2024-05-14
|
149
|
Remedial Action (RA) Design Report Approved
|
|
APPROVAL INCLUDED CONTAMINATED SOIL IMPORTED FROM N RAPIDS RD ROW, BRRTS # 09-36-594418
|
|
2024-05-14
|
857
|
Materials Management Plan Approved
|
|
SEE AC 149 OF SAME DATE FOR DOC, APPROVAL FOR CONTAMINATED SOIL IMPORTED FROM N RAPIDS RD ROW
|
|
2024-05-02
|
43
|
Site Activity Status Update Received
|
|
SUMMARY OF BUILDING DEMOLITION ACTIVITIES FOR PHASE 3 REDEVELOPMENT AREA
|
|
2024-05-01
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2024-05-01
|
148
|
Remedial Action Design Report Received (fee)
|
|
CONTAMINATED SOIL IMPORTED FROM N RAPIDS RD ROW, BRRTS # 09-36-594418
|
|
2024-05-01
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
SEE AC 148 OF SAME DATE FOR DOCUMENTATION, CONTAMINATED SOIL IMPORTED FROM N RAPIDS RD ROW
|
|
2024-04-26
|
43
|
Site Activity Status Update Received
|
|
CHARACTERIZATION OF SOIL IN US-10 EASTBOUND RIGHT OF WAY (GROVE RD TO STEINBERG LN) FOR USE AT SITE
|
|
2024-04-15
|
43
|
Site Activity Status Update Received
|
|
WELL SEALING DOCUMENTATION FOR 8 MONITORING WELLS IN PROPOSED CHICAGO ST ROW
|
|
2024-04-05
|
99
|
Miscellaneous
|
|
PRELIMINARY CONCURRENCE WITH MANAGEMENT OF SOIL FROM N RAPIDS ROAD ROW
|
|
2024-04-04
|
43
|
Site Activity Status Update Received
|
|
CHARACTERIZATION OF SOIL FOR IMPORT FROM N RAPIDS ROAD ROW
|
|
2024-01-19
|
151
|
Remedial Action (RA) Documentation Report Received (non-fee)
|
|
CONSTRUCTION DOCUMENTATION REPORT - BUFFALO STREET RIGHTS OF WAY, PHASE II REDEVELOPMENT AREA
|
|
2024-01-19
|
126
|
Interim Action Report Received (non-fee)
|
|
INTERIM CONSTRUCTION DOC - RIVER POINT DR ROWS & ADJACENT FUTURE RESIDENTIAL & COMMERCIAL PARCELS
|
|
2023-12-20
|
99
|
Miscellaneous
|
|
COMMENTS FOR INTERIM CONSTRUCTION DOCUMENTATION REPORT FOR REMOVAL OF OXIDE BOX WASTE FILL MATERIALS
|
|
2023-12-01
|
126
|
Interim Action Report Received (non-fee)
|
|
INTERIM CONSTRUCTION DOCUMENTATION REPORT - REMOVAL OF APPARENT OXIDE BOX WASTE FILL, PHASE 2 AREA
|
|
2023-12-01
|
43
|
Site Activity Status Update Received
|
|
CHARACTERIZATION OF SOIL AT AN AGRICULTURAL PARCEL ALONG VIEBAHN ST FOR USE AS FILL IN PHASE 2 AREA
|
|
2023-11-08
|
99
|
Miscellaneous
|
|
STATE ACKNOWLEDGEMENT LETTER FOR CITY OF MANITOWOC FY24 EPA COMMUNITY WIDE ASSESSMENT GRANT
|
|
2023-11-04
|
43
|
Site Activity Status Update Received
|
|
INFO FOR STATE ACKNOWLEDGEMENT LETTER FOR EPA COMMUNITY WIDE ASSESSMENT GRANT APPLICATION
|
|
2023-10-20
|
43
|
Site Activity Status Update Received
|
|
CHARACTERIZATION OF GRANULAR FILL FOR IMPORTING TO SITE
|
|
2023-10-19
|
43
|
Site Activity Status Update Received
|
|
TOPSOIL SAMPLING RESULTS FOR SOIL PLANNED TO BE IMPORTED TO THE SITE
|
|
2023-10-13
|
43
|
Site Activity Status Update Received
|
|
PLAN TO IMPORT SOIL TO SITE FROM IN-PLACE QUARRY OVERBURDEN
|
|
2023-10-05
|
126
|
Interim Action Report Received (non-fee)
|
|
CONSTRUCTION DOCUMENTATION FOR INTERIM VEGETATED ENGINEERED BARRIER FOR LOT 3
|
|
2023-07-31
|
99
|
Miscellaneous
|
|
CLARIFICATION ON HISTORIC FILL APPROVAL REQUESTS NEEDED FOR CITY-OWNED & PRIVATELY OWNED PROPERTIES
|
|
2023-07-28
|
43
|
Site Activity Status Update Received
|
|
DATA SUMMARY FOR PFAS SAMPLING IN SOIL IN PHASE 3 REDEVELOPMENT AREA
|
|
2023-07-21
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES FOR PHASE 2 REDEVELOPMENT AREA
|
|
2023-07-21
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
FOR ROAD/UTILITY INFRASTRUCTURE FOR BUFFALO STREET RIGHT OF WAY
|
|
2023-07-19
|
122
|
Interim Action Plan Received (non-fee)
|
|
CONSTRUCTION OF INTERIM VEGETATED ENGINEERED BARRIER FOR LOT 3 OF RIVER POINT DISTRICT
|
|
2023-07-18
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
FOR LOT 3 OF RIVER POINT DISTRICT (INCLUDES FORMER RAILROAD TURNTABLE AREA)
|
|
2023-07-05
|
151
|
Remedial Action (RA) Documentation Report Received (non-fee)
|
|
FOR EXCAVATION IN FORMER JUNKYARD AREA
|
|
2023-06-12
|
99
|
Miscellaneous
|
|
DNR SUPPORT LETTERS FOR EPA GRANT DATED JUNE 8, 2023 AND NOVEMBER 17, 2022
|
|
2023-06-08
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
FOR REMOVAL OF APPARENT OXIDE BOX WASTE FILL MATERIALS IN PHASE 2 REDEVELOPMENT AREA
|
|
2023-06-02
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
FOR PHASE 2 REDEVELOPMENT AREA
|
|
2023-06-02
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
FOR ROAD/UTILITY INFRASTRUCTURE IN PHASE 2 DEVELOPMENT AREA
|
|
2023-05-31
|
43
|
Site Activity Status Update Received
|
|
CHARACTERIZATION OF SOIL FOR IMPORT FROM REED AVE ROW
|
|
2023-05-22
|
43
|
Site Activity Status Update Received
|
|
CHARACTERIZATION OF SOIL FOR IMPORT FROM 333 REED AVE
|
|
2023-05-15
|
43
|
Site Activity Status Update Received
|
|
ADDENDUM TO ROW RAP/MMP, SLIGHT MODIFICATION TO CAP TO FACILITATE FUTURE TOWNHOME REDEVELOPMENT
|
|
2023-04-28
|
43
|
Site Activity Status Update Received
|
|
REDEVELOPMENT STATUS UPDATE
|
|
2023-04-28
|
43
|
Site Activity Status Update Received
|
|
SOIL SAMPLING PLAN FOR IMPORTED SOIL CHARACTERIZATION AND EPA/DNR CORRESPONDENCE
|
|
2023-04-17
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
FOR PHASE 3 CONSTRUCTION AREA OF RIVER POINT DISTRICT
|
|
2023-02-15
|
43
|
Site Activity Status Update Received
|
|
SAMPLING AND ANALYSIS PLANS TO CHARACTERIZE SOIL FROM DIVISION ST AND REED AVE TO IMPORT TO SITE
|
|
2023-01-29
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES - FORMER JUNK YARD AREA OF RIVER POINT DISTRICT
|
|
2022-11-17
|
99
|
Miscellaneous
|
|
DNR ACKNOWLEDGEMENT LETTER FOR EPA CLEANUP GRANT
|
|
2022-10-18
|
43
|
Site Activity Status Update Received
|
|
SITE INVESTIGATION UPDATE FOR PHASE 2 REDEVELOPMENT AREA
|
|
2022-09-26
|
43
|
Site Activity Status Update Received
|
|
LIMITED SITE INVESTIGATION COMPLETED BY AECOM UNDER WAM FOR FMR TURNTABLE AREA - LOT 3 RIVER POINT
|
|
2022-09-16
|
857
|
Materials Management Plan Approved
|
|
MATERIAL MOVED ON-SITE
|
|
2022-09-16
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2022-09-16
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
IMPERVIOUS AND PERVIOUS CAPS FOR DIRECT CONTACT
|
|
2022-09-16
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2022-08-10
|
43
|
Site Activity Status Update Received
|
|
CLARIFICATIONS PROVIDED FOR VOLUMES AND PLACEMENT OF MATERIAL FOR MATERIALS MANAGEMENT PLAN
|
|
2022-08-08
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
MATERIAL MOVED ON-SITE
|
|
2022-08-08
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2022-04-13
|
43
|
Site Activity Status Update Received
|
|
TEMPORARY GRADING & GREENSPACE FOR DRAINAGE & REUSE OF LIMESTONE SCREENINGS FOR ROAD CONSTRUCTION
|
|
2022-04-06
|
98
|
Technical Assistance Provided
|
|
RESPONSE TO EVALUATION OF IMPORTING CRUSHED EXCESS BASIC STRUCTURAL CONCRETE AS FILL
|
|
2022-04-04
|
43
|
Site Activity Status Update Received
|
|
UPDATE ON SHORELINE ENHANCEMENT PLANS FOR AREA OF TILTED SHEET WALL AND WOODEN DOCK WALL
|
|
2022-03-09
|
43
|
Site Activity Status Update Received
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR FMR TURNTABLE AREA - LOT 3 OF RIVERPOINT DISTRICT
|
|
2022-03-07
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
FOR 1101, 1110, & 1200 BUFFALO ST (PHASE 2 CONSTRUCTION AREA OF RIVERPOINT DISTRICT)
|
|
2022-03-07
|
97
|
Technical Assistance Request Received (fee)
|
|
EVALUATION OF IMPORTING CRUSHED EXCESS BASIC STRUCTURAL CONCRETE AS FILL
|
|
2022-02-23
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
FOR 1101, 1110, & 1200 BUFFALO ST (PHASE 2 CONSTRUCTION AREA OF RIVERPOINT DISTRICT)
|
|
2022-01-14
|
43
|
Site Activity Status Update Received
|
|
POTENTIAL REUSE OF CONCRETE FILL
|
|
2021-11-23
|
99
|
Miscellaneous
|
|
STATE ACKNOWLEDGEMENT LETTER FOR EPA SITE-SPECIFIC CLEANUP GRANT
|
|
2021-09-17
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
ADDTIONAL SOIL, GROUNDWATER, VAPOR, SEDIMENT AND SURFACE WATER ASSESSMENT AND/OR SAMPLING NEEDED
|
|
2021-09-17
|
149
|
Remedial Action (RA) Design Report Approved
|
|
FOR REDEVELOPMENT OF MUNICIPAL INFRASTRUCTURE
|
|
2021-09-17
|
857
|
Materials Management Plan Approved
|
|
ON-SITE SOIL MANAGEMENT, DOCUMENTATION INCLUDED IN REMEDIAL ACTION PLAN APPROVAL UNDER THE SAME DATE
|
|
2021-09-17
|
118
|
PFAS Sampling Not Required At This Time
|
|
PFAS FOUND IN GW, NO SOURCE IDENTIFIED IN SCOPING ON-SITE, UNIDENTIFIED SOURCE OF PFAS AT THIS TIME
|
|
2021-09-07
|
114
|
PFAS Scoping Statement Received
|
|
SUPPLEMENTAL DOCUMENTATION - FIRE DEPT RESPONSE DURING EXPLOSIVE DEMO OF A FMR GRAIN ELEVATOR
|
|
2021-09-03
|
114
|
PFAS Scoping Statement Received
|
|
|
|
2021-09-02
|
99
|
Miscellaneous
|
|
SITE INVESTIGATION AND REMEDIAL ACTION PLAN REVIEW CLARIFICATIONS
|
|
2021-08-11
|
99
|
Miscellaneous
|
|
OCP PCB NOTICE #1, NOTIFICATION OF A PCB CONTAMINATION SITE SENT TO EPA
|
|
2021-08-09
|
137
|
Site Investigation Report (SIR) Received (fee)
|
|
FOR PHASE 1 REDEVELOPMENT AREA
|
|
2021-08-09
|
148
|
Remedial Action Design Report Received (fee)
|
|
|
|
2021-08-09
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
MATERIALS TO BE MOVED ON-SITE; DOCUMENTATION AND FEE INCLUDED WITH AC 148 OF THE SAME DATE
|
|
2021-08-09
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2021-08-04
|
43
|
Site Activity Status Update Received
|
|
CHARACTERIZATION OF SOIL FOR IMPORT FROM CUSTER ST ROAD PROJECT
|
|
2021-08-03
|
99
|
Miscellaneous
|
|
CLARIFICATION ON SUBMITTAL TIMING FOR POST CLOSURE MODIFICATION
|
|
2021-05-26
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL TEST PITS TO BE INSTALLED IN OXIDE BOX WASTE AREA TO FURTHER DELINEATE IMPACTS
|
|
2021-05-25
|
43
|
Site Activity Status Update Received
|
|
DECISION MEMO FOR SITE 1 AND 3 OF RIVERPOINT DISTRICT FOR REMEDIAL ACTION FOR RLF LOAN
|
|
2021-05-21
|
43
|
Site Activity Status Update Received
|
|
CHARACTERIZATION OF SOIL FOR IMPORT FROM 8TH AND MARITIME DRIVE
|
|
2021-05-07
|
99
|
Miscellaneous
|
|
PETROLEUM ELIGIBILITY REQUEST, LETTER, AND CORRESPONDENCE FOR SITE 1 AND 3 OF RIVERPOINT DISTRICT
|
|
2021-05-03
|
43
|
Site Activity Status Update Received
|
|
PETROLEUM CONTAMINATION ENCOUNTERED BENEATH FORMER WAREHOUSE SLAB
|
|
2021-04-29
|
43
|
Site Activity Status Update Received
|
|
REQUIREMENTS FOR WATER MAIN INSTALLATION
|
|
2021-03-26
|
43
|
Site Activity Status Update Received
|
|
SOIL SAMPLING FOR IMPORTED SOIL
|
|
2021-03-25
|
99
|
Miscellaneous
|
|
VAPOR INTRUSION GUIDANCE AND CLARIFICATIONS FOR NEW DEVELOPMENT
|
|
2021-02-25
|
43
|
Site Activity Status Update Received
|
|
SAMPLING CHANGES DUE TO AVOID LIVE LARGE WATER UTILITY
|
|
2021-02-22
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
|
|
2021-02-05
|
43
|
Site Activity Status Update Received
|
|
EPA DETERMINATION FOR OXIDE BOX WASTE FOUND ON THE PROPERTY
|
|
2021-01-22
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
2021-01-15
|
43
|
Site Activity Status Update Received
|
|
CONSTRUCTION DOCUMENTATION REPORT FOR DEMO AND REMOVAL OF STRUCTURAL IMPEDIMENTS - SITE 3
|
|
2021-01-15
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
FOR SITE 3 - 1110 BUFFALO STREET
|
|
2021-01-15
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
FOR SITE 1 - 200 NORTH 10TH STREET
|
|
2021-01-15
|
43
|
Site Activity Status Update Received
|
|
CONSTRUCTION DOCUMENTATION REPORT FOR DEMO AND REMOVAL OF STRUCTURAL IMPEDIMENTS - SITE 1
|
|
2021-01-06
|
99
|
Miscellaneous
|
|
CITY PLANS TO DO SITE INVESTIGATION WORK THEN TRANSFER PORTIONS OF THE PROPERTY FOR DEVELOPMENTS
|
|
2020-12-02
|
43
|
Site Activity Status Update Received
|
|
PROPOSED PHASES OF REDEVELOPMENT FOR THE SITE
|
|
2020-10-20
|
99
|
Miscellaneous
|
|
CLARIFICATIONS ON CONTINUING OBLIGATION MODIFICATION AND GRUBBING & CLEARING SITE
|
|
2020-10-16
|
99
|
Miscellaneous
|
|
CLARIFICATIONS ON VPLE PROCESS AND FEES
|
|
2020-09-09
|
43
|
Site Activity Status Update Received
|
|
CONTAMINATION FOUND IN TEST TRENCHES ON NORTH PORTION OF SITE
|
|
2020-08-21
|
43
|
Site Activity Status Update Received
|
|
SOIL SAMPLING FOR IMPORTED SOIL
|
|
2020-07-31
|
43
|
Site Activity Status Update Received
|
|
SOIL SAMPLING FOR IMPORTED SOIL
|
|
2020-07-10
|
99
|
Miscellaneous
|
|
BEST PRACTICES FOR TEMPORARY USES ON-SITE
|
|
2020-06-09
|
611
|
Local Government Unit (LGU) Liability Exemption Applies
|
|
DOCUMENTATION OF ACQUISITION OF SITE, BLIGHT DETERMINATION PREVIOUSLY PROVIDED
|
|
2020-05-18
|
99
|
Miscellaneous
|
|
BEST MANAGEMENT PRACTICES FOR IMPORTING SOIL
|
|
2020-05-13
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
LIMITED SITE INVESTIGATION THROUGH WAM GRANT
|
|
2020-05-07
|
43
|
Site Activity Status Update Received
|
|
SOIL SAMPLING FOR IMPORTED SOIL
|
|
2020-05-05
|
99
|
Miscellaneous
|
|
INFORMATION ON WPS SITE CLEANUP FOR CHICAGO STREET
|
|
2020-05-05
|
43
|
Site Activity Status Update Received
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLANS FOR WEDC SITE ASSESSMENT GRANT APPLICATIONS & DNR COMMENTS
|
|
2020-03-24
|
1
|
Notification of Hazardous Substance Discharge
|
|
CASE CREATED AFTER DATA FROM PHASE II ESA WAS RECEIVED
|
|
2020-03-24
|
120
|
PFAS Sampling Completed - Actionable Levels Detected
|
|
SEE AC 29 DATED 3/23/2020 FOR DOCUMENTATION
|
|
2020-03-23
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
|
|
2020-03-23
|
99
|
Miscellaneous
|
|
CLARIFICATIONS ON IMPORTING SOIL TO SITE
|
|
2018-09-04
|
43
|
Site Activity Status Update Received
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN - PRE-DEMOLITION SURVEY
|
|
2018-08-31
|
43
|
Site Activity Status Update Received
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 1200 BUFFALO ST PORTION OF THE SITE
|
|
2018-08-29
|
43
|
Site Activity Status Update Received
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 1101 BUFFALO ST PORTION OF THE SITE
|
|
2018-08-29
|
43
|
Site Activity Status Update Received
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 1103 CHICAGO ST PORTION OF THE SITE
|
|
2018-08-28
|
43
|
Site Activity Status Update Received
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 1110 BUFFALO ST PORTION OF THE SITE
|
|
2018-08-28
|
43
|
Site Activity Status Update Received
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 200 NORTH 1OTH ST PORTION OF THE SITE
|
|
2018-08-23
|
43
|
Site Activity Status Update Received
|
|
GEOPHYSICAL SURVEY - SITE SPECIFIC SAMPLING & ANALYSIS PLAN
|
|
2018-08-21
|
99
|
Miscellaneous
|
|
PETROLEUM ELIGIBILITY REQUEST, LETTER, AND CORRESPONDENCE FOR 1110 BUFFALO ST PORTION OF THE SITE
|
|
2018-08-16
|
28
|
Phase I Environmental Site Assessment (ESA) Rpt Received
|
|
|
|
2018-08-13
|
43
|
Site Activity Status Update Received
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN - GEOPHYSICAL SURVEY
|
|
2018-08-10
|
99
|
Miscellaneous
|
|
PETROLEUM ELIGIBILITY REQUEST, LETTER, AND CORRESPONDENCE FOR 200 NORTH 10TH ST PORTION OF THE SITE
|