02-41-000023
MILWAUKEE DIE CASTING CO INC FMR
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / OPEN | DNR RR |
Location Name | County | DNR Region |
---|---|---|
FORMER MILWAUKEE DIE CASTING CO FACILITY | MILWAUKEE | SOUTHEAST |
Address | Municipality |
---|---|
4132 N HOLTON ST | MILWAUKEE |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
SW 1/4 of the SW 1/4 of Sec 04, T07N, R22E | 43.0920757 | -87.9039482 |
![]() |
![]() |
Additional Activity Details | Acres |
---|---|
4 |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
241228240 | WIN000510552 | 1989-12-04 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-07-01 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2024 - 6/30/2024 | |
2024-04-08 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER SAMPLING | |
2024-03-19 | 99 | Miscellaneous |
![]() |
REMEDIAL ACTION CONSTRUCTION DOCUMENTATION REPORT - ENHANCED IN-SITU BIOREMEDIATION (EISB) | |
2024-01-19 | 43 | Site Activity Status Update Received |
![]() |
CAP INSPECTION | |
2024-01-18 | 99 | Miscellaneous |
![]() |
GEOSYNTEC NR 700 SEMI-ANNUAL REPORT FOR RP PHARMACIA: 7/1/2023 - 12/31/2023. | |
2024-01-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2023 - 12/31/2023 | |
2023-10-13 | 99 | Miscellaneous |
![]() |
REVISED INJECT INFILTRATE | |
2023-09-22 | 64 | Inject/Infiltrate Request Approved |
![]() |
||
2023-08-18 | 149 | Remedial Action (RA) Design Report Approved |
![]() |
||
2023-08-17 | 63 | Inject/Infiltrate Request Received (fee) |
![]() |
REC'D CK #2704 $700, INFILTRATION AND INJECTION REQ | |
2023-07-25 | 99 | Miscellaneous |
![]() |
NR 700 SEMI-ANNUAL REPORTING FOR PHARMACIA/GEOSYNTEC 01/01/2023 - 06/30/2023. | |
2023-07-06 | 148 | Remedial Action Design Report Received (fee) |
![]() |
REC'D CK #2702 $1050, RAOR & RAP | |
2023-07-06 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) | REC'D RAOR & RAP | ||
2023-06-30 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 01/01/2023 - 06/30/2023 | |
2023-05-19 | 43 | Site Activity Status Update Received |
![]() |
PRE-DESIGN INVESTIGATION REPORT | |
2023-02-10 | 99 | Miscellaneous |
![]() |
PRE-DESIGN INVESTIGATION WORK PLAN | |
2023-01-27 | 99 | Miscellaneous |
![]() |
GEOSYNTEC NR 700 SEMI-ANNUAL REPORT FOR RP PHARMACIA: 7/1/2022 - 12/31/2022 | |
2023-01-09 | 99 | Miscellaneous |
![]() |
CONTINUING OBLIGATION INSPECTION AND MAINTENANCE LOG | |
2023-01-04 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2022 - 12/31/2022 | |
2022-10-25 | 98 | Technical Assistance Provided | TECHNICAL ASSISTANCE WAS PROVIDED IN A PHONE CONFERENCE WITH THE CONSULTANT AND RP ON 10/25/22. | ||
2022-09-27 | 43 | Site Activity Status Update Received |
![]() |
GW MONITORING PROGRESS RPT | |
2022-09-27 | 97 | Technical Assistance Request Received (fee) | REQ MEETING - DISCUSS GW MONITORING PROGRESS RPT SEPT 2022 | ||
2022-09-16 | 98 | Technical Assistance Provided |
![]() |
RESPONSE TO REDEVELOPMENT DESIGN REPORT - PROPOSED SPIKE BREWING. | |
2022-09-14 | 199 | Additional Information Received (Fee-Based or Closure) | REVIEW COMMENTS RECEIVED FOR REDEVELOPMENT DESIGN REPORT - PROPOSED SPIKE BREWING. | ||
2022-09-12 | 198 | Request for Additional Information (Fee-Based or Closure) | PAUSED PENDING REVIEW COMMENTS. | ||
2022-08-02 | 118 | PFAS Sampling Not Required At This Time |
![]() |
PFAS SAMPLING NOT REQUIRED AT THIS TIME. | |
2022-07-05 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-07-05 | 97 | Technical Assistance Request Received (fee) |
![]() |
REC'D CK #008922 $700, REDEVELOPMENT DESIGN RPT | |
2022-06-10 | 40 | Remedial Action Options Report (RAOR) Approved |
![]() |
