2024-07-10
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2024 - 6/30/2024
|
|
2024-04-18
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
AMMENDMENT TO 2017 REVISED REMEDIAL ACTION OPTIONS REPORT & CONCEPTUAL DESIGN RPT
|
|
2024-01-31
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2023-12-12
|
43
|
Site Activity Status Update Received
|
|
ANNUAL REPORT FOR THE PUBLIC SERVICE COMMISSION OF WISCONSIN
|
|
2023-11-02
|
101
|
Continuing Obligation Modification Approval
|
|
CAP MODIFICATION COMPLETE, CONTINUING OBLIGATIONS FROM 2017 RAP APPROVAL LTR CONTINUE TO APPLY
|
|
2023-11-01
|
43
|
Site Activity Status Update Received
|
|
JUNE 2023 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
|
|
2023-10-17
|
194
|
CO Modification Final Documentation Received
|
|
CONSTRUCTION DOCUMENTATION, PROPOSED ENGINEERED TREAMENT SYSTEM - EXTRACTION WELL INSTALLATION
|
|
2023-09-14
|
43
|
Site Activity Status Update Received
|
|
DOCUMENTATION FROM US FORESTRY SERVICES SITE VISIT FOR ONGOING PHYTOREMEDIATION
|
|
2023-08-28
|
43
|
Site Activity Status Update Received
|
|
JUNE 2023 POTABLE WELL TESTING RESULTS FOR VOCS
|
|
2023-08-21
|
43
|
Site Activity Status Update Received
|
|
NOVEMBER 2022 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
|
|
2023-08-21
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL ABANDONMENT STATUS UPDATE FROM AECOM
|
|
2023-08-18
|
43
|
Site Activity Status Update Received
|
|
JUNE 2022 VOC SEMI-ANNUAL POTABLE WELL MONITORING
|
|
2023-08-15
|
43
|
Site Activity Status Update Received
|
|
2021 ANNUAL VOC GROUNDWATER MONITORING REPORT
|
|
2023-07-10
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-06-02
|
24
|
Long Term Monitoring Plan Received (non-Fee)
|
|
2023 AREA WIDE VOC FIVE YEAR POTABLE WELL MONITORING SAMPLING PLAN
|
|
2023-05-23
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
REVISIONS NEEDED FOR CAP MAINTENANCE PLAN AND DEED RESTRICTION INCLUDED IN RADR
|
|
2023-05-08
|
193
|
CO Modification Notice to Proceed (NTP)
|
|
|
|
2023-04-25
|
43
|
Site Activity Status Update Received
|
|
DECEMBER 2021 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
|
|
2023-04-25
|
191
|
CO Modification Notification Received (non-fee)
|
|
|
|
2023-04-05
|
152
|
Remedial Action Documentation Report Received (fee)
|
|
|
|
2023-03-20
|
43
|
Site Activity Status Update Received
|
|
RESEARCH PAPERS FOR PHYTOREMEDIATION SURROUNDING TREATMENT POND
|
|
2023-03-14
|
43
|
Site Activity Status Update Received
|
|
INFORMATION AND CLARIFICATIONS ON PROPOSED SOLAR PANEL PROJECT ON EAST SIDE OF SITE
|
|
2023-03-03
|
43
|
Site Activity Status Update Received
|
|
MEETING AGENDA FOR 3/6/2023 SITE UPDATE CALL
|
|
2023-02-28
|
43
|
Site Activity Status Update Received
|
|
NOVEMBER 2022 POTABLE WELL TESTING RESULTS
|
|
2023-01-25
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-11-08
|
43
|
Site Activity Status Update Received
|
|
WATER MAIN, SITE VISIT, & MONITORING UPDATES; REQUESTS FOR SAMPLING REDUCTION; & DNR CONCURRENCE
|
|
2022-09-01
|
59
|
Environmental Enforcement Action Completed
|
|
COST SHARING AGREEMENT IN PLACE WITH CITY OF MANITOWOC
|
|
2022-08-31
|
43
|
Site Activity Status Update Received
|
|
2021 EMERGING CONTAMINANT GROUNDWATER MONITORING REPORT
|
|
2022-08-29
|
43
|
Site Activity Status Update Received
|
|
DECEMBER 2021 PFAS UP-GRADIENT POTABLE WELL MONITORING LETTER REPORT
|
|
2022-08-19
|
43
|
Site Activity Status Update Received
|
|
AUGUST COST SHARING AGREEMENT UPDATE, DETAILED PROCESS AND SCHEDULE FOR FUTURE COST REIMBURSEMENTS
|
|
2022-07-18
|
43
|
Site Activity Status Update Received
|
|
JULY COST SHARING AGREEMENT UPDATE AND SUMMARY OF CALL WITH NOC REPRESENTATIVES
|
|
2022-07-01
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-06-30
|
43
|
Site Activity Status Update Received
|
|
2021 SILVER CREEK EMERGING CONTAMINANTS SAMPLING LETTER REPORT
|
|
2022-06-29
|
43
|
Site Activity Status Update Received
|
|
JUNE 2021 PFAS POTABLE WELL MONITORING LETTER REPORT
|
|
2022-06-20
|
43
|
Site Activity Status Update Received
|
|
JUNE 2021 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
|
|
2022-05-31
|
43
|
Site Activity Status Update Received
|
|
COST SHARING AGREEMENT UPDATE FOR JUNE
|
|
2022-05-18
|
43
|
Site Activity Status Update Received
|
|
MAY COST SHARING AGREEMENT UPDATE AND NOTIFICATION OF CHANGE FOR ATTORNEY CONTACT
|
|
2022-04-04
|
43
|
Site Activity Status Update Received
|
|
APRIL COST SHARING AGREEMENT UPDATE, PORTION OF PAYMENT MADE TO CITY FOR 2020 COSTS
|
|
2022-03-30
|
43
|
Site Activity Status Update Received
|
|
FORMER DRYING PONDS PFAS SITE INVESTIGATION, TECHNICAL MEMO
|
|
2022-03-18
|
43
|
Site Activity Status Update Received
|
|
MARCH COST SHARING AGREEMENT UPDATE
|
|
2022-02-22
|
43
|
Site Activity Status Update Received
|
|
CITY PLANNING TO USE ARPA FUNDS FOR WATER MAIN PROJECT INSTEAD OF SDWLP FUNDS
|
|
2022-02-04
|
43
|
Site Activity Status Update Received
|
|
2019-2021 EXPANDED DOWNGRADIENT POTABLE WELL VOC SAMPLING AND TOP OF BEDROCK MAPPING LETTER REPORT
|
|
2022-02-02
|
43
|
Site Activity Status Update Received
|
|
JANUARY AND FEBRUARY COST SHARING AGREEMENT UPDATE
|
|
2022-01-20
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL SAMPLING RESULTS AND UPDATE TO DEPT OF HEALTH SERVICES
|
|
2022-01-10
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2021-12-09
|
43
|
Site Activity Status Update Received
|
|
INFORMATION REGARDING APPLICATION TO PUBLIC SERVICE COMMISSION FOR WATER MAIN EXTENSION
|
|
2021-11-22
|
43
|
Site Activity Status Update Received
|
|
NOVEMBER COST SHARING AGREEMENT UPDATE
|
|
2021-11-02
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
FOR EMERGING CONTAMINANT WORK PLAN UPDATE #4 - 2021 GROUNDWATER AND SURFACE WATER SAMPLING
|
|
2021-11-02
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
FOR EMERGING CONTAMINANT WORK PLAN UPDATE #5 - UP-GRADIENT POTABLE WELL INVESTIGATION
|
|
2021-10-28
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
EMERGING CONTAMINANT WORK PLAN UPDATE #5 - UP-GRADIENT POTABLE WELL INVESTIGATION
|
|
2021-10-27
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
EMERGING CONTAMINANT WORK PLAN UPDATE #4 - 2021 GROUNDWATER AND SURFACE WATER SAMPLING
|
|
2021-10-22
|
43
|
Site Activity Status Update Received
|
|
MEETING WITH CITY, AECOM, DHS, AND DNR FOR STATUS UPDATE AND NEXT STEPS FOR INVESTIGATION
|
|
2021-09-22
|
43
|
Site Activity Status Update Received
|
|
AUGUST COST SHARING AGREEMENT UPDATE
|
|
2021-09-10
|
99
|
Miscellaneous
|
|
DNR, DHS, AECOM, AND CITY OF MANITOWOC CORRESPONDENCE FOR PFAS SAMPLING RESULTS & HAZARD INDEX CALCS
|
|
2021-08-25
|
43
|
Site Activity Status Update Received
|
|
PFAS SAMPLING RESULTS FROM POTABLE WELLS
|
|
2021-08-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2021 - 6/30/2021
|
|
2021-07-06
|
43
|
Site Activity Status Update Received
|
|
MAY 2021 POTABLE WELL SAMPLING RESULTS
|
|
2021-07-06
|
43
|
Site Activity Status Update Received
|
|
CLARIFICATION ON PRIVATE WELL SAMPLE COLLECTED IN OCTOBER 2020 WITH MISSING LAB REPORT
|
|
2021-06-17
|
99
|
Miscellaneous
|
|
NR 716.14(3) NOTIFICATION REQUEST DNR CONCURRENCE FOR PRIVATE WELL SAMPLING
|
|
2021-06-15
|
43
|
Site Activity Status Update Received
|
|
JUNE COST SHARING AGREEMENT UPDATE
|
|
2021-06-01
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION FROM CITY OF PUBLIC MEETING CANCELLATION
|
|
2021-05-03
|
99
|
Miscellaneous
|
|
DNR UPDATE FOR SDWLP LOAN COMPLIANCE COMPLETED
|
|
2021-04-30
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
EMERGING CONTAMINANT ON-SITE INVESTIGATION
|
|
2021-04-30
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
EMERGING CONTAMINANT AREA WIDE POTABLE WELL INVESTIGATION
|
|
2021-04-30
|
99
|
Miscellaneous
|
|
COMMENTS FOR AREA WIDE VOC 5-YEAR POTABLE WELL SAMPLING PLAN
|
|
2021-04-30
|
99
|
Miscellaneous
|
|
DNR RESPONSE TO APRIL COST SHARING AGREEMENT UPDATE
|
|
2021-04-20
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
EMERGING CONTAMINANT WORK PLAN UPDATE #3 - AREA WIDE POTABLE WELL INVESTIGATION
|
|
2021-04-20
|
99
|
Miscellaneous
|
|
NEW DEPT OF HEALTH SERVICES CONTACT AND UPDATES TO DNR PROJECT MANAGER CONTACT INFO
|
|
2021-04-19
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
EMERGING CONTAMINANT WORK PLAN UPDATE #2 - CONTINUED ON-SITE INVESTIGATION
|
|
2021-04-16
|
24
|
Long Term Monitoring Plan Received (non-Fee)
|
|
AREA WIDE VOC FIVE YEAR POTABLE WELL SAMPLING WORK PLAN
|
|
2021-04-15
|
43
|
Site Activity Status Update Received
|
|
APRIL COST SHARING AGREEMENT UPDATE
|
|
2021-04-06
|
130
|
DNR Regulatory Reminder Sent
|
|
VAPOR INTRUSION AND TCE REMINDER LETTER
|
|
2021-03-18
|
43
|
Site Activity Status Update Received
|
|
NOVEMBER 2020 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
|
|
2021-03-15
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
2020 SILVER CREEK EMERGING CONTAMINATES SAMPLING LETTER REPORT
|
|
2021-03-15
|
43
|
Site Activity Status Update Received
|
|
MARCH COST SHARING AGREEMENT UPDATE
|
|
2021-02-26
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
EMERGING CONTAMINANT GROUNDWATER INVESTIGATION UPDATE REPORT, JUNE 2020
|
|
2021-02-17
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2020 - 12/31/2020
|
|
2021-02-16
|
43
|
Site Activity Status Update Received
|
|
FEBRUARY COST SHARING AGREEMENT UPDATE AND DNR FOLLOWUP
|
|
2021-01-29
|
43
|
Site Activity Status Update Received
|
|
ACCESS REQUEST LETTERS SENT FOR CONFIRMATION SAMPLING, NO RESPONSE FROM PROPERTY OWNER
|
|
2021-01-23
|
43
|
Site Activity Status Update Received
|
|
JANUARY COST SHARING AGREEMENT UPDATE AND DNR FOLLOWUP
|
|
2020-12-30
|
43
|
Site Activity Status Update Received
|
|
JUNE 2020 VOC SEMI-ANNUAL AND PFAS POTABLE WELL MONITORING LETTER REPORT
|
|
2020-12-15
|
43
|
Site Activity Status Update Received
|
|
NOVEMBER POTABLE WELL SAMPLING LAB ANALYTICAL RESULTS
|
|
2020-12-11
|
99
|
Miscellaneous
|
|
CLARIFICATIONS REGARDING QUESTION ABOUT RETAINING PRIVATE WELLS PER WIS ADM CODE & LOCAL ORDINANCES
|
|
2020-11-24
|
99
|
Miscellaneous
|
|
CORRESPONDENCE TO PAUSE ON-SITE SAMPLING TO FOCUS RESOURCES TO EMERGING CONTAMINANTS
|
|
2020-11-16
|
43
|
Site Activity Status Update Received
|
|
2019 VOC ANNUAL GROUNDWATER MONITORING REPORT
|
|
2020-11-11
|
43
|
Site Activity Status Update Received
|
|
UPDATE ON POTABLE WELLS WITH EMERGING CONTAMINANTS AFTER CYCLE 11 RELEASE BY DHS
|
|
2020-11-10
|
99
|
Miscellaneous
|
|
SUMMARY OF NOVEMBER 5 CALL REGARDING FUTURE COST SHARING AGREEMENT
|
|
2020-10-23
|
43
|
Site Activity Status Update Received
|
|
COST SHARING AGREEMENT FOR COSTS UP TO THE END OF 2019
|
|
2020-10-19
|
99
|
Miscellaneous
|
|
DNR RESPONSE TO ENFORCEMENT SUBMITTALS UPDATE
|
|
2020-10-14
|
43
|
Site Activity Status Update Received
|
|
RESPONSE FOR ENFORCEMENT SUBMITTALS
|
|
2020-08-27
|
43
|
Site Activity Status Update Received
|
|
BRIEF UPDATE FROM NEWELL ON FURTHER DISCUSSIONS WITH CITY OF MANITOWOC
|
|
2020-08-25
|
43
|
Site Activity Status Update Received
|
|
DEPT OF HEALTH SERVICES RESPONSE TO PFAS RESULTS
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-08-14
|
99
|
Miscellaneous
|
|
ENFORCEMENT CONFERENCE SUMMARY LETTER
|
|
2020-08-12
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION LETTERS FOR POTABLE WELL SAMPLING RESULTS FOR VOCS AND PFAS
|
|
2020-07-29
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2020 - 6/30/2020
|
|
2020-07-17
|
99
|
Miscellaneous
|
|
UPDATE TO DEPT OF HEALTH SERVICES (DHS)
|
|
2020-07-06
|
43
|
Site Activity Status Update Received
|
|
NEWELL RESPONSE TO 06/16/2020 NOV
|
|
2020-07-06
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF RESULTS FROM PRIVATE WELL MONITORING EVENT
|
|
2020-06-30
|
99
|
Miscellaneous
|
|
INFORMATION FOR SAFE DRINKING WATER LOAN PROGRAM (SDWLP) APPLICATION
|
|
2020-06-29
|
4
|
Enforcement Conference Held
|
|
WITH NEWELL BRANDS INC
|
|
2020-06-16
|
14
|
Notice of Violation (NOV) Issued
|
|
SITE INVESTIGATION WORK PLAN NEEDS TO BE SUBMITTED
|
|
2020-06-16
|
99
|
Miscellaneous
|
|
ADDITIONAL CORRESPONDENCE FOR THE 3/18/2020 SIWP AND THE 5/13/2020 SIWP NOTICE TO PROCEED
|
|
2020-06-09
|
43
|
Site Activity Status Update Received
|
|
OCTOBER 2019 SEMI-ANNUAL POTABLE WELL MONITORING
|
|
2020-06-02
|
99
|
Miscellaneous
|
|
COMPLIANCE ASSISTANCE RESPONSE
|
|
2020-05-13
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
CONDITIONAL WITH ADDITIONS/REVISIONS TO THE WORK PLAN
|
|
2020-04-28
|
99
|
Miscellaneous
|
|
COMPLIANCE ASSISTANCE REQUESTED
|
|
2020-03-18
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REVISED FROM JANUARY 31, 2020 WORK PLAN SUBMITTAL
|
|
2020-03-06
|
99
|
Miscellaneous
|
|
CLARIFICATIONS ON LAB ANALTYICAL INFORMATION FOR PFAS SAMPLING
|
|
2020-03-05
|
99
|
Miscellaneous
|
|
UPDATE TO COUNTY HEALTH DEPT
|
|
2020-02-17
|
99
|
Miscellaneous
|
|
RESPONSE TO EMERGING CONTAMINANT WORK PLAN UPDATE #1
|
|
2020-01-31
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
EMERGING CONTAMINANT WORK PLAN UPDATE #1
|
|
2020-01-02
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2019 - 12/31/2019
|
|
2019-12-17
|
99
|
Miscellaneous
|
|
INFO FOR DISCONNECTED PRIVATE WELL USED FOR CONTAMINANT MONITORING PURPOSES
|
|
2019-12-17
|
99
|
Miscellaneous
|
|
SITE UPDATE PROVIDED TO MANITOWOC COUNTY HEALTH DEPT
|
|
2019-12-16
|
43
|
Site Activity Status Update Received
|
|
EXPANDED PRIVATE WELL SAMPLING RESULTS
|
|
2019-12-12
|
43
|
Site Activity Status Update Received
|
|
SAFE WATER DRINKING LOAN PROGRAM (SWDLP) APPLICATION INFO
|
|
2019-12-11
|
99
|
Miscellaneous
|
|
CURTIS HEDMAN IS NEW DEPT OF HEALTH SERVICES CONTACT FOR THE SITE
|
|
2019-12-10
|
99
|
Miscellaneous
|
|
CITY/AECOM/DNR SITE UPDATES MEETING
|
|
2019-11-27
|
43
|
Site Activity Status Update Received
|
|
PRIVATE WELL SAMPING RESULTS NOTIFICATION LETTERS
|
|
2019-11-22
|
43
|
Site Activity Status Update Received
|
|
EXPANDED PRIVATE WELL SAMPLING RESULTS
|
|
2019-11-04
|
43
|
Site Activity Status Update Received
|
|
EXPANDED PRIVATE WELL SAMPLING RESULTS
|
|
2019-10-30
|
99
|
Miscellaneous
|
|
RESPONSE TO WORK PLAN ISSUED TO NEWELL
|
|
2019-10-30
|
99
|
Miscellaneous
|
|
UPDATE PROVIDED TO DEPT OF HEALTH SERVICES FOR UPCOMING PRIVATE WELL SAMPLING
|
|
2019-10-25
|
99
|
Miscellaneous
|
|
ADDITIONAL COMMENTS FOR PFAS FOR SI WORKPLAN
|
|
2019-10-25
|
116
|
PFAS Sampling Required
|
|
PFAS SAMPLING WORKPLAN DUE DATE NOT INCLUDED IN LETTER
|
|
2019-09-12
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
|
|
2019-09-11
|
43
|
Site Activity Status Update Received
|
|
JUNE 2019 SEMI-ANNUAL POTABLE WELL MONITORING LETTER RPT
|
|
2019-08-08
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
EXPANDED DOWNGRADIENT POTABLE WELL SAMPLING WORK PLAN - VOCS
|
|
2019-08-07
|
99
|
Miscellaneous
|
|
COMPILATION OF PFAS INFORMATION PROVIDED TO CITY AND AECOM
|
|
2019-07-24
|
99
|
Miscellaneous
|
|
FOLLOWUP WITH PROPERTY OWNER FOR PRIVATE WELL SAMPLING
|
|
2019-07-01
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2019 - 6/30/2019
|
|
2019-06-24
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
NORTH SOURCE AREA, 2018 ANNUAL GW MONITORING, AND INITIAL EMERGING CONTAMINANT SI REPORT
|
|
2019-06-24
|
43
|
Site Activity Status Update Received
|
|
WPDES REPORTING, SEPTEMBER 2017 THROUGH MAY 2019
|
|
2019-05-15
|
99
|
Miscellaneous
|
|
USE OF POET SYSTEM AS TEMPORARY DRINKING WATER SOLUTION, NEED TO SUBMIT WORKPLAN
|
|
2019-02-28
|
43
|
Site Activity Status Update Received
|
|
RESPONSE LETTER TO NON
|
|
2019-02-21
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL MONITORING REPORT
|
|
2019-02-20
|
3
|
Notice of Noncompliance (NON) Issued
|
|
SITE INVESTIGATION WORK PLAN NEEDS TO BE SUBMITTED, SERVES AS FIRST REQUIRED NOTICE UNDER 728.11
|
|
2019-02-01
|
99
|
Miscellaneous
|
|
UPDATES ON NEWELL COORDINATION WITH CITY AND EXTENSIONS FOR SI WORKPLAN DEADLINE
|
|
2019-01-17
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL RESULT NOTIFICATION LETTERS
|
|
2019-01-07
|
99
|
Miscellaneous
|
|
UPDATE PROVIDED TO DEPT OF HEALTH SERVICES
|
|
2019-01-02
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2018 - 12/31/2018
|
|
2018-11-30
|
99
|
Miscellaneous
|
|
PRIVATE WELL COMPLAINT FOLLOWUP
|
|
2018-11-28
|
99
|
Miscellaneous
|
|
EXTENSION PROVIDED FOR COORDINATION OF RESPONSIBLE PARTIES
|
|
2018-11-08
|
43
|
Site Activity Status Update Received
|
|
UPDATE ON DISCHARGE MONITORING REPORTING (DMR) STATUS
|
|
2018-11-06
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL RESULTS NOTIFICATION LETTERS
|
|
2018-10-29
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
EMERGING CONTAMINANT SI WORK PLAN
|
|
2018-10-26
|
43
|
Site Activity Status Update Received
|
|
NEWELL RESPONSE TO RP LETTER
|
|
2018-10-25
|
43
|
Site Activity Status Update Received
|
|
LIMITED GROUNDWATER ASSESSMENT FOR EMERGING CONTAMINANTS
|
|
2018-10-17
|
99
|
Miscellaneous
|
|
CLARIFICATION ON WATER REPLACEMENT IF REFUSED BY PROPERTY OWNER
|
|
2018-10-01
|
43
|
Site Activity Status Update Received
|
|
MAY 2018 SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
|
|
2018-09-24
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF DISCHARGE FOR PFAS
|
|
2018-09-24
|
2
|
Responsible Party (RP) letter sent
|
|
MODIFIED RP LTR TO CITY OF MANITOWOC
|
|
2018-09-24
|
2
|
Responsible Party (RP) letter sent
|
|
NEWELL BRANDS, INC.
|
|
2018-09-24
|
120
|
PFAS Sampling Completed - Actionable Levels Detected
|
|
SEE AC 43 DATED 9/24/2018 FOR DOCUMENTATION
|
|
2018-08-15
|
43
|
Site Activity Status Update Received
|
|
UPDATES FROM LAB FOR PFAS SAMPLES
|
|
2018-07-31
|
43
|
Site Activity Status Update Received
|
|
REVISED UMPIRE RECOMMENDATION BASED ON JULY 30, 2018 APPROVAL
|
|
2018-07-30
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2018 - 6/30/2018
|
|
2018-07-30
|
99
|
Miscellaneous
|
|
APPROVAL OF MODIFIED UMPIRE RECOMMENDATION
|
|
2018-07-26
|
99
|
Miscellaneous
|
|
PHYTOREMEDIATION TOUR OF GRAVEL PIT
|
|
2018-07-23
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO REQUEST FOR FURTHER MODIFICATION TO MODIFIED UMPIRE RECOMMENDATION
|
|
2018-07-19
|
99
|
Miscellaneous
|
|
REQUEST FOR FURTHER MODIFICATION TO MODIFIED UMPIRE RECOMMENDATION
|
|
2018-07-13
|
43
|
Site Activity Status Update Received
|
|
ACCESS AGREEMENT FOR SAMPLING
|
|
2018-07-10
|
43
|
Site Activity Status Update Received
|
|
PFAS SAMPLING UPDATES
|
|
2018-06-26
|
43
|
Site Activity Status Update Received
|
|
PRIVATE WELL RESULT NOTIFICATION LETTERS FOR MAY/JUNE SAMPLING
|
|
2018-06-26
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO REQUIRED MODIFICATIONS TO UMPIRE RECOMMENDATION
|
|
2018-06-25
|
99
|
Miscellaneous
|
|
CORRESPONDENCE FOR PFAS SAMPLING PROPOSAL
|
|
2018-06-20
|
43
|
Site Activity Status Update Received
|
|
WORK PLAN FOR INITIAL ASSESSMENT OF EMERGING CONTAMINANTS-PFAS
|
|
2018-06-14
|
99
|
Miscellaneous
|
|
APPROVAL OF NEGOTIATION AGREEMENTS FOR LGU COST RECOVERY
|
|
2018-06-14
|
99
|
Miscellaneous
|
|
REQUIRED MODIFICATIONS TO UMPIRE RECOMMENDATION
|
|
2018-06-08
|
43
|
Site Activity Status Update Received
|
|
PRIVATE WELL RESULTS NOTIFICATION LETTERS FOR MAY 2018 SAMPLING
|
|
2018-05-25
|
43
|
Site Activity Status Update Received
|
|
RECOMMENDED PFAS SAMPLE METHOD
|
|
2018-05-23
|
99
|
Miscellaneous
|
|
CLARIFICATIONS WITH EPA ON DEED RESTRICTION REQUIREMENTS FOR PCB TYPE B SITE
|
|
2018-05-14
|
99
|
Miscellaneous
|
|
REQUEST FOR ACCESS TO THE PROPERTY
|
|
2018-05-14
|
99
|
Miscellaneous
|
|
ADDITIONAL INVESTIGATION NEEDED LETTER ISSUED
|
|
2018-05-07
|
43
|
Site Activity Status Update Received
|
|
STATE LEAD PROPOSAL UPDATE FOR SITE SAMPLING
|
|
2018-05-02
|
43
|
Site Activity Status Update Received
|
|
SUMMARY MEMO FOR NORTHERN SOURCE AREA
|
|
2018-04-30
|
99
|
Miscellaneous
|
|
STATUS OF UMPIRE RECOMMENDATION AND SITE INVESTIGATION
|
|
2018-04-12
|
99
|
Miscellaneous
|
|
DNR DRINKING & GW PROGRAM CORRESPONDENCE FOR WATER QUALITY ISSUES IN NEW PRIVATE WELLS
|
|
2018-04-06
|
114
|
PFAS Scoping Statement Received
|
|
VERBAL FOR SAP PREPARATION
|
|
2018-04-03
|
43
|
Site Activity Status Update Received
|
|
CLARIFICATIONS FOR ANALYSIS OF WIS. STAT. 292.35(7) FOR UMPIRE PROCESS
|
|
2018-03-29
|
43
|
Site Activity Status Update Received
|
|
2017 GW MONITORING LETTER REPORT
|
|
2018-03-09
|
99
|
Miscellaneous
|
|
CORRESPONDENCE FOR A PRIVATE WELL ON AN UNOCCUPIED PROPERTY
|
|
2018-03-08
|
99
|
Miscellaneous
|
|
WRITTEN STATEMENT
|
|
2018-03-01
|
99
|
Miscellaneous
|
|
PRIVATE WELL RESULT CORRESPONDENCE
|
|
2018-02-26
|
99
|
Miscellaneous
|
|
AESTHETIC WATER QUALITY INFORMATION OF NEW PRIVATE WELLS
|
|
2018-02-26
|
99
|
Miscellaneous
|
|
PRIVATE WELL RESULTS SUMMARY OF DNR SAMPLING CONDUCTED END OF 2017/EARLY 2018
|
|
2018-02-22
|
43
|
Site Activity Status Update Received
|
|
OCTOBER 2017 SEMI-ANNUAL POTABLE WELL MONITORING
|
|
2018-02-19
|
99
|
Miscellaneous
|
|
CORRESPONDENCE ON WRITTEN STATEMENTS
|
|
2018-02-17
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2017 - 12/31/2017
|
|
2018-02-09
|
99
|
Miscellaneous
|
|
UMPIRE RECOMMENDATION
|
|
2018-02-08
|
99
|
Miscellaneous
|
|
DNR PROVIDED UPDATE TO DEPT OF HEALTH SERVICES
|
|
2018-01-31
|
43
|
Site Activity Status Update Received
|
|
WGNHS BEDROCK GEOLOGY OF MANITOWOC COUNTY FINAL REPORT
|
|
2018-01-26
|
99
|
Miscellaneous
|
|
ADDT'L POTABLE WELL PLUME DELINEATION & REPLACEMENT REQUEST LETTER
|
|
2018-01-11
|
99
|
Miscellaneous
|
|
CORRESPONDENCE WITH PRIVATE WELL OWNER
|
|
2018-01-10
|
99
|
Miscellaneous
|
|
TELCON W/CITY & AECOM - SITE UPDATES
|
|
2018-01-09
|
99
|
Miscellaneous
|
|
PRIVATE WELL SAMPLE RESULT NOTIFICATION LETTERS ISSUED
|
|
2018-01-08
|
43
|
Site Activity Status Update Received
|
|
LAB QUALIFIER SUMMARY RECEIVED FROM STATE LAB FOR PRIVATE WELL SAMPLING
|
|
2018-01-05
|
99
|
Miscellaneous
|
|
PRIVATE WELL SAMPLING UPDATES
|
|
2017-12-19
|
43
|
Site Activity Status Update Received
|
|
SAMPLE RESULTS FOR REPLACEMENT WELL AT 2918 SOUTH 26TH ST
|
|
2017-12-19
|
99
|
Miscellaneous
|
|
PRIVATE WELL SAMPLING AND ACCESS UPDATES
|
|
2017-12-18
|
99
|
Miscellaneous
|
|
TELCON W/CITY & AECOM - SITE UPDATES
|
|
2017-12-15
|
99
|
Miscellaneous
|
|
2ND SET OF ACCESS REQUEST LETTERS FOR PRIVATE WELL SAMPLING
|
|
2017-12-15
|
99
|
Miscellaneous
|
|
PRIVATE WELL SAMPLING UPDATE
|
|
2017-12-13
|
99
|
Miscellaneous
|
|
PRIVATE WELL SAMPLE RESULTS FROM 3008 SOUTH 26TH ST
|
|
2017-12-06
|
43
|
Site Activity Status Update Received
|
|
NOTICE OF PROJECT COMPLETION FOR CH. 30 PERMIT
|
|
2017-11-03
|
99
|
Miscellaneous
|
|
UMPIRE SELECTION FOR COST RECOVERY PROCESS
|
|
2017-11-03
|
99
|
Miscellaneous
|
|
ACCESS REQUEST LETTERS FOR PRIVATE WELL SAMPLING
|
|
2017-11-01
|
99
|
Miscellaneous
|
|
TELCON W/CITY & AECOM - SITE UPDATES
|
|
2017-10-27
|
99
|
Miscellaneous
|
|
CONSTRUCTION DEPTH FOR REPLACEMENT WELL AT 2918 SOUTH 26TH ST
|
|
2017-10-23
|
99
|
Miscellaneous
|
|
WELL LOG INFORMATION FOR 2918 SOUTH 26TH ST LOCATION
|
|
2017-10-20
|
43
|
Site Activity Status Update Received
|
|
LETTER FROM CITY REGARDING RESPONSE TO NEW PRIVATE WELL CONTAMINATION
|
|
2017-10-20
|
99
|
Miscellaneous
|
|
UPDATES ON NEXT STEPS FOR NEW PRIVATE WELL INVESTIGATION AREA
|
|
2017-09-28
|
99
|
Miscellaneous
|
|
UPDATE PROVIDED TO OTHER DNR STAFF FOR NEW POTABLE WELL INVESTIGATION AREA
|
|
2017-09-27
|
99
|
Miscellaneous
|
|
MEETING W/CITY & AECOM - SITE UPDATES
|
|
2017-09-20
|
43
|
Site Activity Status Update Received
|
|
COST RECOVERY PROCESS UPDATE - REQUEST FOR UMPIRE
|
|
2017-09-13
|
43
|
Site Activity Status Update Received
|
|
OFFER TO SETTLE WITH CAUSERS
|
|
2017-09-13
|
99
|
Miscellaneous
|
|
UPDATE PROVIDED TO HEALTH DEPT FOR NEW IMPACTED WELL
|
|
2017-09-05
|
43
|
Site Activity Status Update Received
|
|
RESULTS FOR NEW IMPACTED PRIVATE WELL ON SOUTH 26TH ST
|
|
2017-08-31
|
43
|
Site Activity Status Update Received
|
|
MAY 2017 SEMI-ANNUAL POTABLE WELL MONITORING
|
|
2017-07-28
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2017 - 6/30/2017
|
|
2017-07-17
|
700
|
Database Fee Paid for Groundwater Continuing Obligation(s)
|
|
|
|
2017-07-17
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2017-07-07
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
|
|
2017-07-07
|
149
|
Remedial Action (RA) Design Report Approved
|
|
|
|
2017-07-07
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2017-07-07
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
|
|
2017-07-07
|
226
|
Continuing Obligation - Vapor Intrusion Response
|
|
|
|
2017-07-07
|
228
|
Continuing Obligation - Site Specific Condition
|
|
DEED RESTRICTION & SIGNAGE FOR TSCA PCBS-EPA REQUIREMENT
|
|
2017-07-07
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2017-07-07
|
236
|
Continuing Obligation - Residual GW Contamination
|
|
|
|
2017-07-03
|
43
|
Site Activity Status Update Received
|
|
SAMPLING RESULTS FOR REPLACEMENT WELLS
|
|
2017-06-30
|
43
|
Site Activity Status Update Received
|
|
CITY RESPONSES TO PRPS COMMENTS ON RAOR
|
|
2017-06-20
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
REVISED RAOR
|
|
2017-06-19
|
99
|
Miscellaneous
|
|
WASTE WATER DISCHARGE PERMIT PLANS AND SPECS APPROVAL
|
|
2017-06-12
|
43
|
Site Activity Status Update Received
|
|
WASTEWATER DISCHARGE PERMIT PLANS AND SPECS
|
|
2017-05-10
|
24
|
Long Term Monitoring Plan Received (non-Fee)
|
|
5 YR POTABLE WELL MONITORING PLAN
|
|
2017-05-01
|
43
|
Site Activity Status Update Received
|
|
2016 GW MONITORING RPT
|
|
2017-05-01
|
43
|
Site Activity Status Update Received
|
|
NR 718 SOIL SAMPLING & WASTE DETERMINATION TECHNICAL MEMO
|
|
2017-04-27
|
99
|
Miscellaneous
|
|
TELCON W/CITY & AECOM - SITE UPDATES
|
|
2017-03-24
|
43
|
Site Activity Status Update Received
|
|
PUBLIC MEETING FOR RAP SUMMARY LETTERS SENT TO PRPS
|
|
2017-03-13
|
99
|
Miscellaneous
|
|
PUBLIC MEETING FOR LGU COST RECOVERY PROCESS
|
|
2017-03-13
|
43
|
Site Activity Status Update Received
|
|
2ND INFORMATION REQUEST LETTERS TO IDENTIFIED PRPS
|
|
2017-03-10
|
43
|
Site Activity Status Update Received
|
|
OCTOBER 2016 SEMI-ANNUAL POTABLE WELL MONITORING RPT
|
|
2017-03-03
|
99
|
Miscellaneous
|
|
CLARIIFCATIONS ON WASTEWATER SYSTEM APPROVAL REQUEST
|
|
2017-02-23
|
99
|
Miscellaneous
|
|
MEETING W/CITY & AECOM - SITE UPDATES
|
|
2017-02-23
|
43
|
Site Activity Status Update Received
|
|
ARMY CORPS GENERAL PERMIT LETTER
|
|
2017-02-15
|
43
|
Site Activity Status Update Received
|
|
SUPPLEMENTAL SUBMITTAL FOR WASTEWATER SYSTEM APPROVAL REQUEST
|
|
2017-02-06
|
99
|
Miscellaneous
|
|
CHAPTER 30 PERMIT ISSUED FOR CONSTRUCTION OF A WATERWAY WITH A NON-NAVIGABLE CONNECTION
|
|
2017-02-01
|
43
|
Site Activity Status Update Received
|
|
INFORMATION REQUEST LETTERS TO IDENTIFIED RESPONSIBLE PARTIES REC'D
|
|
2017-01-10
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2016 - 12/31/2016
|
|
2017-01-09
|
99
|
Miscellaneous
|
|
CONCURRENCE WITH WASTE CHARACTERIZATION SAMPLING APPROACH PRIOR TO FINALIZATION OF RAOR
|
|
2017-01-05
|
43
|
Site Activity Status Update Received
|
|
COPY OF WPDES PERMIT APPLICATION-CONTAMINATED GW FROM PROPOSED RA OPERATIONS
|
|
2017-01-05
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION THAT CITY HAS INITIATED COST RECOVERY PROCESS
|
|
2016-12-03
|
99
|
Miscellaneous
|
|
4TH OPEN HOUSE @ NEWTON TOWN HALL
|
|
2016-12-02
|
99
|
Miscellaneous
|
|
TCLP & TOTALS SAMPLING DISCUSSION WITH CONSULTANT
|
|
2016-12-02
|
99
|
Miscellaneous
|
|
TCLP & TOTALS SAMPLING CONCURRENCE
|
|
2016-11-22
|
43
|
Site Activity Status Update Received
|
|
NOVEMBER PRIVATE WELL TESTING RESULT LETTERS
|
|
2016-11-15
|
43
|
Site Activity Status Update Received
|
|
PROPOSED APPROACH FOR WASTE CHARACTERIZATION SAMPLING
|
|
2016-11-08
|
99
|
Miscellaneous
|
|
MEETING W/CITY & AECOM FOR SITE UPDATES
|
|
2016-11-07
|
43
|
Site Activity Status Update Received
|
|
PRIVATE WELL TESTING LETTERS
|
|
2016-10-10
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
ADDITIONAL MTGS/DISCUSSION NEEDED FOR RAOR
|
|
2016-09-20
|
99
|
Miscellaneous
|
|
TELCON TO DISCUSS SAFE DRINKING WATER LOAN PROGRAM LOAN
|
|
2016-09-16
|
99
|
Miscellaneous
|
|
COMMENTS/REVISION PROVIDED TO CONSULTANT FOR RAOR RPT
|
|
2016-09-07
|
99
|
Miscellaneous
|
|
CONFIRMATION OF TYPE B SITE DESIGNATION FOR PCBS W/EPA UNDER ONE CLEANUP PROGRAM MOA
|
|
2016-09-06
|
99
|
Miscellaneous
|
|
MEETING W/DNR PROGRAMS TO DISCUSS REMEDIAL ACTION OPTION RPT
|
|
2016-08-26
|
148
|
Remedial Action Design Report Received (fee)
|
|
|
|
2016-08-03
|
43
|
Site Activity Status Update Received
|
|
LNAPL CHARACTERIZATION & CONTAMINANT MASS ANALYSIS TECHICAL MEMO
|
|
2016-08-03
|
43
|
Site Activity Status Update Received
|
|
SOIL VAPOR EXTRACTION PILOT STUDY TECHNICAL MEMO
|
|
2016-07-18
|
43
|
Site Activity Status Update Received
|
|
MARCH 2016 SEMI-ANNUAL POTABLE WELL MONITORING REPORT
|
|
2016-07-12
|
315
|
Superfund Site Assessment Transmittal Memos
|
|
|
|
2016-07-12
|
350
|
Superfund Site Assessment Preliminary Assessment (PA)
|
|
|
|
2016-07-08
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2016 - 6/30/2016
|
|
2016-06-23
|
99
|
Miscellaneous
|
|
MEETING W/CITY & AECOM FOR UPDATES ON PREPARATIONS FOR REMEDIAL ACTION OPTIONS
|
|
2016-06-06
|
99
|
Miscellaneous
|
|
REMEDIAL ACTION ALTERNATIVES DISCUSSION W/AECOM ON ACTIONS THAT CAN BE COMPLETED IN 2016
|
|
2016-04-22
|
43
|
Site Activity Status Update Received
|
|
PRIVATE WELL TESTING LETTERS
|
|
2016-04-06
|
43
|
Site Activity Status Update Received
|
|
2015 GW MONITORING
|
|
2016-04-06
|
43
|
Site Activity Status Update Received
|
|
GW TREATMENT AREA FEASIBILITY STUDY TECHNICAL MEMO
|
|
2016-04-06
|
99
|
Miscellaneous
|
|
MEETING W/CITY & AECOM TO DISCUSS REMEDIAL ACTION OPTIONS
|
|
2016-03-28
|
43
|
Site Activity Status Update Received
|
|
WI GEOLOGICAL SURVEY MANITOWOC COUNTY BEDROCK GEOLOGY MAP
|
|
2016-01-26
|
99
|
Miscellaneous
|
|
TELCON: REMEDIAL ACTION PLANNING DISCUSSION
|
|
2016-01-14
|
43
|
Site Activity Status Update Received
|
|
OCTOBER 2015 SEMI-ANNUAL POTABLE WELL MONITORING
|
|
2016-01-14
|
99
|
Miscellaneous
|
|
MEETING W/CITY & AECOM - SITE UPDATES
|
|
2016-01-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2015 - 12/31/2015
|
|
2015-12-07
|
99
|
Miscellaneous
|
|
SPECIAL WELL CASING DEPTH AREA APPROVED
|
|
2015-12-05
|
99
|
Miscellaneous
|
|
3RD OPEN HOUSE @ NEWTON TOWN HALL
|
|
2015-12-01
|
99
|
Miscellaneous
|
|
NOTICE TO PROCEED FOR 2015-2016 SEMI-ANNUAL POTABLE WELL MONITORING PLAN
|
|
2015-11-02
|
99
|
Miscellaneous
|
|
MEETING W/CITY & AECOM - SITE UPDATES
|
|
2015-10-09
|
43
|
Site Activity Status Update Received
|
|
STATUS REPORT REC'D: CASE ACTIVITY REPORT OF NEWTON RESIDENT INTERVIEW
|
|
2015-09-24
|
43
|
Site Activity Status Update Received
|
|
2015-2016 POTABLE WELL MONITORING WORK PLAN
|
|
2015-09-24
|
99
|
Miscellaneous
|
|
UPDATE MEETING WITH CITY & AECOM
|
|
2015-09-24
|
43
|
Site Activity Status Update Received
|
|
STATUS REPORT REC'D: SOURCE AREA/DOWNGRADIENT SOIL WASTE ANALYTICAL DATA
|
|
2015-09-11
|
43
|
Site Activity Status Update Received
|
|
CASE ACTIVITY REPORT FOR INTERVIEW
|
|
2015-08-27
|
43
|
Site Activity Status Update Received
|
|
UPDATE FOR SITE INVESTIGATION
|
|
2015-07-23
|
43
|
Site Activity Status Update Received
|
|
PROPOSED REMEDIAL ACTION SCOPE OF SERVICES LIST
|
|
2015-07-23
|
99
|
Miscellaneous
|
|
MTG W/CITY & AECOM: WATER MAIN, POTABLE WELL RESULTS & PROPOSED RA SCOPE OF SERVICES
|
|
2015-07-22
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2015 - 6/30/2015
|
|
2015-06-18
|
43
|
Site Activity Status Update Received
|
|
GW MONITORING
|
|
2015-05-11
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL MONITORING
|
|
2015-04-27
|
99
|
Miscellaneous
|
|
MTG W/CITY & AECOM: POTABLE WELLS, REPORT & PRELIMINARY RA SOW UPDATED
|
|
2015-04-02
|
43
|
Site Activity Status Update Received
|
|
3RD QTR POTABLE WELL RESULTS & REGIONAL GW FLOW MAP
|
|
2015-04-01
|
99
|
Miscellaneous
|
|
TECHNICAL INFORMATION MTG TO DETERMINE 2015 SI & REMEDIAL WORK
|
|
2015-03-11
|
99
|
Miscellaneous
|
|
MTG W/CITY & AECOM - POTABLE WELL SAMPLING UPDATE, OFF-SITE INVESTIGATION & REMEDIAL ACTION
|
|
2015-02-04
|
-
|
Site Investigation
|
|
|
|
2015-02-01
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2014 - 12/31/2014
|
|
2015-01-28
|
99
|
Miscellaneous
|
|
DNR TELCON TO DISCUSS SOURCE REMEDIAL ACTION & OFF-SITE INVESTIGATION
|
|
2015-01-14
|
99
|
Miscellaneous
|
|
DNR MTG TO DISCUSS PRPS, POTABLE WELL SAMPLING & INTERIM GIS REGISTRY DOCUMENTATION
|
|
2014-12-06
|
99
|
Miscellaneous
|
|
2ND OPEN HOUSE @ NEWTON TOWN HALL
|
|
2014-12-06
|
43
|
Site Activity Status Update Received
|
|
2014 SECOND QTLY POTABLE WELL MONITORING REPORT REC'D
|
|
2014-12-03
|
43
|
Site Activity Status Update Received
|
|
2014 SILVER CREEK SAMPLING LETTER REPORT REC'D
|
|
2014-12-03
|
99
|
Miscellaneous
|
|
TELCON MEETING MINUTES
|
|
2014-12-02
|
43
|
Site Activity Status Update Received
|
|
2014 FIRST QTLY POTABLE WELL MONITORING LETTER REPORT REC'D
|
|
2014-11-26
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL RESULTS REC'D
|
|
2014-11-12
|
43
|
Site Activity Status Update Received
|
|
2ND ROUND POTABLE WELL RESULTS FOR FIVE REPLACEMENT WELLS REC'D
|
|
2014-11-05
|
99
|
Miscellaneous
|
|
TELCON MEETING MINUTES
|
|
2014-10-28
|
43
|
Site Activity Status Update Received
|
|
3403 CTH CR NEW POTABLE WELL RESULTS REC'D
|
|
2014-10-14
|
99
|
Miscellaneous
|
|
CALL FROM NEWTON RESIDENT REGARDING POTABLE WELL SAMPLING SUMMARY
|
|
2014-10-08
|
99
|
Miscellaneous
|
|
TELCON-MONTHLY UPDATE-POTABLE WELL SAMPLING, ADDT'L SITE INVESTIGATION & PREPARATIONS FOR OPEN HOUSE
|
|
2014-10-03
|
99
|
Miscellaneous
|
|
SITE PROPERTY DEED REC'D
|
|
2014-10-02
|
99
|
Miscellaneous
|
|
TOWN OF NEWTON I-43 SOIL BORING DATA REC'D
|
|
2014-10-01
|
99
|
Miscellaneous
|
|
MEETING W/GEOLOGICAL SURVEY TO DISCUSS MANITOWOC COUNTY BEDROCK GEOLOGY & HYDROGEOLOGY
|
|
2014-09-24
|
99
|
Miscellaneous
|
|
CALL FROM NEWTON RESIDENT REGARDING POTABLE WELL RESULTS & SAMPLING
|
|
2014-09-22
|
99
|
Miscellaneous
|
|
PROPERTY ACCESS MEETING FOR ADDT'L SITE INVESTIGATION - PROPERTY ACCESS ATTAINED
|
|
2014-09-16
|
43
|
Site Activity Status Update Received
|
|
REPLACEMENT POTABLE WELL SPECIFICATIONS REC'D
|
|
2014-09-15
|
99
|
Miscellaneous
|
|
MEETING W/PROPERTY OWNER FOR PROPERTY ACCESS
|
|
2014-09-15
|
43
|
Site Activity Status Update Received
|
|
REC'D REMAINING 2ND ROUND POTABLE WELL SAMPLE RESULTS PER THE 1-YR POTABLE WELL MONITORING PLAN
|
|
2014-09-12
|
99
|
Miscellaneous
|
|
FINAL LETTER REQUESTING PROPERTY ACCESS ISSUED
|
|
2014-09-12
|
99
|
Miscellaneous
|
|
DNR WATER DIVISION APPROVES SILVER CREEK SAMPLING SURVEY PROPOSAL
|
|
2014-09-11
|
43
|
Site Activity Status Update Received
|
|
REPLACEMENT POTABLE WELL DRILLING SCHEDULE REC'D
|
|
2014-09-10
|
99
|
Miscellaneous
|
|
TELCON-MONTHLY UPDATE-POTABLE WELL REPLACEMENT INSTALLS & SAMPLING
|
|
2014-09-10
|
99
|
Miscellaneous
|
|
SILVER CREEK SAMPLING SURVEY PROPOSAL REC'D
|
|
2014-09-10
|
43
|
Site Activity Status Update Received
|
|
REC'D PARTIAL 2ND ROUND POTABLE WELL SAMPLE RESULTS PER THE 1-YR POTABLE WELL MONITORING PLAN
|
|
2014-09-05
|
99
|
Miscellaneous
|
|
LETTER REQUESTING PROPERTY ACCESS MEETING ISSUED
|
|
2014-09-04
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2014 - 6/30/2014
|
|
2014-09-03
|
99
|
Miscellaneous
|
|
PROPERTY ACCESS UPDATE/DISCUSSION-TELCON
|
|
2014-08-29
|
99
|
Miscellaneous
|
|
WARDEN CASE ACTIVITY REPORTS REC'D
|
|
2014-08-26
|
99
|
Miscellaneous
|
|
THREE ON-SITE INTERVIEWS CONDUCTED BY DNR WARDEN
|
|
2014-08-21
|
43
|
Site Activity Status Update Received
|
|
2013-2014 POTABLE WELL MONITORING LETTER REPORT REC'D
|
|
2014-08-18
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
EXPANDED SI WORKPLAN
|
|
2014-08-18
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
|
|
2014-08-07
|
99
|
Miscellaneous
|
|
CITY WEBSITE UPDATED
|
|
2014-08-05
|
99
|
Miscellaneous
|
|
CONFIRMATION - 3609 HECKER RD POTABLE WELL RESULTS & REMAINING RESULTS REC'D
|
|
2014-07-23
|
99
|
Miscellaneous
|
|
TELCON UPDATE MEETING MINUTES
|
|
2014-07-02
|
99
|
Miscellaneous
|
|
CONTACTED BY MEDIA - REC'D NOV 24 & DEC 8, 2013 AND JULY 1, 2014 NEWS ARTICLES
|
|
2014-06-26
|
99
|
Miscellaneous
|
|
REC'D 1ST ROUND POTABLE WELL SAMPLE RESULTS PER THE 1-YR POTABLE WELL MONITORING PLAN
|
|
2014-06-26
|
99
|
Miscellaneous
|
|
PRELIMINARY ASSESSMENT PRE-CERCLIS FORM
|
|
2014-06-24
|
313
|
Superfund Site Assessment Pre-CERCLA Screening (PCS)
|
|
|
|
2014-06-17
|
99
|
Miscellaneous
|
|
TELCON TO DISCUSS MAY 2014 POTABLE WELL SAMPLING RESULTS & FUTURE SI & POTABLE WELL ACTIONS
|
|
2014-06-17
|
99
|
Miscellaneous
|
|
UPDATE WI DEPT OF HEALTH SERVICES & COUNTY HEALTH DEPT ON POTABLE WELLS STATUS
|
|
2014-05-23
|
99
|
Miscellaneous
|
|
NEW DNR PROJECT MANAGER ASSIGNED
|
|
2014-05-15
|
43
|
Site Activity Status Update Received
|
|
2013 GW MONITORING LETTER REPORT REC'D
|
|
2014-05-01
|
43
|
Site Activity Status Update Received
|
|
3518 HECKER RD NEW POTABLE WELL 3RD RD RESULTS RECD
|
|
2014-05-01
|
43
|
Site Activity Status Update Received
|
|
STATUS UPDATE RECD FOR 2013 GROUNDWATER MONITORING REPORT
|
|
2014-04-16
|
43
|
Site Activity Status Update Received
|
|
3518 HECKER RD NEW POTABLE WELL 2ND RD RESULTS RECD
|
|
2014-04-15
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL MONITORING WORK PLAN RECD
|
|
2014-04-04
|
99
|
Miscellaneous
|
|
TELCON WITH EPA TO DISCUSS PA ONLY OPTION
|
|
2014-04-02
|
99
|
Miscellaneous
|
|
TELCON WITH CITY TO DISCUSS RESIDENT AND ATTORNEY REQUESTS
|
|
2014-03-26
|
43
|
Site Activity Status Update Received
|
|
STATUS UPDATE RECEIVED: RA OPTIONS AND ADDITIONAL SI WORK DISCUSSION
|
|
2014-03-24
|
43
|
Site Activity Status Update Received
|
|
STATUS UPDATE RECEIVED: CITY DECIDES NO EPA REMOVALS ASSISTANCE
|
|
2014-03-17
|
43
|
Site Activity Status Update Received
|
|
3312 CTH CR POTABLE WELL RESULTS RECEIVED
|
|
2014-03-13
|
43
|
Site Activity Status Update Received
|
|
3518 HECKER RD NEW POTABLE WELL RESULTS RECEIVED
|
|
2014-03-11
|
99
|
Miscellaneous
|
|
NEW POTABLE WELL INSTALLED AT 3518 HECKER RD
|
|
2014-03-10
|
43
|
Site Activity Status Update Received
|
|
CITY POTABLE WELL RESULTS RESIDENT NOTIFICATION LETTERS RECEIVED
|
|
2014-03-07
|
99
|
Miscellaneous
|
|
EPA REMOVALS TELCON WITH CITY
|
|
2014-02-21
|
99
|
Miscellaneous
|
|
DNR VAPOR INTRUSION CONCURRENCE LETTER MAILED
|
|
2014-02-19
|
99
|
Miscellaneous
|
|
DATA GAPS MEETING WITH CITY
|
|
2014-02-18
|
43
|
Site Activity Status Update Received
|
|
QA/QC SPLIT POTABLE WELL SAMPLE RESULTS RECEIVED
|
|
2014-02-18
|
43
|
Site Activity Status Update Received
|
|
WGNHS GEOPHYSICAL SURVEY REPORT RECEIVED
|
|
2014-02-14
|
99
|
Miscellaneous
|
|
OPEN HOUSE FOLLOW UP INFORMATIONAL FLYER MAILED
|
|
2014-02-14
|
99
|
Miscellaneous
|
|
CITY PUBLIS OUTREACH WEBSITE ACTIVATED
|
|
2014-02-14
|
43
|
Site Activity Status Update Received
|
|
CITY POTABLE WELL RESULTS NOTIFICATION LETTRS TO RESIDENTS RECEIVED
|
|
2014-02-12
|
43
|
Site Activity Status Update Received
|
|
FEB 4 POTABLE WELL SAMPLING RESULTS RECEIVED
|
|
2014-02-09
|
99
|
Miscellaneous
|
|
DATA GAP MEETING MINUTES
|
|
2014-02-04
|
99
|
Miscellaneous
|
|
TELCON WITH CITY AND STROESS TO DISCUSS INTERVIEWS
|
|
2014-01-31
|
43
|
Site Activity Status Update Received
|
|
PRIVATE WELL TESTING LETTERS
|
|
2014-01-30
|
99
|
Miscellaneous
|
|
CONCURRENCE TO DELAY CAPPING OF NEWTON GRAVEL PIT WESTERN SOURCE AREA LETTER SENT
|
|
2014-01-30
|
43
|
Site Activity Status Update Received
|
|
CONTINUING POTABLE WELL SAMPLING WORK PLAN REC'D
|
|
2014-01-28
|
99
|
Miscellaneous
|
|
2ND ADDT'L REQUIREMENTS LETTER SENT
|
|
2014-01-24
|
43
|
Site Activity Status Update Received
|
|
REC'D 5/24/1996 WAST GENERATOR AGREEMENT
|
|
2014-01-24
|
43
|
Site Activity Status Update Received
|
|
3518 HECK RD VAPOR INTRUSION REPORT REC'D
|
|
2014-01-24
|
43
|
Site Activity Status Update Received
|
|
PERMITTED WELLS WITHIN CITY LIMITS
|
|
2014-01-23
|
99
|
Miscellaneous
|
|
TELCON W/CITY TO DISCUSS SHORT TERM & LONG TERM INVESTIGATIVE/REMEDIAL REQUIREMENTS
|
|
2014-01-23
|
43
|
Site Activity Status Update Received
|
|
REQUEST TO DELAY CAPPING OF WESTERN SOURCE AREA LETTER REC'D
|
|
2014-01-22
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL SAMPLE RESULTS REC'D FOR CTH CR PROPERTIES, CITY NOTIFIED IMPACTED PROPERTY OWNERS
|
|
2014-01-22
|
43
|
Site Activity Status Update Received
|
|
REC'D TABULATED WELL CONSTRUCTION INFO, POTABLE WELL RESULTS & POTABLE WELL SAMPLE LOCATIONS FIGURE
|
|
2014-01-14
|
99
|
Miscellaneous
|
|
TELCON W/EPA TO DISCUSS POTENTIAL FOR PA/SI
|
|
2014-01-13
|
43
|
Site Activity Status Update Received
|
|
WASTE HAULERS LIST
|
|
2014-01-10
|
43
|
Site Activity Status Update Received
|
|
WEISSBACH/HEINEN INTERVIEW W/RETIRED CONSERVATION WARDEN ON HISTORIC DUMPING ACTIVITIES @ SITE
|
|
2014-01-10
|
43
|
Site Activity Status Update Received
|
|
REC'D CASE ACTIVITY REPORT FOR 2ND FORMER TRUCK DRIVER INTERVIEW
|
|
2014-01-10
|
99
|
Miscellaneous
|
|
TELCON W/EPA TO REVIEW & DISCUSS CASE SUMMARY
|
|
2014-01-08
|
99
|
Miscellaneous
|
|
TELCON W/CITY TO DISCUSS CASE STATUS, OUTREACH & POTABLE WELL RESULTS
|
|
2014-01-08
|
99
|
Miscellaneous
|
|
3609 M&M LANE-CLEAN WELL RESULTS NOTIFICATION LETTER SENT
|
|
2013-12-30
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL SAMPLING RESULTS RECEIVED FOR THREE WELLS
|
|
2013-12-30
|
43
|
Site Activity Status Update Received
|
|
CASE ACTIVITY REPORT FOR INTERVIEWS RECEIVED
|
|
2013-12-30
|
99
|
Miscellaneous
|
|
TELCON W/CITY DISCUSS WELL REPLACEMENT, OPEN HOUSE FOLLOW-UP, INTERVIEWS, WELL SAMPLING, EPA ASSIST
|
|
2013-12-30
|
99
|
Miscellaneous
|
|
TELCON W/CITY TO DISCUSS CASE STATUS, OUTREACH & POTABLE WELL RESULTS
|
|
2013-12-23
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL SAMPLE RESULTS RECEIVED. HEINEN - SAMPLE RESULTS LETTER SENT TO RESIDENTS
|
|
2013-12-23
|
43
|
Site Activity Status Update Received
|
|
STROESS INTERVIEW W/2ND FORMER TRUCK DRIVER REGARDING HISTORIC DUMPING ACTIVITIES @ SITE
|
|
2013-12-20
|
43
|
Site Activity Status Update Received
|
|
BEGGS/STROESS INTERVIEW WITH FORMER DRUCK DRIVER REGARDING HISTORIC DUMPING ACTIVITIES AT SITE
|
|
2013-12-20
|
99
|
Miscellaneous
|
|
TELCON WITH EPA TO DISCUSS POTENTIAL FOR EPA ASSISTANCE
|
|
2013-12-19
|
43
|
Site Activity Status Update Received
|
|
POTABLE WELL SAMPLING RESULTS RECEIVED FOR 12 ADDITIONAL WELLS
|
|
2013-12-19
|
99
|
Miscellaneous
|
|
TELCON WITH CITY TO DISCUSS WELL DRILLING AND POTABLE WELL RESULTS
|
|
2013-12-13
|
99
|
Miscellaneous
|
|
MAGNETOMETER SURVEY AT GRAVEL PIT AND ROBERTS
|
|
2013-12-13
|
99
|
Miscellaneous
|
|
WCUB RADIO INTERVIEW WITH MC DANIEL AND BEGGS
|
|
2013-12-12
|
43
|
Site Activity Status Update Received
|
|
REVISED POTABLE WELL DRILLING SCHEDULE RECEIVED
|
|
2013-12-11
|
99
|
Miscellaneous
|
|
TELCON WITH CONSULTANT ABOUT METALS SAMPLING RESULTS IN POTABLE WELLS
|
|
2013-12-07
|
99
|
Miscellaneous
|
|
OPEN HOUSE AT NEWTON TOWN HALL
|
|
2013-12-05
|
99
|
Miscellaneous
|
|
DNR ISSUES MEDIA ADVISORY ABOUT OPEN HOUSE
|
|
2013-12-04
|
43
|
Site Activity Status Update Received
|
|
MEETING AT CITY HALL TO PREP FOR OPEN HOUSE
|
|
2013-12-03
|
99
|
Miscellaneous
|
|
TELCON WITH ROBERTS ATTORNEY ABOUT ACCESS AGREEMENT
|
|
2013-12-02
|
43
|
Site Activity Status Update Received
|
|
CITY EMAILS QUOTE FOR REPLACEMENT POTABLE WELL (WITH SPECS BY HEINEN)
|
|
2013-12-02
|
43
|
Site Activity Status Update Received
|
|
CITY EMAILS LIST OF ADDITIONAL 12 POTABLE WELLS TO BE SAMPLED (LOCATIONS CHOSEN BY HEINEN)
|
|
2013-11-27
|
99
|
Miscellaneous
|
|
DNR SENDS SOW FOR MAGNETOMETER SURVEY AND ACCESS AGREEMENT
|
|
2013-11-26
|
99
|
Miscellaneous
|
|
OPEN HOUSE POST CARDS MAILED
|
|
2013-11-25
|
99
|
Miscellaneous
|
|
HTR NEWSPAPER ARTICLE ABOUT CONTAMINATED WELLS
|
|
2013-11-22
|
43
|
Site Activity Status Update Received
|
|
CITY SUGGESTS A POLICY FOR GENERAL REQUESTS FOR ACCESS TO THE GRAVEL PIT
|
|
2013-11-20
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SUBSLAB SAMPLING PLAN RECEIVED
|
|
2013-11-19
|
99
|
Miscellaneous
|
|
DNR EMAILS OUTREACH PLAN TO CITY
|
|
2013-11-19
|
99
|
Miscellaneous
|
|
TELCON WITH CONSULTANT ABOUT SUBSLAB SAMPLING
|
|
2013-11-15
|
99
|
Miscellaneous
|
|
DNR "ADDITIONAL REQUIREMENTS" LETTER SENT
|
|
2013-11-14
|
99
|
Miscellaneous
|
|
HEINEN SENDS ADVISORY LETTER TO RESIDENTS SAMPLED BY CITY
|
|
2013-11-13
|
99
|
Miscellaneous
|
|
MEETING WITH CITY
|
|
2013-11-06
|
43
|
Site Activity Status Update Received
|
|
NOTICE OF POTABLE WELLS IMPACT
|
|
2013-11-06
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL DNR REQUIREMENTS IN RESPONSE TO IMPACTED POTABLE WELLS
|
|
2013-10-01
|
43
|
Site Activity Status Update Received
|
|
CITY RESPONSE TO WDNR REVIEW OF 2012 GW MONITORING LETTER REPORT
|
|
2013-08-22
|
24
|
Long Term Monitoring Plan Received (non-Fee)
|
|
NEW WELL PZ-12 LOCATION & OCTOBER SAMPLING SCHEDULE
|
|
2013-08-22
|
27
|
Long Term Monitoring Plan Approved
|
|
APPROVAL & ADDT'L PARAMETERS, FIGURES REQ'D IN NEXT ANNUAL REPORT
|
|
2013-06-25
|
43
|
Site Activity Status Update Received
|
|
WILL SEND RESPONSE LETTER W/HISTORICAL DATA
|
|
2013-06-20
|
99
|
Miscellaneous
|
|
STATUS UPDATED REQUESTED
|
|
2013-04-08
|
26
|
Long Term Monitoring Plan Not Approved
|
|
ADDITIONAL SAMPLING AND MONITORING WELL REQUIRED
|
|
2013-03-27
|
24
|
Long Term Monitoring Plan Received (non-Fee)
|
|
ANNUAL REPORT
|
|
2011-09-08
|
130
|
DNR Regulatory Reminder Sent
|
|
Vapor Intrusion (VI) Assessment Notification Ltr Sent
|
|
2011-07-07
|
43
|
Site Activity Status Update Received
|
|
WRITTEN UPDATE COMING
|
|
2010-03-03
|
99
|
Miscellaneous
|
|
REQUESTED SITE HISTORY FROM CONSULTANT & RP
|
|
2010-02-03
|
99
|
Miscellaneous
|
|
REQUEST FOR CLARIFICATION OF SITE HISTORY
|
|
2010-02-03
|
43
|
Site Activity Status Update Received
|
|
CLARIFICATION PROVIDED BY CONSULTANT
|
|
2009-08-10
|
99
|
Miscellaneous
|
|
CLARIFICATION OF SI APPROVAL REQUIREMENTS
|
|
2009-08-05
|
38
|
Site Investigation Report (SIR) Approved
|
|
|
|
2009-08-03
|
99
|
Miscellaneous
|
|
REQUEST CLARIFICATION OF REPORT
|
|
2009-08-03
|
43
|
Site Activity Status Update Received
|
|
INFORMATION SUPPLIED
|
|
2009-07-15
|
99
|
Miscellaneous
|
|
ACKNOWLEDGMENT - RECEIPT OF SIR
|
|
2009-06-29
|
137
|
Site Investigation Report (SIR) Received (fee)
|
|
|
|
2009-05-20
|
43
|
Site Activity Status Update Received
|
|
CITY COUNCIL APPROVED PROPOSED RAP & BUDGET, RAP COMING WITHIN FEW WEEKS
|
|
2009-05-11
|
43
|
Site Activity Status Update Received
|
|
SI & RAP WILL BE SENT TO DNR
|
|
2009-05-11
|
99
|
Miscellaneous
|
|
MTG W/CITY STREET & SANITATION COMMITTEE REGARDING PROPOSED RAP
|
|
2009-04-13
|
43
|
Site Activity Status Update Received
|
|
GW DATA
|
|
2009-04-13
|
99
|
Miscellaneous
|
|
MTG W/CITY & CONSULTANT REGARDING STATUS, PROPOSED WORK
|
|
2008-10-07
|
43
|
Site Activity Status Update Received
|
|
UPDATE, SI/RAP COMING
|
|
2008-06-05
|
43
|
Site Activity Status Update Received
|
|
UPDATE & SURFACE WATER DATA
|
|
2007-12-13
|
805
|
Historic Waste Site
|
|
|
|
2007-12-13
|
807
|
Registry of Waste Disposal Site - SHWIMS Listing
|
|
|
|
2007-11-09
|
99
|
Miscellaneous
|
|
DIRECTION TO PROCEED W/FREE PRODUCT RECOVERY
|
|
2007-11-01
|
43
|
Site Activity Status Update Received
|
|
FREE PRODUCT RECOVERY DATA
|
|
2007-08-30
|
43
|
Site Activity Status Update Received
|
|
UPDATED ON NEW MONITORING WELL INSTALLATION
|
|
2007-08-28
|
43
|
Site Activity Status Update Received
|
|
UPDATED ON ACCESS TO NEIGHBORING PROPERTIES. REQUEST TO ABANDON TWO WELLS.
|
|
2007-08-28
|
99
|
Miscellaneous
|
|
APPROVAL TO ABANDON THE TWO WELLS
|
|
2007-08-16
|
43
|
Site Activity Status Update Received
|
|
PROPERTY OWNER INFORMATION
|
|
2007-08-16
|
99
|
Miscellaneous
|
|
PROVIDED SUMMARY OF DNR CONVERSATION W/PROPERTY OWNER
|
|
2007-06-20
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
|
|
2007-06-19
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
2005-10-03
|
43
|
Site Activity Status Update Received
|
|
GW SAMPLING EVALUATION
|
|
2005-06-10
|
99
|
Miscellaneous
|
|
STATUS INQUIRY
|
|
2004-06-21
|
99
|
Miscellaneous
|
|
REQUESTED STATUS UPDATE
|
|
2002-11-18
|
43
|
Site Activity Status Update Received
|
|
GW DATA
|
|
2002-04-16
|
43
|
Site Activity Status Update Received
|
|
GW DATA
|
|
1994-01-07
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
ADDENDUM
|
|
1993-08-01
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
FIELD INVEST P2
|
|
1993-01-15
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
FIELD INVEST P2
|
|
1992-10-01
|
59
|
Environmental Enforcement Action Completed
|
|
ENFORCEMENT CONFERENCE
|
|
1991-07-02
|
1
|
Notification of Hazardous Substance Discharge
|
|
|