WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-46-587191 BAY CLEANERS - SW DOOR
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
PHILLIPS 66 OZAUKEE SOUTHEAST
Address Municipality
201 S MAIN ST THIENSVILLE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SE 1/4 of Sec 22, T09N, R21E 43.2275109 -87.9849766 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Location Description
201-207 S MAIN ST
Additional Activity Details Acres
1
Facility ID PECFA No. EPA ID Start Date End Date
246042170 2021-01-22 2022-07-12
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag  
Actions and Documents
Date Code Name File Comment
2022-07-12 11 Activity Closed
2022-07-12 56 Continuing Obligation(s) Applied Download PDF file
2022-07-12 226 Continuing Obligation - Vapor Intrusion Response
2022-07-12 232 Continuing Obligation - Residual Soil Contamination
2022-07-12 48 Preventive Action Limit (PAL) NR140 Exemption at Closure
2022-07-12 66 Continuing Obligations (COs) Apply at Off-site Property(ies)
2022-07-05 190 Remaining Actions Needed Requirements Met or Docs Received Download PDF file
2022-07-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-06-28 84 Remaining Actions Needed Download PDF file MONITORING WELL OR REMEDIAL SYSTEM PIPING FILLING AND SEALING
2022-06-10 99 Miscellaneous REC'D CLOSURE RESUBMITTAL
2022-05-31 43 Site Activity Status Update Received Download PDF file FIELD INVESTIGATION GROUNDWATER & SEDIMENT SAMPLING, REVISED FIGURES AND TABLES
2022-05-31 179 Case Closure Review Request Received (non-fee) Download Compressed Zip file REC'D CLOSURE REVISIONS
2022-05-20 80 Closure Not Recommended Download PDF file CASE CLOSURE IS NOT RECOMMENDED BECAUSE ADDITIONAL LEGAL REQUIREMENTS MUST BE MET
2022-04-05 199 Additional Information Received (Fee-Based or Closure) AR Restart
2022-03-23 99 Miscellaneous CLOSURE REVISIONS RCVD
2022-03-17 79 Case Closure Review Request Received Download Compressed Zip file AUTO-ENTERED
2022-03-17 198 Request for Additional Information (Fee-Based or Closure) AR Pause
2022-03-08 779 Case Closure Review Fee Received REC'D CK #27127 $1050
2022-03-08 710 Database Fee Paid for Soil Continuing Obligation(s) REC'D CK #27127 $300
2022-03-01 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file REC'D SI ADDENDUM LTR RPT
2022-02-28 99 Miscellaneous Download PDF file SI ADDENDUM LTR RPT
2022-01-17 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2022-01-05 118 PFAS Sampling Not Required At This Time Download PDF file
2021-12-10 140 Site Investigation Report (SIR) Not Approved Download PDF file
2021-11-23 99 Miscellaneous Download PDF file REVISED EMERGING CONTAMINANTS STATEMENT
2021-11-18 114 PFAS Scoping Statement Received Download PDF file
2021-11-15 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file
2021-10-12 137 Site Investigation Report (SIR) Received (fee) Download PDF file REC'D CK #27081 $1050.00
2021-07-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-02-17 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file OCTOBER 2019 LIMITED PHASE II ESA
2021-02-17 99 Miscellaneous Download PDF file FIGURE AND TABLES FOR ADDITIONAL SAMPLING SUBMITTED WITH PHASE II
2021-02-15 2 Responsible Party (RP) letter sent Download PDF file
2021-01-22 1 Notification of Hazardous Substance Discharge Download PDF file
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
Property Affected -> 13-46-594613 213 S MAIN ST
Substances
Substance Type Amt Released Units
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Volatile Organic Compounds VOC
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
Responsible Party
JENIOR--BAGNESKI LLC N61W6058 COLUMBIA RD, CEDARBURG, WI 53012
For More Information on this Activity
Southeast Region Contact: Jenny Meyer  jennifer.meyer1@wisconsin.gov
587191 | 02-46-587191
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages