ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on
the Web
ACTIVITY DETAILS
AFFECTED ANOTHER
PROPERTY OR RIGHT-OF-WAY
Contamination from this property
moved beyond the property line to other properties or rights-of-way (ROWs).
For more information, please see the Relationships to Other Activities section, and
files, if available, in the Actions and Documents section below.
|
*** CONTINUING
OBLIGATIONS APPLY ***
Continuing obligations apply to
one or more properties due to remaining contamination. For
information specific to the continuing obligations, review the
documentation below. Before constructing or reconstructing a
water supply well, you need to contact DNR for approval of
well construction specifications.
|
02-41-552635
CRESTWOOD AREA PROJECT - GLENDALE MEDICAL BL
|
Activity Type / Status |
Jurisdiction |
ERP
/
CLOSED
|
DNR RR |
Address |
Municipality |
5630 - 5666 N GREEN BAY RD |
GLENDALE |
PLSS Description |
Latitude (WGS84) |
Longitude (WGS84) |
Google Maps |
RR Sites Map |
SW 1/4 of the SE 1/4 of Sec 30, T08N, R22E
|
43.1200717 |
-87.9341897 |
|
|
Additional Activity Details |
Acres |
|
1.5
|
Facility ID |
PECFA No. |
EPA ID |
Start Date |
End Date |
341167420
|
|
|
1997-10-16
|
2008-10-13
|
Characteristics
Above Ground Petrol Tank
|
Drycleaner |
EPA NPL Site
|
EPA Superfund
|
PECFA Funds Eligible
|
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank
|
WI DOT Site
|
|
|
|
|
|
|
|
|
|
|
Actions and Documents
Records related to the site are
documents that were available at the time the scanned paper or
electronic file was uploaded. Records withheld by the
department due to confidentiality, attorney-client privilege,
and other sensitive records, as well as lab data, may not be
included. Additional records associated with the site may or
may not be accessible through an open records request through
DNR or another state agency (see Jurisdiction above).
|
|
Date |
Code |
Name |
File |
Comment |
|
2014-01-07
|
187
|
Continuing Obligation(s) Compliance Audit Follow-up Complete
|
|
SUBMITTED COPY OF BARRIER INSPECTIONG LOG
|
|
2012-08-27
|
185
|
Continuing Obligation(s) Compliance Audit Complete
|
|
|
|
2012-08-27
|
186
|
Continuing Obligation(s) Compliance Audit Follow-up Needed
|
|
REPAIR COVER/CAP, REPLACE COVER/CAP, DOCUMENT INSPECTIONS
|
|
2008-10-13
|
11
|
Activity Closed
|
|
|
|
2008-10-13
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
|
|
2008-10-13
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2008-10-13
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2008-10-13
|
236
|
Continuing Obligation - Residual GW Contamination
|
|
|
|
2008-10-13
|
226
|
Continuing Obligation - Vapor Intrusion Response
|
|
SLAB AND VENTING SYSTEM
|
|
2008-10-13
|
46
|
Impacted Right-of-Way (ROW) Notification
|
|
AUTO-POPULATED 2018-03-20
|
|
2008-10-13
|
66
|
Continuing Obligations (COs) Apply at Off-site Property(ies)
|
|
auto-populated on 08/01/2019 per activity relationship to off-site(s)
|
|
2008-10-08
|
700
|
Database Fee Paid for Groundwater Continuing Obligation(s)
|
|
REC'D CK# 038001 $250.00
|
|
2008-10-08
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
REC'D CK# 038001 $200.00
|
|
2008-06-23
|
179
|
Case Closure Review Request Received (non-fee)
|
|
WELL ABANDONMENT FORMS
|
|
2008-01-29
|
84
|
Remaining Actions Needed
|
|
ABANDON WELLS/SVE SYSTEM
|
|
2007-09-07
|
179
|
Case Closure Review Request Received (non-fee)
|
|
|
|
2007-06-01
|
43
|
Site Activity Status Update Received
|
|
MAY GW SAMPLING RESULTS REC'D
|
|
2007-04-24
|
179
|
Case Closure Review Request Received (non-fee)
|
|
ALSO SEE BRRTS# 02-41-184990
|
|
1997-10-16
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
|
1997-05-15
|
80
|
Closure Not Recommended
|
|
PND, MIM: MORE GW MONITORING REQUIRED
|
Relationships to Other Activities
Click Activity Below to View
Details
Substances
Substance |
Type |
Amt Released |
Units |
Lead (Pb) |
Metals |
|
|
Metals |
Metals |
|
|
Solid Waste |
Solid Waste |
|
|
Tetrachloroethene (Perchloroethylene) |
VOC |
|
|
Volatile Organic Compounds |
VOC |
|
|
Vapor Intrusion Continuing Obligation(s)
(A) Exceedence of Vapor Risk Levels - Vapor Mitigation Required: Vapor mitigation is required due to sub-slab or nearby soil vapor concentrations exceeding vapor risk screening levels.
|
Responsible Party
ST FRANCIS BANK C/O MARK MARK TRETER TRETER LAW OFFICE, GREENDALE, WI 53129 |
For More Information on this Activity
552635
|
02-41-552635