2021-03-08
|
11
|
Activity Closed
|
|
|
|
2021-03-08
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2021-03-08
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2021-03-08
|
66
|
Continuing Obligations (COs) Apply at Off-site Property(ies)
|
|
|
|
2021-03-08
|
46
|
Impacted Right-of-Way (ROW) Notification
|
|
|
|
2021-03-02
|
95
|
Deed Instrument Terminated
|
|
DEED AFFIDAVIT NOTICE OF CONTAMINATION RECINDED
|
|
2021-02-16
|
118
|
PFAS Sampling Not Required At This Time
|
|
PFAS SAMPLING NOT REQUIRED
|
|
2021-02-10
|
114
|
PFAS Scoping Statement Received
|
|
PFAS SCOPING STATEMENT REC'D
|
|
2021-01-13
|
99
|
Miscellaneous
|
|
SIGNED RETURN CERTIFIED RECEIPT FOR NOTICE OF INTENT TO MODIFY DEED LETTER
|
|
2021-01-11
|
99
|
Miscellaneous
|
|
NOTICE OF INTENT TO EXTINGUISH FORMER DEED, REPLACE W/ UPDATED
NOTICE
|
|
2021-01-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2020 - 12/31/2020
|
|
2020-11-12
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
ADDITIONAL REQUESTED INFORMATION REC'D
|
|
2020-09-30
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
INFO REQ
|
|
2020-09-29
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
AR Restart
|
|
2020-09-09
|
79
|
Case Closure Review Request Received
|
|
AUTO-ENTERED
|
|
2020-09-09
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
AR Pause
|
|
2020-09-08
|
779
|
Case Closure Review Fee Received
|
|
CK # 081973
|
|
2020-09-08
|
700
|
Database Fee Paid for Groundwater Continuing Obligation(s)
|
|
CK # 081973
|
|
2020-09-08
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
CK # 081973
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-07-06
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2020 - 6/30/2020
|
|
2020-06-27
|
99
|
Miscellaneous
|
|
EMAIL RECEIPT FOR CLOSURE PACKET SUBMITAL
|
|
2020-06-23
|
99
|
Miscellaneous
|
|
MW ABANDONMENT FORMS RECIEVED. CLOSURE PACKET SUBMITTED W/O FEES
|
|
2020-06-18
|
182
|
Case Closure Review Request Received - Fee Required
|
|
CLOSURE SUBMTAL REC'D - REQ FEE TO COME FROM RP
|
|
2020-06-04
|
99
|
Miscellaneous
|
|
MW/PZ ABANDONMENT APPR
|
|
2020-04-09
|
99
|
Miscellaneous
|
|
SMOLKA PW ANALYTICAL RAW LAB RESULTS
|
|
2020-02-17
|
505
|
PECFA Cost Request Approved
|
|
PECFA COSTS APPR $951.74 - UPDATE HISTORIC FIGURES/TABLES
|
|
2020-02-11
|
504
|
PECFA Cost Request Received
|
|
PECFA COST REQ - UPDATE HISTORIC FIGURES/TABLES
|
|
2020-01-23
|
130
|
DNR Regulatory Reminder Sent
|
|
PECFA REMINDER LETTER
|
|
2020-01-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2019 - 12/31/2019
|
|
2019-11-04
|
505
|
PECFA Cost Request Approved
|
|
PECFA COSTS APPR $7,887.95 - 1 PW SAMPLE, CLOSURE PKG PREP, ABAND MW'S
|
|
2019-10-30
|
43
|
Site Activity Status Update Received
|
|
STATUS RPT REC'D
|
|
2019-10-30
|
504
|
PECFA Cost Request Received
|
|
PECFA COSTS REQ - 1 PW SAMPLE, CLOSURE PKG PREP, ABAND MW'S
|
|
2019-07-26
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2019 - 6/30/2019
|
|
2019-07-25
|
130
|
DNR Regulatory Reminder Sent
|
|
PECFA REMINDER LETTER
|
|
2019-06-03
|
505
|
PECFA Cost Request Approved
|
|
PECFA COSTS APPR $881.78 - ABANDON PW IN ROW
|
|
2019-05-28
|
504
|
PECFA Cost Request Received
|
|
PECFA COSTS REQ TO ABANDON PW IN ROW
|
|
2019-05-14
|
505
|
PECFA Cost Request Approved
|
|
PECFA COST APPR $7,009.91 - 2 RNDS GW, ALL MW'S, PW'S, WASTE DISPOSAL, LETTER RPT
|
|
2019-05-13
|
43
|
Site Activity Status Update Received
|
|
STATUS RPT - CARBON INJECTION, MW INSTALL, GW-2 RNDS, SMOLKA PW REPLACEMENT
|
|
2019-05-13
|
504
|
PECFA Cost Request Received
|
|
PECFA COST REQ - 2 RNDS GW, ALL MW'S, PW'S, WASTE DISPOSAL, LETTER RPT
|
|
2019-01-23
|
130
|
DNR Regulatory Reminder Sent
|
|
PECFA REMINDER LETTER
|
|
2019-01-23
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2018 - 12/31/2018
|
|
2018-08-28
|
99
|
Miscellaneous
|
|
REC'D OFFSITE PW INSTALL RPT
|
|
2018-08-23
|
504
|
PECFA Cost Request Received
|
|
PECFA COSTS REQ FOR CARBON INJECTION, U&C + VAR
|
|
2018-08-23
|
505
|
PECFA Cost Request Approved
|
|
PECFA COSTS APPR $36,749.37 - CARBON INJECTION, U&C, VAR
|
|
2018-08-01
|
99
|
Miscellaneous
|
|
REVISED INJECTION PERMIT LETTER ISSUED. ORIGINAL 7/26/18
|
|
2018-07-26
|
97
|
Technical Assistance Request Received (fee)
|
|
CK # 6348
|
|
2018-07-26
|
98
|
Technical Assistance Provided
|
|
TECH ASSIST PROVIDED - INJECTION PERMIT ISSUE
|
|
2018-07-24
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2018 - 6/30/2018
|
|
2018-07-16
|
130
|
DNR Regulatory Reminder Sent
|
|
PECFA REMINDER LETTER
|
|
2018-06-21
|
505
|
PECFA Cost Request Approved
|
|
COST APPR $20,000.00 - INSTALL NEW PW, ABAND OLD PW SMOLKA RESIDENCE
|
|
2018-06-15
|
504
|
PECFA Cost Request Received
|
|
REQ FROM WELL DRILLING CO TO INSTALL NEW PW & ABAND OLD PW - SMOLKA RESIDENCE
|
|
2018-05-17
|
505
|
PECFA Cost Request Approved
|
|
COSTS APPR $129,556.83 NEW MW, GW-4 QRTS, EXCAVATION, INJECTION
|
|
2018-05-14
|
504
|
PECFA Cost Request Received
|
|
REQ FOR NEW MW, GW-QTRS, EXCAVATION, INJECTION
|
|
2018-03-13
|
99
|
Miscellaneous
|
|
REVIEWED RPT AND SENT COMMENTS
|
|
2018-03-05
|
43
|
Site Activity Status Update Received
|
|
REC'D STATUS UPDATE RPT
|
|
2018-01-16
|
130
|
DNR Regulatory Reminder Sent
|
|
PECFA REMINDER LETTER
|
|
2018-01-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2017 - 12/31/2017
|
|
2017-12-08
|
505
|
PECFA Cost Request Approved
|
|
APPROVED ATF ($1,441.43) 1 ADDT'L GEOPROBDE, GW SAMPLES FROM PREV APPR 10/20/17
|
|
2017-12-06
|
504
|
PECFA Cost Request Received
|
|
ATF ADDT'L GEOPROBE, GW SAMPLES FOR PREV APPROVAL OF 10/20/17
|
|
2017-10-20
|
505
|
PECFA Cost Request Approved
|
|
APPROVED COSTS ($5,024.66) 8 GEOPROBES W/ GW & SOIL SAMPLES/ PREV APPROVAL 2/27/17 NOT PERFORMED
|
|
2017-10-16
|
504
|
PECFA Cost Request Received
|
|
REC'D COSTS FOR 8 GEOPROBES W/ GW & SOIL SAMPLES / PREV APPROVAL 2/27/17 WAS NOT PERFORMED
|
|
2017-09-27
|
505
|
PECFA Cost Request Approved
|
|
APPROVED COSTS ($329.23) FOR A REGULATORY MEETING
|
|
2017-09-15
|
504
|
PECFA Cost Request Received
|
|
COST REQUEST FOR A REGULATORY MEETING
|
|
2017-07-11
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2017 - 6/30/2017
|
|
2017-06-30
|
505
|
PECFA Cost Request Approved
|
|
APPROVED COSTS ($213.79) TEMP WELL INSTALL + SAMPLING PREV APPROVED SOW ON 2/27/17
|
|
2017-06-28
|
504
|
PECFA Cost Request Received
|
|
REC'D COSTS FOR ATF APPROVAL FOR TEMP WELL INSTALL + SAMPLING FROM PREV APPROVED SOW 2/27/17
|
|
2017-02-27
|
505
|
PECFA Cost Request Approved
|
|
APPROVED U&C + VAR ($27,535.66) BORINGS, MW'S, PW'S-4 RNDS, DRILL RIG, PER DIEMS
|
|
2017-02-21
|
504
|
PECFA Cost Request Received
|
|
REC'D U&C FOR BORINGS, MW'S, PW'S-4 QRTLY RNDS, DRILL RIG, PER DIEMS
|
|
2017-01-17
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2016 - 12/31/2016
|
|
2017-01-17
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
RAOR REC'D
|
|
2016-07-12
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2016 - 6/30/2016
|
|
2016-06-03
|
505
|
PECFA Cost Request Approved
|
|
APPROVAL OF REQUEST VARIANCE FOR LOW PROFILE DRILL RIG $500
|
|
2016-06-01
|
504
|
PECFA Cost Request Received
|
|
REQUEST VARIANCE FOR LOW PROFILE DRILL RIG
|
|
2016-05-25
|
99
|
Miscellaneous
|
|
WELL INSTALLATION VARIANCE REQUEST REC'D
|
|
2016-05-13
|
505
|
PECFA Cost Request Approved
|
|
SOW & COST APPROVED FOR WELL INSTAL, VI, & 2 QGWS
|
|
2016-04-14
|
504
|
PECFA Cost Request Received
|
|
PECFA COST REQUEST & SOW REC'D
|
|
2016-03-29
|
99
|
Miscellaneous
|
|
CALL FROM RP
|
|
2016-03-10
|
504
|
PECFA Cost Request Received
|
|
COST REQUEST REC'D FOR ACCESS AGREEMENT $8,812.25
|
|
2016-03-10
|
505
|
PECFA Cost Request Approved
|
|
COST REQUEST APPROVED FOR ACCESS AGREEMENT $8,812.25
|
|
2016-01-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2015 - 12/31/2015
|
|
2015-12-17
|
99
|
Miscellaneous
|
|
SITE MEETING & ATTEMPT TO TALK TO NEIGHBOR
|
|
2015-12-11
|
99
|
Miscellaneous
|
|
CONFERENCE W/ CONSULTANT & RP
|
|
2015-08-24
|
130
|
DNR Regulatory Reminder Sent
|
|
PECFA SUNSET LETTER
|
|
2015-07-13
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2015 - 6/30/2015
|
|
2015-03-25
|
505
|
PECFA Cost Request Approved
|
|
APPROVAL FOR WDOT SIGNAGE HWY 35 ROW FIELDWORK AS VARIANCE. U&C $1000.80
|
|
2015-03-23
|
506
|
PECFA Cost Request Not Approved
|
|
VARIANCE COST REQUEST DENIED
|
|
2015-03-17
|
506
|
PECFA Cost Request Not Approved
|
|
VARIANCE COSTS REQUEST DENIAL ($3,181.50) DUE TO COSTS BEING INCURED PRIOR TO APPROVAL OF BUDGET
|
|
2015-03-17
|
504
|
PECFA Cost Request Received
|
|
REQUEST PECFA BUDGET COST VARIANCE, ADDT'L U&C FOR WDOT ROW HWY 35 SIGNAGE
|
|
2015-02-09
|
504
|
PECFA Cost Request Received
|
|
VARIANCE COSTS REQUEST REC'D RE: IN RELATION TO ADJACENT PROPERTY OWNER CONTAMINATED PRIVATE WELL
|
|
2015-02-02
|
99
|
Miscellaneous
|
|
EMAIL CONSULTANT & ATTORNEY RE: ON-GOING USE OF MW ON FRANCINES PROPERTY
|
|
2015-02-02
|
99
|
Miscellaneous
|
|
PHONE CALL WITH RP RE: TAX ISSUES RELATED TO CLEANUP OF SITE
|
|
2015-01-06
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2014 - 12/31/2014
|
|
2014-11-17
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2014 - 6/30/2014
|
|
2014-11-12
|
99
|
Miscellaneous
|
|
CONF CALL W/ DNR DRINKING WATER & RR STAFF
|
|
2014-10-13
|
505
|
PECFA Cost Request Approved
|
|
VARIANCE COSTS BID DEFERMENT BUDGET APPROVAL FOR DRILLER & CONSULTANT EVALUATE PRIVATE WELL $2,500
|
|
2014-10-10
|
504
|
PECFA Cost Request Received
|
|
PECFA COSTS REQUEST REC'D FOR BID DEFERMENT
|
|
2014-10-08
|
99
|
Miscellaneous
|
|
PHONE CALL TO DISCUSS CONCERNS RELATED TO MW'S, SUPPLIED BOTTLED WATER & PRIVATE WELL REPLACEMENT
|
|
2014-09-17
|
99
|
Miscellaneous
|
|
NR141 MONITORING WELL CONSTRUCTION EXCEPTION OK'D
|
|
2014-08-13
|
504
|
PECFA Cost Request Received
|
|
PECFA COSTS REQUEST REC'D FOR A CHANGE ORDER TO THE EXISTING BUDGET
|
|
2014-06-24
|
99
|
Miscellaneous
|
|
TECHNICAL REVIEW FOR BID DEFERMENT BUDGET LETTER
|
|
2014-05-19
|
99
|
Miscellaneous
|
|
EMAILS ABOUT WELL REPLACEMENT ISSUES WITH CONSULTANT
|
|
2014-04-16
|
99
|
Miscellaneous
|
|
BOTTLED WATER SUPPLY & REPLACEMENT PRIVATE WATER WELL TECH & FINANCIAL ISSUE E-MAILS
|
|
2014-04-14
|
505
|
PECFA Cost Request Approved
|
|
BOTTLED WATER SUPPLY COST VARIANCE APPROVAL LTR - BUDGET APPROCVAL FOR $75 (RECURRING BASIS)
|
|
2014-04-11
|
504
|
PECFA Cost Request Received
|
|
PECFA COSTS REQUEST REC'D FOR BID DEFERMENT
|
|
2014-04-09
|
99
|
Miscellaneous
|
|
BOTTLED WATER SUPPLY COST VARIANCE REQUEST
|
|
2014-03-25
|
99
|
Miscellaneous
|
|
SCOPE OF WORK TASK REVIEW; TO ENABLE BUDGET ESTIMATE BY CONSULTANT
|
|
2014-03-20
|
99
|
Miscellaneous
|
|
EMAIL W/ DOT ABOUT MONITORING WELLS IN HWY 35 ROW
|
|
2014-03-11
|
504
|
PECFA Cost Request Received
|
|
EMAIL SENT DISCUSS ALTERNATIVE WATER SUPPLY & DETERMINE TECH FOCUS, PECFA REIMBURSABLE ITEMS
|
|
2014-02-06
|
505
|
PECFA Cost Request Approved
|
|
SI RPT BUDGET APPROVAL FOR $4,728.90 (RECURRING BASIS)
|
|
2014-02-03
|
99
|
Miscellaneous
|
|
CONSULTANT PHONE CALL - UPDATE ON STATUS FOR ALTERNATIVE WATER SUPPLY PROVISIONS & SIR ISSUE
|
|
2014-01-31
|
504
|
PECFA Cost Request Received
|
|
PECFA COSTS REQUEST REC'D FOR BID DEFERMENT
|
|
2013-12-18
|
507
|
PECFA Cost Request Additional Information Requested
|
|
EMAIL STATUS UPDATES ON ADJACENT PROPERTY OWNER ALTERNATIVE WATER SUPPLIES PROVISIONS
|
|
2013-12-06
|
507
|
PECFA Cost Request Additional Information Requested
|
|
PECFA ELIGIBLE RPOVISIONS FOR ALTERNATIVE WATER SUPPLIES
|
|
2013-12-02
|
43
|
Site Activity Status Update Received
|
|
SOURCE PROPERTY POTABLE WELL RESULTS REC'D & MW DATA REC'D. MW-5 NEEDS TO BE PROPERLY ABAND
|
|
2013-11-13
|
505
|
PECFA Cost Request Approved
|
|
SAMPLE PRIVATE WELLS & MW NETWORK BUDGET APPROVAL FOR $2,338.90
|
|
2013-11-08
|
99
|
Miscellaneous
|
|
AGENT/CONSULTANT UPDATES
|
|
2013-11-08
|
504
|
PECFA Cost Request Received
|
|
PECFA COSTS REQUEST REC'D FOR BID DEFERMENT
