WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
03-61-183093 RINDTS SERVICE & AUTO BODY REPAIR
Activity Type / Status Jurisdiction
LUST  CLOSED DNR RR
Location Name County DNR Region
RINDTS SERVICE & AUTO BODY REPAIR TAYLOR NORTHERN
Address Municipality
316 S STH 13 STETSONVILLE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the NW 1/4 of Sec 19, T30N, R02E 45.0741738 -90.3145673 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
.5
Facility ID PECFA No. EPA ID Start Date End Date
861055910 54480-9742-16 1998-02-11 2019-12-20
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Pecfa Flag ROW Impact flag Underground Storage Tank Flag
Actions and Documents
Date Code Name File Comment
2019-12-20 11 Activity Closed
2019-12-20 56 Continuing Obligation(s) Applied Download PDF file
2019-12-20 224 Continuing Obligation - Structural Impediment to Cleanup
2019-12-20 232 Continuing Obligation - Residual Soil Contamination
2019-12-20 236 Continuing Obligation - Residual GW Contamination
2019-12-20 334 Monitoring Well Transferred to Another Site MW-7, MW-7P, MW-9, MW-9P TRANSFERRED TO 03-61-563926
2019-12-20 46 Impacted Right-of-Way (ROW) Notification
2019-12-20 66 Continuing Obligations (COs) Apply at Off-site Property(ies)
2019-12-13 190 Remaining Actions Needed Requirements Met or Docs Received Download PDF file MW ABAND FORM REC'D
2019-12-12 99 Miscellaneous REC'D CLOSURE REVISIONS REQ IN RA LTR
2019-10-24 84 Remaining Actions Needed Download PDF file REMAINING ACTION LTR SENT
2019-09-27 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $229.39 - ADDT'L OFF-SITE NOTIFICATION
2019-09-26 504 PECFA Cost Request Received Download PDF file PECFA COST REQ FOR ADDT'L OFF-SITE NOTIFICATION FOR CLOSURE
2019-09-03 199 Additional Information Received (Fee-Based or Closure) ADDT'L INFO REC'D
2019-07-25 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2019-07-19 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR - $3,652.78 REVISED CLOSURE PKG PREP
2019-07-15 505 PECFA Cost Request Approved Download PDF file COSTS APPR $1,690.58 - ABAND MW'S, PZ'S, VI POINTS
2019-07-15 504 PECFA Cost Request Received Download PDF file PECFA COST REQ REVISED CLOSURE PKG PREP
2019-07-14 504 PECFA Cost Request Received Download PDF file PECFA COST REQ TO ABANDON SOME MW'S/PZ'S
2019-07-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-02-08 508 PECFA Cost Cap Adjustment Download PDF file COST CAP ADJUSTMENT FOR ENGINEERING REVIEW VAR OF $1,129.60 PREVIOUSLY APPR 1/25/19
2019-01-25 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPV $2,193.40 - ENGINEER REVIEW OF SI, REMEDIAL ACTIONS, CLOSUR PKG
2019-01-23 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2019-01-23 504 PECFA Cost Request Received Download PDF file PECFA COSTS REQ FOR ENGINEER REVIEW OF SI, REMEDIAL ACTIONS, CLOSURE PKG
2019-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-07-16 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2018-07-13 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-04-03 198 Request for Additional Information (Fee-Based or Closure) REQ FOR ADDT'L INFO
2018-02-28 179 Case Closure Review Request Received (non-fee) CLOSURE PKG REC'D
2018-01-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2018-01-16 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2017-07-18 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-05-31 505 PECFA Cost Request Approved Download PDF file PECFA COST APPR $58,562.54 - VI INVESTIGATION, EXCAVATION, REPL SLAB, REPORT
2017-05-23 504 PECFA Cost Request Received Download PDF file PECFA COSTS REQ REC'D - VI INVESTIGATION, EXCAVATION, REPORT UPON COMPLETION
2017-02-13 505 PECFA Cost Request Approved Download PDF file APPROVED U&C COSTS ($3,811.85) FOR CLOSURE PKG PREP
2017-02-08 43 Site Activity Status Update Received Download PDF file REC'D GW RPT - REVIWED & SENT COMMNETS TO CONSULTANT
2017-02-08 504 PECFA Cost Request Received REC'D U&C FOR CLOSURE PKG PREP
2017-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-07-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-01-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-10-30 505 PECFA Cost Request Approved APPROVED COSTS ($13,205.32) SOIL GAS, SUB-SLAB + GW MONITORING
2015-10-23 504 PECFA Cost Request Received REC'D VAR FOR VI INVESTIGATION & GW MONITORING
2015-08-24 130 DNR Regulatory Reminder Sent Download PDF file PECFA SUNSET LETTER
2015-08-05 43 Site Activity Status Update Received PROGRESS RPT REC'D
2015-07-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-06-29 99 Miscellaneous REPORT TO COME FIRST PART OF JULY
2015-06-17 99 Miscellaneous EMAILED CONSULTANT RE: STATUS GW MONITORING RPT
2015-03-10 99 Miscellaneous CALLED CONSULTANT RE: TIMEFRAME FOR GW RPT. RPT TO COME WITH IN 2 WEEKS
2015-01-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2014-12-31 99 Miscellaneous SAMPLED IN JUNE & SEPT 2014. REPORT TO COME
2014-12-26 99 Miscellaneous SENT EMAIL TO CONSULTANT RE: STATUS OF GW SAMPLING RPT
2014-09-10 99 Miscellaneous EMAILED CONSULTANT FOR LATEST SAMPLING RESULTS/REPORT
2014-09-10 99 Miscellaneous SAMPLING ON 9/23. RPT DUE TO COME IN
2014-07-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-07-18 505 PECFA Cost Request Approved PECFA SOW - REPAIR MW'S AND RESURVEY WELLS OK'D
2014-03-31 99 Miscellaneous OK TO DO WORK PLAN
2014-03-29 43 Site Activity Status Update Received WORK PLAN REC'D
2014-03-14 80 Closure Not Recommended RESIDUAL CONTAMINATION IN ROW & EXPANDING PLUME
2014-02-12 199 Additional Information Received (Fee-Based or Closure) AR Restart
2013-11-13 99 Miscellaneous EMAILED CONSULTANT FOR UPDATES
2013-11-13 99 Miscellaneous MISSING INFO COMING SOON
2013-10-22 79 Case Closure Review Request Received
2013-10-22 198 Request for Additional Information (Fee-Based or Closure) Administrative Pause
2013-10-21 700 Database Fee Paid for Groundwater Continuing Obligation(s) CK # 5828
2013-10-21 710 Database Fee Paid for Soil Continuing Obligation(s) CK # 5828
2013-10-21 779 Case Closure Review Fee Received CK # 5828
2013-08-12 99 Miscellaneous MORE SAMPLING NEEDED. INCREASING TRENDS, CHANGE ORDER TO COME
2013-08-05 99 Miscellaneous EMAILED CONSULTANT FOR UPDATES
2013-05-29 99 Miscellaneous EMAILED CONSULTANT FOR UPDATES
2013-05-29 99 Miscellaneous CLOSURE PKG COMING IN JUNE
2013-03-04 99 Miscellaneous EMAILED CONSULTANT RE: STATUS
2013-03-04 99 Miscellaneous RPT TO COME
2013-01-28 99 Miscellaneous CONSULTANT WILL SUBMIT PACKET FOR CLOSURE MEETING IN MARCH
2013-01-22 99 Miscellaneous REVIEWED SAMPLING RESULTS/ SENT EMAIL WITH QUESTIONS TO CONSULTANT
2013-01-08 99 Miscellaneous REC'D WEBREPORT FOR LATEST SAMPLING FROM DSPS
2012-10-19 99 Miscellaneous RPT TO COME
2012-10-18 99 Miscellaneous EMAILED CONSULTANT FOR UPDATES
2012-08-08 99 Miscellaneous EMAILED CONSULTANT FOR UPDATE
2012-08-08 99 Miscellaneous RPT TO COME IN A FEW WEEKS
2012-06-20 99 Miscellaneous EMAILED CONSULTANT FOR UPDATES
2012-06-20 99 Miscellaneous SAMPLED IN MAY - RPT TO COME W/CLOSURE RECOMMENDATIONS
2012-04-27 99 Miscellaneous SAMPLING EVENT IN MAY
2011-09-07 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-08-04 43 Site Activity Status Update Received REC'D STATUS REPORT FROM CONSULTANT
2011-06-29 99 Miscellaneous EMAILED CONSULTANT RE: PM CHANGE AND ASKED FOR STATUS UPDATE
2011-06-29 99 Miscellaneous REC'D UPDATE FROM CONSULTANT, WILL SUBMIT REPORT IN 1-2 WEEKS
2009-11-19 99 Miscellaneous REVISED GW MONITORING CHANGE ORDER.
2009-09-28 43 Site Activity Status Update Received GW MONITORING RPT RECVD
2009-02-23 43 Site Activity Status Update Received STATUS UPDATE REPORT
2008-09-22 43 Site Activity Status Update Received
2008-01-14 99 Miscellaneous BID CHANGE ORDER FOR ADDITIONAL MONITORING WELLS
2008-01-09 99 Miscellaneous WORK PLAN FOR ADDITIONAL MONITORING WELLS
2007-12-06 99 Miscellaneous BID CHANGE ORDER ADDITIONAL SOIL EXCAVATED
2007-10-15 99 Miscellaneous BID CHANGE ORDER UST REMOVAL
2007-09-14 502 PECFA Bidding Completed
2007-07-30 501 PECFA Bidding to Establish Cost Cap
2007-06-30 501 PECFA Bidding to Establish Cost Cap Download PDF file * SYSTEM ADDED *
2007-05-11 99 Miscellaneous GW SAMPLING RESULTS RECD
2007-02-11 37 Site Investigation Report (SIR) Received (non-fee)
2006-04-24 43 Site Activity Status Update Received
2005-10-18 3 Notice of Noncompliance (NON) Issued
2005-07-14 200 Push Action Taken LETTER SENT
2005-07-14 99 Miscellaneous PHONE CALL FROM RP
2000-08-14 99 Miscellaneous PHONE CALL TO RP
2000-08-09 99 Miscellaneous STATUS UPDATE REQUEST SENT
1999-07-09 99 Miscellaneous FILE 03-61-000114 WAS COMBINED WITH THIS FILE
1999-04-19 99 Miscellaneous SITE INVESTIGATION REQUIRED
1999-03-18 99 Miscellaneous CONSULTANT HIRED
1999-03-16 33 Tank System Site Assessment (TSSA) Report Received
1998-05-20 99 Miscellaneous GRO = 5400 PPM
1998-03-12 2 Responsible Party (RP) letter sent
1998-02-11 1 Notification of Hazardous Substance Discharge
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
Property Affected -> 13-61-585413 324 S STH 13
Property Affected -> 13-61-585414 328 S STH 13
Monitoring Well Remains at Closure
Reasons when Action Code 234 is Present
RESPONSIBILITY FOR MW TRANSFERRED TO ANOTHER SITE OR PROGRAM
Substances
Substance Type Amt Released Units
Gasoline - Unleaded and Leaded Petroleum
Gasoline - Unleaded and Leaded Petroleum
Volatile Organic Compounds VOC
PECFA Total Claims Paid
Payments made from the Petroleum Environmental Cleanup Fund Award
PECFA Site Name: Rindt's Service & Auto Body Repair (Ed's Service)
Max. Reimbursement: $1,000,000 Total Amount Paid: $145,656.01
Occ No Claim No Audit Date Paid Date Amt Submitted Amt Ineligible Amt Paid
A 1 2007-03-07 2007-04-26 $17,469.47 $.00 $17,469.47
A 2 2007-08-27 2007-10-12 $2,422.51 $.00 $2,422.51
A 3 2007-11-19 2007-12-21 $35,659.12 $.00 $35,659.12
A 4 2008-05-14 2008-06-26 $9,757.00 $.00 $9,757.00
A 5 2009-02-23 2009-04-07 $7,305.00 $.00 $7,305.00
A 6 2009-09-30 2009-11-11 $5,902.98 $.00 $5,902.98
A 7 2010-03-29 2010-04-21 $11,650.69 $.00 $11,650.69
A 8 2010-08-18 2010-09-22 $5,129.75 $.00 $5,129.75
A 9 2011-02-08 2011-03-09 $5,166.80 $.00 $5,166.80
A 10 2011-11-28 2011-12-27 $3,684.50 $.00 $3,684.50
A 11 2012-06-25 2012-08-08 $3,033.20 $.00 $3,033.20
A 12 2014-02-10 2014-03-26 $3,803.70 $.00 $3,803.70
A 13 2014-07-02 2014-07-22 $2,506.90 $.00 $2,506.90
A 14 2014-10-13 2014-11-03 $3,745.50 $.00 $3,745.50
A 15 2015-08-24 2015-10-21 $1,778.10 $.00 $1,778.10
A 16 2016-03-08 2016-06-23 $1,252.48 $.00 $1,252.48
A 17 2016-03-21 2016-07-01 $5,518.62 $.00 $5,518.62
A 18 2016-04-18 2016-07-01 $1,554.24 $.00 $1,554.24
A 19 2016-07-07 2016-08-25 $3,573.61 $.00 $3,573.61
A 20 2016-12-09 2017-01-23 $206.33 $.00 $206.33
A 21 2017-02-13 2017-04-24 $1,789.41 $.00 $1,789.41
A 22 2017-06-26 2017-07-13 $1,002.96 $.00 $1,002.96
A 23 2018-03-05 2018-03-27 $4,171.06 $.00 $4,171.06
A 24 2019-09-09 2019-10-04 $5,076.46 $.00 $5,076.46
A 25 2019-12-12 2020-01-13 $2,097.19 $.00 $2,097.19
A 26 2019-12-26 2020-01-21 $398.43 $.00 $398.43
Responsible Party
RINDT'S SERVICE & AUTO BODY 316 S STH 13, STETSONVILLE, WI 54480
For More Information on this Activity
Northern Region Contact: Kathleen Shafel  kathleen.shafel@wisconsin.gov
183093 | 03-61-183093
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages