WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-36-000112 LEMBERGER FLY ASH LF (SF NPL)
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
LEMBERGER LF MANITOWOC NORTHEAST
Address Municipality
6114 HEMPTON LAKE RD FRANKLIN TN
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SE 1/4 of Sec 27, T20N, R22E 44.172936 -87.8434965 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
436016790 WID980901243 1984-01-01
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Superfund NPL Flag  
Actions and Documents
Date Code Name File Comment
2024-03-27 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file GROUNDWATER MONITORING RESULTS - Q4 2023
2024-03-19 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file GROUNDWATER MONITORING RESULTS - Q3 2023
2023-12-23 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file ANNUAL O & M REPORT
2023-11-06 99 Miscellaneous Download PDF file WPDES PERMIT TERMINATED
2023-11-03 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file 2023 Q2 O & M
2023-10-12 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file 2023 Q1 O & M
2023-06-08 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file 2022 Q4 O & M
2023-05-25 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file 2022 Q3 O & M
2023-03-29 43 Site Activity Status Update Received Download PDF file PFAS SAMPLE RESULTS
2022-11-15 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file 2022 Q2 O & M
2022-10-13 43 Site Activity Status Update Received Download PDF file QAPP
2022-09-09 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file 2022 Q1 O & M
2022-03-17 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file GW O & M - Q4 2021
2022-03-09 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file GW O & M - Q3 2021
2022-02-17 116 PFAS Sampling Required Download PDF file EPA REQUEST FOR ADDITIONAL PFAS SAMPLING
2021-12-02 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file ANNUAL O AND M THROUGH JUNE 2021
2021-11-19 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SIR - PFAS
2021-11-19 121 PFAS Sampling Completed - Non-Actionable Levels Detected SEE AC 37 ON 11/19/2021
2021-09-08 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file Q1 O AND M, 2021
2021-08-17 99 Miscellaneous Download PDF file EPA APPROVAL AND COMMENTS ON PFAS SIWP
2021-08-16 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file PFAS WP APPROVED
2021-07-09 114 PFAS Scoping Statement Received Download PDF file PFAS SAMPLING WORK PLAN
2021-07-09 35 Site Investigation Workplan (SIWP) Received (non-fee) SIWP SUBMITTED; SEE AC 114 ON 7/9/2021
2021-07-07 116 PFAS Sampling Required Download PDF file PFAS SAMPLE REQUEST LETTER
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-03-26 43 Site Activity Status Update Received Download PDF file 4TH QUARTER 2020 GW BACKGROUND AND PLUME MONITORING
2021-02-25 24 Long Term Monitoring Plan Received (non-Fee) Download PDF file LONG TERM MONITORING PLAN WITH REVISED TABLE 1
2021-02-16 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file OPERATION AND MAINTENANCE RPT Q3 2020
2021-01-14 314 Superfund Decision Document (ROD or ESD) - See Description Download PDF file ROD AMENDMENT
2021-01-06 99 Miscellaneous Download PDF file PM CHANGE TO LEROY
2020-12-22 92 Operation & Maintenance (O&M) Report Received (non-fee) Download Compressed Zip file O&M REPORT #30 (JULY 2019 - JUNE 2020
2020-12-18 99 Miscellaneous Download PDF file ROD AMENDMENT CONCURRENCE LETTER
2020-11-13 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-22 326 Superfund Five Year Review Report Signed Download PDF file 5TH REVIEW
2020-07-15 99 Miscellaneous JULY 2020 UPDATE CALL
2020-07-15 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING, AND BACKGROUND WELLS - FIRST QUARTER 2020
2020-06-10 99 Miscellaneous JUNE 2020 UPDATE CALL
2020-05-13 43 Site Activity Status Update Received BRIEF MAY 2020 UPDATE
2020-04-15 99 Miscellaneous APRIL 2020 UPDATE CALL
2020-03-16 43 Site Activity Status Update Received PLUME MONITORING AND BACKGROUND WELLS - FOURTH QUARTER 2019
2020-01-31 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING, AND BACKGROUND WELLS
2019-12-19 92 Operation & Maintenance (O&M) Report Received (non-fee) #29
2019-12-12 99 Miscellaneous DECEMBER 2019 UPDATE CALL
2019-11-18 99 Miscellaneous PRIVATE WELL RESULTS NOTIFICATION LETTER ISSUED
2019-11-14 99 Miscellaneous NOVEMBER 2019 UPDATE CALL
2019-11-12 43 Site Activity Status Update Received EPA ARRAY BRIEFING PRESENTATION FOR PROPOSAL OF ROD AMMENDMENT
2019-10-23 99 Miscellaneous SITE VISIT WITH EPA, TRC, AND LSRG; UPDATES PROVIDED BY EPA ON ROD AMENDMENT
2019-10-10 99 Miscellaneous OCTOBER 2019 UPDATE CALL
2019-09-12 99 Miscellaneous SEPTEMBER 2019 UPDATE CALL
2019-09-11 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING, AND BACKGROUND WELLS
2019-08-13 99 Miscellaneous PRIVATE WELL RESULTS NOTIFICATION LETTERS ISSUED
2019-08-12 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING, AND BACKGROUND WELLS
2019-08-09 98 Technical Assistance Provided Download PDF file RESPONSE TO DMZ EXPANSION REQUEST
2019-08-08 99 Miscellaneous AUGUST 2019 UPDATE CALL
2019-08-08 199 Additional Information Received (Fee-Based or Closure) UPDATE CALL
2019-07-31 43 Site Activity Status Update Received NOTIFICATION FROM EPA FOR START OF FIVE YEAR REVIEW
2019-07-18 99 Miscellaneous JULY 2019 UPDATE CALL
2019-06-13 198 Request for Additional Information (Fee-Based or Closure) Download PDF file NEED TO DISCUSS PROPOSED ROD AND ARARS (DMZ) WITH EPA PRIOR TO ISSUING LETTER
2019-06-07 43 Site Activity Status Update Received PLUME MONITORING AND BACKGROUND WELLS
2019-05-28 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING AND BACKGROUND WELLS
2019-04-18 97 Technical Assistance Request Received (fee) Download PDF file DMZ EXPANSION REQUEST
2019-02-27 99 Miscellaneous PRIVATE WELL RESULT NOTIFICATION LETTERS ISSUED
2019-02-11 92 Operation & Maintenance (O&M) Report Received (non-fee) #28
2019-01-18 43 Site Activity Status Update Received PLUME MONITORING AND BACKGROUND WELLS
2018-12-14 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING, AND BACKGROUND WELLS
2018-12-11 43 Site Activity Status Update Received MONITORED NATURAL ATTENUATION REPORT - FINAL
2018-08-29 99 Miscellaneous SUMMARY OF OBSERVATIONS OF AQUIFER, PRIVATE WELL CONSTRUCTION AND SPECIAL WELL CASING DEPTH AREA
2018-06-15 99 Miscellaneous INITIAL MNA REPORT COMMENTS TO DISCUSS WITH TRC AND LSRG
2018-06-11 - Website URL URL to website Lemberger Landfill EPA Superfund NPL/SAA Website This EPA website contains additional information about this Activity.
2018-05-22 99 Miscellaneous RESIDENTIAL WELL RESULTS NOTIFICATION LETTERS ISSUED
2018-04-20 43 Site Activity Status Update Received PLUME MONITORING & BACKGROUND WELLS
2018-03-23 43 Site Activity Status Update Received MONITORED NATURAL ATTENUATION REPORT
2018-02-16 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING & BACKGROUND WELLS
2017-12-21 43 Site Activity Status Update Received FOR WORK COMPLETED IN DECEMBER 2017
2017-12-11 99 Miscellaneous CLARIFICATIONS FOR GW TREATMENT SYSTEM PERMIT
2017-11-16 99 Miscellaneous TELCON: LL UPDATES
2017-11-08 43 Site Activity Status Update Received O & M PROGRESS REPORT #27
2017-11-01 99 Miscellaneous EPA APPROVAL TO WINTERIZE/MOTHBALL THE GW TREATMENT SYSTEM
2017-09-14 99 Miscellaneous DNR PROJECT MANAGEMENT TRANSITION
2017-09-11 99 Miscellaneous MEETING WITH TRC, LSRG & EPA FOR MNA PROPOSAL
2017-09-11 43 Site Activity Status Update Received TECHNICAL MEMO FOR MNA PROPOSAL
2017-09-01 43 Site Activity Status Update Received PLUME MONITORING & BACKGROUND WELLS
2017-08-18 43 Site Activity Status Update Received RM-404XXD MONITORING WELL INSTALLATION
2017-08-17 99 Miscellaneous TELCON: LL UPDATES
2017-07-27 99 Miscellaneous CLARIFICATION ON DETERMINATION FOR SOIL CUTTINGS FROM NEW WELL
2017-07-20 99 Miscellaneous TELCON: LL UPDATES
2017-07-14 99 Miscellaneous RESIDENTIAL WELL RESULTS NOTIFICATION LETTERS ISSUED
2017-05-18 99 Miscellaneous TELCON: LL UPDATES
2017-05-15 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING & BACKGROUND WELLS
2017-04-20 99 Miscellaneous LL UPDATES
2017-04-10 99 Miscellaneous GEMS ID CREATED FOR NEW WELL RM-404XXD
2017-03-31 99 Miscellaneous RESIDENTIAL WELL RESULTS NOTIFICATION LETTERS ISSUED
2017-03-29 43 Site Activity Status Update Received WELL INFO FORM FOR NEW WELL RM-404XXD
2017-02-24 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING & BACKGROUND WELLS
2017-02-16 99 Miscellaneous TELCON: LL UPDATES
2017-02-16 99 Miscellaneous TELCON: LL UPDATES
2016-11-29 43 Site Activity Status Update Received O&M PROGRESS REPORT #26
2016-11-17 99 Miscellaneous TELCON: LL UPDATES
2016-10-20 99 Miscellaneous TELCON: LL UPDATED
2016-09-15 99 Miscellaneous TELCON: UPDATED ON GW MONITORING & NEW MONITORING WELL INSTALLATION
2016-09-06 43 Site Activity Status Update Received PLUME MONITORING & BACKGROUND WELLS
2016-07-28 99 Miscellaneous RESIDENTIAL WELL RESULTS NOTIFICATION LETTERS ISSUED
2016-07-21 99 Miscellaneous TELCON: LL UPDATED
2016-07-05 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING & BACKGROUND WELLS
2016-06-23 99 Miscellaneous TELCON: LL UPDATES
2016-05-26 99 Miscellaneous RESIDENTIAL WELL RESULTS NOTIFICATION LETTERS ISSUED
2016-05-19 99 Miscellaneous TELCON: LL UPDATES
2016-03-31 43 Site Activity Status Update Received PLUME MONITORING & BACKGROUND WELLS
2016-03-17 99 Miscellaneous TELCON & FOLLOWUP CALL W/EPA FOR PROPOSED LONG TERM GW SAMPLING PLAN
2016-02-18 99 Miscellaneous LL UPDATES & PROPOSED REVISIONS TO LONG TERM SAMPLING PROGRAM
2016-02-15 43 Site Activity Status Update Received RESIDENTIAL, PLUME MONITORING & BACKGROUND WELLS
2016-01-21 99 Miscellaneous TELCON: LL UPDATES
2015-12-15 43 Site Activity Status Update Received O & M PROGRESS REPORT #25
2015-11-20 99 Miscellaneous Download PDF file EPA/DNR SOURCE CONTROL EVALUATION REPORT COMMENTS ISSUED
2015-11-20 43 Site Activity Status Update Received SEPTEMBER 2015 MEETING NOTES
2015-10-15 99 Miscellaneous TELCON: MONTHLY UPDATE
2015-10-02 43 Site Activity Status Update Received GW & RESIDENTIAL WELL MONITORING
2015-09-24 99 Miscellaneous MTG W/LSRG & TRC TO DISCUSS MNA & LL SOURCE EVALUATION REPORTS
2015-09-14 43 Site Activity Status Update Received Download PDF file SOURCE CONTROL EVALUATION
2015-08-27 99 Miscellaneous TELCON: LL UPDATES
2015-08-13 326 Superfund Five Year Review Report Signed 4TH REVIEW
2015-07-28 99 Miscellaneous CHANGE IN DNR PM LETTER ISSUED
2015-07-16 99 Miscellaneous RESIDENTIAL WELL RESULTS NOTIFICATION LETTERS ISSUED
2015-05-20 43 Site Activity Status Update Received MONITORING NATURAL ATTENUATION REPORT
2015-04-10 43 Site Activity Status Update Received PLUME MONITORING & BACKGROUND WELLS & GR-14
2014-12-10 43 Site Activity Status Update Received O&M PROGRESS REPORT #24
2014-08-21 43 Site Activity Status Update Received 1ST QTR 2014 TRANSMITTAL OF DATA
2014-07-21 99 Miscellaneous NOTICE OF EPA CERCLA 5 YR REVIEW DUE 7-14-2015
2014-05-27 43 Site Activity Status Update Received TELCON WITH ROXANNE: SUMMARY OF MEETING IN CHICAGO
2014-05-15 43 Site Activity Status Update Received LSRG-AGENCY MEETING IN CHICAGO TO DISCUSS CONTINUED ACTION AT LL
2014-04-21 43 Site Activity Status Update Received GW DATA REPORT
2014-04-17 99 Miscellaneous MONTHLY CONF CALL LSRG/AGENCIES
2014-03-27 99 Miscellaneous O&M REPORT #23 REVISED APPROVED BY AGENCIES
2014-03-27 99 Miscellaneous ENVIRONMENTAL MONITORING PLAN REV 4 APPROVED BY AGENCIES
2014-03-20 99 Miscellaneous MONTHLY CONF CALL, COMMENTS ON DEC 2013 LL REPORT
2014-02-28 43 Site Activity Status Update Received ENVIRONMENTAL MONITORING PLAN REVIE #4 RECEIVED
2014-02-26 43 Site Activity Status Update Received RECEIVED REVISED O&M PROGRESS REPORT #23
2014-02-24 99 Miscellaneous SEPTEMBER 2013 RESIDENTIAL WELL SAMPLE RESULTS MAILED
2014-02-21 43 Site Activity Status Update Received NR812 VARIANCE DATA WUD XG829
2014-02-21 43 Site Activity Status Update Received THIRD QUARTER 2013 DATA TRANSMITTAL (RESIDENTIAL AND MONITORING WELLS)
2014-01-17 99 Miscellaneous AGENCY COMMENTS TO LSRG ON O&M #23
2014-01-15 99 Miscellaneous DNR COMMENTS TO EPA ON O&M #23
2013-12-30 43 Site Activity Status Update Received LEMBERGER LF (LL) SUMMARY OF DATA TO DATE, EVALUATION IF FURTHER DATA COLLECTION IS REQUIRED
2013-12-30 24 Long Term Monitoring Plan Received (non-Fee) LEMBERGER LANDFILL (LL) 2010-2013 DATA SUMMARY RECEIVED
2013-11-26 99 Miscellaneous AGENCY COMMENTS ON ENV MONITORING PLAN REV 3 SENT TO LSRG
2013-11-22 43 Site Activity Status Update Received O&M PROGRESS REPORT #23 RECEIVED
2013-11-21 99 Miscellaneous MONTHLY CONF CALL BETWEEN AGENCIES AND LSRG CONSULTANTS
2013-09-20 27 Long Term Monitoring Plan Approved SECOND QUARTER 2013 MONITORING WELL DATA RECEIVED
2013-09-19 43 Site Activity Status Update Received MONTHLY CONF CALL, SEPTEMBER WELL SAMPLING UNDERWAY
2013-09-06 24 Long Term Monitoring Plan Received (non-Fee) ENVIRONMENTAL MONITORING PLAN, REVISION 3 RECEIVED
2013-09-05 27 Long Term Monitoring Plan Approved EPA APPROVAL OF SAMPLING AND ANALYSIS PLAN
2013-08-30 43 Site Activity Status Update Received RESIDENTIAL WELL SAMPLE RESULTS MAILED TO RESIDENTS
2013-08-29 43 Site Activity Status Update Received 1ST QTR MONITORING DATA REC'D
2013-08-23 43 Site Activity Status Update Received SAMPLING & ANALYSIS PLAN REVISION 23 FINAL/APPROVED
2013-08-15 43 Site Activity Status Update Received TREND PLOTS FOR Q1 2013 REC'D & DISCUSSED DURING MONTHLY CONF CALL
2013-06-20 24 Long Term Monitoring Plan Received (non-Fee) MNA STUDY WORKPLAN CONSIDERED FINAL BY EPA
2013-06-18 99 Miscellaneous EPA SITE VISIT
2013-06-13 24 Long Term Monitoring Plan Received (non-Fee) MNA STUDY WELL INSTALLATION REPORT
2013-06-12 43 Site Activity Status Update Received REVISION 1 QAPP WITH 2012 SOP MODIFICATION
2013-06-12 24 Long Term Monitoring Plan Received (non-Fee) SAMPLING AND ANALYSIS PLAN REVISION 3
2013-04-30 99 Miscellaneous AGENCY COMMENTS ON THE SAP
2013-04-11 43 Site Activity Status Update Received SAMPLING AND ANALYSIS PLAN REV 2 RECEIVED
2013-04-05 99 Miscellaneous AGENCY COMMENTS ON MNA WORKPLAN REV
2013-03-04 35 Site Investigation Workplan (SIWP) Received (non-fee) LSRG DESIGNATION OF NEW PROJECT COORDINATOR: KENNY OGLIVIE
2013-03-01 35 Site Investigation Workplan (SIWP) Received (non-fee) MNA STUDY WORKPLAN REVIEWION 2 RECEIVED
2013-02-21 99 Miscellaneous MONTHLY CONF CALL
2013-02-06 43 Site Activity Status Update Received FOURTH QUARTER 2012 GW MONITORING DATA RECEIVED
2013-02-06 43 Site Activity Status Update Received GWMP TABLES RECEIVED
2013-01-29 43 Site Activity Status Update Received ANALYTICAL RESULTS OF NEWLY INSTALLED MWS
2013-01-24 43 Site Activity Status Update Received THIRD QUARTER 2012 MONITORING WELL/RESIDENTIAL WELL DATA RECEIVED
2012-12-20 43 Site Activity Status Update Received WIFS FOR NEW WELLS REC'D
2012-12-17 43 Site Activity Status Update Received O&M PROGRESS REPORT #22 RECEIVED
2012-12-05 43 Site Activity Status Update Received MNA STUDY MONITORING WELL INSTALLATION ENDED
2012-11-12 43 Site Activity Status Update Received MNA STUDY MONITORING WELL INSTALLATION STARTED
2012-11-08 43 Site Activity Status Update Received SECOND QUARTER 2012 MONITORING WELL DATA
2012-10-23 99 Miscellaneous AGENDY COMMENT ON MNA WORKPLAN
2012-10-19 99 Miscellaneous WDNR COMMENTS ON MNA STUDY WORKPLAN LTR NEAR FIELD AREA
2012-10-15 35 Site Investigation Workplan (SIWP) Received (non-fee) MNA STUDY WORKPLAN FOR THE LTR NEAR - FIELD AREA
2012-10-09 27 Long Term Monitoring Plan Approved EPA APPROVAL OF SEPT 2011 QUALITY ASSURANCE PROJECT PLAN
2012-08-30 43 Site Activity Status Update Received ADDITIONAL MONITORING WELLS FOR MNA STUDY TO FOLLOWUP TO CONF CALL
2012-08-23 43 Site Activity Status Update Received CONF CALL TO DISCUSS ADDITIONAL MONITORING WELL INSTALLATION
2012-08-09 99 Miscellaneous CONF CALL TO DISCUSS ADDITIONAL MONITORING WELL INSTALLATION
2012-08-07 43 Site Activity Status Update Received RATIONALE FOR PROPOSED MONITORING WELL
2012-07-31 99 Miscellaneous MARCH/APRIL 2012 PRIVATE WELL LETTERS MAILED
2012-07-25 99 Miscellaneous CONF CALL: COMPLIANCE BOUNDARY AND PROPERTY OWNERSHIP
2012-07-20 99 Miscellaneous APRIL 2012 GROUNDWATER DATA RECEIVED
2012-07-12 99 Miscellaneous SUMMARY OF 1,4 DIOXANE ANALYSIS RESULTS
2012-07-10 99 Miscellaneous CONFERENCE CALL TO DISCUSS PROPOSED PATH FORWARD
2012-07-10 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file 1-4 DIOXANE SIR
2012-06-21 99 Miscellaneous CONF CALL LSRG/AGENCIES TO DISCUSS COMPLIANCE BOUNDARIES
2012-03-21 43 Site Activity Status Update Received SENT PUMPING TEST UPDATE TO FOBR
2012-03-21 43 Site Activity Status Update Received FOURTH QUARTER 2011 ANALYTICAL RESULTS RECEIVED
2012-03-12 99 Miscellaneous CONF CALL EPA/DNR/TRC ON PUMPING TEST
2012-02-23 43 Site Activity Status Update Received PUMPING TEST POINTS FOR DISCUSSION
2012-02-14 43 Site Activity Status Update Received REQUEST TO ADD DIOXANE TO MARCH SAMPLING
2012-02-10 43 Site Activity Status Update Received EPA FOLLOW-UP LETTER TO JAN 6, 201 MTG (LSRG/DNR/EPA)
2012-01-25 99 Miscellaneous PRIVATE WELL LETTERS MAILED
2012-01-23 43 Site Activity Status Update Received 3RD QUARTER MONITORING WELL AND PRIVATE WELL RESULTS RECEIVED
2012-01-06 99 Miscellaneous MEETING WITH LSRG/DNR/EPA
2011-12-27 43 Site Activity Status Update Received O&M PROGRESS REPORT #21 RECEIVED
2011-12-05 99 Miscellaneous DNR/EPA/LSRG CONFERENCE CALL
2011-11-21 99 Miscellaneous EPA COMMENTS ON HEALTH & SAFETY PLAN
2011-11-07 99 Miscellaneous DNR/EPA CONFERENCE CALL
2011-11-07 99 Miscellaneous NEW EPA RPM: DEMAREE COLLIER
2011-10-31 99 Miscellaneous 2ND QUARTER 2011 MONITORING WELL DATA RECEIVED
2011-10-12 99 Miscellaneous DNR SUGGESTED ACTIONS GOING FORWARD
2011-10-06 99 Miscellaneous EPA COMPILATION OF DISCUSSION RESULTS
2011-09-27 43 Site Activity Status Update Received SAP REVISION #1 RECEIVED
2011-09-14 99 Miscellaneous GROUNDWATER MONITORING PLAN REVISION 1 RECEIVED
2011-08-26 99 Miscellaneous WDNR MEETING WITH LSRG
2011-08-15 43 Site Activity Status Update Received REVISED HEALTH AND SAFETY PLAN RECEIVED
2011-08-03 99 Miscellaneous DNR COMMENTS ON LEACHAT HEAD EVALUATION SUBMITTED TO EPA
2011-07-19 99 Miscellaneous EPA COMMENTS ON QAPP
2011-07-05 99 Miscellaneous AGENCY COMMENTS ON AMENDED RD/RA, WP & SAP
2011-07-05 43 Site Activity Status Update Received LEACHATE HEAD EVALUATION REPORT REC'D
2011-06-13 99 Miscellaneous DNR COMMENTS ON REVISED RD/RA WP, SAP, QAPP SENT TO EPA
2011-06-06 99 Miscellaneous AGENCY COMMENTS ON GWMP SENT TO RMT
2011-05-31 92 Operation & Maintenance (O&M) Report Received (non-fee) FIRST QUARTER 2011 GROUNDWATER RESULTS RECEIVED
2011-05-23 43 Site Activity Status Update Received MEETING @ EPA RE: HYDROFRACKING
2011-04-26 43 Site Activity Status Update Received LSRG LETTER TO EPA OBJECTING TO HYDROFRACTURING
2011-04-18 99 Miscellaneous QUALITY ASSURANCE PROJECT PLAN RECEIVED
2011-04-18 99 Miscellaneous EPA DISAPPROVAL OF HSP
2011-04-15 99 Miscellaneous DEPARTMENT COMMENTS ON GW MONITORING PLAN
2011-04-11 43 Site Activity Status Update Received REVISED O&M PROGRESS REPORT #20 RECEIVED
2011-04-04 43 Site Activity Status Update Received SAMPLING AND ANALYSIS PLAN
2011-04-04 43 Site Activity Status Update Received GROUNDWATER MONITORING PLAN, REVISION 1 RECEIVED
2011-03-28 43 Site Activity Status Update Received HEALTH AND SAFETY PLAN RECEIVED
2011-03-21 43 Site Activity Status Update Received FOURTH QUARTER 2010 MONITORING WELL DATA RECEIVED
2011-03-07 43 Site Activity Status Update Received UPDATED DELIVERABLES SCHEDULE APPROVED
2011-02-08 99 Miscellaneous CONF CALL TO DISCUSS PLANNED PUMP TESTS
2011-02-07 43 Site Activity Status Update Received EPA RESPONSE ON AMC AND PLANNED PUMP TESTS
2011-02-01 99 Miscellaneous EPA RESPONSE ON GROUNDWATER MONITORING PLAN AND QAPP
2011-01-24 92 Operation & Maintenance (O&M) Report Received (non-fee) O&M PROGRESS REPORT #20
2011-01-10 99 Miscellaneous RESPONSE TO EPA COMMENTS ON THE ACM
2010-12-29 43 Site Activity Status Update Received THIRD QUARTER 2010 MONITORING WELL AND RESIDENTIAL WELL DATA RECEIVED
2010-12-09 43 Site Activity Status Update Received ANALYTICAL DATA FOR LW-7 RECEIVED
2010-12-09 43 Site Activity Status Update Received ANALYTICAL DATA FROM LW-7
2010-12-06 24 Long Term Monitoring Plan Received (non-Fee) ADDENDUM TO QAPP RECEIVED
2010-12-06 24 Long Term Monitoring Plan Received (non-Fee) GROUNDWATER MONITORING PLAN RECEIVED
2010-12-06 24 Long Term Monitoring Plan Received (non-Fee) ADDENDUM TO QAPP RECEIVED
2010-12-06 24 Long Term Monitoring Plan Received (non-Fee) GROUNDWATER MONITORING PLAN RECEIVED
2010-11-19 35 Site Investigation Workplan (SIWP) Received (non-fee) DNR COMMENTS ON ACM
2010-11-01 35 Site Investigation Workplan (SIWP) Received (non-fee) AMENDED CONCEPTUAL MEMORANDUM RECEIVED
2010-10-04 43 Site Activity Status Update Received SECOND QUARTER (JUNE 2010) MONITORING WELL DATA RECEIVED
2010-09-16 99 Miscellaneous WATERSHED BUREAU COMMENTS ON BRANCH RIVER TO EPA
2010-09-01 99 Miscellaneous EPA RESPONSE LETTER RE RMT'S JUNE 25 LETTER AND 5-YEAR REPORT RECOMMENDATIONS
2010-08-19 99 Miscellaneous WDNR COMMENTS ON 5-YEAR ISSUES LETTER
2010-08-09 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2010-08-09 228 Continuing Obligation - Site Specific Condition SITE FENCED
2010-08-09 56 Continuing Obligation(s) Applied Download PDF file CONTINUING OBLIGATION AT SITE
2010-08-09 236 Continuing Obligation - Residual GW Contamination AUTO-POPULATED PER CONTAM_SITE_TYPE LISTING
2010-08-02 99 Miscellaneous WDNR COMMENTS ON FRACTURING EVALUATION
2010-07-14 326 Superfund Five Year Review Report Signed THIRD FYR
2010-07-07 99 Miscellaneous MARCH 10 RESIDENTAIL SAMPLING RESULTS LETTERS SENT
2010-06-28 43 Site Activity Status Update Received EVALUATION OF FRACTURE INDUCEMENT, ANGLE DRILLING AND CONTAINMENT
2010-06-28 43 Site Activity Status Update Received FIRST QUARTER 2010 TRANSMITTAL OF DATA
2010-06-24 99 Miscellaneous DNR COMMENTS ON EPA 5-YEAR REPORT
2010-06-07 43 Site Activity Status Update Received SECOND SET OF LSRG COMMENTS ON EPA'S RESPONSE
2010-05-26 43 Site Activity Status Update Received EPA COMMENTS ON LSRG COMMENTS
2010-05-24 43 Site Activity Status Update Received LSRG COMMENTS ON EPA 5-YEAR REPORT RECEIVED
2010-05-19 43 Site Activity Status Update Received LTR 1996 CAP AND COVER DRAWINGS RECEIVED
2010-04-30 43 Site Activity Status Update Received SITE INSPECTION (APRIL 7) REPORT RECEIVED
2010-04-29 99 Miscellaneous MEETING WITH LSGR AND AGENCIES TO DISCUSS CURRENT UNDERSTANDING OF SITE
2010-04-23 43 Site Activity Status Update Received RESPONSE TO EPA MEMO 3/2/2010 REGARDING THIRD QUARTER 2009 MONITORING DATA
2010-04-07 99 Miscellaneous 5-YEAR REVIEW SITE INSPECTION
2010-02-22 43 Site Activity Status Update Received AGENCY COMMENTS ON PUMPING TEST WORKPLAN
2010-02-17 43 Site Activity Status Update Received WATER LEVEL HEAD DEMONSTRATION PROJECT REPORT
2010-02-17 43 Site Activity Status Update Received RECEIVED THIRD QUARTER 2009 DATA PRIVATE WELLS AND MW DATA
2010-02-04 43 Site Activity Status Update Received O&M PROGRESS REPORT #19
2010-02-01 43 Site Activity Status Update Received 3RD QUARTER 2009 MONITORING DATA
2010-01-20 43 Site Activity Status Update Received O & M PROGRESS REPORT 19
2009-12-01 43 Site Activity Status Update Received 2ND QUARTER 2009 MONITORING DATA
2009-11-30 43 Site Activity Status Update Received PUMPING TEST WORKPLAN
2009-08-06 43 Site Activity Status Update Received 1ST QUARTER 2009 MONITORING DATA
2009-06-18 43 Site Activity Status Update Received 4TH QUARTER 2008 MONITORING DATA
2009-06-01 43 Site Activity Status Update Received HYDRAULIC CONTAINMENT ASSESSMENT
2009-05-29 43 Site Activity Status Update Received HYDRAULIC CONTAINMENT ASSESSMENT
2009-05-12 99 Miscellaneous RESIDENTIAL WELL LETTERS MAILED 10/08 RESULTS
2009-04-20 43 Site Activity Status Update Received RESIDENTIAL MONITORING DATA
2009-04-20 43 Site Activity Status Update Received RESPONSES TO 02/19/2009 EPA LETTER
2009-04-17 43 Site Activity Status Update Received RESPONSES TO EPA LETTER ON MNA
2009-04-16 43 Site Activity Status Update Received 3RD QUARTER 2008 MONITORING DATA
2009-03-09 43 Site Activity Status Update Received SUMMARY OF GROUNDWATER PUMP AND TREATMENT REMEDY AND EVALUATION OF SOURCE CONTROL ALTERNATIVES
2009-01-07 92 Operation & Maintenance (O&M) Report Received (non-fee) O&M PROGRESS REPORT #18
2008-12-26 43 Site Activity Status Update Received NATURAL ATTENTUATION SUMMARY REPORT
2008-12-15 43 Site Activity Status Update Received MONITORING REPORT
2008-12-15 43 Site Activity Status Update Received DEEP MONITORING WELL INSTALLATION
2008-11-11 43 Site Activity Status Update Received EPA APPROVAL OF WORKPLAN FOR HEAD LEVEL DEMONSTRATION PROJECT
2008-10-22 43 Site Activity Status Update Received WORKPLAN FOR LEMBERGER LANDFILL WATER LEVEL HEAD DEMO PROJECT
2008-08-14 43 Site Activity Status Update Received FIRST QUARTER 08 DATA RECEIVED
2008-08-14 43 Site Activity Status Update Received MNA SEMI-ANNUAL REPORT #3 RECEIVED
2008-08-07 99 Miscellaneous AGENCY APPROVAL OF DEEP MONITORING WELL INSTALLATION
2008-07-28 36 Site Investigation Workplan (SIWP) Approved SUPPLEMENTAL WORKPLAN FOR MWS APPROVED
2008-06-05 99 Miscellaneous TELCON WITH EPA REGARDING LL LEACHATE WITHDRAWAL
2008-05-28 43 Site Activity Status Update Received FOURTH QUARTER 07 ANALYTICAL RESULTS RECEIVED
2008-05-12 99 Miscellaneous DECEMBER 07 RESIDENTIAL LETTERS MAILED
2008-04-21 43 Site Activity Status Update Received FOURTH QUARTER (DEC 07) RESIDENTIAL DATA RECEIVED
2008-04-18 43 Site Activity Status Update Received EPA RPM CHANGE TO RICHARD BOISE 312-886-4740
2008-04-01 43 Site Activity Status Update Received THIRD QUARTER (SEPT 07) MONITORING DATA RECEIVED
2008-01-30 43 Site Activity Status Update Received SECOND QUARTER 2007 RESIDENTIAL & MONITORING WELL RESULTS RECEIVED
2008-01-29 92 Operation & Maintenance (O&M) Report Received (non-fee) O&M PROGRESS REPORT #17
2008-01-29 92 Operation & Maintenance (O&M) Report Received (non-fee) MNA SEMI-ANNUAL PROGRESS REPORT #2
2008-01-04 43 Site Activity Status Update Received LSRG REQUESTS MEETING TO DISCUSS SUBMITTALS & FUTURE DIRECTION
2008-01-04 43 Site Activity Status Update Received LSRG REQUEST FOR MEETING WITH AGENCIES
2007-12-17 35 Site Investigation Workplan (SIWP) Received (non-fee) SUPPLEMENT WORKPLAN FOR DEEP MONITORING WELL INSTALLATION
2007-10-25 43 Site Activity Status Update Received LEACHATE HEAD EVALUATION REPORT RECEIVED
2007-09-10 99 Miscellaneous JUNE RESIDENTIAL WELL SAMPLING LETTERS MAILED
2007-08-17 43 Site Activity Status Update Received 1ST QUARTER 2007 MONITORING DATA RECEIVED
2007-07-25 43 Site Activity Status Update Received MNA STATUS REPORT NO 1 REC'D
2007-05-14 43 Site Activity Status Update Received MARCH RESIDENTIAL SAMPLING RESULTS RECEIVED
2007-04-23 43 Site Activity Status Update Received 4TH QTR MONITORING RESULTS REC'D
2007-03-21 43 Site Activity Status Update Received
2007-02-26 43 Site Activity Status Update Received THIRD QUARTER 2006 MONITORING RESULTS RECEIVED.
2007-01-16 43 Site Activity Status Update Received SECOND QUARTER 2006 MONITORING DATA RECEIVED
2006-12-28 99 Miscellaneous APRIL/JULY/SEPTEMBER RESIDENTIAL SAMPLING RESULTS MAILED
2006-12-20 43 Site Activity Status Update Received SECOND & THIRD QUARTERS RESIDENTIAL SAMPLING RESULTS
2006-11-24 43 Site Activity Status Update Received O&M PROGRESS REPORT #16 JULY 2005 - JUNE 2006
2006-11-24 43 Site Activity Status Update Received NEW RMT PROJECT MANAGER - KRIS KRAUSE
2006-10-27 43 Site Activity Status Update Received EXPLANATION OF SIGNIFICANT DIFFERENCES FOR MNA PILOT STUDY (SIGNED BY EPA 09/26/2006)
2006-10-25 43 Site Activity Status Update Received CLEAN OUT OF LEACHATE RECOVERY WELLS REPORTED TO EPA
2006-10-12 99 Miscellaneous APPROVAL OF REVISED MONITORING SCHEDULE
2006-08-25 43 Site Activity Status Update Received RESAMPLE LETTERS MAILED
2006-08-07 43 Site Activity Status Update Received SUBSTANTIVE WPDES REQUIREMENTS - NOTIFICATION OF PLANNED CHANGES
2006-07-05 37 Site Investigation Report (SIR) Received (non-fee) FIELD INVESTIGATION OF BEDROCK CHARACTERISTICS REPORT
2006-06-22 43 Site Activity Status Update Received EPA APPROVAL ON MNA WP & QAPP ADDENDUM
2006-06-05 43 Site Activity Status Update Received RESPONSES TO EPA COMMENTS ON QAPP ADDENDUM #1
2006-05-30 43 Site Activity Status Update Received 1ST QTR '06 GW DATA
2006-04-13 43 Site Activity Status Update Received JANUARY RESIDENTIAL WELL SAMPLING RECEIVED
2006-04-13 24 Long Term Monitoring Plan Received (non-Fee) MNA DEMO WORKPLAN REVISION 1 RECEIVED
2006-04-13 43 Site Activity Status Update Received QAPP ADDENDUM FOR MNA DEMO
2006-04-13 43 Site Activity Status Update Received SUPPLEMENTAL QAPP MNA DEMO ANALYTICAL SOP
2006-04-03 43 Site Activity Status Update Received EPA WELL OWNERS LETTERS REGARDING MNA PILOT
2006-03-30 43 Site Activity Status Update Received 4TH QUARTER MONITORING DATA REC'D
2006-03-27 99 Miscellaneous AGENCY RESPONSE TO MNA WORKPLAN COMMENTS
2006-03-09 35 Site Investigation Workplan (SIWP) Received (non-fee) SUPPLEMENTAL WP FOR BEDROCK INVESTIGATION - REVISION 1
2006-03-02 43 Site Activity Status Update Received ADDT'L DRILLING TO START THIS WEEK
2006-02-20 43 Site Activity Status Update Received FOURTH QUARTER GROUNDWATER RESULTS RECEIVED
2006-02-13 43 Site Activity Status Update Received RMT COMMENTS ON MNA WORKPLAN EPA/DNR COMMENTS
2006-02-13 43 Site Activity Status Update Received RMT COMMENTS ON SUPPL BEDROCK WORKPLAN EPA/DNR COMMENTS
2006-01-29 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) COMMENTS ON SUPPLEMENTAL BEDROCK INVESTIGATION
2006-01-10 35 Site Investigation Workplan (SIWP) Received (non-fee) SUPPLEMENTAL WORKPLAN FOR BEDROCK INVESTIGATION
2005-12-22 43 Site Activity Status Update Received ANNUAL & ACUTE TOXICITY TEST BATTERIES
2005-12-22 43 Site Activity Status Update Received 3RD QTR 2005 MONITORING WELL RESULTS
2005-12-21 43 Site Activity Status Update Received APPROVAL TO REDUCT MERCURY EFFLUENT MONITORING
2005-12-01 99 Miscellaneous EPA COMMENTS ON MNA WORKPLAN
2005-11-30 43 Site Activity Status Update Received REQUEST FOR REDUCTION OF MERCURY MONITORING
2005-10-31 99 Miscellaneous COMMENTS TO EPA ON MNA DEMO PROJECT
2005-09-28 92 Operation & Maintenance (O&M) Report Received (non-fee)
2005-09-21 99 Miscellaneous SECOND FIVE-YEAR REPORT SIGNED BY EPA
2005-09-21 326 Superfund Five Year Review Report Signed SECOND FYR
2005-09-15 99 Miscellaneous DRAFT SECOND FIVE-YEAR REPORT SUBMITTED
2005-09-01 43 Site Activity Status Update Received 3RD QTR RESIDENTIAL DATA REC'D
2005-08-30 99 Miscellaneous DRAFT FIVE-YEAR REVIEW SUBMITTED TO EPA
2005-08-17 24 Long Term Monitoring Plan Received (non-Fee) WP FOR MONITORED NATURAL ATTENUATION ENGINEERING DEMONSTRATION PROJECT
2005-07-28 36 Site Investigation Workplan (SIWP) Approved AGENCY APPROVAL FOR BEDROCK INVESTIGATION WP
2005-06-17 43 Site Activity Status Update Received 2ND QTR 2005 RESIDENTIAL WELL SUBMITTAL
2005-06-17 43 Site Activity Status Update Received 1ST QTR 2005 FULL MONITORING REPORT
2005-05-23 43 Site Activity Status Update Received AGENCY REVIEW COMMENTS OF BEDROCK INVESTIGATION WP
2005-05-13 43 Site Activity Status Update Received EW-2D PIPELINE REPAIR SCHEDULED 05/23
2005-04-22 35 Site Investigation Workplan (SIWP) Received (non-fee) WP FOR FIELD INVESTIGATION OF BEDROCK CHARACTERISTICS (AT LTR SITE)
2005-03-04 43 Site Activity Status Update Received EXTRACTION WELL EW-2D PIPELINE LEAK & 4TH QTR 2004 DATA
2005-02-22 3 Notice of Noncompliance (NON) Issued CYANIDE EXCEEDANCE IN EFFLUENT
2005-02-10 99 Miscellaneous MNA ENGINEERING DEMONSTRATION PROPOSAL
2005-01-27 43 Site Activity Status Update Received 4TH QTR '04 RESIDENTIAL WELL DATA
2005-01-19 43 Site Activity Status Update Received EMAIL UPDATE ON SAMPLING COMPLETED AT LEAK
2005-01-11 43 Site Activity Status Update Received TELCON ON EW-2D BURIED PIPELINE LEAK
2004-12-17 43 Site Activity Status Update Received RESULTS OF BAIL DOWN TESTS (AUG '04)
2004-12-14 43 Site Activity Status Update Received ANNUAL ACUTE & CHRONIC TOXICITY TEST RESULTS
2004-11-12 43 Site Activity Status Update Received RESIDENTIAL WELL QUARTERLY RESULTS
2004-11-01 92 Operation & Maintenance (O&M) Report Received (non-fee) O&M PROGRESS REPORT #14
2004-10-19 99 Miscellaneous FINAL REVISED WPDES (SUBSTANTIVE REQUIREMENTS) E-MAILED TO RMT
2004-09-13 170 Registry of Waste Disposal Site Screening Completed
2004-09-13 355 Superfund No Further Remedial Action Planned (NFRAP)
2004-09-13 807 Registry of Waste Disposal Site - SHWIMS Listing
2004-09-13 805 Historic Waste Site
2004-08-15 27 Long Term Monitoring Plan Approved QAPP APPROVAL BY EPA
2004-08-02 24 Long Term Monitoring Plan Received (non-Fee) ADDENDUM TO QUALITY ASSURANCE PROJECT PLAN
2004-07-27 99 Miscellaneous LETTERS TO RESIDENTS - 2ND QTR RESULTS
2004-07-19 99 Miscellaneous EPA/WDNR RESPONSE TO RMT RESPONSE ON O&M #13 & PROPOSED REVISIONS TO GW MONITORING
2004-07-15 41 Remedial Action Report Received 2ND QTR '04 RESIDENTIAL DATA TRANSMITTAL
2004-07-06 41 Remedial Action Report Received ASSESSMENT OF REMEDIAL ACTION EFFECTIVENESS
2004-05-06 99 Miscellaneous QAPP ADDENDUM
2004-05-06 99 Miscellaneous REQUEST CHANGES TO SUBSTANTIVE REQUIREMENTS
2004-04-30 99 Miscellaneous COMMENTS TO EPA ON RESPONSES FROM RMT
2004-04-19 43 Site Activity Status Update Received RESPONSES TO EPA/WDNR, COMMENTS ON O&M #13 AND REVISIONS TO MONITORING PROGRAM
2004-03-11 24 Long Term Monitoring Plan Received (non-Fee) REORGANIZE SUMMARY OF MONITORING PROGRAM
2004-03-11 27 Long Term Monitoring Plan Approved EPA & DNR APPROVAL ON ABOVE
2004-02-25 27 Long Term Monitoring Plan Approved APPROVAL FOR MODIFICATION TO GW MONITORING PLAN
2004-02-16 43 Site Activity Status Update Received QUARTERLY RESIDENTIAL WELL RESULTS REC'D AND MAILED
2004-02-13 99 Miscellaneous HORIZONTAL WELL COORDINATES REC'D