WDNR CONCEPTUAL APPROVAL TO MODIFY PROTECTIVE BARRIER FOR SPIKE BREWING REDEVELOPMENT PLAN. | |
2022-06-10 | 99 | Miscellaneous |
![]() |
EMAIL - REQUESTED REVIEW CLARIFICATION FROM USEPA FOR SPIKE BREWING REDEVELOPMENT PLAN. | |
2022-06-02 | 99 | Miscellaneous |
![]() |
EMAIL CORRESPONDENCE REGARDING SPIKE BREWING PROPOSED REDEVELOPMENT. | |
2022-05-19 | 143 | Remedial Action Options Report (RAOR) Received (fee) |
![]() |
REC'D CK #008839 $1050 | |
2022-05-11 | 114 | PFAS Scoping Statement Received | PFAS SCOPING STATEMENT RECEIVED. ADDITIONAL SCOPING INFORMATION RECEIVED 09/30/2021. | ||
2022-04-28 | 98 | Technical Assistance Provided |
![]() |
TECHNICAL ASSISTANCE PROVIDED | |
2022-04-21 | 97 | Technical Assistance Request Received (fee) |
![]() |
REC'D CK #008787 $700 | |
2022-04-11 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER MONITORING PROGRESS REPORT | |
2022-03-24 | 98 | Technical Assistance Provided | TECHNICAL ASSISTANCE PROVIDED | ||
2022-03-11 | 198 | Request for Additional Information (Fee-Based or Closure) | REQUEST FOR ADDITIONAL INFORMATION | ||
2022-03-11 | 199 | Additional Information Received (Fee-Based or Closure) | ADDITIONAL INFORMATION RECEIVED | ||
2022-01-20 | 97 | Technical Assistance Request Received (fee) |
![]() |
REC'D CK #008639 $700, POST-REMOVAL SITE CONTROL PLAN MODIFICATION REQ | |
2022-01-14 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2021 - 12/31/2021 | |
2022-01-12 | 99 | Miscellaneous |
![]() |
SEMI ANNUAL CAP INSPECTION DOC | |
2021-10-13 | 43 | Site Activity Status Update Received |
![]() |
GW MONITORING PROGRESS REPORT | |
2021-10-01 | 99 | Miscellaneous |
![]() |
2019 CONTINUING OBLIGATIONS INSPECTION AND MAINTENANCE LOG (WDNR FORM 4400‐305) | |
2021-10-01 | 99 | Miscellaneous |
![]() |
2020 CONTINUING OBLIGATIONS INSPECTION AND MAINTENANCE LOG (WDNR FORM 4400‐305) | |
2021-09-30 | 99 | Miscellaneous |
![]() |
RESPONSE TO SIWP APPROVAL AND ADDITIONAL INFORMATION FOR EMERGING CONTAMINANT SCOPING STATEMENT | |
2021-08-06 | 36 | Site Investigation Workplan (SIWP) Approved |
![]() |
||
2021-08-06 | 38 | Site Investigation Report (SIR) Approved | REFER TO THE 08-06-2021 SIWP APPROVAL LETTER FOR THE SIR APPROVAL | ||
2021-07-22 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2021 - 6/30/2021 | |
2021-07-07 | 99 | Miscellaneous |
![]() |
MONITORING EVENT | |
2021-07-06 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
REC'D CK #2648 $700.00 | |
2021-05-11 | 137 | Site Investigation Report (SIR) Received (fee) |
![]() |
REC'D CK# 2645, $1050 | |
2021-04-06 | 130 | DNR Regulatory Reminder Sent |
![]() |
VAPOR INTRUSION AND TCE REMINDER LETTER | |
2021-03-18 | 99 | Miscellaneous |
![]() |
NOTIFICATION OF PLANNED ADDITIONAL GROUNDWATER SAMPLING EVENT | |
2021-01-25 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2020 - 12/31/2020 | |
2020-12-18 | 81 | Site Investigation Workplan (SIWP) Not Approved |
![]() |
SIWP MODIFICATION RESPONSE | |
2020-12-01 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
SIWP MODIFICATION REQUEST | |
2020-08-17 | 130 | DNR Regulatory Reminder Sent |
![]() |
EMERGING CONTAMINANTS REMINDER LETTER | |
2020-07-17 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2020 - 6/30/2020 | |
2020-01-24 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2019 - 12/31/2019 | |
2019-12-19 | 36 | Site Investigation Workplan (SIWP) Approved |
![]() |
SI WORK PLAN APPROVED | |
2019-11-18 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
REC'D REVISED SIWP | |
2019-08-29 | 99 | Miscellaneous |
![]() |
DNR EMAIL RESPONSE TO GEOSYNTEC LTR DATED 8/22/19 | |
2019-08-26 | 99 | Miscellaneous |
![]() |
RESPONSES TO WDNR SUPPLEMENTAL COMMENTS FOR SIWP | |
2019-06-28 | 99 | Miscellaneous |
![]() |
EMAIL RESPONSE TO CONSULTANT COMMENTS RE SIWP ADDITIONAL INFO REQUEST. | |
2019-04-04 | 99 | Miscellaneous |
![]() |
RESPONSES TO WDNR COMMENTS TO SIWP | |
2019-02-13 | 198 | Request for Additional Information (Fee-Based or Closure) | EMAILED ADDITION INFORMATION REQUEST TO CONSULTANT | ||
2019-02-13 | 99 | Miscellaneous |
![]() |
EMAIL REGARDING ADDITIONAL INFO NEEDED FOR SIWP | |
2019-02-04 | 99 | Miscellaneous |
![]() |
REC'D CO INSPECTION/MAINTENANCE LOG FORM 4400-305 (NOT REQUESTED BY DNR) | |
2018-12-19 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
REC'D CK# 2743, $700 | |
2018-10-16 | 99 | Miscellaneous | RESPONSE TO DNR RP LETTER | ||
2018-10-10 | 7 | Environmental Consultant Hired |
![]() |
GEOSYNTEC CONSULTANTS | |
2018-08-10 | 2 | Responsible Party (RP) letter sent |
![]() |
||
2018-06-07 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
APPENDICIES IN DOCUMENTS MODULE | |
2018-06-01 | 149 | Remedial Action (RA) Design Report Approved |
![]() |
||
2018-06-01 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | 3-CAP SYSTEM: TSCA CLAY CAP, SOIL COVER, & TOPSOIL (ONLY) COVER. | ||
2018-06-01 | 226 | Continuing Obligation - Vapor Intrusion Response | |||
2018-06-01 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2018-06-01 | 236 | Continuing Obligation - Residual GW Contamination | |||
2018-06-01 | 56 | Continuing Obligation(s) Applied |
![]() |
ONGOING CLEANUP WITH CONTINUING OBLIGATIONS DOCUMENTATION PACKAGE | |
2018-06-01 | 220 | Continuing Obligation - Soil at Industrial Levels | |||
2018-06-01 | 66 | Continuing Obligations (COs) Apply at Off-site Property(ies) | |||
2013-03-19 | 315 | Superfund Site Assessment Transmittal Memos | SSI TRANSMITTAL MEMO | ||
2013-03-06 | 356 | Superfund Removal Action Taken | ADMINISTRATIVE SETTLEMENT AGREEMENT & ORDER ON CONSENT FOR REMOVAL ACTION (US EPA) | ||
2012-12-21 | 351 | Superfund Site Assessment Site Inspection (SI) |
![]() |
||
2012-12-03 | 99 | Miscellaneous | ENFORCEMENT ACTION MEMORANDUM REQUESTING TIME-CRITICAL REMOVAL (US EPA) | ||
2012-05-03 | 99 | Miscellaneous | WDHS HEALTH CONSULTATION REPORT | ||
2012-02-29 | 99 | Miscellaneous | EPA REMOVAL SITE ASSESSMENT REPORT | ||
2012-02-28 | 315 | Superfund Site Assessment Transmittal Memos | PA TRANSMITTAL MEMO | ||
2012-02-28 | 303 | Superfund Site Assessment Action Taken - Not on NPL or SAS | |||
2012-02-14 | 350 | Superfund Site Assessment Preliminary Assessment (PA) |
![]() |
FINAL DRFT PA REPORT | |
2011-12-13 | 316 | Superfund Site Assessment DNR Planning Documentation | SI HEALTH & SAFETY PLAN (SI HASP) | ||
2011-10-14 | 316 | Superfund Site Assessment DNR Planning Documentation | SITE INSPECTION WORK PLAN (SIWP) | ||
2011-09-07 | 130 | DNR Regulatory Reminder Sent |
![]() |
Vapor Intrusion (VI) Assessment Notification Ltr Sent | |
2011-09-07 | 313 | Superfund Site Assessment Pre-CERCLA Screening (PCS) |
![]() |
PCS FORM | |
2011-01-21 | 356 | Superfund Removal Action Taken | PRP GROUP CONDUCTING REMOVAL UNDER AOC SEE THE EPA OSC WEBSITE FOR REMOVAL INFORMATION | ||
2010-03-15 | 99 | Miscellaneous | REC'D 2004 PHASE II ESA | ||
2010-02-12 | 99 | Miscellaneous | 2004 SITE DATA REC'D | ||
2009-03-24 | 43 | Site Activity Status Update Received | REC'D IMMEDIATE RESPONSE SUMMARY REPT | ||
2008-11-17 | 43 | Site Activity Status Update Received | SITE ACTIVTY UPDATE FROM ARCADIS | ||
2008-11-13 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-11-06 | 99 | Miscellaneous | SITE VISIT WITH EPA; VIEW INTERIOR/EXTERIOR | ||
2008-10-29 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-10-27 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-10-23 | 99 | Miscellaneous | SITE VISIT - VIEW INTERIOR/EXTERIOR CONDITIONS | ||
2008-10-17 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-10-15 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-10-14 | 43 | Site Activity Status Update Received | 2 SITE ACTIVITY UPDATES FROM ARCADIS | ||
2008-10-09 | 43 | Site Activity Status Update Received | 2 SITE ACTIVITY UPDATES FROM ARCADIS | ||
2008-10-08 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-10-06 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-10-03 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-10-02 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-10-01 | 43 | Site Activity Status Update Received | 2 SITE ACTIVITY UPDATES FROM ARCADIS | ||
2008-09-29 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-09-26 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE BY ARCADIS | ||
2008-09-25 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-09-25 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE BY ARCADIS | ||
2008-09-24 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-09-22 | 43 | Site Activity Status Update Received | 2 SITE ACTIVITY UPDATES FROM ARCADIS | ||
2008-09-18 | 43 | Site Activity Status Update Received | 2 SITE ACTIVITY UPDATES FROM ARCADIS | ||
2008-09-16 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-09-15 | 43 | Site Activity Status Update Received | 2 SITE ACTIVITY UPDATES FROM ARCADIS | ||
2008-09-10 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-09-09 | 99 | Miscellaneous | SITE VISIT - CONFIRMED SUMPS HAD BEEN PUMPED | ||
2008-09-09 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-09-08 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-09-05 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-09-03 | 99 | Miscellaneous | SITE VISIT - CONFIRMED SUMPS ARE BEING PUMPED OUT | ||
2008-09-03 | 43 | Site Activity Status Update Received | SITE ACTIVITY UPDATE FROM ARCADIS | ||
2008-08-29 | 43 | Site Activity Status Update Received | CONTRACTOR'S SITE UPDTE | ||
2008-08-28 | 99 | Miscellaneous | SITE VISIT - OBSERVED EXTERIOR SUMP | ||
2008-08-28 | 43 | Site Activity Status Update Received | RESPONSE TO 08/9/08 RP LTR | ||
2008-08-28 | 43 | Site Activity Status Update Received | SAMPLE RESULTS | ||
2008-08-22 | 99 | Miscellaneous | SITE VISIT - OBSERVED EXTERIOR SUMP LIQUID LEVEL | ||
2008-08-19 | 2 | Responsible Party (RP) letter sent | NEW RP - 10 DAY DEADLINE TO REMOVE LIQUIDS | ||
2008-08-19 | 99 | Miscellaneous | SITE VISIT - OBSERVED EXTERIOR SUMP LIQUID LEVEL | ||
2008-08-11 | 99 | Miscellaneous | SITE VISIT - OBSERVED EXTERIOR SUMP LIQUID LEVEL | ||
2004-09-17 | 99 | Miscellaneous | PM. GREEN TEAM MTG W/ POT. PURCHASER | ||
2004-08-05 | 140 | Site Investigation Report (SIR) Not Approved | PM-FILE REVIEW PROVIDED | ||
2004-05-05 | 137 | Site Investigation Report (SIR) Received (fee) | REC'D CK# 1154 $750.00 | ||
1999-08-09 | 206 | Site Investigation End - State Lead | |||
1998-08-05 | 99 | Miscellaneous | DOJ REQUESTS SETTLEMENT/JUDGEMENT | ||
1998-07-30 | 37 | Site Investigation Report (SIR) Received (non-fee) | INCL RAO | ||
1998-04-03 | 99 | Miscellaneous | INVESTIGATION SUMMARY REPORT RECD | ||
1997-09-10 | 43 | Site Activity Status Update Received | |||
1997-01-03 | 23 | Referral to Department of Justice (DOJ) | |||
1996-08-29 | 36 | Site Investigation Workplan (SIWP) Approved | CONDITIONAL | ||
1996-04-10 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | |||
1996-01-16 | 14 | Notice of Violation (NOV) Issued | FAILURE TO NOTIFY | ||
1995-07-11 | 2 | Responsible Party (RP) letter sent |
![]() |
||
1989-12-04 | 1 | Notification of Hazardous Substance Discharge |