2024-06-11
|
99
|
Miscellaneous
|
|
CREATION OF NEW BRRTS CASE LETTER ISSUED TO NEWELL OPERATING COMPANY AND WEST RIVER LOFTS, LLC
|
|
2024-05-16
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF PFAS SAMPLING RESULTS IN GROUNDWATER
|
|
2024-04-18
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF PFAS SAMPLING RESULTS IN SOIL
|
|
2024-03-08
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
|
|
2024-03-06
|
43
|
Site Activity Status Update Received
|
|
INFORMATION ABOUT STATUS OF MW-1 AND TW-82 ON-SITE
|
|
2024-02-27
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
PFAS FOCUSED WORK PLAN SUBMITTED BY RAMBOLL ON BEHALF OF NEWELL
|
|
2024-02-07
|
43
|
Site Activity Status Update Received
|
|
DNR REQUEST AND NEWELL/RAMBOLL RESPONSE THAT SI WORK PLAN FOR PFAS WILL BE SUBMITTED WITHIN 30 DAYS
|
|
2024-01-29
|
43
|
Site Activity Status Update Received
|
|
RAMBOLL, ON BEHALF OF NOC, UPDATE ON TIMELINE OF SITE INVESTIGATION WORK PLAN SUBMITTAL
|
|
2024-01-22
|
43
|
Site Activity Status Update Received
|
|
SEMI-ANNUAL REPORTING FROM RAMBOLL ON BEHALF OF NEWELL OPERATING CO
|
|
2024-01-19
|
43
|
Site Activity Status Update Received
|
|
REVISION TO SEMI-ANNUAL REPORT TO CORRECT 1/15/2024 SEMI-ANNUAL REPORT
|
|
2024-01-15
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2023-12-01
|
99
|
Miscellaneous
|
|
REQUEST FOR STATUS UPDATE FROM NEWELL FOR NEXT STEPS & SCHEDULE OF WORK PLAN SUBMITTAL BY 1/30/2024
|
|
2023-10-30
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER SAMPLING FOR PFAS
|
|
2023-10-30
|
120
|
PFAS Sampling Completed - Actionable Levels Detected
|
|
|
|
2023-07-28
|
43
|
Site Activity Status Update Received
|
|
SEMI-ANNUAL REPORTING FROM RAMBOLL ON BEHALF OF NEWELL OPERATING CO
|
|
2023-07-20
|
99
|
Miscellaneous
|
|
DNR UPDATES TO DHS FOR REMEDIATION, VAPOR SAMPLING, AND MITIGATION FOR UPCOMING REDEVELOPMENT
|
|
2023-07-17
|
99
|
Miscellaneous
|
|
CLARIFICATION FOR COPIED CONTACTS ON THE DNR LETTERS
|
|
2023-07-14
|
98
|
Technical Assistance Provided
|
|
FOR CONCURRENCE WITH SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN AND VAPOR SAMPLING PLAN
|
|
2023-07-12
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
ADDENDUM, SAMPLING COMPLETED UNDER EPA COMMUNITY WIDE ASSESSMENT GRANT TO PREP FOR REDEVELOPMENT
|
|
2023-07-10
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
COPY OF SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN AND VAPOR SAMPLING PLAN IN LETTER FORMAT
|
|
2023-06-30
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-06-29
|
857
|
Materials Management Plan Approved
|
|
MATERIAL MOVED ON-SITE, SEE AC 149 OF SAME DATE FOR DOCUMENTATION
|
|
2023-06-29
|
149
|
Remedial Action (RA) Design Report Approved
|
|
FOR RESIDENTIAL REDEVELOPMENT
|
|
2023-06-29
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2023-06-29
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
BUILDING, PAVEMENT, CONCRETE, & GREENSPACE
|
|
2023-06-29
|
226
|
Continuing Obligation - Vapor Intrusion Response
|
|
|
|
2023-06-29
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2023-06-29
|
99
|
Miscellaneous
|
|
JUNE 22, 2023 AND JUNE 29, 2023 DNR REVISIONS TO VAPOR MITIGATION SYSTEM AND VAPOR SAMPLING PLAN
|
|
2023-06-29
|
43
|
Site Activity Status Update Received
|
|
FINAL VAPOR MITIGATION SYSTEM & VAPOR PORT DESIGN AND FINAL VAPOR SAMPLING PLAN
|
|
2023-06-29
|
99
|
Miscellaneous
|
|
CONDITIONAL APPROVAL FOR VMS DESIGN AND VAPOR SAMPLING PLAN, FORMAL APPROVAL LETTER TO FOLLOW
|
|
2023-06-21
|
43
|
Site Activity Status Update Received
|
|
ADDENDUM TO REMEDIAL ACTION AND MATERIALS MANAGMENT PLAN (AC 148, DATED 6/12/2023)
|
|
2023-06-21
|
99
|
Miscellaneous
|
|
DNR CORRESPONDENCE WITH CONSULANT AND WITH EPA REGARDING PCB CONTAMINATED SOIL REMOVAL
|
|
2023-06-12
|
148
|
Remedial Action Design Report Received (fee)
|
|
FOR RESIDENTIAL REDEVELOPMENT
|
|
2023-06-12
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
MOVED ON-SITE; PAID THROUGH AC148 OF THE SAME DATE. DOCUMENTATION INCLUDED WITH AC 148 OF SAME DATE
|
|
2023-06-12
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2023-06-09
|
43
|
Site Activity Status Update Received
|
|
REVISED SUB-SLAB VAPOR MITIGATION SYSTEM & VAPOR PORT DESIGN AND VAPOR SAMPLING PROPOSAL
|
|
2023-05-03
|
99
|
Miscellaneous
|
|
DNR COMMENTS FOR VAPOR PORTS AND MITIGATION SYSTEM DESIGN
|
|
2023-01-05
|
43
|
Site Activity Status Update Received
|
|
SEMI-ANNUAL REPORT FROM OTHER RP-NEWELL OPERATING CO
|
|
2023-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-09-30
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR ADDITIONAL SI VIA AN EPA COMMUNITY ASSESSMENT GRANT
|
|
2022-07-29
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
|
|
2022-07-29
|
116
|
PFAS Sampling Required
|
|
DOCUMENTATION INCLUDED IN AC 36 OF SAME DATE
|
|
2022-07-15
|
99
|
Miscellaneous
|
|
CLARIFICATION ON DEFERRING WORK PLAN UNTIL PROPOSED INVESTIGATION WORK IS COMPLETED
|
|
2022-07-12
|
43
|
Site Activity Status Update Received
|
|
SEMI-ANNUAL REPORT FROM RAMBOLL ON BEHALF OF NEWELL
|
|
2022-07-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-06-23
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
|
|
2022-06-23
|
114
|
PFAS Scoping Statement Received
|
|
INCLUDED IN SITE INVESTIGATION WORK PLAN OF SAME DATE
|
|
2022-06-14
|
7
|
Environmental Consultant Hired
|
|
RAMBOLL ON BEHALF OF NEWELL OPERATING COMPANY
|
|
2022-04-25
|
43
|
Site Activity Status Update Received
|
|
ENVIRONMENTAL WORK TASKS PROPOSAL
|
|
2022-04-22
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO RESPONSIBLE PARTY LETTER
|
|
2022-04-19
|
99
|
Miscellaneous
|
|
CLARIFICATIONS ON RESPONSIBLE PARTY AND WIS. ADMIN. CODE NR 700 PROCESS
|
|
2022-04-07
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
DOCUMENTATION OF VAPOR MITIGATION DESIGN NEEDED FOR THE PROPOSED ELEVATOR
|
|
2022-03-25
|
2
|
Responsible Party (RP) letter sent
|
|
NEWELL OPERATING COMPANY
|
|
2022-03-16
|
7
|
Environmental Consultant Hired
|
|
FEHR GRAHAM
|
|
2022-03-11
|
43
|
Site Activity Status Update Received
|
|
HISTORICAL USE AND OWNERSHIP ASSESSMENT TO DETERMINE POTENTIALLY RESPONSIBLE PARTIES
|
|
2022-03-08
|
97
|
Technical Assistance Request Received (fee)
|
|
REVIEW OF SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN FOR NEW BUILDING CONSTRUCTION
|
|
2022-03-04
|
2
|
Responsible Party (RP) letter sent
|
|
FOR POSSESSOR WEST RIVER LOFTS, LLC
|
|
2022-03-01
|
43
|
Site Activity Status Update Received
|
|
WARRANTY DEED FOR ACQUISITION OF PROPERTY BY WEST RIVER LOFTS LLC
|
|
2022-03-01
|
28
|
Phase I Environmental Site Assessment (ESA) Rpt Received
|
|
PART 1 OF 2; BY FEHR GRAHAM ON BEHALF OF SCOTT CRAWFORD INC
|
|
2022-03-01
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
AUTOPOPULATED FROM 28 ENTRY
|
|
2022-03-01
|
28
|
Phase I Environmental Site Assessment (ESA) Rpt Received
|
|
PART 2 OF 2
|
|
2022-03-01
|
99
|
Miscellaneous
|
|
PROPERTY OWNER CLARIFICATIONS
|
|
2022-02-22
|
1
|
Notification of Hazardous Substance Discharge
|
|
|