ACTIVITY DETAILS

 
04-17-591149 3M SPILL
Activity Type / Status Jurisdiction
SPILL  CLOSED DNR RR
Location Name County DNR Region
3M MENOMONIE DUNN WEST CNTRL
Address Municipality
1425 STOKKE PKWY MENOMONIE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NW 1/4 of the NE 1/4 of Sec 19, T28N, R12W 44.8980109 -91.88371 Click to view on Google Maps using Lat/Long
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
617056660 2022-05-16 2022-10-28
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Site Files
Name File
SITE FILE DOCUMENTATION FOR ACTIVITY. Download PDF Document
Actions
Date Code Name File Comment
2022-10-28 11 Spill Activity Closed
2022-05-16 1 Spill Incident Occurred
2022-05-16 5 Notification of Hazardous Substance Spill
2022-05-16 118 PFAS Sampling Not Required At This Time
Spill Details
SERTS Spill ID Spill Occurred Date/Time Spill Reported Date/Time
20220516WC17-1+ 2022-05-16  1716 2022-05-16  1817
Description of Incident/General Comments
5/17/22 1027HRS - SPOKE WITH REIF. ARE THEY EXCAVATING RIGHT AWAY? CAN YOU PROVIDE MAP OF WHERE THE SPILL OCCURRED? 1135HRS - JS CONTACTS 3M REP BRAD LUEDTKE. SAMPLES BEING TAKEN TODAY BY TETRA TECH. CLEAN HARBORS/ MCCADE CONSTRUCTION EXCAVATED (2) 20-30 ROLLOFFS OF MATERIAL. 700 GALLONS INFULTRATED SOIL, OVER 1000 GAL RELEASED. REMOVED SECTION OF PIPE YESTERDAY, CAPPED, AND PRESSURE TESTED FOR OVER 1 HR AND SUDDENLY BOTH CAPS IN ONE COMMON TRENCH RELEASED. CONFIRMATION SAMPLING & WASTE CHARACTORIZATION? WAS SYSTEM PURGED? WHY WAS THE PIPE CUT? 100-PPB ACCORDING TO THEIR TESTS? WHAT TESTS ARE YOU DOING? IS THIS MATERIAL ACTIVELY IN THE SYSTEM OR IS THIS RESIDUAL? THIS SEEMS HIGH TO BE RESIDUAL. IS THIS RELATED TO THE OTHER SPILL FROM NOV? ERP CASE CREATED - 02-17-590808
Type of Location
CHEMICAL COMPANY (PRODUCTION/PROCESSING/STORAGE/REPACKAGING)
Spill Cause
EQUIPMENT FAILURE 
Description of Cause or Additional Details
WAS RELEASED BY ACCIDENT, WORKING ON NEW BUILDING AND LINE BLEW OUT
Description of Environmental Impact
IMPACTED SOIL AT THIS TIME, NO WATERWAYS OR STORM DRAIN. 100 PPB OF PFAS ACCORDING TO THEIR TESTS
Cleanup Efforts at Time Incident Reported
CONTRACTOR PUMPED OUT REMAINING WATER IN DRENCH, WILL BE GETTING DUMPSTERS TOMORROW FOR THE SOIL
Substances
Substance Type Amt Released Units
Per- and Polyfluoroalkyl Substances (WATER W/ PFAS) Industrial Chem 700 Gal
Responsible Party
3M - MENOMONIE 1425 STOKKE PKWY, MENOMONIE, WI 54751
For More Information on this Activity
West Central Region Contact: Hayley Schnae  hayley.schnae@wisconsin.gov