2020-01-13
|
28
|
Phase I Environmental Site Assessment (ESA) Rpt Received
|
|
|
|
2014-01-13
|
99
|
Miscellaneous
|
|
OKAY TO CONSTRUCT LOADING BAYS ON SOUTH SIDE OF BUILDING
|
|
2013-06-04
|
11
|
Activity Closed
|
|
|
|
2013-06-04
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
EXISTING CONCRETE FLOOR
|
|
2013-06-04
|
226
|
Continuing Obligation - Vapor Intrusion Response
|
|
INDUSTRIAL ZONING DUE TO VAPORS E SIDE OF BLDG: PRESS RM, PAINT RM & FRMR HAZ WASTE STORAGE AREA
|
|
2013-06-04
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
MOSTLY LOW LEVEL TCE, RCL EXCED AT CS2 (PAINT AREA), CS4 (PRESS AREA), CS6 AND CS7 (HAZ WASTE STORAG
|
|
2013-06-04
|
236
|
Continuing Obligation - Residual GW Contamination
|
|
PCE, TCE, VC, 12 DCE (ES AT MW4, MW6, PZ7, MW9, PZ13, PZ14R, EXT15 & EXT16)
|
|
2013-06-04
|
56
|
Continuing Obligation(s) Applied
|
|
CAP MAINTENANCE, VAPOR CONCERNS, MAINT INDUSTRIAL LAND USE-ZONING, REMAINING SOIL AND GW CONTAMINAT
|
|
2013-06-04
|
190
|
Remaining Actions Needed Requirements Met or Docs Received
|
|
|
|
2013-06-04
|
46
|
Impacted Right-of-Way (ROW) Notification
|
|
AUTO-POPULATED 2018-03-20
|
|
2013-06-04
|
66
|
Continuing Obligations (COs) Apply at Off-site Property(ies)
|
|
auto-populated on 08/01/2019 per activity relationship to off-site(s)
|
|
2013-04-11
|
84
|
Remaining Actions Needed
|
|
MONITORING WELL ABANDONMENT NEEDED
|
|
2013-04-10
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
Administrative Restart
|
|
2013-04-05
|
79
|
Case Closure Review Request Received
|
|
|
|
2013-04-05
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
ADMIN PAUSE- GEOLOGIC CROSS-SECTION FIGURE, GW ISOCONCENTRATION FIGURE, MW STATUS, OWNER LTR RECEIPT
|
|
2013-04-01
|
779
|
Case Closure Review Fee Received
|
|
CLOSURE FEE PAID PREVIOUSLY
|
|
2013-03-03
|
99
|
Miscellaneous
|
|
NTP WITH SVE DECOMMISSION AND MW ABANDONMENT
|
|
2013-03-01
|
43
|
Site Activity Status Update Received
|
|
SUMMARY OF 2-28-13 PHONE DISCUSSION RECEIVED
|
|
2013-02-27
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
PRE-CLOSURE COMMITTEE MTG, OKAY TO ABANDON RA AND MWS
|
|
2013-02-04
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
APPROVAL: CLOSURE SAMPLING PLAN UNDER VPLE
|
|
2013-01-28
|
43
|
Site Activity Status Update Received
|
|
CLOSURE SAMPLING PLAN UNDER VPLE
|
|
2012-11-28
|
43
|
Site Activity Status Update Received
|
|
TELCON W/CONSULTANT ABOUT SITE EVALUATION REQUEST
|
|
2012-11-06
|
43
|
Site Activity Status Update Received
|
|
REQUEST FOR SITE EVALUATION
|
|
2012-10-25
|
43
|
Site Activity Status Update Received
|
|
EMAIL REPORT RECEIVED: SUMMARY OF SOIL, GROUNDWATER AND VAPOR CONDITIONS
|
|
2012-10-25
|
99
|
Miscellaneous
|
|
FORWARDED EMAILED REPORT REVD SUMMARY OF SOIL, GW, AND VAPOR CONDITIONS TO PROPERTY OWNER RABBI WOLF
|
|
2012-10-19
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUESTED
|
|
2012-08-16
|
43
|
Site Activity Status Update Received
|
|
TELCON WITH CONSULTANT ABOUT CLOSURE OPTIONS
|
|
2012-07-20
|
43
|
Site Activity Status Update Received
|
|
STATUS UPDATE RECEIVED, CONTINUED SVE O&M, TELCON WITH OWNER
|
|
2012-01-04
|
43
|
Site Activity Status Update Received
|
|
SUMMARY OF 12/22/11 DISCUSSION/SSRCL CALCULATIONS, SOIL/GW SAMPLE RESULTS
|
|
2011-12-12
|
99
|
Miscellaneous
|
|
TELCON WITH CONSULTANT RE SOIL SAMPLING RESULTS
|
|
2011-12-09
|
43
|
Site Activity Status Update Received
|
|
SOIL SAMPLING RESULTS RECEIVED
|
|
2011-10-26
|
43
|
Site Activity Status Update Received
|
|
ON-SITE MONITORING WELLS SAMPLED
|
|
2011-08-24
|
99
|
Miscellaneous
|
|
SVE SHUTDOWN PROCEDURE APPROVED
|
|
2011-08-18
|
43
|
Site Activity Status Update Received
|
|
SVE SHUTDOWN PROCEDURE RECEIVED
|
|
2011-07-28
|
149
|
Remedial Action (RA) Design Report Approved
|
|
SVE/EXCAVATION/SAMPLING RA APPROVED
|
|
2011-07-21
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
DESIGN FIGURES FOR SVE RECEIVED
|
|
2011-07-19
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
DESIGN PLANS AND SPECS FOR SVE
|
|
2011-06-21
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
CONDITIONAL WP APPROVAL, NEED TO SUBMIT NR724 DESIGN AND SPECS
|
|
2011-06-03
|
43
|
Site Activity Status Update Received
|
|
HARD COPY OF WORKPLAN FOR REMEDIAL ACTION UNDER VPLE RECEIVED
|
|
2011-05-27
|
99
|
Miscellaneous
|
|
WORK PLAN FOR REMEDIAL ACTION REC'D
|
|
2010-12-16
|
38
|
Site Investigation Report (SIR) Approved
|
|
PHASE II SI WDNR COMMENTS AND APPROVAL
|
|
2010-09-21
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
PHASE II ESA RECEIVED
|
|
2010-08-31
|
99
|
Miscellaneous
|
|
SI/VI REPORT SHOULD BE MAILED TO DNR BY 9/3/10
|
|
2010-01-13
|
99
|
Miscellaneous
|
|
CONFERENCE CALL TO DISCUSS OCT SAMPLING RESULTS AND NEXT STEPS
|
|
2009-12-03
|
99
|
Miscellaneous
|
|
RECEIVED SI DATA AND TELCOM WITH CONSULTANT
|
|
2009-10-07
|
99
|
Miscellaneous
|
|
FIELDWORK COMPLETED OCTOBER 7-9
|
|
2009-09-01
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
REVISED WORKPLAN APPROVED, SITE WORK TO BEGIN OCT 6
|
|
2009-08-25
|
43
|
Site Activity Status Update Received
|
|
REVISED WORKPLAN RECEIVED
|
|
2009-08-25
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
REVISED/FINAL WORKPLAN
|
|
2009-07-29
|
99
|
Miscellaneous
|
|
CONF CALL TO DISCUSS VAPOR INTRUSION SAMPLING
|
|
2009-06-30
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
COMMENTS ON REVISED WORKPLAN FORWARDED TO CONSULTANT
|
|
2009-06-25
|
43
|
Site Activity Status Update Received
|
|
REVISED WP RECEIVED
|
|
2009-06-04
|
43
|
Site Activity Status Update Received
|
|
REVISED WP DUE WEEK OF JUNE 8, FIELD WORK START END OF JUNE
|
|
2009-03-23
|
99
|
Miscellaneous
|
|
TELCON WITH CONSULTANT REGARDING WORKPLAN
|
|
2009-03-19
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUESTED
|
|
2008-12-30
|
99
|
Miscellaneous
|
|
PHASE I & WORKPLAN RESPONSE LETTER - ADDITIONAL WORK NEEDED
|
|
2008-12-03
|
28
|
Phase I Environmental Site Assessment (ESA) Rpt Received
|
|
PHASE I & SITE ASSESSMENT WORKPLAN RECEIVED
|
|
2008-12-03
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
PHASE I & SITE ASSESSMENT WORKPLAN RECEIVED
|
|
2008-09-25
|
99
|
Miscellaneous
|
|
NEED TO EVALUATE VI PATHWAY
|
|
2008-08-29
|
99
|
Miscellaneous
|
|
TRANSFER OF PARTNERSHIP DOCUMENTATION RECEIVED
|
|
2008-08-27
|
99
|
Miscellaneous
|
|
CONFERENCE CALL WITH NEW PARTNER OWNERS
|
|
2008-08-08
|
43
|
Site Activity Status Update Received
|
|
WORKPLAN/PHASE I FOR SITE ASSESSMENT RECEIVED
|
|
2008-08-05
|
43
|
Site Activity Status Update Received
|
|
PHASE I AND WORKPLAN SUBMITTED BY END OF WEEK
|
|
2008-05-29
|
99
|
Miscellaneous
|
|
VPLE APPLICATION & ADVANCED DEPOSIT SUBMITTED
|
|
2008-04-24
|
43
|
Site Activity Status Update Received
|
|
EXPECTS TO ENTER INTO VPLE PROGRAM
|
|
2008-03-12
|
43
|
Site Activity Status Update Received
|
|
TELCON WITH POTENTIAL PURCHASER
|
|
2008-01-03
|
99
|
Miscellaneous
|
|
LETTER CLARIFYING CLOSURE OPTIONS
|
|
2007-11-09
|
99
|
Miscellaneous
|
|
GLC LETTER REQUEST REGARDING OTHER CLOSURE OPTIONS
|
|
2007-09-27
|
43
|
Site Activity Status Update Received
|
|
HISTORICAL WELL ABANDONMENT FORMS FOUND/SCHEDULING ABANDONMENT OF EXISTING WELLS FOR OCTOBER
|
|
2007-08-31
|
99
|
Miscellaneous
|
|
"PENDING" CLOSURE LETTER (2ND CONDITIONAL CLOSURE)
|
|
2007-08-31
|
40
|
Remedial Action Options Report (RAOR) Approved
|
|
ROAR RESULTED IN DECISION TO RESUBMIT FOR CLOSURE
|
|
2007-05-25
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2007-03-30
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUESTED
|
|
2007-03-30
|
43
|
Site Activity Status Update Received
|
|
CLOSURE ADDENDUM REPORT SENT TO INVENSYS FOR REVIEW
|
|
2006-09-27
|
84
|
Remaining Actions Needed
|
|
UPDATED MAPS, FIGURES, TABLES, FEE, CAP MAINT PLAN
|
|
2006-08-22
|
85
|
NR 720.19 Performance Based Closure
|
|
MAINTAIN EXISTING PERVIOUS SURFACE FOR GW PROTECTION
|
|
2006-08-22
|
99
|
Miscellaneous
|
|
UPDATE CLOSURE SUBMITTAL PACKET, ADDT'L FEE NEEDED, CAP PLAN, MW ABANDONMENT
|
|
2006-07-27
|
143
|
Remedial Action Options Report (RAOR) Received (fee)
|
|
|
|
2006-07-27
|
700
|
Database Fee Paid for Groundwater Continuing Obligation(s)
|
|
|
|
2006-04-19
|
99
|
Miscellaneous
|
|
E-MAIL WITH CONSULTANT REGARDING CLOSURE REQUEST
|
|
2006-02-21
|
99
|
Miscellaneous
|
|
TELEPHONE CONFERENCE WITH CONSULTANT REGARDING CLOSURE SUBMITTAL
|
|
2006-01-20
|
179
|
Case Closure Review Request Received (non-fee)
|
|
|
|
2005-05-17
|
99
|
Miscellaneous
|
|
TELCON W/CONSULTANT, WILL SUBMIT FOR CLOSURE
|
|
2005-05-10
|
43
|
Site Activity Status Update Received
|
|
MAY '05 GW RESULTS SUBMITTED
|
|
2005-03-30
|
43
|
Site Activity Status Update Received
|
|
GW MONITORING RESULTS OCT'04 - JAN'05
|
|
2004-11-02
|
99
|
Miscellaneous
|
|
ISSUANCE OF WPDES DISCHARGE PERMIT
|
|
2004-10-06
|
64
|
Inject/Infiltrate Request Approved
|
|
INJECTION APPROVAL (EDIBLE OIL SUBSTRATE)
|
|
2004-09-30
|
43
|
Site Activity Status Update Received
|
|
STS RESPONSE TO NTP
|
|
2004-09-08
|
149
|
Remedial Action (RA) Design Report Approved
|
|
ENHANCED BIOREMEDIATION W/EOS INJECTION NTP
|
|
2004-08-25
|
63
|
Inject/Infiltrate Request Received (fee)
|
|
ENHANCED NA WORKPLAN (EOS)
|
|
2004-06-21
|
99
|
Miscellaneous
|
|
MTG TO DISCUSS EOS INJECTION APPROVAL
|
|
2004-04-30
|
99
|
Miscellaneous
|
|
COMMENTS ON WP
|
|
2004-04-23
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
WP FOR ENHANCED NA
|
|
2004-04-21
|
43
|
Site Activity Status Update Received
|
|
ADDT'L SAMPLING COMPLETE, WILL SUBMIT WORKPLAN SOON.
|
|
2003-12-04
|
43
|
Site Activity Status Update Received
|
|
STATUS UPDATE, WELL SAMPLING: DEC. 15
|
|
2003-10-28
|
99
|
Miscellaneous
|
|
TELCON W/CONSULTANT, QTLY MONITORING STARTUP AGAIN
|
|
2003-10-09
|
99
|
Miscellaneous
|
|
TELCON W/CONSULTANT, SALE OF PROPERTY & CONTINUED WORK EFFORT
|
|
2003-01-27
|
43
|
Site Activity Status Update Received
|
|
TELCON WITH CONSULTANT ABOUT STATUS UPDATE (HAVE PRELIM RAP DONE)
|
|
2002-08-06
|
43
|
Site Activity Status Update Received
|
|
GW SAMPLES, REM. SYSTEM RESTARTED 06/2002, EVALUATING OPTIONS
|
|
2002-07-02
|
99
|
Miscellaneous
|
|
WDNR REQUESTS STATUS UPDATE
|
|
2002-02-05
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY RESULTS AND UPDATE
|
|
2001-10-01
|
80
|
Closure Not Recommended
|
|
NEED MORE GW EXTRACTION/POTENTIAL TCE TOO HIGH NEAR WATER INTAKE
|
|
2001-06-29
|
79
|
Case Closure Review Request Received
|
|
|
|
2001-01-08
|
43
|
Site Activity Status Update Received
|
|
SUPPLEMENTAL CLOSURE INFO
|
|
2000-11-15
|
94
|
Operation & Maintenance (O & M) Report Not Approved
|
|
CLOSURE PLAN REVIEW LETTER - ADDITIONAL WORK REQUIRED
|
|
2000-08-01
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL INFO FOR O&M REPORT
|
|
2000-07-31
|
192
|
Operation & Maintenance (O & M) Report Received (fee)
|
|
O & M WITH CLOSURE OPTIONS IDENTIFIED
|
|
2000-04-10
|
43
|
Site Activity Status Update Received
|
|
PROJECT STATUS & CLOSURE PLANNING MEETING
|
|
1999-10-20
|
43
|
Site Activity Status Update Received
|
|
GW DATA - PUMPING SYSTEM
|
|
1999-09-22
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
10/1996 THROUGH 04/99 PROGRESS REPORT
|
|
1997-02-07
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
1996 PROGRESS REPORT - GROUNDWATER EXTRACTION & TREATMENT SYSTEM
|
|
1995-06-26
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
1995 REPORT AND EXT. 16 CONSTRUCTION
|
|
1994-12-23
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SUMMARY OF ADDITIONAL SUBSURFACE EXPLORATION & REMEDIAL DESIGN EFFORTS
|
|
1994-06-13
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
1994-04-29
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
1993 PROGRESS RPORT & GROUNDWATER EXTRACTION CONSTRUCTION RECORD
|
|
1993-08-16
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
PROGRESS REPORT & DOWNGRADIENT GROUNDWATER EXTRACTION WORK PLAN
|
|
1993-02-16
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
FOURTH QUARTER 1992 PROGRESS REPORT
|
|
1992-09-09
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
WORK PLAN FOR CHARACTERIZING GROUNDWATER QUALITY
|
|
1992-06-03
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
REMEDIAL ACTION P1, VAPOR EMMISIONS
|
|
1992-04-28
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
RESULTS OF SITE ASSESSMENT & CORRECTIVE ACTION
|
|
1992-02-20
|
43
|
Site Activity Status Update Received
|
|
SITE MEETING
|
|
1992-02-11
|
43
|
Site Activity Status Update Received
|
|
PROGRESS REPORT
|
|
1992-01-10
|
43
|
Site Activity Status Update Received
|
|
PROGRESS REPORT
|
|
1991-10-29
|
43
|
Site Activity Status Update Received
|
|
WPDES APPLICATION
|
|
1991-08-27
|
43
|
Site Activity Status Update Received
|
|
PROJECT SCHEDULE FOR TREATMENT SYSTEM
|
|
1991-08-26
|
43
|
Site Activity Status Update Received
|
|
SPILL PREVENTIVE ACTION PLAN
|
|
1991-06-13
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
INITIAL DESIGN AND CONSTRUCTION OF SOIL VAPOR & GROUNDWATER EXTRACTION AND TREATMENT SYSTEM
|
|
1991-04-24
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SOILS AND GROUNDWATER ASSESSMENT FOR A 550 GAL UST MINERAL SPIRITS STORAGE TANK
|
|
1991-02-13
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SUBSURFACE/HYDROGEOLOGIC INVESTIGATION
|
|
1990-09-20
|
2
|
Responsible Party (RP) letter sent
|
|
LUST RP LETTER - ASSUMPTION OF PETROLEUM & OTHER RELEASES FROM USTS
|
|
1990-06-26
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
REVISED CLOSURE OF 12000 GAL DIESEL UST
|
|
1990-05-24
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
CONTAMINATION ASSESSMENT
|
|
1990-03-12
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
REVISED REPORT-AST INSTALL & UST CLOSURE (3 TANKS - 550 GAL MINERAL SPIR, 550 & 2000 GAL CUTTING OIL
|
|
1989-02-24
|
1
|
Notification of Hazardous Substance Discharge
|
|
EPA NOTIFICATION OF SOLVENT SPILLS IN 1983 & 1984
|