02-29-563566
VOLK FIELD RIFLE RANGE #5/RANGE #250
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / OPEN | DNR RR |
Location Name | County | DNR Region |
---|---|---|
WI AIR NATL GUARD VOLK FIELD | JUNEAU | WEST CNTRL |
Address | Municipality |
---|---|
100 INDEPENDENCE DR | CAMP DOUGLAS |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
SE 1/4 of the SW 1/4 of Sec 21, T17N, R02E | 43.924907 | -90.2622045 |
![]() |
![]() |
Additional Activity Details | Acres |
---|---|
UNKNOWN |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
729055690 | 2015-02-12 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
Name | File |
---|---|
SITE FILE DOCUMENTATION FOR ACTIVITY | ![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-07-09 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2024 - 6/30/2024 | |
2024-01-08 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2023 - 12/31/2023 | |
2023-07-05 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 01/01/2023 - 06/30/2023 | |
2023-01-03 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2022 - 12/31/2022 | |
2022-07-01 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2021-04-06 | 130 | DNR Regulatory Reminder Sent |
![]() |
VAPOR INTRUSION AND TCE REMINDER LETTER | |
2020-08-17 | 130 | DNR Regulatory Reminder Sent |
![]() |
EMERGING CONTAMINANTS REMINDER LETTER | |
2020-07-01 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2020 - 6/30/2020 | |
2020-01-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2019 - 12/31/2019 | |
2019-07-18 | - | Remediation |
![]() |
||
2019-07-18 | - | Remediation |
![]() |
||
2019-07-18 | - | Remediation |
![]() |
||
2019-07-01 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2019 - 6/30/2019 | |
2019-01-03 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2018 - 12/31/2018 | |
2017-04-27 | 310 | Superfund Final Feasibility Study (FS) Submittal |
![]() |
FINAL MMRP FEASIBILITY STUDY RPT | |
2017-04-24 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) |
![]() |
FEASIBILITY STUDY | |
2017-04-07 | 99 | Miscellaneous |
![]() |
DNR DIRECTION ON MUNITIONS RESPONSE SITES | |
2016-12-12 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) | FINAL SITE-SPECIFIC REPORT ON MMRP IRA'S | ||
2016-12-08 | 43 | Site Activity Status Update Received |
![]() |
INTERIM REMEDIAL ACTION REPORT;REPORT AND APPENDICES A-J IN FOUR SEPARATE DOCUMENTS | |
2016-11-30 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
REMEDIAL INVESTIGATION RPT ADDENDUM | |
2016-11-17 | 99 | Miscellaneous | DRAFT FINAL FEASIBILITY STUDY REPORT RECEIVED | ||
2015-06-26 | 43 | Site Activity Status Update Received |
![]() |
RI-FS AREA EXT WKPLN | |
2015-05-11 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
FINAL WORK PLAN FOR INTERIM REMOVAL ACTION RECD | |
2015-05-07 | 99 | Miscellaneous |
![]() |
COND APPVL OF DRAFT FINAL WORK PLAN FOR INTERIM REMOVAL ACTION | |
2015-05-01 | 7 | Environmental Consultant Hired | EA ENGINEERING SCIENCE & TECH | ||
2015-04-28 | 99 | Miscellaneous | COND APPVL OF ACTION MEMO FOR INTERIM REMOVAL ACTION | ||
2015-04-20 | 2 | Responsible Party (RP) letter sent | |||
2015-03-06 | 99 | Miscellaneous |
![]() |
ENGINEERING EVALUATION/COST ANALYSIS | |
2015-02-12 | 1 | Notification of Hazardous Substance Discharge | |||
2015-01-12 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
APPENDICES A, D, F & G ON CD ONLY | |
2012-09-15 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
RI-FS WORKPLAN | |
2011-02-15 | 29 | Phase II Environmental Site Assessment (ESA) Rpt Received |
![]() |
Type | Related Activity |
---|---|
ERP to Facility Wide | 16-16-560657 ENBRIDGE ENERGY-SUPERIOR TERM FACILITY WIDE |
Substance | Type | Amt Released | Units |
---|---|---|---|
Crude Oil | Petroleum |
ENBRIDGE ENERGY 2800 E 21ST ST, SUPERIOR, WI 54880 |
JOHN SAGER john.sager@wisconsin.gov |