2004-02-06 93 Operation & Maintenance (O&M) Report Approved COMMENTS ON PROPOSED REVISIONS TO GW MONITORING PROGRAM AND O&M REPORT #13
2004-02-06 99 Miscellaneous EPA COMMENTS ON O&M REPORT #13
2004-01-26 99 Miscellaneous EFFLUENT TOXICITY REPORT REVIEW BY DNR
2003-11-17 43 Site Activity Status Update Received 3RD QTR '03 RESIDENTIAL WELL RESULTS
2003-11-03 43 Site Activity Status Update Received SEMI-ANNUAL O&M PROGRESS REPORT #13
2003-10-30 43 Site Activity Status Update Received LEACHATE WITHDRAWAL WELLS REHABILITATION
2003-10-15 24 Long Term Monitoring Plan Received (non-Fee) PROPOSED REVISIONS TO GW MONITORING PROGRAM
2003-10-05 43 Site Activity Status Update Received QTLY SAMPLING SECOND QUARTER - 2003
2003-08-21 43 Site Activity Status Update Received 2ND QUARTER (JUNE) SAMPLING RESULTS
2003-07-24 43 Site Activity Status Update Received FIRST QUARTER 03 MARCH SAMPLING RESULTS
2003-06-09 99 Miscellaneous LEDVINA DRAIN TILE SAMPLE RESULTS LETTER
2003-05-15 43 Site Activity Status Update Received 1ST QUARTER RESIDENTIAL WELL RESULTS
2003-05-09 43 Site Activity Status Update Received PUMP FAILURE/REPLACEMENT & SPRING INSPECTION SCHEDULED
2003-04-11 43 Site Activity Status Update Received O&M REPORT #12 JULY-DEC 2002
2003-03-19 99 Miscellaneous EPA/DNR COMMENTS ON PROGRESS REPORT #11
2003-02-28 43 Site Activity Status Update Received THIRD QUARTER 2002 MONITORING RESULTS
2003-02-05 43 Site Activity Status Update Received JULY 2002 RESIDENTIAL SAMPLING RESULTS
2002-10-22 92 Operation & Maintenance (O&M) Report Received (non-fee) O&M PROGRESS REPORT #11
2002-10-09 43 Site Activity Status Update Received QUARTERLY MONITORING RESULTS
2002-09-10 43 Site Activity Status Update Received SECOND QUARTER PRIVATE WELL RESULTS
2002-07-12 43 Site Activity Status Update Received EPA RESPONSE TO O&M PROGRESS REPORT #10
2002-06-25 99 Miscellaneous COMMENT LETTER ON O&M FORWARDED TO EPA
2002-06-24 43 Site Activity Status Update Received QUARTERLY SAMPLING RESULTS
2002-05-02 43 Site Activity Status Update Received MARCH 2002 WELL SAMPLE RESULTS
2002-04-01 43 Site Activity Status Update Received O&M REPORT #10
2002-03-21 43 Site Activity Status Update Received QUARTERLY MONITORING DATA
2002-02-07 43 Site Activity Status Update Received RESPONSE TO EPA & DNR COMMENTS ON O&M REPORTS # 8 & 9
2002-02-01 43 Site Activity Status Update Received CHRONIC TOXICITY REPORT (WPDES)
2002-01-28 43 Site Activity Status Update Received QUARTERLY MONITORING REPORT
2002-01-24 43 Site Activity Status Update Received QUARTERLY SAMPLING RESULTS
2001-12-07 99 Miscellaneous COMMENTS ON O&M RPT SENT TO EPA
2001-11-28 99 Miscellaneous AGENCY COMMENTS ON PROGRESS REPORT #8
2001-10-29 92 Operation & Maintenance (O&M) Report Received (non-fee)
2001-06-01 43 Site Activity Status Update Received QUARTERLY POTABLE WELL SAMPLING 2001
2001-04-11 92 Operation & Maintenance (O&M) Report Received (non-fee)
2000-11-13 326 Superfund Five Year Review Report Signed FIRST FYR
2000-09-18 92 Operation & Maintenance (O&M) Report Received (non-fee)
2000-03-27 92 Operation & Maintenance (O&M) Report Received (non-fee)
1999-10-05 92 Operation & Maintenance (O&M) Report Received (non-fee)
1999-03-30 92 Operation & Maintenance (O&M) Report Received (non-fee)
1998-10-23 92 Operation & Maintenance (O&M) Report Received (non-fee)
1998-06-15 92 Operation & Maintenance (O&M) Report Received (non-fee)
1997-01-01 43 Site Activity Status Update Received O&M WORKPLAN
1997-01-01 149 Remedial Action (RA) Design Report Approved
1996-12-17 41 Remedial Action Report Received
1993-03-25 39 Remedial Action Options Report (RAOR) Received (non-fee)
1991-09-23 43 Site Activity Status Update Received EPA RECORD OF DECISION
1989-03-23 37 Site Investigation Report (SIR) Received (non-fee)
1984-08-01 351 Superfund Site Assessment Site Inspection (SI)
1984-01-01 1 Notification of Hazardous Substance Discharge
1984-01-01 350 Superfund Site Assessment Preliminary Assessment (PA)
1984-01-01 301 Superfund NPL, NPL Proposed or Alternative Approach Site 301 DATE BASED ON FINAL NPL LISTING DATE
1983-06-01 350 Superfund Site Assessment Preliminary Assessment (PA)
1983-05-01 351 Superfund Site Assessment Site Inspection (SI)
Substances
Substance Type Amt Released Units
Chlorinated Solvents VOC
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Responsible Party
KENNETH LEMBERGER 10007 REIFS MILL RD, WHITELAW, WI 54247
DNR Project Manager
B J LEROY  bruce.leroy@wisconsin.gov
33195 | 02-36-000112
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages