report (RAOR) Received (fee) |
![]() |
ABANDON BASEMENT/GWP&T, EXCAVATE UNSAT SOIL, APPLY REDUCING AGENT & IN-SITU TREATMENT VIA INJECTION | |
2018-01-18 | 99 | Miscellaneous | DNR PEER REVIEW OF SIR W/FEE | ||
2018-01-05 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2017 - 12/31/2017 | |
2017-10-27 | 137 | Site Investigation Report (SIR) Received (fee) |
![]() |
SIR - 1 OF 2 | |
2017-10-27 | 25 | Long Term Monitoring Plan Received (fee) |
![]() |
FEE COMBINED IN CODE 137 OF SAME DATE (10/27/2017) | |
2017-10-27 | 137 | Site Investigation Report (SIR) Received (fee) |
![]() |
SIR - 2 OF 2 | |
2017-08-23 | 43 | Site Activity Status Update Received |
![]() |
REQUEST FOR EXTENSION TO SUBMIT SIR & GW MONITORING PLAN BY 10/26/2017 | |
2017-08-23 | 99 | Miscellaneous |
![]() |
SIR SUBMITTAL EXTENSION APPROVED | |
2017-08-21 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN - JUNE 2017 | |
2017-07-24 | 43 | Site Activity Status Update Received | NR716.14 WAC NOTICE OF RESULTS TO PROPERTY OWNERS - SOIL-GW MAY & JUNE 2017 | ||
2017-07-05 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2017 - 6/30/2017 | |
2017-05-12 | 36 | Site Investigation Workplan (SIWP) Approved |
![]() |
CONDITIONAL APPROVAL OF SIWP & ADDENDUM | |
2017-05-05 | 99 | Miscellaneous | DNR PROVIDED VERBAL NOTICE TO PROCEED W/INVESTIGATION ACTIVITIES SCHEDULED TO BEGIN 05/08/2017 | ||
2017-05-03 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2017 GW VOC DATA | |
2017-05-03 | 199 | Additional Information Received (Fee-Based or Closure) | SIWP ADDENDUM REC'D | ||
2017-05-03 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | ADDENDUM TO FEB 2017 SIWP | ||
2017-04-13 | 99 | Miscellaneous |
![]() |
DNR REQUEST FOR SI WORKPLAN & ADDENDUM | |
2017-04-03 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JULY - DEC 2016 | |
2017-03-23 | 198 | Request for Additional Information (Fee-Based or Closure) | DNR CONFERENCE CALL W/CONSULTANT & ALBANY (RP) - ADDT'L INFORMATION NEEDED FOR SIWP | ||
2017-02-01 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
SUPPLEMENTAL SITE INVESTIGATION & DOCUMENTATION | |
2017-01-09 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2016 - 12/31/2016 | |
2016-11-10 | 43 | Site Activity Status Update Received | WORK PLAN WILL BE SUBMITTED BY 02/06/2017 PER RP/CONSULTANT | ||
2016-11-08 | 4 | Enforcement Conference Held |
![]() |
SCHEDULED ENFORCEMENT VIA PHONE W/DNR, ALBANY & ENVIROFORENSICS - SUMMARY LETTER DATED 11/14/16 | |
2016-11-07 | 7 | Environmental Consultant Hired | ENVIROFORENSICS | ||
2016-10-17 | 140 | Site Investigation Report (SIR) Not Approved |
![]() |
ADDT'L INVESTIGATION NEEDED; COMBINED SSIR/RAOR RESPONSE | |
2016-10-17 | 82 | Remedial Action Options Report (RAOR) Not Approved | ADDT'L EVALUATION NEEDED; COMBINED SSIR'SAOR RESPONSE | ||
2016-08-29 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN - JUNE 2016 | |
2016-07-29 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2016 - 6/30/2016 | |
2016-07-29 | 137 | Site Investigation Report (SIR) Received (fee) |
![]() |
||
2016-07-29 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) |
![]() |
REVIEW FEE PAID UNDER SSIR | |
2016-07-21 | 99 | Miscellaneous | DNR CONVERSATION WITH ALBANY & CONSULTANT RE: NR 716, 722, 724 & 726 | ||
2016-07-20 | 4 | Enforcement Conference Held |
![]() |
ALBANY INTERNATIONAL, BADGER LABS & CHEMREPORT (APPLETON LUVATA) - SUMMARY LETTER DATED 07/25/16 | |
2016-07-13 | 140 | Site Investigation Report (SIR) Not Approved | DNR INFORMED RP VIA EMAIL SSIR INCOMPLETE & SITE REMAINS OUT OF COMPLIANCE | ||
2016-07-13 | 99 | Miscellaneous | ENFORCEMENT CONFERENCE RESCHEDULED FOR 07/20/2016 | ||
2016-07-12 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SUPPLEMENTAL SIR (MAY 2014 SOIL AND GROUNDWATER) | |
2016-06-23 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JUL - DEC 2015 | |
2016-06-21 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) |
![]() |
RAOR HARD COPY RECEIVED 06/21/2016; E-COPY RECEIVED 04/13/2016 | |
2016-06-21 | 82 | Remedial Action Options Report (RAOR) Not Approved | DNR INFORMED RP RAOR INCOMPLETE & SITE REMAINS OUT OF COMPLIANCE VIA EMAIL 04/21/2016 | ||
2016-06-17 | 99 | Miscellaneous | ENFORCEMENT CONFERENCE RESCHEDULED FOR 07/14/2016 | ||
2016-06-08 | 14 | Notice of Violation (NOV) Issued |
![]() |
ALBANY INTERNATIONAL | |
2016-05-26 | 2 | Responsible Party (RP) letter sent |
![]() |
LUVATA APPLETON, LLC (PROPERTY OWNER) | |
2016-05-26 | 43 | Site Activity Status Update Received |
![]() |
1983 INDEMNIFICATION AGREEMENT BETWEEN ALBANY & LAWE | |
2016-03-18 | 43 | Site Activity Status Update Received | JP HAMMERTON REPLACED RON BUCK AS CONTACT AT ALBANY INTERNATIONAL ON FEB 1, 2016 | ||
2016-03-17 | 3 | Notice of Noncompliance (NON) Issued |
![]() |
SSIR/RAOR DUE 04/01/2016 PER DNR | |
2016-01-29 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2015 - 12/31/2015 | |
2015-09-09 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JULY-DEC 2014 | |
2015-09-03 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN - JUNE 2015 | |
2015-07-30 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2015 - 6/30/2015 | |
2015-07-30 | 99 | Miscellaneous | JULY 2014-JULY 2015 O&M REPORT DUE 8/31/15; SSIR/RAOR DUE 9/30/15 PER DNR | ||
2015-02-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2014 - 12/31/2014 | |
2014-09-22 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2014 - 6/30/2014 | |
2014-08-05 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN - JUNE 2014 | |
2014-05-06 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
EXPANDING SOIL AND GROUNDWATER INVESTIGATION | |
2014-04-01 | 43 | Site Activity Status Update Received | ADDT'L INVESTIGATION SCHEDULED FOR WEEK OF MAY 12, 2014; WORKPLAN FORTHCOMING | ||
2014-03-12 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JULY - DEC 2013 | ||
2014-03-12 | 99 | Miscellaneous | DNR REQUESTED WORKPLAN FOR ADDITIONAL WELL INSTALLATION BY MAY 12, 2014 | ||
2013-09-10 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JAN - JUNE 2013 | ||
2013-03-12 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JULY - DECEMBER 2012 | ||
2012-08-15 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JAN - JUNE 2012 | ||
2012-03-01 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JULY - DEC 2011 | ||
2011-09-08 | 130 | DNR Regulatory Reminder Sent |
![]() |
Vapor Intrusion (VI) Assessment Notification Ltr Sent | |
2011-02-28 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JULY - DECEMBER 2010 | ||
2010-08-31 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JAN - JUNE 2010 | ||
2010-03-05 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JULY - DECEMBER 2009 | ||
2009-11-04 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) | |||
2009-08-28 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JAN - JUNE 2009 | ||
2009-08-27 | 43 | Site Activity Status Update Received | MODIFICATIONS FOR PREVIOUSLY SUBMITTED REPORTS | ||
2009-08-06 | 43 | Site Activity Status Update Received | TWO WELLS INSTALLED AND TWO ROUNDS GROUNDWATER DATA COLLECTED - DATA TO FOLLOW | ||
2009-06-16 | 99 | Miscellaneous |
![]() |
LETTER TO RP & PROPERTY OWNERS RE: CHANGE IN ADDRESS FROM 831 N MEADE ST TO 908 N LAWE ST | |
2009-06-01 | 99 | Miscellaneous |
![]() |
DNR RESPONSE TO COMPLIANCE AGREEMENT DOCUMENTS | |
2009-05-04 | 43 | Site Activity Status Update Received |
![]() |
FINAL RESPONSE TO NOV FROM ALBANY/BADGER LABS | |
2009-04-23 | 99 | Miscellaneous |
![]() |
SIGNED COMPLIANCE AGREEMENT WITH ALBANY INTERNATIONAL | |
2009-04-13 | 43 | Site Activity Status Update Received | ALBANY'S WRITTEN PRELIMINARY RESPONSE TO 3/6/09 NOV | ||
2009-03-31 | 4 | Enforcement Conference Held | INVESTIGATION, REMEDIAL ACTION EVAL & REPORTING REQUIREMENTS DISCUSSED, COMPLIANCE AGREEMENT DRAFTED | ||
2009-03-27 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JULY 2008 GROUNDWATER DATA, JAN 1, 2008 - JUNE 30, 2008 | ||
2009-03-27 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JAN 1, 2008 - DEC 31, 2008 | ||
2009-03-27 | 43 | Site Activity Status Update Received | GEOPROBE MONITORING WELL SUMMARY REPORT (MC MAHON GMW01-GMW11) | ||
2009-03-06 | 14 | Notice of Violation (NOV) Issued | S 292.11 WIS STATUS, CH NR 724, WIS ADM CODE | ||
2008-05-19 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | ANNUAL O&M 2007 | ||
2008-05-09 | 43 | Site Activity Status Update Received | O&M CONTINUES; NO PLANS TO MODIFY OR ENHANCE COLLECTION SYSTEM | ||
2008-04-22 | 3 | Notice of Noncompliance (NON) Issued | FAILURE TO SUBMIT SEMI-ANNUAL O&M REPORTS; O&M DUE 05/16/08; UPDATE ON REM ACT OPTIONS DUE 05/09/08 | ||
2008-04-22 | 2 | Responsible Party (RP) letter sent |
![]() |
REITERATION OF SPILLS LAW REQUIREMENTS - INITIALLY COMMUNICATED IN 1986 | |
2007-06-28 | 99 | Miscellaneous | DNR MTING W/ALBANY INTERNAT'L ON SITE STATUS, REPORTING, PLUME DELINEATION & REMEDIAL ACTION OPTIONS | ||
2007-03-08 | 43 | Site Activity Status Update Received | JANUARY 2007 GROUNDWATER DATA | ||
2007-03-08 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | 01/01/2006 - 12/31/2006 | ||
2006-12-28 | 43 | Site Activity Status Update Received | OCTOBER 2006 GROUNDWATER DATA | ||
2006-12-28 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | 01/01/06 - 06/30/06 | ||
2006-09-22 | 43 | Site Activity Status Update Received | JULY 2006 GW DATA | ||
2006-07-14 | 43 | Site Activity Status Update Received | APRIL 2006 GW DATA | ||
2006-03-29 | 43 | Site Activity Status Update Received | JAN 2006 GROUNDWATER DATA | ||
2006-03-29 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | ANNUAL O&M FOR 2005 | ||
2006-01-17 | 43 | Site Activity Status Update Received | OCT 2005 GW DATA | ||
2005-10-20 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | JULY 2006 GW DATA & 6/30/05-7/1/05 ACTIONS | ||
2005-06-15 | 43 | Site Activity Status Update Received | APRIL 2005 GW DATA | ||
2005-04-08 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | 2004 ANNUAL REPORT | ||
2005-03-11 | 43 | Site Activity Status Update Received | JAN 2005 GW DATA | ||
2005-02-16 | 37 | Site Investigation Report (SIR) Received (non-fee) | EXTENS & CAPTURE ZONE EVALUATION | ||
2004-12-06 | 43 | Site Activity Status Update Received | OCTOBER 2004 GW DATA | ||
2004-11-04 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | 1/1 - 6/30 O&M & JULY 2004 GW DATA | ||
2004-06-07 | 43 | Site Activity Status Update Received | APRIL 2004 GW DATA | ||
2004-04-05 | 43 | Site Activity Status Update Received | JAN 2004 GW DATA | ||
2004-03-23 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | 1/1/03 -12/31/03 | ||
2004-02-10 | 43 | Site Activity Status Update Received | NEW CONSULTANT | ||
2003-11-10 | 43 | Site Activity Status Update Received | |||
2003-10-15 | 43 | Site Activity Status Update Received | JULY 2003 GW DATA | ||
2003-08-01 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) | |||
2003-06-25 | 43 | Site Activity Status Update Received | APRIL 2003 GW RESULTS | ||
2003-06-09 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | ADDITIONAL INVESTIGATION | ||
2003-04-16 | 94 | Operation & Maintenance (O & M) Report Not Approved | EVALUATE VERTICAL EXTENT AND CAPTURE ZONE | ||
2003-01-27 | 43 | Site Activity Status Update Received | OCTOBER 2002 GW RESULTS | ||
2002-11-19 | 93 | Operation & Maintenance (O&M) Report Approved | |||
2002-10-21 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | |||
2002-07-23 | 43 | Site Activity Status Update Received | APRIL 2002 GW DATA | ||
2002-06-06 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | PROPOSED WELL NEST LOCATION | ||
2002-06-06 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) | |||
2002-05-29 | 99 | Miscellaneous | WDNR REQUEST FOR STATUS UPDATE | ||
2002-04-15 | 99 | Miscellaneous | SI NOT COMPLETE - REQUEST ADDITIONAL WELLS | ||
2002-03-20 | 99 | Miscellaneous | SITE VISIT | ||
2002-03-20 | 43 | Site Activity Status Update Received | HISTORICAL SUMMARY FROM WINGERT | ||
2002-03-20 | 93 | Operation & Maintenance (O&M) Report Approved | REQUESTED CLARIFICATION ON TABLES | ||
2002-03-15 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | |||
2002-01-08 | 99 | Miscellaneous | REQUEST FOR SITE VISIT | ||
2001-12-27 | 99 | Miscellaneous | REQUEST FOR O&M REPORTS SEMI-ANNUALLY & PROGRESS REPORTS | ||
2001-11-29 | 43 | Site Activity Status Update Received | GW UPDATE | ||
2001-09-24 | 43 | Site Activity Status Update Received | QUARTERLY GW RESULTS | ||
2001-09-20 | 43 | Site Activity Status Update Received | CITY OF APPLETON OUTFALL RESULTS | ||
2001-05-21 | 43 | Site Activity Status Update Received | QUARTERLY GW MONITORING RESULTS | ||
2001-02-26 | 43 | Site Activity Status Update Received | QUARTERLY GW RESULTS | ||
2000-11-13 | 43 | Site Activity Status Update Received | QUARTERLY GW RESULTS | ||
2000-08-15 | 43 | Site Activity Status Update Received | QUARTERLY GW RESULTS | ||
2000-05-12 | 43 | Site Activity Status Update Received | QUARTERLY GW RESULTS | ||
2000-02-15 | 43 | Site Activity Status Update Received | |||
1999-09-20 | 43 | Site Activity Status Update Received | |||
1999-05-21 | 43 | Site Activity Status Update Received | |||
1999-03-01 | 43 | Site Activity Status Update Received | |||
1998-12-16 | 43 | Site Activity Status Update Received | |||
1993-06-01 | 43 | Site Activity Status Update Received | LONG TERM MONITORING | ||
1993-03-01 | 43 | Site Activity Status Update Received | LONG TERM MONITORING\GW SAMPLES | ||
1988-09-01 | 43 | Site Activity Status Update Received | QUARTERLY GW MONITORING | ||
1986-11-18 | 2 | Responsible Party (RP) letter sent |
![]() |
ALBANY INTERNATIONAL, ALBANY WIRE DIVISION | |
1985-10-10 | 1 | Notification of Hazardous Substance Discharge | |||
1985-09-20 | 1 | Notification of Hazardous Substance Discharge |
![]() |
CHROMIUM CONTAMINATED GROUNDWATER SEEPING IN THROUGH BASEMENT WALLS | |
1985-05-29 | 1 | Notification of Hazardous Substance Discharge |
Type | Related Activity |
---|---|
Property Affected -> | 13-45-591051 714 E HANCOCK ST |
Reasons when Action Code 234 is Present |
---|
RESPONSIBILITY FOR MW TRANSFERRED TO ANOTHER SITE OR PROGRAM |
Substance | Type | Amt Released | Units |
---|---|---|---|
Chromium | Metals | ||
Metals (chromium) | Metals | ||
Resource Conservation and Recovery Act Subtitle C Wastes | RCRA | ||
Tetrachloroethene (Perchloroethylene) | VOC | ||
Trichloroethylene | Industrial Chem | ||
Volatile Organic Compounds (SOLVENT - CHRLORINATED) | VOC |
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR. |
ALBANY INTERNATIONAL , APPLETON, WI 54913 |
Northeast Region Contact: Denise Danelski denise.danelski@wisconsin.gov |