|
|
2013-11-07
|
507
|
PECFA Cost Request Additional Information Requested
|
|
EMAIL - ADJACENT PROPERTY OWNER RE: BOTTLED WATER SUPPLY OFFER, OWNER WILLING TO DISCUSS FURTHER
|
|
2013-10-04
|
99
|
Miscellaneous
|
|
HEALTH ADVISORY REC'D; FROM WIDNR DG WATER SUPPLY
|
|
2013-09-27
|
99
|
Miscellaneous
|
|
DAIRYLAND DG HEALTH ADV LTR SENT
|
|
2013-09-25
|
99
|
Miscellaneous
|
|
AGENT CONTRACT WITHDRAWAL LTR
|
|
2013-09-11
|
43
|
Site Activity Status Update Received
|
|
GW MONITORING RPT REC'D
|
|
2013-09-11
|
151
|
Remedial Action Documentation Report Received (non-fee)
|
|
|
|
2012-05-11
|
99
|
Miscellaneous
|
|
POTABLE WELL RESULTS
|
|
2012-03-23
|
99
|
Miscellaneous
|
|
POTABLE WELL RESULTS
|
|
2012-02-28
|
99
|
Miscellaneous
|
|
LTR SENT REQUESTING POTABLE WELL INFO
|
|
2012-02-27
|
99
|
Miscellaneous
|
|
GW MONITORING RPT
|
|
2012-01-30
|
99
|
Miscellaneous
|
|
POTABLE WELL DATA - WELL IMPACTED
|
|
2011-09-07
|
130
|
DNR Regulatory Reminder Sent
|
|
Vapor Intrusion (VI) Assessment Notification Ltr Sent
|
|
2010-10-12
|
63
|
Inject/Infiltrate Request Received (fee)
|
|
$500 MOOSE JUNCTION BAR CHECK #4840 RECD.
|
|
2010-10-12
|
64
|
Inject/Infiltrate Request Approved
|
|
|
|
2010-03-04
|
99
|
Miscellaneous
|
|
LETTER REGARDING ACCESS TO ADJOINING PROPERTY
|
|
2010-02-17
|
99
|
Miscellaneous
|
|
PROPERTY ACCESS LETTER TO CONRAD SWENSON
|
|
2009-01-09
|
99
|
Miscellaneous
|
|
PRIVATE WELL RESULTS
|
|
2008-12-08
|
502
|
PECFA Bidding Completed
|
|
PRO SOURCE TECH WAS LOW BIDDER ($31,256.80)
|
|
2008-09-30
|
501
|
PECFA Bidding to Establish Cost Cap
|
|
DIRECTED TO BID ROUND 57
|
|
2008-09-22
|
99
|
Miscellaneous
|
|
SEPT 08 PRIVATE WELL RESULTS RECVD
|
|
2008-03-20
|
41
|
Remedial Action Report Received
|
|
RAOR RECVD PER BID REQUIREMENT
|
|
2008-01-24
|
43
|
Site Activity Status Update Received
|
|
GW MONITORING REPORT REC'D
|
|
2007-10-26
|
99
|
Miscellaneous
|
|
PRIVATE WELL RESULTS
|
|
2007-05-30
|
99
|
Miscellaneous
|
|
MAY '07 OFF-SITE PRIVATE WELL SAMPLE RESULTS RECVD
|
|
2007-05-07
|
43
|
Site Activity Status Update Received
|
|
PRIVATE WELL RESULTS
|
|
2007-01-09
|
502
|
PECFA Bidding Completed
|
|
TETRA-TECH WAS LOW BIDDER
|
|
2006-11-06
|
501
|
PECFA Bidding to Establish Cost Cap
|
|
SITE WILL GO TO BID IN ROUND 46
|
|
2006-08-10
|
99
|
Miscellaneous
|
|
ANALYTICAL RESULTS RECVD
|
|
2006-07-21
|
99
|
Miscellaneous
|
|
PECFA SENT LETTER REVOKING COST CAP. SITE WILL GO TO BID
|
|
2006-05-10
|
43
|
Site Activity Status Update Received
|
|
APRIL '06 GW RESULTS SUBMITTED BY E-MAIL
|
|
2006-02-17
|
2
|
Responsible Party (RP) letter sent
|
|
NEW LAND OWNER/RP (TRENT SPRAGUE)
|
|
2006-02-17
|
200
|
Push Action Taken
|
|
|
|
2002-04-29
|
99
|
Miscellaneous
|
|
DRINKING WATER SAMPLE RESULTS RECVD FROM DW SPECIALIST
|
|
2001-02-26
|
99
|
Miscellaneous
|
|
DRINKING WATER LTR & RSLTS FEB 2001
|
|
1999-08-05
|
53
|
Deed Affidavit for Contamination (NR 728) Recorded
|
|
|
|
1999-08-05
|
59
|
Environmental Enforcement Action Completed
|
|
COMPLIANCE ACHEIVED WITH RECORDING OF DEED AFFIDAVIT
|
|
1999-04-22
|
99
|
Miscellaneous
|
|
ENF. CONF. SUMMARY LETTER SENT
|
|
1999-03-19
|
4
|
Enforcement Conference Held
|
|
DEED AFFIDAVIT DISCUSSION
|
|
1998-12-29
|
99
|
Miscellaneous
|
|
NOTICE TO RECORD DEED AFFIDAVIT SENT
|
|
1997-08-12
|
40
|
Remedial Action Options Report (RAOR) Approved
|
|
|
|
1997-08-01
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
|
|
1997-03-21
|
43
|
Site Activity Status Update Received
|
|
|
|
1996-08-05
|
43
|
Site Activity Status Update Received
|
|
|
|
1996-05-15
|
43
|
Site Activity Status Update Received
|
|
|
|
1996-04-02
|
43
|
Site Activity Status Update Received
|
|
|
|
1996-03-14
|
43
|
Site Activity Status Update Received
|
|
|
|
1996-02-12
|
43
|
Site Activity Status Update Received
|
|
|
|
1995-12-13
|
43
|
Site Activity Status Update Received
|
|
|
|
1995-11-28
|
40
|
Remedial Action Options Report (RAOR) Approved
|
|
RA WORK PLAN APPV'D
|
|
1995-11-06
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
RA WORK PLAN RECV'D/REVISED
|
|
1995-09-18
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT
|
|
1995-06-12
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT
|
|
1995-05-17
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT
|
|
1995-04-12
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT
|
|
1995-02-10
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT
|
|
1995-01-09
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT
|
|
1994-12-09
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SI REPORT RECV'D/ANNUAL REPORT
|
|
1994-12-05
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT
|
|
1994-11-18
|
99
|
Miscellaneous
|
|
NEW RP ADDRESS
|
|
1994-09-19
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT REC'D
|
|
1994-03-03
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT(R)
|
|
1993-11-01
|
41
|
Remedial Action Report Received
|
|
RA REPORT RECV'D(R)
|
|
1993-11-01
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT(R)
|
|
1993-11-01
|
147
|
Remedial Action Design Report Received (non-fee)
|
|
|
|
1993-10-11
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT(R)
|
|
1993-09-13
|
43
|
Site Activity Status Update Received
|
|
QRTLY/MTHLY STATUS RPT(R)
|
|
1993-07-15
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SI REPORT RECV'D
|
|
1993-02-10
|
14
|
Notice of Violation (NOV) Issued
|
|
SEE CASETRACK
|
|
1992-11-24
|
18
|
Administrative or Consent Order Issued
|
|
SEE CASETRACK
|
|
1992-11-04
|
4
|
Enforcement Conference Held
|
|
SEE CASETRACK
|
|
1992-09-24
|
14
|
Notice of Violation (NOV) Issued
|
|
SEE CASETRACK93-NWEE-014
|
|
1990-12-21
|
2
|
Responsible Party (RP) letter sent
|
|
R.P. LETTER SEND
|
|
1990-12-18
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
1990-12-14
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
|
1990-12-04
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
DOT PHASE II RPT REC'D
|