WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-67-000801 JACOBUS OIL CO
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
JACOBUS OIL CO WASHINGTON SOUTHEAST
Address Municipality
N116 W16261 MAIN ST GERMANTOWN
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NW 1/4 of the SE 1/4 of Sec 22, T09N, R20E 43.2276841 -88.1113422 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
1
Facility ID PECFA No. EPA ID Start Date End Date
267054920 53022-2541-11 1980-01-01 2013-03-04
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Above Ground Storage Tank Flag Pecfa Flag ROW Impact flag
Site Files
Name File
SITE FILE DOCUMENTATION FOR ACTIVITY Download PDF Document
Actions and Documents
Date Code Name File Comment
2023-06-13 99 Miscellaneous Download PDF file ANNUAL COVER INSPECTION FORM
2021-07-01 99 Miscellaneous Download PDF file ANNUAL CAP INSPECTION
2020-06-16 99 Miscellaneous Download PDF file CAP INSPECTION LOG
2018-08-06 99 Miscellaneous Download PDF file CASE CLOSURE ADDENDUM LETTER
2018-08-06 227 Continuing Obligation Removed - Vapor Intrusion Response FUTURE USE CO REPLACED BY VAPOR MITIGATION MAINTENANCE REQUIREMENT
2018-08-06 222 Continuing Obligation - Maintain Cap Over Contaminated Area MAINTAIN COVER
2018-08-06 226 Continuing Obligation - Vapor Intrusion Response GARAGE VENTILATION SYSTEM MAINTENANCE REQUIRED SEE VI OPTIONS SECTION FOR DETAILS.
2018-06-21 99 Miscellaneous Download PDF file REVISED CMP
2018-05-14 99 Miscellaneous Download PDF file POST CONSTRUCTION SUMP SAMPLE RESULTS
2018-03-22 99 Miscellaneous Download PDF file POST CONSTRUCTION CAP MAINTENANCE PLAN
2018-01-26 43 Site Activity Status Update Received Download PDF file POST CONSTRUCTION 718 SOIL MANAGEMENT PLAN REPORT
2016-09-14 193 CO Modification Notice to Proceed (NTP) Download PDF file SOILS MANAGEMENT PLAN APPROVED
2016-09-09 199 Additional Information Received (Fee-Based or Closure) Download PDF file FINAL SOILS MANAGEMENT PLAN
2016-08-03 99 Miscellaneous Download PDF file GAVE GO-AHEAD WITH CAVEAT TO REVISED SMP SAMPLING PLAN
2016-03-31 99 Miscellaneous Download PDF file EMAIL RESPONSE
2016-03-08 198 Request for Additional Information (Fee-Based or Closure) Download PDF file ASKED FOR MORE SITE INVESTIGATION AND MORE INFORMATION
2016-01-21 181 Continuing Obligation Modification Request Received (fee) Download PDF file REC'D CK # 44156 $1050.00
2016-01-21 700 Database Fee Paid for Groundwater Continuing Obligation(s) REC'D CK # 44156 $350.00
2016-01-21 710 Database Fee Paid for Soil Continuing Obligation(s) REC'D CK # 44156 $300.00
2013-03-04 11 Activity Closed
2013-03-04 226 Continuing Obligation - Vapor Intrusion Response
2013-03-04 232 Continuing Obligation - Residual Soil Contamination
2013-03-04 236 Continuing Obligation - Residual GW Contamination
2013-03-04 56 Continuing Obligation(s) Applied Download PDF file
2013-03-04 46 Impacted Right-of-Way (ROW) Notification AUTO-POPULATED 2018-03-20
2013-03-04 66 Continuing Obligations (COs) Apply at Off-site Property(ies) auto-populated on 08/01/2019 per activity relationship to off-site(s)
2013-01-24 190 Remaining Actions Needed Requirements Met or Docs Received REC'D WELL ABANDONMENT DOCS
2012-12-06 84 Remaining Actions Needed CONDITIONAL CLOSURE PENDING WELL ABANDONMENT
2012-11-09 79 Case Closure Review Request Received REC'D CK# 62138 $750.00
2012-11-09 700 Database Fee Paid for Groundwater Continuing Obligation(s) REC'D CK# 2139 $200.00
2012-11-09 710 Database Fee Paid for Soil Continuing Obligation(s) 5REC'D CK# 62139 $250.00
2012-04-25 99 Miscellaneous COPY OF PECFA PUBLIC BID DEFERRED - COAST CAP APPROVED
2012-02-06 43 Site Activity Status Update Received REC'D COPY PECFA COST APPROVAL REQ-ADD'L SAMPLING
2012-01-23 153 Remedial Action (RA) Documentation Report Approved Download PDF file REM ACTION PLN CONDITIONALL APPROVED - REQT 2 MORE PVOC SAMPLES FROM JMW-6D & VAPOR ASSESS
2012-01-03 99 Miscellaneous PM CHANGE LETTER SENT (CHRISTINE LILEK)
2012-01-03 99 Miscellaneous PM CHANGE LETTER SENT (CHRISTINE LILEK)
2011-11-17 151 Remedial Action (RA) Documentation Report Received (non-fee)
2011-02-04 151 Remedial Action (RA) Documentation Report Received (non-fee)
2010-09-07 501 PECFA Bidding to Establish Cost Cap Download PDF file
2010-05-07 99 Miscellaneous REC'D DERF SI BID
2009-05-08 501 PECFA Bidding to Establish Cost Cap REC'D PUBLIC BID RD 55 WORKSCOPE
2008-12-01 99 Miscellaneous REC'D COST CAP MODIFICATION REQT
2008-03-17 501 PECFA Bidding to Establish Cost Cap Download PDF file ROUND 55
2007-11-30 91 SER First In/First Out (FIFO) Review Process Complete PROVIDED COMMENTS RE: ADD'L INVESTIGATIVE WORK
2007-10-17 43 Site Activity Status Update Received
2007-07-13 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) BID DEFERMENT, WORKPLAN APPROVED
2007-04-06 90 SER First In/First Out (FIFO) Review Process Started REC'D LTR RE ADD'L WORK FOR CLOSURE
2007-01-19 42 Remedial Action Report Approved ADD'L WORK NEEDED TO MOVE CASE TO CLOSURE
2006-11-20 151 Remedial Action (RA) Documentation Report Received (non-fee)
2005-04-07 501 PECFA Bidding to Establish Cost Cap Download PDF file BID ROUND 37
2005-03-31 90 SER First In/First Out (FIFO) Review Process Started FREE PRODUCT MEASUREMENTS
2005-02-09 99 Miscellaneous BB. TECHNICAL ASSISTANCE LETTER SENT
2004-11-16 97 Technical Assistance Request Received (fee) REC'D CK# 42322 $500.00 WITH STATUS REPORT
2004-11-16 98 Technical Assistance Provided REC'D CK# 42322 $500.00 WITH STATUS REPORT
2001-05-10 152 Remedial Action Documentation Report Received (fee) JD
2001-05-10 153 Remedial Action (RA) Documentation Report Approved JD
2000-08-17 40 Remedial Action Options Report (RAOR) Approved
1998-07-13 39 Remedial Action Options Report (RAOR) Received (non-fee)
1997-07-22 99 Miscellaneous TECH ASSISTANCE ON ALTERNATIVES
1997-06-27 206 Site Investigation End - State Lead
1997-06-27 207 Remedial Design Start - State Lead
1980-01-01 1 Notification of Hazardous Substance Discharge
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
Property Affected -> 13-67-575419 SQUIRE DR PARCEL
Property Affected -> 13-67-575729 N116 W16257 MAIN ST
Property Affected -> 13-67-575730 STONEWOOD HOMES & CONDOS
Substances
Substance Type Amt Released Units
Gasoline - Unleaded and Leaded Petroleum
Petroleum - Unknown Type Petroleum
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
(A) Exceedence of Vapor Risk Levels - Vapor Mitigation Required: Vapor mitigation is required due to sub-slab or nearby soil vapor concentrations exceeding vapor risk screening levels.
PECFA Total Claims Paid
Payments made from the Petroleum Environmental Cleanup Fund Award
PECFA Site Name: Jacobus Co
Max. Reimbursement: $1,000,000 Total Amount Paid: $941,977.39
Occ No Claim No Audit Date Paid Date Amt Submitted Amt Ineligible Amt Paid
A 1 1997-06-09 1999-06-22 $437,453.47 $26,589.64 $406,646.55
A 1 1997-06-09 2000-04-21 $.00 $.00 $2,884.63
A 2 2004-11-18 2005-01-12 $118,170.34 $243.53 $115,568.27
A 3 2006-05-31 2006-10-10 $233,068.61 $.00 $228,407.24
A 4 2008-06-25 2008-08-13 $18,921.50 $480.06 $17,772.61
A 5 2009-07-15 2009-08-12 $11,775.45 $.00 $11,539.94
A 6 2011-01-24 2011-02-23 $5,755.63 $.00 $5,640.52
A 7 2011-05-18 2011-06-27 $99,792.45 $.00 $97,796.60
A 8 2011-11-10 2011-12-14 $49,981.11 $.00 $48,981.49
A 9 2013-05-03 2013-06-14 $6,877.08 $.00 $6,739.54
Responsible Party
JACOBUS ENERGY INC K 11815 W BRADLEY RD, MILWAUKEE, WI 53224
For More Information on this Activity
Southeast Region Contact: Jenny Meyer  jennifer.meyer1@wisconsin.gov
35291 | 02-67-000801
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages