02-05-000254
WPSC GREEN BAY MGP (ALT SF)
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / OPEN | DNR RR |
Location Name | County | DNR Region |
---|---|---|
WIS PUBLIC SERVICE CORP (CENTRAL LAB) | BROWN | NORTHEAST |
Address | Municipality |
---|---|
700 N ADAMS ST | GREEN BAY |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
SW 1/4 of the SW 1/4 of Sec 30, T24N, R21E | 44.5183621 | -88.0088717 |
![]() |
![]() |
Additional Location Description |
---|
ALSO REFERRED TO AS 417 ELM ST - PARCEL #11-217-1 |
Additional Activity Details | Acres |
---|---|
UNKNOWN |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
405063890 | WIN000509948 | 1986-01-07 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-06-14 | 43 | Site Activity Status Update Received |
![]() |
MAY 2024 MONTHLY PROGRESS REPORT | |
2024-05-14 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2024 MONTHLY PROGRESS REPORT | |
2024-05-06 | 43 | Site Activity Status Update Received |
![]() |
2024 ANNUAL PROGRESS REPORT AND MASTER SCHEDULE UPDATE | |
2024-04-15 | 43 | Site Activity Status Update Received |
![]() |
MARCH 2024 MONTHLY PROGRESS REPORT | |
2024-03-14 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS ON OU1 (UPLAND) REMEDIAL INVESTIGATION REVISION 0 | |
2024-03-14 | 307 | Superfund Final Remedial Investigation (RI) Approval | |||
2024-03-13 | 43 | Site Activity Status Update Received |
![]() |
FEBRUARY 2024 MONTHLY PROGRESS REPORT | |
2024-03-06 | 43 | Site Activity Status Update Received | FINAL OU2 REMEDIAL INVESTIGATION REPORT REVISION 2 & SEDIMENTS STABILITY MEMO REVISION 2 | ||
2024-03-06 | 99 | Miscellaneous | DNR HAS NO ADDITIONAL COMMENTS ON THE OU2(SEDIMENT) RI REV 2 & STABILITY MEMO REV2 | ||
2024-02-14 | 43 | Site Activity Status Update Received |
![]() |
JANUARY 2024 MONTHLY PROGRESS REPORT | |
2024-02-07 | 99 | Miscellaneous |
![]() |
DNR REVIEW OF OU1 (UPLAND) REMEDIAL INVESTIGATION REVISION 0 | |
2024-01-25 | 364 | VAL and/or VRSL Exceeded | |||
2024-01-12 | 43 | Site Activity Status Update Received |
![]() |
DECEMBER 2023 MONTHLY PROGRESS REPORT | |
2024-01-09 | 43 | Site Activity Status Update Received | REMEDIAL INVESTIGATION REPORT OPERABLE UNIT 1 (UPLAND) REVISION 0 | ||
2024-01-08 | 99 | Miscellaneous |
![]() |
PRELIMINARY STATE ARARS SENT TO EPA | |
2024-01-05 | 99 | Miscellaneous |
![]() |
DNR REVIEW OF REMEDIAL INVESTIGATION OU2 (SEDIMENT) REVISION 2 | |
2023-12-14 | 43 | Site Activity Status Update Received |
![]() |
NOVEMBER 2023 MONTHLY PROGRESS REPORT | |
2023-12-12 | 43 | Site Activity Status Update Received |
![]() |
NOTIFICATION OF SOIL SAMPLING RESULTS TO PROPERTY OWNERS | |
2023-12-08 | 43 | Site Activity Status Update Received |
![]() |
FINAL OU1 REMOVAL ACTION SUMMARY REPORT - NORTH PARKING LOT | |
2023-12-07 | 43 | Site Activity Status Update Received |
![]() |
EPA REVIEW OF OU1 - NORTH PARKING LOT EARLY REMOVAL ACTION SUMMARY REPORT | |
2023-12-07 | 43 | Site Activity Status Update Received | OU2 REMEDIAL INVESTIGATION REVISION 2 WITH SEDIMENT STABILITY MEMO REV1 AND | ||
2023-11-17 | 43 | Site Activity Status Update Received |
![]() |
REVISION 1 OF THE EARLY ACTION SUMMARY REPORT AND RESPONSE TO COMMENTS FOR OU1 NORTH PARKING LOT | |
2023-11-17 | 99 | Miscellaneous | NO DNR COMMENTS ON OU1 EARLY ACTION SUMMARY REPORT REVISION 1 | ||
2023-11-14 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT OCTOBER 2023 | |
2023-10-25 | 43 | Site Activity Status Update Received |
![]() |
EPA REVIEW OF EARLY REMOVAL ACTION SUMMARY REPORT OU2 UTILITY COURT AREA REV 2 - NO COMMENTS | |
2023-10-24 | 43 | Site Activity Status Update Received |
![]() |
EARLY REMOVAL ACTION SUMMARY REPORT OPERABLE UNIT 2 UTILITY COURT AREA REVISION 2 | |
2023-10-13 | 99 | Miscellaneous | NO COMMENTS ON THE EARLY REMOVAL ACTION SUMMARY REPORT FOR OU1 | ||
2023-10-13 | 99 | Miscellaneous | NO COMMENTS ON THE OU2 SEDIMENT STABILITY MONITORING MEMORANDUM | ||
2023-10-13 | 43 | Site Activity Status Update Received |
![]() |
SEPTEMBER 2023 MONTHLY PROGRESS REPORT | |
2023-10-09 | 43 | Site Activity Status Update Received | NO COMMENTS ON THE OU2 EARLY ACTION SUMMARY REPORT - UTILITY COURT COVE REV 1 | ||
2023-09-22 | 43 | Site Activity Status Update Received |
![]() |
EARLY REMOVAL ACTION SUMMARY REPORT - OU2 UTILITY COURT COVE AREA REVISION 1 | |
2023-09-15 | 43 | Site Activity Status Update Received |
![]() |
AUGUST 2023 MONTHLY PROGRESS REPORT | |
2023-09-13 | 43 | Site Activity Status Update Received |
![]() |
EARLY REMOVAL ACTION SUMMARY REPORT OU1 REVISION 0 | |
2023-09-12 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS ON EARLY REMOVAL ACTION SUMMARY REPORT OU2 REVISION 0 | |
2023-09-06 | 99 | Miscellaneous | DNR NO COMMENTS ON THE EARLY REMOVAL ACTION SUMMARY REPORT OU2 REVISION 0 | ||
2023-08-14 | 43 | Site Activity Status Update Received |
![]() |
JULY 2023 MONTHLY PROGRESS REPORT | |
2023-08-04 | 43 | Site Activity Status Update Received |
![]() |
EARLY REMOVAL ACTION SUMMARY REPORT OU2 REVISION 0- UTILITY COURT COVE AREA | |
2023-07-15 | 43 | Site Activity Status Update Received |
![]() |
JUNE 2023 MONTHLY PROGRESS REPORT | |
2023-07-12 | 43 | Site Activity Status Update Received |
![]() |
EPA REVIEW AND RESPONSE ON THE SITE SPECIFIC WORK PLAN ADDENDUM REVISION 1 | |
2023-07-06 | 99 | Miscellaneous | DNR NO COMMENTS ON THE OU2 SEDIMENT STABILITY MONITORING MEMO | ||
2023-06-29 | 43 | Site Activity Status Update Received |
![]() |
SITE SPECIFIC WORK PLAN ADDENDUM REVISION 1 AND RESPONSE TO COMMENTS | |
2023-06-27 | 43 | Site Activity Status Update Received |
![]() |
OU2 SEDIMENT STABILITY MONITORING MEMO | |
2023-06-15 | 43 | Site Activity Status Update Received |
![]() |
MAY 2023 MONTHLY PROGRESS REPORT | |
2023-05-31 | 99 | Miscellaneous |
![]() |
DNR COMMENTS ON THE SITE SPECIFIC WORK PLAN ADDENDUM 1: NO COMMENTS | |
2023-05-16 | 43 | Site Activity Status Update Received |
![]() |
REMEDIAL INVESTIGATION SITE SPECIFIC WORK PLAN ADDENDUM 1: VI AND SOUTH PARKING LOT INVESTIGATION | |
2023-05-12 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2023 MONTHLY PROGRESS REPORT | |
2023-05-05 | 43 | Site Activity Status Update Received |
![]() |
2023 ANNUAL PROGRESS REPORT AND MASTER SCHEDULE UPDATE | |
2023-04-14 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT - MARCH 2023 | |
2023-03-30 | 43 | Site Activity Status Update Received |
![]() |
MODIFIED CONFIRMATION SAMPLING PLAN FOR ZONE 4 EXCAVATION AREA - EARLY REMOVAL ACTION | |
2023-03-14 | 43 | Site Activity Status Update Received |
![]() |
FEBRUARY 2023 MONTHLY PROGRESS REPORT | |
2023-02-24 | 99 | Miscellaneous |
![]() |
DNR COMMENTS ON ERA WP ADDENDUM 1; NO COMMENTS ON THE ERA WP ADDENDUM 1 | |
2023-02-24 | 43 | Site Activity Status Update Received |
![]() |
EPA HAS NO COMMENTS ON THE ERA WP ADDENDUM 1 | |
2023-02-13 | 43 | Site Activity Status Update Received |
![]() |
JANUARY 2023 MONTHLY PROGRESS REPORT | |
2023-02-02 | 43 | Site Activity Status Update Received |
![]() |
EARLY REMOVAL ACTION WORK PLAN ADDENDUM 1 REVISION 0 | |
2023-01-13 | 43 | Site Activity Status Update Received |
![]() |
DECEMBER 2022 MONTHLY PROGRESS REPORT | |
2022-12-13 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT NOVEMBER 2022 | |
2022-11-30 | 43 | Site Activity Status Update Received |
![]() |
11/28/2022 PRE-CONSTRUCTION MEETING MINUTES | |
2022-11-14 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT OCTOBER 2022 | |
2022-10-18 | 122 | Interim Action Plan Received (non-fee) |
![]() |
FINAL EARLY REMOVAL ACTION WORK PLAN REVISION 2 | |
2022-10-14 | 43 | Site Activity Status Update Received |
![]() |
SEPTEMBER 2022 MONTHLY PROGRESS REPORT | |
2022-10-12 | 43 | Site Activity Status Update Received |
![]() |
EPA LETTER; NO ADDITIONAL COMMENT ON EARLY REMOVAL ACTION WORK PLAN | |
2022-09-26 | 122 | Interim Action Plan Received (non-fee) | DRAFT EARLY REMOVAL ACTION WORK PLAN REVISION 2 | ||
2022-09-22 | 43 | Site Activity Status Update Received |
![]() |
RP RESPONSE TO COMMENT REGARDING OFF-SITE NOTIFICATION FOR CONTINUING OBLIGATIONS | |
2022-09-14 | 43 | Site Activity Status Update Received |
![]() |
AUGUST 2022 MONTHLY PROGRESS REPORT | |
2022-09-14 | 99 | Miscellaneous |
![]() |
RESPONSE THAT UPDATED NOTIFICATION TO ALL OFF-SITE PROPERTY OWNERS IS NECESSARY | |
2022-09-09 | 43 | Site Activity Status Update Received |
![]() |
RP QUESTION IF 2004 NOTIFICATION TO CITY OF GREEN BAY SATTISFIES CURRENT NOTIFICATION REQUIREMENT | |
2022-08-31 | 99 | Miscellaneous |
![]() |
DNR COMMENTS ON THE EARLY REMOVAL ACTION WORK PLAN REVISION 1 | |
2022-08-17 | 122 | Interim Action Plan Received (non-fee) |
![]() |
EARLY REMOVAL ACTION WORK PLAN REVISION 1 | |
2022-08-15 | 43 | Site Activity Status Update Received |
![]() |
JULY 2022 MONTHLY PROGRESS REPORT | |
2022-07-21 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS ON THE EARLY REMOVAL ACTION WORK PLAN | |
2022-07-13 | 43 | Site Activity Status Update Received |
![]() |
JUNE 2022 MONTHLY PROGRESS REPORT | |
2022-07-08 | 99 | Miscellaneous |
![]() |
DNR COMMENTS ON EARLY REMOVAL ACTION WORK PLAN | |
2022-06-15 | 43 | Site Activity Status Update Received | MAY 2022 MONTHLY PROGRESS REPORT | ||
2022-06-07 | 122 | Interim Action Plan Received (non-fee) |
![]() |
EARLY REMOVAL ACTION WORK PLAN | |
2022-05-11 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2022 MONTHLY PROGRESS REPORT | |
2022-05-05 | 43 | Site Activity Status Update Received |
![]() |
2021 ANNUAL PROGRESS REPORT AND MASTER SCHEDULE UPDATE | |
2022-04-26 | 43 | Site Activity Status Update Received |
![]() |
EPA AUTHORIZATION LETTER TO CONDUCT VOLUNTARY REMOVAL ACTION | |
2022-04-21 | 43 | Site Activity Status Update Received | EPA RESPONSE TO RP RESPONSE TO COMMENTS (INCLUDED, DATED 4/19/2022) ON UPDATED PROJECT SCHEDULE | ||
2022-04-18 | 43 | Site Activity Status Update Received | EPA COMMENTS ON PROPOSED PROJECT SCHEDULE UPDATE | ||
2022-04-15 | 43 | Site Activity Status Update Received |
![]() |
MARCH 2022 MONTHLY PROGRESS REPORT | |
2022-04-15 | 43 | Site Activity Status Update Received | PROPOSED UPDATED PROJECT SCHEDULE | ||
2022-04-06 | 43 | Site Activity Status Update Received |
![]() |
RESPONSE TO COMMENTS ON PRE-DESIGN INVESTIGATION WORK PLAN ADDENDUM 2 | |
2022-04-06 | 99 | Miscellaneous | DNR NO ADDITIONAL COMMENTS ON THE PRE-DESIGN INVESTIGATION WORK PLAN ADDENDUM 2 | ||
2022-04-06 | 43 | Site Activity Status Update Received | EPA NO ADDITIONAL COMMENTS ON THE PDI WP ADD 2, 3/15/2022 PDI WP ADD 2 FINAL WITH 4/6/2022 RTC | ||
2022-04-04 | 99 | Miscellaneous |
![]() |
DNR NO ADDITIONAL COMMENTS ON THE LETTER OF INTENT REV. 1 | |
2022-04-04 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS ON PRE-DESIGN INVESTIGATION WORK PLAN ADDENDUM 2 | |
2022-04-01 | 99 | Miscellaneous |
![]() |
DNR NO ADDITIONAL COMMENTS ON EAST RIVER TECH MEMO, ALL ADDRESSED /PROPOSED TO BE IN FUTURE REPORTS | |
2022-04-01 | 43 | Site Activity Status Update Received |
![]() |
EPA NO ADDITIONAL COMMENTS AT THIS TIME ON EAST RIVER TECH MEMO | |
2022-03-31 | 43 | Site Activity Status Update Received | RESPONSE TO COMMENTS ON EAST RIVER TECH MEMO | ||
2022-03-25 | 43 | Site Activity Status Update Received |
![]() |
LETTER OF INTENT TO CONDUCT EARLY REMOVAL ACTION REVISION 1 AND RESPONSE TO COMMENTS | |
2022-03-15 | 43 | Site Activity Status Update Received |
![]() |
PRE-DESIGN INVESTIGATION WORK PLAN ADDENDUM 2, ADDITIONAL SOIL SAMPLING | |
2022-03-15 | 43 | Site Activity Status Update Received |
![]() |
FEBRUARY 2022 MONTHLY PROGRESS REPORT | |
2022-03-15 | 99 | Miscellaneous |
![]() |
DNR COMMENTS TO EPA ON THE PDI-WP ADDENDUM 2 | |
2022-03-15 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS ON EAST RIVER SHEEN INVESTIGATION TECH MEMO | |
2022-03-07 | 99 | Miscellaneous |
![]() |
DNR COMMENTS TO EPA ON EAST RIVER SHEEN INVESTIGATION TECH MEMO | |
2022-02-18 | 43 | Site Activity Status Update Received |
![]() |
SUPPLEMENTAL INVESTIGATION OF EAST RIVER SHEEN TECH MEMO | |
2022-02-15 | 43 | Site Activity Status Update Received |
![]() |
JANUARY 2022 MONTHLY PROGRESS REPORT | |
2022-02-02 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER SAMPLING RESULTS THIRD PARTY NOTIFICATIONS | |
2022-01-18 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS REGARDING UTILITY CORRIDOR INVESTIGATION WORK PLAN (PDI WP ADDENDUM 1) | |
2022-01-14 | 43 | Site Activity Status Update Received |
![]() |
DECEMBER 2021 MONTHLY PROGRESS REPORT | |
2022-01-06 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS ON REMEDIAL INVESTIGATION REPORT REV. 1 ADDENDUM 1 FOR OU2 (SEDIMENT) | |
2022-01-05 | 99 | Miscellaneous |
![]() |
DNR RESPONSE TO EPA REGARDING PDI WP ADDENDUM 1 DATED 12/21/2021, DNR HAS NO COMMENTS | |
2021-12-21 | 43 | Site Activity Status Update Received |
![]() |
PRE-DESIGN INVESTIGATION WORK PLAN ADDENDUM 1 - UTILITY CORRIDOR INVESTIGATION | |
2021-12-15 | 43 | Site Activity Status Update Received |
![]() |
NOVEMBER 2021 MONTHLY PROGRESS REPORT | |
2021-11-15 | 43 | Site Activity Status Update Received |
![]() |
OCTOBER 2021 MONTHLY PROGRESS REPORT | |
2021-10-14 | 43 | Site Activity Status Update Received |
![]() |
SEPTEMBER 2021 MONTHLY PROGRESS REPORT | |
2021-09-10 | 43 | Site Activity Status Update Received |
![]() |
AUGUST 2021 MONTHLY PROGRESS REPORT | |
2021-08-16 | 43 | Site Activity Status Update Received |
![]() |
JULY 2021 MONTHLY PROGRESS REPORT | |
2021-07-27 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER MONITORING SAMPLING RESULTS NOTIFICATION TO PROPERTY OWNERS | |
2021-07-15 | 43 | Site Activity Status Update Received |
![]() |
JUNE 2021 MONTHLY PROGRESS REPORT | |
2021-06-14 | 43 | Site Activity Status Update Received |
![]() |
MAY 2021 MONTHLY PROGRESS REPORT | |
2021-05-26 | 99 | Miscellaneous |
![]() |
DNR COMMENTS ON OU2 REMEDIAL INVESTIGATION REV. 1 | |
2021-05-14 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2021 MONTHLY PROGRESS REPORT | |
2021-05-05 | 43 | Site Activity Status Update Received |
![]() |
2021 ANNUAL MULTI-SITE PROGRESS REPORT | |
2021-04-14 | 43 | Site Activity Status Update Received |
![]() |
MARCH 2021 MONTHLY PROGRESS REPORT | |
2021-04-09 | 99 | Miscellaneous |
![]() |
DNR RESPONSE TO NR700 SPECIFIC COMMENT RESPONSES | |
2021-04-06 | 130 | DNR Regulatory Reminder Sent |
![]() |
VAPOR INTRUSION AND TCE REMINDER LETTER | |
2021-03-30 | 43 | Site Activity Status Update Received |
![]() |
WPS RESPONSE TO NR700 SPECIFIC COMMENTS | |
2021-03-15 | 43 | Site Activity Status Update Received |
![]() |
FEBRUARY 2021 MONTHLY PROGRESS REPORT | |
2021-02-19 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS REGARDING LETTER OF INTENT | |
2021-02-19 | 37 | Site Investigation Report (SIR) Received (non-fee) | OU2 RI REVISION 1 | ||
2021-02-11 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT JANUARY 2021 | |
2021-02-09 | 99 | Miscellaneous |
![]() |
DNR RESPONSE TO COMMENT RESPONSES FROM WPS ON THE UPLAND RI TECH MEMO | |
2021-02-04 | 99 | Miscellaneous |
![]() |
DNR COMMENTS ON LETTER OF INTENT TO CONDUCT EARLY REMOVAL ACTION | |
2021-02-01 | 43 | Site Activity Status Update Received |
![]() |
RESPONSE TO COMMENTS ON THE UPLAND RI TECH MEMO | |
2021-01-15 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT DECEMBER 2020 | |
2020-12-15 | 43 | Site Activity Status Update Received |
![]() |
NOVEMBER 2020 MONTHLY PROGRESS REPORT | |
2020-12-07 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS ON UPLAND RI DATA SUMMARY | |
2020-12-02 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS ON OU2 (SEDIMENT) RI REPORT | |
2020-11-18 | 99 | Miscellaneous |
![]() |
DNR COMMENTS TO EPA FOR THE UPLAND RI SUMMARY DATA REPORT | |
2020-11-18 | 99 | Miscellaneous |
![]() |
DNR RESPONSE TO WPS NR700 SPECIFIC COMMENT RESPONSE | |
2020-11-13 | 43 | Site Activity Status Update Received |
![]() |
OCTOBER 2020 PROGRESS REPORT | |
2020-11-12 | 43 | Site Activity Status Update Received |
![]() |
RESPONSE TO NR700 SPECIFIC COMMENTS | |
2020-11-11 | 99 | Miscellaneous |
![]() |
DNR COMMENTS SPECIFIC TO NR700 ARARS FOR THE UPLAND RI SUMMARY DATA REPORT | |
2020-11-06 | 99 | Miscellaneous |
![]() |
DNR COMMENTS FOR SEDIMENT RI REV 0 | |
2020-11-06 | 99 | Miscellaneous |
![]() |
DNR REQUEST FOR ADDITIONAL EVALUATION FOR NR700 ARARS IN THE UPLAND | |
2020-10-15 | 43 | Site Activity Status Update Received |
![]() |
SEPTEMBER 2020 MONTHLY PROGRESS REPORT | |
2020-09-28 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SEDIMENT REMEDIAL INVESTIGATION REPORT - REV 0 | |
2020-09-18 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
UPLAND RI DATA SUMMARY REV 0 | |
2020-09-14 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT AUGUST 2020 | |
2020-09-11 | 43 | Site Activity Status Update Received |
![]() |
DAILY PDI STATUS UPDATE (9/10/2020) | |
2020-08-31 | 43 | Site Activity Status Update Received |
![]() |
DAILY PDI STATUS UPDATE (8/28/2020 & 8/29/2020) | |
2020-08-27 | 43 | Site Activity Status Update Received |
![]() |
PDI DAILY STATUS UPDATE (8/27/2020) | |
2020-08-26 | 43 | Site Activity Status Update Received |
![]() |
DAILY PDI STATUS UPDATE (8/26/2020) | |
2020-08-25 | 43 | Site Activity Status Update Received |
![]() |
DAILY PDI STATUS UPDATE (8/25/2020) | |
2020-08-21 | 43 | Site Activity Status Update Received |
![]() |
EPA APPROVAL OF REVISED PDI WORK PLAN | |
2020-08-20 | 99 | Miscellaneous |
![]() |
DNR APPROVAL OF REVISED PDI WORK PLAN | |
2020-08-17 | 130 | DNR Regulatory Reminder Sent |
![]() |
EMERGING CONTAMINANTS REMINDER LETTER | |
2020-08-14 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT (JULY 2020) | |
2020-08-12 | 43 | Site Activity Status Update Received |
![]() |
REVISED PDI WORK PLAN REV 1 | |
2020-07-30 | 43 | Site Activity Status Update Received | NOTIFICATION TO OFF-SITE PROPERTY OWNERS OF GROUNDWATER SAMPLING RESULTS | ||
2020-07-15 | 43 | Site Activity Status Update Received |
![]() |
JUNE 2020 PROGRESS REPORT | |
2020-06-15 | 43 | Site Activity Status Update Received |
![]() |
MAY 2020 PROGRESS REPORT | |
2020-05-29 | 43 | Site Activity Status Update Received |
![]() |
EPA COMMENTS ON PRE-DESIGN INVESTIGATION WORKPLAN | |
2020-05-20 | 99 | Miscellaneous |
![]() |
WDNR COMMENTS ON PRE-DESIGN INVESTIGATION WORKPLAN TO EPA | |
2020-05-18 | 43 | Site Activity Status Update Received | NORTH FOCUS AREA REMEDIAL ACTION SUMMARY REPORT REV 1 | ||
2020-05-15 | 43 | Site Activity Status Update Received |
![]() |
PROGRESS REPORT APRIL 2020 | |
2020-05-07 | 43 | Site Activity Status Update Received |
![]() |
UPDATED FIGURE 8, PRE-DESIGN INVESTIGATION WORK PLAN | |
2020-05-04 | 43 | Site Activity Status Update Received |
![]() |
2020 ANNUAL PROGRESS REPORT & MASTER SCHEDULE UPDATE | |
2020-04-14 | 43 | Site Activity Status Update Received |
![]() |
MARCH 2020 MONTHLY PROGRESS REPORT | |
2020-03-31 | 43 | Site Activity Status Update Received |
![]() |
ADDENDUM TO THE FINAL 2019 UPDATE TO PHASE 2B REMEDIAL ACTION WORK PLAN MGP NORTH FOCUS AREA | |
2020-03-18 | 43 | Site Activity Status Update Received |
![]() |
PRE-DESIGN INVESTIGATION WORK PLAN | |
2020-03-13 | 43 | Site Activity Status Update Received |
![]() |
FEBRUARY 2020 PROGRESS REPORT | |
2020-02-14 | 43 | Site Activity Status Update Received |
![]() |
JANUARY 2020 MONTHLY PROGRESS REPORT | |
2020-01-13 | 43 | Site Activity Status Update Received |
![]() |
DECEMBER 2019 PROGRESS REPORT | |
2019-12-30 | 43 | Site Activity Status Update Received |
![]() |
3RD PARTY NOTIFICATIONS OF SAMPLING RESULTS | |
2019-12-15 | 43 | Site Activity Status Update Received |
![]() |
NOVEMBER 2019 PROGRESS REPORT | |
2019-11-14 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT - OCTOBER 2019 | |
2019-10-15 | 43 | Site Activity Status Update Received |
![]() |
MONTHLY PROGRESS REPORT - SEPTEMBER 2019 | |
2019-09-30 | 43 | Site Activity Status Update Received | SEDIMENT SAMPLE RESULTS FROM NORTH & SOUTH FOCUS AREAS | ||
2019-09-16 | 43 | Site Activity Status Update Received |
![]() |
AUGUST 2019 PROGRESS REPORT | |
2019-08-16 | 43 | Site Activity Status Update Received |
![]() |
JULY 2019 MONTHLY PROGRESS REPORT | |
2019-07-29 | 43 | Site Activity Status Update Received |
![]() |
MGP SEDIMENT SAMPLING SCHEDULE & ADDT'L SAMPLING | |
2019-07-12 | 43 | Site Activity Status Update Received |
![]() |
JUNE 2019 MONTHLY PROGRESS REPORT | |
2019-07-08 | 99 | Miscellaneous |
![]() |
NOTIFICATION OF CHANGE OF PROJECT MANAGER (KRUEGER) | |
2019-07-03 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER RESULTS NOTIFICATION | |
2019-06-14 | 43 | Site Activity Status Update Received |
![]() |
MAY 2019 PROGRESS REPORT | |
2019-06-05 | 43 | Site Activity Status Update Received | RESPONSE TO COMMENTS, SOUTH FOCUS AREA REMEDIAL ACTION SUMMARY | ||
2019-06-04 | 43 | Site Activity Status Update Received |
![]() |
NORTH FOCUS AREA DAILY REPORT | |
2019-05-14 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2019 PROGRESS REPORT | |
2019-05-06 | 43 | Site Activity Status Update Received |
![]() |
ANNUAL STATUS REPORT FOR WPS MGP SITES | |
2019-04-15 | 43 | Site Activity Status Update Received |
![]() |
MARCH 2019 PROGRESS REPORT | |
2019-03-14 | 43 | Site Activity Status Update Received |
![]() |
FEBRUARY 2019 PROGRESS REPORT | |
2019-02-14 | 43 | Site Activity Status Update Received |
![]() |
JANUARY 2019 PROGRESS REPORT | |
2019-01-15 | 43 | Site Activity Status Update Received |
![]() |
DECEMBER 2018 PROGRESS REPORT | |
2018-12-21 | 43 | Site Activity Status Update Received | GROUNDWATER RESULTS NOTIFICATIONS | ||
2018-12-13 | 43 | Site Activity Status Update Received |
![]() |
NOVEMBER 2018 PROGRESS REPORT | |
2018-11-15 | 43 | Site Activity Status Update Received |
![]() |
OCTOBER 2018 PROGRESS REPORT | |
2018-10-15 | 43 | Site Activity Status Update Received | SEPTEMBER 2018 PROGRESS REPORT | ||
2018-09-14 | 43 | Site Activity Status Update Received |
![]() |
AUGUST 2018 PROGRESS REPORT | |
2018-08-15 | 43 | Site Activity Status Update Received |
![]() |
JULY 2018 PROGRESS REPORT | |
2018-07-30 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER RESULTS NOTIFICATION | |
2018-07-16 | 43 | Site Activity Status Update Received |
![]() |
JUNE 2018 PROGRESS REPORT | |
2018-06-15 | 43 | Site Activity Status Update Received |
![]() |
MAY 2018 PROGRESS REPORT | |
2018-06-11 | - | Website URL |
![]() |
WPSC Green Bay MGP EPA Superfund NPL/SAA Website This EPA website contains additional information about this Activity. | |
2018-06-05 | 43 | Site Activity Status Update Received | RESPONSE TO COMMENTS, SOUTH FOCUS AREA REMEDIAL ACTION SUMMARY | ||
2018-05-15 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2018 PROGRESS REPORT | |
2018-04-13 | 43 | Site Activity Status Update Received |
![]() |
MARCH 2018 PROGRESS REPORT | |
2018-03-15 | 43 | Site Activity Status Update Received | FEBRUARY 2018 PROGRESS REPORT | ||
2018-02-15 | 43 | Site Activity Status Update Received | JANUARY 2018 PROGRESS REPORT | ||
2018-01-29 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER RESULTS NOTIFICATION | |
2018-01-15 | 43 | Site Activity Status Update Received |
![]() |
DECEMBER 2017 PROGRESS REPORT | |
2018-01-04 | 99 | Miscellaneous |
![]() |
EPA COMMENTS REGARDING MULTI-SITE QAPP ADDENDUM 3 DATED 11/3/2017 | |
2017-12-08 | 43 | Site Activity Status Update Received | PROPOSED PROJECT SCHEDULE | ||
2017-11-28 | 43 | Site Activity Status Update Received |
![]() |
OCTOBER 2017 MONTHLY PROGRESS REPORT | |
2017-11-07 | 43 | Site Activity Status Update Received | RESPONSE TO EPA 11/06/2017 REQUEST FOR STATUS UPDATE | ||
2017-11-06 | 99 | Miscellaneous | EPA REQUEST FOR STATUS UPDATE REGARDING DELIVERABLE DUE THE END OF OCT 2017 | ||
2017-11-06 | 43 | Site Activity Status Update Received | MULTI-SITE QAPP - ADDENDUM #3 | ||
2017-11-01 | 43 | Site Activity Status Update Received |
![]() |
WPS TO MOVE FORWARD W/NAPL MOBILITY SAMPLING PRIOR TO RECEIVING FORMAL APPROVAL FROM THE AGENCIES | |
2017-10-31 | 43 | Site Activity Status Update Received |
![]() |
SEPTEMBER 2017 US EPA MONTHLY PROGRESS REPORT | |
2017-10-30 | 43 | Site Activity Status Update Received |
![]() |
NAPL MOBILITY TESTING AND PATH FORWARD | |
2017-10-27 | 99 | Miscellaneous |
![]() |
CONTINUE NAPL MOBILITY DISCUSSIONS DURING OCT 31 BI-WEEKLY CALL | |
2017-10-20 | 99 | Miscellaneous |
![]() |
DNAPL MOBILITY SAMPLING PUT ON HOLD. REQUEST FOR A SAMPLING & ANALYSIS PLAN | |
2017-10-18 | 43 | Site Activity Status Update Received | DRILLING DATE CHANGED, REDUCED SAMPLING, REVISED SAMPLE LOCATION & DOCUMENTS ADDED TO DNR FTP SITE | ||
2017-10-17 | 99 | Miscellaneous |
![]() |
NEW DATE FOR SEDIMENT SAMPLING | |
2017-10-16 | 43 | Site Activity Status Update Received | 3D MODEL FOR DNAPL DELINEATION | ||
2017-10-12 | 99 | Miscellaneous |
![]() |
10/13/2017 MEETING MINUTES & AGENDA FOR 10/17/2017 CALL | |
2017-09-27 | 99 | Miscellaneous |
![]() |
ADDT'L EPA COMMENTS TO RP REGARDING DNAPLT MOBILITY TESTING | |
2017-09-25 | 99 | Miscellaneous | EPA COMMENTS TO RP REGARDING DNAPL MOBILITY | ||
2017-09-25 | 43 | Site Activity Status Update Received |
![]() |
RP RESPONSE TO EPA COMMENTS REGARDING DNAPL MOBILITY | |
2017-09-20 | 43 | Site Activity Status Update Received |
![]() |
AUGUST 2017 MONTHLY PROGRESS REPORT | |
2017-09-20 | 99 | Miscellaneous | ACTION ITEMS FROM SEPTEMBER 19 2017 MEETING | ||
2017-09-05 | 43 | Site Activity Status Update Received |
![]() |
RECENT SAMPLING RESULTS | |
2017-08-22 | 43 | Site Activity Status Update Received |
![]() |
JULY 2017 MONTHLY PROGRESS REPORT | |
2017-08-09 | 99 | Miscellaneous | EPA COMMENTS TO WPS REGARDING SOUTH FOCUS AREA DRAFT CONCEPT DREDGE DESIGNS | ||
2017-08-07 | 99 | Miscellaneous |
![]() |
DNR RESPONSE TO EPA REGARDING SOUTH FOCUS AREA DRAFT CONCEPT DREDGE DESIGNS | |
2017-08-03 | 99 | Miscellaneous |
![]() |
EPA COMMENTS TO WPS REGARDING SOUTH FOCUS AREA DRAFT CONCEPT DREDGE DESIGNS | |
2017-07-21 | 43 | Site Activity Status Update Received |
![]() |
JUNE 2017 MONTHLY PROGRESS REPORT | |
2017-07-17 | 43 | Site Activity Status Update Received |
![]() |
MAY 2017 MONTHLY PROGRESS REPORT | |
2017-05-25 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2017 MONTHLY PROGRESS REPORT | |
2017-05-25 | 43 | Site Activity Status Update Received |
![]() |
2017 ANNUAL PROGRESS REPORT & MASTER SCHEDULE UPDATE - REV 0 | |
2017-04-21 | 43 | Site Activity Status Update Received | MARCH 2017 MOTHLY PROGRESS REPORT | ||
2017-03-21 | 43 | Site Activity Status Update Received |
![]() |
FEBRUARY 2017 MONTHLY PROGRESS REPORT | |
2017-03-20 | 99 | Miscellaneous | EPA RESPONSE TO DNR COMMENTS REGARDING DRAFT SEDIMENT CONFIRMATION SAMPLING DECISION TREE | ||
2017-03-17 | 99 | Miscellaneous | DNR COMMENTS TO EPA REGARDING DRAFT SEDIMENT CONFIRMATION SAMPLING DECISION TREE | ||
2017-03-14 | 99 | Miscellaneous | EPA PROVIDED DNR WITH A DRAFT SEDIMENT DECISION TREE | ||
2017-03-06 | 43 | Site Activity Status Update Received | RP RESPONSE TO EPA COMMENTS REGARDING DNAPL INVESTIGATION WORK PLAN | ||
2017-03-04 | 99 | Miscellaneous | EPA RESPONSE TO RP REGARDING DNAPL INVESTIGATION WORK PLAN | ||
2017-03-01 | 99 | Miscellaneous | DNR COMMENTS REGARDING WORK PLAN SUBMITTED ON 02/27/2017 | ||
2017-02-27 | 43 | Site Activity Status Update Received | WORK PLAN FOR VISUALLY MAPPING THE EXTENT OF MGP DNAPL IN SEDIMENT NEAR THE EAST RIVER TURNING BASIN | ||
2017-02-23 | 43 | Site Activity Status Update Received | DNAPL DELINEATION APPROACH | ||
2017-02-22 | 99 | Miscellaneous | DNAPL DELINEATION APPROACH | ||
2017-02-21 | 43 | Site Activity Status Update Received | JANUARY 2017 MONTHLY PROGRESS REPORT | ||
2017-01-23 | 43 | Site Activity Status Update Received | DECEMBER 2016 MONTHLY PROGRESS REPORT | ||
2017-01-04 | 43 | Site Activity Status Update Received |
![]() |
NOVEMBER 2016 MONTHLY PROGRESS REPORT | |
2016-12-22 | 99 | Miscellaneous | EPA APPROVAL W/MODIFICATIONS OF VAPOR INTRUSION TECHNICAL MEMO 3 | ||
2016-11-14 | 43 | Site Activity Status Update Received | OCTOVER 2016 MONTHLY PROGRESS REPORT | ||
2016-10-28 | 99 | Miscellaneous | MGP DNAPL INVESTIGATION DOCUMENTATION | ||
2016-10-26 | 43 | Site Activity Status Update Received | PROPOSED MGP DREDGING POSTPONED UNTIL 2017 | ||
2016-10-25 | 43 | Site Activity Status Update Received | BOOM DEPLOYMENT IN CASE OF NAPL | ||
2016-10-25 | 43 | Site Activity Status Update Received | CROSS SECTIONS | ||
2016-10-25 | 99 | Miscellaneous | TAX EXEMPTION - MGP MATERIAL | ||
2016-10-25 | 99 | Miscellaneous | DREDGING IN EAST RIVER TURNING BASIN AREA | ||
2016-10-24 | 99 | Miscellaneous | NAPL OBSERVATION FIELD WORK, 10/21/2016 TETRATECH SUBMITTAL DREDGING EAST RIVER TURNING BASIN AREA | ||
2016-10-24 | 99 | Miscellaneous | DREDGING IN EAST RIVER TURNING BASIN AREA | ||
2016-10-24 | 43 | Site Activity Status Update Received | SEPTEMBER 2016 MONTHLY PROGRESS REPORT | ||
2016-10-24 | 99 | Miscellaneous | DREDGING IN THE EAST RIVER TURNING BASIN AREA | ||
2016-10-24 | 99 | Miscellaneous | DREDGING IN THE EAST RIVER TURNING BASIN AREA | ||
2016-10-24 | 43 | Site Activity Status Update Received | NAPL SAMPLING REPORT | ||
2016-10-13 | 43 | Site Activity Status Update Received | AUGUST 2016 MONTHLY PROGRESS REPORT | ||
2016-08-29 | 43 | Site Activity Status Update Received | JULY 2016 MONTHLY PROGRESS REPORT | ||
2016-07-26 | 43 | Site Activity Status Update Received | MONTHLY PROGRESS REPORT | ||
2016-07-26 | 43 | Site Activity Status Update Received | VAPOR INTRUSION TECHNICAL MEMO & RESPONSE TO USEPA COMMENTS | ||
2016-07-26 | 99 | Miscellaneous | EPA RESPONSE TO 07/26/2016 TECHNICAL MEMO | ||
2016-06-21 | 43 | Site Activity Status Update Received | MAY 2016 MONTHLY PROGRESS REPORT | ||
2016-06-21 | 99 | Miscellaneous | RESPONSE TO EPAS 06/14/2016 COMMENTS ON 2016 ANNUAL PROGRESS RPT & MASTER SCHEDULE UPDATE - REV 0 | ||
2016-06-14 | 99 | Miscellaneous | EPA COMMENTS TO RP REGARDING 2016 ANNUAL PROGRESS REPORT & MASTER SCHEDULE UPDATE - REV 0 | ||
2016-06-13 | 43 | Site Activity Status Update Received | APRIL 2016 MONTHLY PROGRESS REPORT | ||
2016-06-06 | 99 | Miscellaneous | DNR PROVIDED COMMENTS TO EPA REGARDING 2016 ANNUAL PROGRESS REPORT & MASTER SCHEDULE - REVISION 0 | ||
2016-06-06 | 43 | Site Activity Status Update Received | TECHNICAL MEMO #1 - SUPPLEMENTAL ACTIVITIES - VI EVALUATION | ||
2016-05-11 | 43 | Site Activity Status Update Received | 2015 ANNUAL PROGRESS REPORT & MASTER SCHEDULE UPDATE - REVISION 0 | ||
2016-04-21 | 43 | Site Activity Status Update Received | MARCH 2016 MONTHLY PROGRESS REPORT | ||
2016-03-22 | 43 | Site Activity Status Update Received | FEBRUARY 2016 MONTHLY PROGRESS REPORT | ||
2016-03-18 | 43 | Site Activity Status Update Received | CH2M FIELD OVERSIGHT REPORT - FEBRUARY 2016 | ||
2016-02-18 | 43 | Site Activity Status Update Received | JANUARY 2016 MONTHLY PROGRESS REPORT | ||
2016-01-04 | 43 | Site Activity Status Update Received | NOV 2015 MONTHLY PROGRESS REPORT | ||
2015-12-17 | 99 | Miscellaneous | DNR RESPONSE TO VAPOR INTRUSION EVALUATIONS | ||
2015-12-17 | 99 | Miscellaneous | EPA RESPONSE TO VAPOR INTRUSION EVALUATIONS | ||
2015-12-01 | 43 | Site Activity Status Update Received | REVISED VAPOR INTRUSION DECISION MATRIX | ||
2015-12-01 | 43 | Site Activity Status Update Received | REVISED VAPOR INTRUSION DECISION MATRIX | ||
2015-11-19 | 43 | Site Activity Status Update Received | OCT 2015 MONTHLY PROGRESS REPORT | ||
2015-11-04 | 99 | Miscellaneous | TECH MEMO - CH2M FIELD OVERSIGHT | ||
2015-10-22 | 99 | Miscellaneous | EPA RESPONSE TO VAPOR INTRUSION EVALUATIONS | ||
2015-10-20 | 43 | Site Activity Status Update Received | SEPT 2015 MONTHLY PROGRESS REPORT | ||
2015-10-20 | 43 | Site Activity Status Update Received | SSWP FOR UPLAND AREAS-REV 2 | ||
2015-10-13 | 99 | Miscellaneous | DNR COMMENTS REGARDING VAPOR INTRUSION EVALUATIONS | ||
2015-09-29 | 99 | Miscellaneous | EPA RESPONSE TO FOCUSED SED INVEST RPT-REV 2 | ||
2015-09-28 | 43 | Site Activity Status Update Received | VAPOR INTRUSION EVALUATIONS | ||
2015-09-21 | 43 | Site Activity Status Update Received | AUGUST MONTHLY PROGRESS REPORT | ||
2015-09-21 | 43 | Site Activity Status Update Received | RESPONSE TO EPA COMMENTS -FOCUSED SED INVEST RPT-REV 2 | ||
2015-08-24 | 43 | Site Activity Status Update Received | JULY 2015 MONTHY PROGRESS REPORT | ||
2015-08-05 | 43 | Site Activity Status Update Received | VAPOR INTRUSION EVALUATIONS | ||
2015-07-31 | 99 | Miscellaneous | EPA RESPONSE TO FOCUSED SED INVEST RPT- REV 2 | ||
2015-07-20 | 43 | Site Activity Status Update Received | JUN MONTHLY PROGRESS REPORT | ||
2015-07-15 | 99 | Miscellaneous | DNR PROVIDED COMMENTS TO EPA RE: FOCUSED SEDIMENT REPORT REC'D 06/29/2015 | ||
2015-07-07 | 43 | Site Activity Status Update Received | VAPOR INTRUSION EVALUATIONS | ||
2015-06-29 | 43 | Site Activity Status Update Received | FOCUSED SEDIMENT INVEST RPT-REVISION 2 & RESPONSE TO USEPA REVISION 1 COMMENTS | ||
2015-06-18 | 43 | Site Activity Status Update Received | MAY 2015 MONTHLY PROGRESS REPORT | ||
2015-06-02 | 43 | Site Activity Status Update Received | DNR PROVIDED COMMENTS TO EPA RE: 2015 ANNUAL PROGRESS REPORT & MASTER SCHEDULE UPDATE - REVISION 0 | ||
2015-05-21 | 99 | Miscellaneous | EPA PROVIDED RP W/COMMENTS RE: FOCUSED SEDIMENT INVESTIGATION REPORT - REVISION 1 | ||
2015-05-19 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2015 MONTHLY PROGRESS REPORT | |
2015-05-14 | 99 | Miscellaneous | DNR PROVIDED COMMENTS TO EPA RE: FOCUSED SEDIMENT REPORTS REC'D ON 05/12/2015 | ||
2015-05-12 | 43 | Site Activity Status Update Received | FOCUSED SEDIMENT INVEST RPT-REVISION 1 & RESPONSE TO USEPA FOCUSED INVEST RPT-REVISION, 0 COMMENTS | ||
2015-05-11 | 43 | Site Activity Status Update Received | 2015 ANNUAL PROGRESS REPORT & MASTER SCHEDULE UPDATE | ||
2015-03-17 | 43 | Site Activity Status Update Received | SITE-SPECIFIC WORK PLAN FOR UPLAND AREAS - REVISION 2 | ||
2015-03-12 | 43 | Site Activity Status Update Received | FEB 2015 MONTHLY PROGRESS REPORT | ||
2015-02-19 | 43 | Site Activity Status Update Received | JANUARY 2015 MONTHLY PROGRESS REPORT | ||
2015-02-19 | 43 | Site Activity Status Update Received | JAN 2015 MONTHLY PROGRESS REPORT | ||
2015-02-11 | 43 | Site Activity Status Update Received | FOCUSED SEDIMENT INVESTIGATION REPORT - REVISION 0 | ||
2015-01-26 | 99 | Miscellaneous | EPA PROVIDED COMMENTS TO RP REGARDING 01/05/2015 SSWP - REV 1 SUBMITTAL | ||
2015-01-23 | 99 | Miscellaneous | DNR PROVIDED COMMENTS TO EPA REGARDING 01/05/2015 SSWP - REV 1 SUBMITTAL | ||
2015-01-20 | 43 | Site Activity Status Update Received | DECEMBER 2014 MONTHLY PROGRESS REPORT | ||
2015-01-12 | 43 | Site Activity Status Update Received | JAN 7, 2015 MEETING NOTES | ||
2015-01-05 | 43 | Site Activity Status Update Received | SITE SPECIFIC WORK PLAN - REVISION 1 | ||
2015-01-05 | 43 | Site Activity Status Update Received | NOV 2014 MONTHLY PROGRESS REPORT | ||
2014-11-05 | 99 | Miscellaneous | EPA PROVIDED COMMENTS TO RP REGARDING 09/25/2014 SSWP | ||
2014-10-31 | 99 | Miscellaneous | DNR PROVIDED COMMENTS TO EPA REGARDING 9/15/2014 SSWP | ||
2014-09-25 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
||
2014-08-05 | 43 | Site Activity Status Update Received | RESPONSE TO EPA COMMENTS - FOCUSED RIVER INVESTIGATION | ||
2014-08-05 | 43 | Site Activity Status Update Received | FOCUSED RIVER INVESTIGATION - TECHNICAL MEMORANDUM NO. 1 (REVISION 1) | ||
2014-07-21 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) | DNR PROVIDED COMMENTS TO EPA | ||
2014-06-23 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | SEDIMENT INVESTIGATION | ||
2014-06-20 | 43 | Site Activity Status Update Received | COMPLETION REPORT | ||
2014-05-13 | 43 | Site Activity Status Update Received | 2014 ANNUAL PROGRESS REPORT AND MASTER SCHEDULE UPDATE | ||
2014-02-17 | 43 | Site Activity Status Update Received | 2014 GROUNDWATER MONTORING DATA | ||
2013-05-10 | 43 | Site Activity Status Update Received | 2013 ANNUAL PROGRESS REPORT AND MASTER SCHEDULE UPDATE - REV 0 | ||
2013-02-14 | 43 | Site Activity Status Update Received | GW MONITORING REPORT | ||
2012-02-29 | 43 | Site Activity Status Update Received | 2011 GROUNDWATER MONITORING DATA TRANSMITTAL | ||
2011-09-08 | 130 | DNR Regulatory Reminder Sent |
![]() |
Vapor Intrusion (VI) Assessment Notification Ltr Sent | |
2011-05-09 | 43 | Site Activity Status Update Received | MULTI-SITE RISK ASSESSMENT FRAMEWORK ADDENDUM | ||
2011-05-09 | 43 | Site Activity Status Update Received | 2011 ANNUAL PROGRESS REPORT & MASTER SCHEDULE UPDATE | ||
2011-02-14 | 43 | Site Activity Status Update Received | 2010 GW MONITORING DATA TRANSMITTAL | ||
2010-05-10 | 43 | Site Activity Status Update Received | 2010 ANNUAL PROGRESS REPORT AND MASTER SCHEDULE UPDATE | ||
2010-03-29 | 43 | Site Activity Status Update Received | MULTI-SITE FEASIBILITY STUDY SUPPORT DOCUMENT - REVISION 1 | ||
2010-02-04 | 43 | Site Activity Status Update Received | GROUNDWATER MONITORING DATA - MAY 2009 | ||
2009-09-03 | 99 | Miscellaneous | WDNR COMMENTS REGARDING MULTI-SITE FEASIBILITY STUDY SUPPORT DOCUMENT - REVISION 0 | ||
2009-07-22 | 43 | Site Activity Status Update Received | MULTI-SITE FEASIBILITY STUDY SUPPORT DOCUMENT - REVISION 0 | ||
2009-05-06 | 43 | Site Activity Status Update Received | 2009 ANNUAL PROGRESS REPORT AND MASTER SCHEDULE UPDATE | ||
2008-10-03 | 43 | Site Activity Status Update Received | WARNING SIGNS TO BE POSTED AT BOOM LANDING | ||
2008-05-05 | 43 | Site Activity Status Update Received | 2008 ANNUAL PROGRESS REPORT & MASTER SCHEDULE UPDATE - REV 0 | ||
2008-05-01 | 99 | Miscellaneous | EPA REQUEST FOR ANNUAL SCHEDULE UPDATE | ||
2007-12-19 | 43 | Site Activity Status Update Received | GROUNDWTER MONITORING DATA - APRIL THRU SEPTEMBER 2007 | ||
2007-11-06 | 99 | Miscellaneous | WDNR COMMENTS TO MULTI-SITE FSP, RAP & QAPP | ||
2007-09-06 | 43 | Site Activity Status Update Received | MULTI-SITE RAF, QAPP & FSP | ||
2007-05-11 | 43 | Site Activity Status Update Received | ANNUAL PROGRESS REPORT & MASTER SCHEDULE UPDATE | ||
2007-01-11 | 43 | Site Activity Status Update Received | GROUNDWATER MONITORING UPDATE. NEXT SUBMITTAL DUE JANUARY 2008. | ||
2006-09-18 | 43 | Site Activity Status Update Received | DRAFT MULTI-SITE FIELD SAMPLING & ANALYSIS PLAN | ||
2006-09-08 | 43 | Site Activity Status Update Received | DRAFT MULTI-SITE RISK ASSESSMENT FRAMEWORK | ||
2006-09-08 | 43 | Site Activity Status Update Received | DRAFT GENERALIZED CONCEPTUAL SITE MODEL | ||
2006-08-14 | 43 | Site Activity Status Update Received | MULTI-SITE CSM & HSP | ||
2006-07-06 | 43 | Site Activity Status Update Received | DRAFT MULTI-SITE QAPP & DRAFT MULTI-SITE HSP | ||
2006-05-05 | 305 | Superfund Enforcement Documents - See Description | ORDER ON CONSENT FOR RI/FS | ||
2006-05-05 | 301 | Superfund NPL, NPL Proposed or Alternative Approach Site | |||
2006-02-06 | 43 | Site Activity Status Update Received | GROUNDWATER MONITORING UPDATE | ||
2005-11-30 | 43 | Site Activity Status Update Received | NRP REPORT TITLED SEDIMENT SITE SUMMARIES FORMER MANUFACTURING GAS PLANT SITES. | ||
2005-06-24 | 99 | Miscellaneous | SITE OVERSIGHT TRANSFERRED TO EPA | ||
2004-12-14 | 43 | Site Activity Status Update Received | GW MONITORING DATA | ||
2004-12-14 | 99 | Miscellaneous | REQUEST TO CONDUCT SEMI-ANNUAL GW MONITORING APPROVED | ||
2004-11-30 | 43 | Site Activity Status Update Received | REPORT TO BE SUBMITTED IN DEC. '04 | ||
2004-11-01 | 43 | Site Activity Status Update Received | GROUNDWATER MONITORING REPORT TO BE SUBMITTED AT THE END OF NOV 2004 | ||
2004-10-28 | 99 | Miscellaneous | REQUEST FOR CASE STATUS UPDATE | ||
2004-03-15 | 43 | Site Activity Status Update Received | GW MONITORING RESULTS | ||
2004-02-10 | 43 | Site Activity Status Update Received | OFF-SITE NOTIFICATION LETTER TO CITY OF GREEN BAY | ||
2004-01-15 | 99 | Miscellaneous | DISCUSSION W/CONSULTANT REGARDING CURSORY REVIEW OF 1/2/04 SUBMITTAL. | ||
2004-01-02 | 41 | Remedial Action Report Received | |||
2003-12-04 | 43 | Site Activity Status Update Received | RA DOC T/BE SUBMITTED IN DEC. 03. GW MONITORING REPORT T/BE SUBMITTED IN JAN/FEB 04. | ||
2003-07-23 | 43 | Site Activity Status Update Received | ANNUAL STATUS UPDATE REPORT | ||
2003-07-21 | 43 | Site Activity Status Update Received | NOTICE OF TERMINATION-STORMWATER DISCHARGES ASSOC W/LAND DISTURBING | ||
2003-06-18 | 43 | Site Activity Status Update Received | SOIL EXCAVATION/REMEDIATION ACTIVITIES COMPLETED 06/04/2003 | ||
2003-06-18 | 43 | Site Activity Status Update Received | DNR TO RECEIVED RAR OCT - DEC 2003 | ||
2003-04-23 | 43 | Site Activity Status Update Received | AIR MONITORING RESULTS | ||
2003-04-04 | 99 | Miscellaneous | ODOR COMPLAINTS ASSOCIATED WITH THERMAL TREATMENT FACILITY | ||
2003-04-04 | 43 | Site Activity Status Update Received | EXCAVATION & THERMAL TREATMENT ACTIVITIES BEGAN 03/31/03 | ||
2003-04-01 | 99 | Miscellaneous | MEMO FROM DNR WATER RESOURCES SUMMARIZING PRELIMINARY DISCHARGE LIMITATIONS | ||
2003-03-31 | 43 | Site Activity Status Update Received | THERMAL TREATMENT UNIT INSPECTION SUMMARY FROM DNR WASTE MGT | ||
2003-03-20 | 43 | Site Activity Status Update Received | THERMAL TREATMENT ANTICIPATED TO BEGIN WEEK OF 03/24/2003 | ||
2003-03-20 | 43 | Site Activity Status Update Received | WILL BE CALCULATING SSRCL'S FOR METALS AT A LATER DATE | ||
2003-03-14 | 43 | Site Activity Status Update Received | NRT MEMO REGARDING REVISED AIR MONITORING APPROACH | ||
2003-03-12 | 99 | Miscellaneous | WDNR RESPONSE TO WPSC ON CHAPTER 30 PERMITS | ||
2003-03-10 | 43 | Site Activity Status Update Received | NRT WRITTEN RESPONSE TO WDNR 02/27/03 MEMO & 03/05/03 MEETING | ||
2003-03-10 | 149 | Remedial Action (RA) Design Report Approved | |||
2003-03-10 | 43 | Site Activity Status Update Received | COPY OF RIPRAP PROJECTS FORM 3500-91 (R 6/2000) | ||
2003-03-10 | 43 | Site Activity Status Update Received | COPY OF CONSTRUCTION PLANS | ||
2003-02-28 | 43 | Site Activity Status Update Received | NRT E-MAIL RESPONSE TO WDNR 02/27/03 MEMO | ||
2003-02-27 | 99 | Miscellaneous | MEMO TO FILE SUMMARIZING WDNR COMMENTS ON NRT'S 02/20/2003 SUBMITTAL | ||
2003-02-27 | 43 | Site Activity Status Update Received | COPY OF LETTER FROM WPS TO NEIGHBORING BUSINESSES - LTR SUMMARIZES UPCOMING RA | ||
2003-02-24 | 43 | Site Activity Status Update Received | RESPONSE FROM NRT REGARDING DNR'S 02/18/03 MEMO TO FILE | ||
2003-02-18 | 99 | Miscellaneous | MEMO TO FILE DOCUMENTING COMMENTS ON REMEDIAL WORK PLAN SUBMITTED 02/07/03 | ||
2003-02-07 | 99 | Miscellaneous | WDNR RESPONSE TO TECHNICAL ASSISTANCE REQUEST | ||
2003-02-07 | 148 | Remedial Action Design Report Received (fee) | |||
2003-01-23 | 97 | Technical Assistance Request Received (fee) | |||
2003-01-23 | 98 | Technical Assistance Provided | |||
2002-12-23 | 43 | Site Activity Status Update Received | SITE CONDITIONS UPDATE AND RAOR ADDENDUM | ||
2002-12-16 | 43 | Site Activity Status Update Received | WILL BE SUBMITTING GW MONITORING REPORT & RA WP IN NEAR FUTURE | ||
2002-04-30 | 43 | Site Activity Status Update Received | PROPOSE TO COLLECT A ROUND OF GW SAMPLES IN SUMMER 2002 | ||
2002-02-15 | 43 | Site Activity Status Update Received | INTEND TO CONDUCT GW MONITORING IN SUMMER 2002 | ||
2001-08-09 | 43 | Site Activity Status Update Received | OVERVIEW OF WPS COAL GAS SITE ACTIVITIES | ||
2001-07-18 | 99 | Miscellaneous | WDNR REQUEST FOR CASE STATUS UPDATE | ||
1997-08-21 | 43 | Site Activity Status Update Received | RESPONSE TO DNR SEDIMENT REPORT | ||
1997-07-23 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) | |||
1997-01-06 | 43 | Site Activity Status Update Received | SEDIMENTS INVESTIGATION REPORT | ||
1996-09-30 | 37 | Site Investigation Report (SIR) Received (non-fee) | |||
1996-06-20 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | |||
1995-06-15 | 37 | Site Investigation Report (SIR) Received (non-fee) | |||
1995-04-10 | 43 | Site Activity Status Update Received | SEDIMENT SAMPLE RESULTS | ||
1994-07-27 | 38 | Site Investigation Report (SIR) Approved | |||
1994-06-30 | 37 | Site Investigation Report (SIR) Received (non-fee) | |||
1992-01-21 | 2 | Responsible Party (RP) letter sent | |||
1991-10-07 | 38 | Site Investigation Report (SIR) Approved | |||
1986-02-05 | 37 | Site Investigation Report (SIR) Received (non-fee) | |||
1986-01-07 | 1 | Notification of Hazardous Substance Discharge |
Substance | Type | Amt Released | Units |
---|---|---|---|
Polynuclear Aromatic Hydrocarbons | Petroleum | ||
Polynuclear Aromatic Hydrocarbons (COAL TAR) | Petroleum |
WISCONSIN PUBLIC SERVICE CORP 333 W EVERETT ST, MILWAUKEE, WI 53203 |
SARAH KRUEGER sarah.krueger@wisconsin.gov |