WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
04-16-560095 ENBRIDGE ENERGY SPILL
Activity Type / Status Jurisdiction
SPILL  CLOSED DNR RR
Location Name County DNR Region
ENBRIDGE SUPERIOR TERMINAL DOUGLAS NORTHERN
Address Municipality
2800 E 21ST ST SUPERIOR
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
  Click to view on Google Maps using Address
Additional Location Description
PRODUCT LINE NEAR TANK 8
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
816010580 2011-04-04 2013-02-15
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Actions and Document
Date Code Name File Comment
2013-02-16 - Spill Documentation Download PDF file
2013-02-15 11 Spill Activity Closed
2011-04-05 5 Notification of Hazardous Substance Spill
2011-04-04 1 Spill Incident Occurred
Spill Details
SERTS Spill ID Spill Occurred Date/Time Spill Reported Date/Time
20110405NO16-1 2011-04-04  unknown 2011-04-05  10:32
Description of Incident/General Comments
CALLED MIKE GOMEN AND LEFT A VOICE MAIL MESSAGE AT APPROXIMATELY 1300HRS ON 04/05/2011. GOMEN CALLED SAGER BACK. GOMEN REPORTED THAT ENBRIDGE IS EXCAVATING ALONG A PRODUCT LINE NEAR TANK 8 TO FIND THE SOURCE OF THE RELEASE. PAUL TURNER, ENBRIDGE, CALLED SAGER AT APPROXIMATELY 0904HRS ON 04/08/2011. TURNER REPORTED THAT ENBRIDGE IS CONTINUING TO EXCAVATE TO TRACE THE SOURCE OF THE RELEASE. ENBRIDGE HAS RECOVERED APPROXIMATELY 15 GALLONS OF OIL. TURNER WILL CALL SAGER ON 04/11/2011 WITH AN UPDATE OF ACTIVITIES. TURNER CALLED SAGER AT APPROXIMATELY 1540HRS ON 4/13/11. LEAK IN THE LINE WAS FOUND AND THE LINE PLUGGED AND CAPPED. SOIL IS STOCKPILED ON SITE WAITING DISPOSAL. TURNER WILL SEND SAGER COPIES OF DISPOSAL DOCUMENTATION. KARL BEASTER, ENBRIDGE ENERGY, CALLED SAGER ON 10/05/2011. EXCAVATION OF CONTAMIANTED SOIL IS COMPLETED. A CLOSURE REPORT FROM BARR ENGINEERING IS PENDING. SAGER EMAILED KARL BEASTER ON 3/15/2012 ASKING FOR AN UPDATE. SAGER RECEIVED A RESPONSE REPORT FROM BARR ENGINEERING ON 2/15/13.
Type of Location
BULK PETROLEUM STORAGE (TANK FARM/TERMINAL/REFINERY)
Spill Cause
EQUIPMENT FAILURE EQUIPMENT FAILURE
Description of Environmental Impact
NOT PROVIDED
Cleanup Efforts at Time Incident Reported
Spiller Actions
Action Comment
Cleanup Method - Excavation
Contractor Hired BARR ENGINEERING
Waste Destination TEMPRPARY ON SITE HOLDING FACILITY
Substances
Substance Type Amt Released Units
Crude Oil Petroleum 12 Gal
Waste Destination
Destination Comment
OTHER: TEMPRPARY ON SITE HOLDING FACILITY
Responsible Party
ENBRIDGE ENERGY 2800 E 21ST ST, SUPERIOR, WI 54880
For More Information on this Activity
Northern Region Contact: Kathleen Shafel  kathleen.shafel@wisconsin.gov
560095 | 04-16-560095
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages