02-05-563707 BUTH OIL FACILITY (FORMER)
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
GEORGIA-PACIFIC BROADWAY LLC BROWN NORTHEAST
Address Municipality
1919 S BROADWAY GREEN BAY
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SE 1/4 of the NE 1/4 of Sec 02, T23N, R20E 44.496626 -88.0339465 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
.3
Facility ID PECFA No. EPA ID Start Date End Date
405032870 2015-03-25 2020-08-19
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Above Ground Storage Tank Flag   Underground Storage Tank Flag
Actions and Documents
Date Code Name File Comment
2023-01-09 43 Site Activity Status Update Received Download PDF file ABANDONMENT FORM FOR MONITORING WELL GP-08
2022-08-26 221 Continuing Obligation Removed - Soil at Industrial Use Level
2022-08-26 223 Continuing Obligation Removed - Maintain Cap
2022-08-26 227 Continuing Obligation Removed - Vapor Intrusion Response
2022-08-26 233 Continuing Obligation Removed - Residual Soil Contamination
2022-08-26 237 Continuing Obligation Removed - Residual GW Contamination
2022-08-26 104 Continuing Obligations Satisfied - No Longer Apply Download PDF file ALL COS ASSIGNED IN 2020 HAVE BEEN SATISFIED AS ALL CONTAMINATION HAS BEEN REMOVED
2022-07-29 194 CO Modification Final Documentation Received Download PDF file DOCUMENTATION OF SOIL EXCAVATION AND SOIL AND GROUNDWATER SAMPLING RESULTS
2022-02-15 99 Miscellaneous Download PDF file DNR CONCERNS REGARDING THE POTENTIAL FOR VAPOR INTRUSION FROM ADJACENT SITE (02-05-000627)
2022-02-11 64 Inject/Infiltrate Request Approved Download PDF file APPROVAL TO TREAT CONTAMINATED SOIL & GROUNDWATER WITH CALCIUM PEROXIDE
2022-02-02 63 Inject/Infiltrate Request Received (fee) Download PDF file REQUEST FORM & WRITE-UP; SEE AC 181 DATED 11/1/2021 FOR COMPLETE DOCUMENTATION
2021-11-12 193 CO Modification Notice to Proceed (NTP) Download PDF file DNR HAS PROVIDED ADDITIONAL COMMENTS TO NTP
2021-11-01 181 Continuing Obligation Modification Request Received (fee) Download PDF file REQUEST TO REMOVE ALL CONTINUING OBLIGATIONS (AC 220, AC222, AC226, AC232, AC236)
2021-11-01 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2021-11-01 710 Database Fee Paid for Soil Continuing Obligation(s)
2021-10-01 43 Site Activity Status Update Received Download PDF file MEETING MINUTES (WITH DNR RESPONSE) FROM POST CLOSURE MODIFICATION DISCUSSION ON 9/30/2021
2021-09-10 43 Site Activity Status Update Received Download PDF file MINUTES FROM 9/10/2021 MEETING REGARDING UPCOMING REMEDIATION PROJECT
2021-02-03 99 Miscellaneous Download PDF file CONCURRENCE TO SOIL MANAGEMENT ACTIVITIES AS RELATED TO AC97 ON 3/15/2015
2021-01-13 43 Site Activity Status Update Received Download PDF file OUTSTANDING SOIL MANAGEMENT DOCUMENTS
2020-11-30 99 Miscellaneous Download PDF file SUMMARY OF OUTSTANDING MATERIALS MANAGEMENT DOCUMENTS
2020-08-19 11 Activity Closed
2020-08-19 56 Continuing Obligation(s) Applied Download PDF file
2020-08-19 220 Continuing Obligation - Soil at Industrial Levels
2020-08-19 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2020-08-19 226 Continuing Obligation - Vapor Intrusion Response 7E
2020-08-19 232 Continuing Obligation - Residual Soil Contamination
2020-08-19 236 Continuing Obligation - Residual GW Contamination
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-23 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-06-24 190 Remaining Actions Needed Requirements Met or Docs Received Download PDF file BW-3 & BW-6 WELL ABANDONMENT FORMS
2020-06-03 84 Remaining Actions Needed Download PDF file MONITORING WELL ABANDONMENT
2020-05-28 199 Additional Information Received (Fee-Based or Closure) FINAL REVISIONS TO CLOSURE PACKET RECEIVED (VIA EMAIL)
2020-05-06 99 Miscellaneous Download PDF file REQUESTED REVISIONS TO CLOSURE PACKET
2020-04-22 43 Site Activity Status Update Received RP DECISION ON PATHWAY TO CLOSURE
2020-04-03 198 Request for Additional Information (Fee-Based or Closure) Download PDF file REQUESTING CLARIFICATION FROM CONSULTANT/RP ON PATHWAY TO CLOSURE
2020-03-16 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2020-03-16 199 Additional Information Received (Fee-Based or Closure) RECEIVED SIR, PROCEED WITH CLOSURE REVIEW
2020-02-24 198 Request for Additional Information (Fee-Based or Closure) Download PDF file COMPLETE SIR MUST BE SUBMITTED BEFORE REVIEW
2020-02-21 179 Case Closure Review Request Received (non-fee) RESUBMITTAL
2020-01-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-10-24 99 Miscellaneous Download PDF file UPDATE REQUEST & CLARIFICATION OF CAP REQUIREMENT
2019-07-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-05-16 43 Site Activity Status Update Received Download PDF file GROUNDWATER SAMPLING RESULTS (VIA EMAIL)
2019-03-15 99 Miscellaneous Download PDF file NEW PROJECT MANAGER (ANDY JAMES)
2019-01-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-09-26 43 Site Activity Status Update Received Download PDF file GROUNDWATER SAMPLING RESULTS (VIA EMAIL)
2018-08-06 80 Closure Not Recommended Download PDF file ADDT'L GROUNDWATER INVESTIGATION IS REQUIRED
2018-07-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-06-28 79 Case Closure Review Request Received AUTO-ENTERED
2018-06-15 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2018-06-15 710 Database Fee Paid for Soil Continuing Obligation(s)
2018-06-15 779 Case Closure Review Fee Received
2018-05-01 99 Miscellaneous Download PDF file NOTICE OF NEW PROJECT MANAGER - BEGLEY
2018-01-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2017-07-28 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-01-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-07-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-01-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-08-25 33 Tank System Site Assessment (TSSA) Report Received Download PDF file TSSA REPORT
2015-07-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-06-01 98 Technical Assistance Provided Download PDF file 718 EXEMPTION APPROVAL
2015-05-21 199 Additional Information Received (Fee-Based or Closure) Download PDF file ADDENDUM 1 TO SOIL MANAGEMENT PLAN
2015-05-20 2 Responsible Party (RP) letter sent Download PDF file
2015-05-01 198 Request for Additional Information (Fee-Based or Closure) SMP MEETING & REQUEST ADDT'L INFORMATION
2015-03-25 1 Notification of Hazardous Substance Discharge GEOTECHNICAL BORINGS FOR PARKING LOT RESURFACING - 6/19/2014
2015-03-25 97 Technical Assistance Request Received (fee) Download PDF file
Substances
Substance Type Amt Released Units
Metals (LEAD) Metals
Petroleum - Unknown Type Petroleum
Volatile Organic Compounds VOC
Responsible Party
GEORGIA-PACIFIC CONSUMER PRODUCTS 1919 S BROADWAY, GREEN BAY, WI 54307
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov
563707 | 02-05-563707
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages