WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
03-55-282548 AUTO STOP/SSG CORP
Activity Type / Status Jurisdiction
LUST  CLOSED DNR RR
Location Name County DNR Region
LADYSMITH AUTO STOP RUSK NORTHERN
Address Municipality
119 W 9TH ST LADYSMITH
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NW 1/4 of the NW 1/4 of Sec 03, T34N, R06W 45.4648797 -91.1108224 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
WI DOT PROJECT # 1580-31-00 .5
Facility ID PECFA No. EPA ID Start Date End Date
855000520 54848-1295-19 2001-08-31 2022-10-31
Characteristics
Above Ground
Petrol Tank

Drycleaner
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Superfund
NPL Site
Underground
Petrol Tank
WI DOT
Site
  Pecfa Flag ROW Impact flag Underground Storage Tank Flag
Site Files
Name File
SITE FILE DOCUMENTATION FOR ACTIVITY - 2014 THRU 2022 Download PDF Document
SITE FILE DOCUMENTATION FOR ACTIVITY - 2009 THRU 2013 Download PDF Document
SITE FILE DOCUMENTATION FOR ACTIVITY 2001 thru 2008 Download PDF Document
Actions and Documents
Date Code Name File Comment
2022-10-31 11 Activity Closed Download PDF file
2022-10-31 56 Continuing Obligation(s) Applied Download PDF file
2022-10-31 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2022-10-31 232 Continuing Obligation - Residual Soil Contamination
2022-10-31 236 Continuing Obligation - Residual GW Contamination
2022-10-31 66 Continuing Obligations (COs) Apply at Off-site Property(ies)
2022-10-31 46 Impacted Right-of-Way (ROW) Notification
2022-10-21 190 Remaining Actions Needed Requirements Met or Docs Received Download PDF file MW ABANDONMENT FORMS REC'D
2022-10-21 99 Miscellaneous Download PDF file SVE PIPING ABANDONMENT PICTURES
2022-10-21 99 Miscellaneous Download PDF file MW ABANDONMENT FORM - DOUG'S TIRE 03-55-000408
2022-09-23 84 Remaining Actions Needed Download PDF file RA LTR SENT
2022-09-06 199 Info. Received or Request Ended (Fee-Based or Closure)
2022-09-01 198 Request for Additional Information (Fee-Based or Closure) REQ ADDT'L INFO
2022-07-31 199 Info. Received or Request Ended (Fee-Based or Closure) Document Exception INFO REC'D
2022-07-31 114 PFAS Scoping Statement Received Document Exception PFAS SCOPING STATEMENT IN CLOSURE REVISIONS DATED 7/31/22
2022-07-18 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-02-04 99 Miscellaneous Document Exception PHONE CALL W/RP - RE: CLOSURE REVISIONS. RP WILL CONTACT CONSULTANT. DNR FOLLOW UP IN 30 DAYS
2021-07-15 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-01-15 99 Miscellaneous Download PDF file STATUS UPDATE REQUEST LETTER FOR CLOSURE REVISIONS SENT
2021-01-13 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2020-09-08 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file PHASE 2.5 WI DOT PROJECT # 1580-31-00
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-06-30 99 Miscellaneous Download PDF file MW ABANDONMENT FORMS FOR MWS 1000 AND 1100
2020-06-26 198 Request for Additional Information (Fee-Based or Closure) ADDT'L INFO REQ
2020-06-23 199 Info. Received or Request Ended (Fee-Based or Closure) AR Restart
2020-06-22 779 Case Closure Review Fee Received CK # 4643
2020-06-22 700 Database Fee – GW above NR 140 ES or CO per WI Stat 292.12 CK # 4643
2020-06-22 710 Database Fee - Soil above NR 720 RCLs CK # 4643
2020-06-22 79 Case Closure Review Request Received AUTO-ENTERED
2020-06-22 198 Request for Additional Information (Fee-Based or Closure) AR Pause
2020-06-18 505 PECFA Cost Request Approved Download PDF file PECFA COST APPR $329.64 - CAP MAIN PLAN PREP. OTHER COSTS PREV APPR ON 6/16/20
2020-06-17 504 PECFA Cost Request Received Download PDF file PECFA COST REQ - PREP CAP MAINT PLAN. OTHER COSTS PREV APPROVED ON 6/16/20
2020-06-16 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $14,943.44 - SVE ABND, WASTE, CLOSURE PKG PREP-W/ENG AND MW ABND
2020-06-15 504 PECFA Cost Request Received Download PDF file PECFA COST REQUEST FOR SVE ABND, WASTE, CLOSURE PKG PREP-W/ENG AND MW ABND
2020-06-12 43 Site Activity Status Update Received Download PDF file STATUS REPORT REC'D
2020-05-28 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $1,639.50 - FOR DRILLING DEPTH CHANGES, PREV APPRD MAY 14, 2020
2020-05-27 504 PECFA Cost Request Received Download PDF file PECFA COST REQ - FOR DRILLING DEPTH CHANGES, PREV APPROVED ON MAY14, 2020
2020-05-14 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $25,256.77 - 3 WELL NESTS, 1 WT WELL, SAMPLE ALL -1 RD + SELECT WELLS, REPORT
2020-05-12 504 PECFA Cost Request Received Download PDF file PECFA COST REQ - INSTALLATION OF 3 WELL NESTS, 1 WT WELL, SAMPLE ALL 1 RND + SELECT MWS, RPT
2020-04-27 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $3,139.46 - ADDT'L WELL SAMPLING, ADJUSTMENT TO PREV MARCH 23 APPROV
2020-04-24 504 PECFA Cost Request Received Download PDF file PECFA COST REQUEST - ADDT'L WELL SAMPLING & ADJUSTMENT TO PREV MARCH 23 APPROVAL
2020-03-23 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $35,761.26 - INSTALL PZS, SAMPLE ALL WELLS, SVE RUN 1 MONTH
2020-03-22 504 PECFA Cost Request Received Download PDF file PECFA COST REQ - INSTALL PZS, SAMPLE ALL WELLS, WELL ABAND, SVE RUN 1 MONTH
2020-02-27 43 Site Activity Status Update Received Download PDF file STATUS RPT REC'D
2020-01-23 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2020-01-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-10-25 504 PECFA Cost Request Received Download PDF file PECFA COSTS REQ - ADDT'L LAB DATA REVIEW VI, ORIGINALLY APPR 4/29/19
2019-10-25 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $150.00 - ADDT'L LAB DATA REVIEW VI, ORIGINALLY APPR 4/29/19
2019-10-09 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $2,906.25 - REVISION FOR PUMPING ON SATURDAY. PREV APPR 8/13/19.
2019-10-01 504 PECFA Cost Request Received Download PDF file PECFA COSTS REQ - REVISION FOR PUMPING ON SATURDAY. PREV APPR 8/13/19.
2019-08-13 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $23,294.26 - MW/PZ INSTALL, EXTRACTION WELLS, ABAND MW'S, PUMP EXTRACTION WELLS
2019-08-12 504 PECFA Cost Request Received Download PDF file PECFA COSTS REQ - MW/PZ INSTALL, EXTRACTION WELLS, ABAND MW'S, PUMP EXTRACTION WELLS
2019-08-05 99 Miscellaneous Download PDF file LTR TO RP RE: MW ABAND 03-55-000592
2019-08-05 99 Miscellaneous Download PDF file CONSULTANT RESPONSE TO ABANDONING 03-55-000592 MW'S
2019-07-25 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2019-07-19 43 Site Activity Status Update Received Download PDF file STATUS RPT REC'D - GW SAMPLING, SUB SLAB AIR SAMPLING, SVE SYSTEM OPERATION
2019-07-09 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $1,380.49 - REPL SVE DRIVE/ELECTRICIAN TO REMOVE & INSTALL
2019-07-08 504 PECFA Cost Request Received Download PDF file PECFA COSTS REQ TO REPL SVE DRIVE/ELECTRICIAN TO REMOVE & INSTALL
2019-07-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-06-25 504 PECFA Cost Request Received Download PDF file PECFA COSTS REQ FOR CONTINGENCY VISIT - SVE SYSTEM
2019-06-25 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR - CONTINGENCY VISIT SVE SYSTEM
2019-04-29 504 PECFA Cost Request Received Download PDF file PECFA COSTS REQ 4 RNDS GW, VI INVESTIGATION, O&M SVE 8 MONTHS
2019-04-29 505 PECFA Cost Request Approved Download PDF file COSTS APPR $27,25303, GW 4 RNDS, VI INVESTIGATION, O&M SVE 8 MONTHS
2019-02-07 92 Operation & Maintenance (O & M) Report Received (non-Fee) Download PDF file O&M RPT REC'D
2019-01-23 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2019-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-07-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-07-16 130 DNR Regulatory Reminder Sent Download PDF file PECFA REMINDER LETTER
2018-06-19 505 PECFA Cost Request Approved Download PDF file APPR COSTS $952.11 - 1 RND GW MW 900 THEN ABANDON IF OK DUE TO DAIRY QUEEN EXPANSION
2018-06-18 504 PECFA Cost Request Received Download PDF file REQ 1 RND GW SAMPLING MW 900, THEN ABANDON IF OK DUE TO DAIRY QUEEN EXPANSION
2018-05-18 505 PECFA Cost Request Approved Download PDF file COSTS APPR $14,972.52 SVE O&M 7 MONTHS W/ DOUG'S TIRE 03-55-000408
2018-05-17 505 PECFA Cost Request Approved Download PDF file PECFA COSTS APPR $453.31 - GW MONITORING 600,700,700A,700B
2018-05-14 504 PECFA Cost Request Received Download PDF file PECFA COSTS REQ - GW MONITORING SELECT MW'S
2018-05-14 504 PECFA Cost Request Received Download PDF file REQ PECFA COSTS FOR SVE O&M 7 MONTHS
2018-02-23 505 PECFA Cost Request Approved Download PDF file APPROVED COSTS ($631.61)
2018-02-21 504 PECFA Cost Request Received Download PDF file COSTS TO THAW SVE PIPING
2018-01-16 130 DNR Regulatory Reminder Sent PECFA REMINDER LETTER
2018-01-12 505 PECFA Cost Request Approved Download PDF file APPROVED COSTS ($18,063.78) SVE 5/8 COSTS
2018-01-11 504 PECFA Cost Request Received Download PDF file REQUEST COSTS FOR SVE 10/17 TO 5/18
2018-01-04 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2017-11-20 92 Operation & Maintenance (O & M) Report Received (non-Fee) Download PDF file O&M RPT REC'D
2017-08-22 99 Miscellaneous Download PDF file REQUEST FOR ONSITE SVE CONTINGENCY ALARM. OK'D
2017-07-18 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-10-25 505 PECFA Cost Request Approved Download PDF file APPROVED U&C + VAR ($21,683.61) FOR O&M OF SVE + PUMPING WASTE + RW'S
2016-10-14 504 PECFA Cost Request Received U&C + VAR FOR O&M OF SVE + PUMPING OF WASTE WATER + RW'S
2016-09-12 151 Remedial Action Documentation Report Received (non-fee) Download PDF file SVE PROGRESS RPT AND RECOMMENDATIONS RCVD
2016-07-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-02-11 505 PECFA Cost Request Approved APPROVED VAR COSTS ($478.89) FOR T&M TO HOOK UP OXIDIZER TO NATURAL GAS LINE
2016-02-01 504 PECFA Cost Request Received SUBMITTED VAR REQUEST FOR T&M TO HOOK UP OXIDISER TO NATURAL GAS LINE
2016-01-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-11-20 505 PECFA Cost Request Approved APPROVED MOD TO CAP ($7,735) + VAR ($1,608.75) FOR NATURAL GAS HOOK UP
2015-11-17 504 PECFA Cost Request Received REC'D MODIFICATION REQUEST TO COST CAP + VARIANCE FOR NATURAL GAS HOOK UP
2015-09-16 504 PECFA Cost Request Received REC'D COST REQUEST FOR ADDT'L OVERNIGHT PER DIEM-SVE SYSTEM INSTALLATION
2015-09-16 505 PECFA Cost Request Approved APPROVED U&C COST ($701.66) PER DIEM OVERNIGHTS FOR SVE SYSTEM INSTALLATION
2015-08-31 505 PECFA Cost Request Approved COSTS APPROVED U&C + VAR ($2,777) FOR 9 MW REPAIRS/TIME/TRAVEL
2015-08-25 504 PECFA Cost Request Received COST REQUEST REC'D MW REPAIRS/TIME/TRAVEL DUE TO BLACKTOPPING EVENT
2015-08-24 130 DNR Regulatory Reminder Sent Download PDF file PECFA SUNSET LETTER
2015-08-04 99 Miscellaneous ELECTRIC 8/6/15, SVE SYSTEM SCHEDULE IN SEPT. ONLINE BY EARLY OCT
2015-07-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-06-29 99 Miscellaneous SVE PIPING INSTALLED, TRAILER TO BE CONNECTED IN AUGUST
2015-04-10 149 Remedial Action Design Report Approved APPROVED RAP $140,370.36 FOR VAR + U&C FOR RAP 1 YEAR
2015-02-27 147 Remedial Action Design Report Received (non-fee) Download PDF file NON FEE - REVISED RAP REC'D
2015-01-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2014-12-26 99 Miscellaneous SENT EMAIL TO CONSULTANT RE: STATUS OF RAP
2014-07-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-07-09 147 Remedial Action Design Report Received (non-fee) NON FEE - REMEDIAL ACTION PLAN REC'D
2014-06-02 99 Miscellaneous PILOT TEST AND SYSTEM DESIGN COMPLETED / COST ESTIMATE BY JULY
2014-05-30 99 Miscellaneous EMAILED CONSULTANT FOR UPDATES
2014-02-21 99 Miscellaneous PILOT TEST SCHEDULED FOR SPRING OF 2014
2014-02-03 505 PECFA Cost Request Approved COST APPROVED
2014-01-15 99 Miscellaneous REC'D REMEDIAL DESIGN CHANGE ORDER
2013-02-21 99 Miscellaneous REVIEWED PUMPING RPT
2013-02-19 43 Site Activity Status Update Received REC'D REMEDIAL PUMPING RPT
2012-12-07 99 Miscellaneous REVIEWED LATEST PUMPING RPT
2012-11-07 43 Site Activity Status Update Received REC'D PUMPING RPT, FINAL PUMPING IN DEC/RPT TO COME IN JAN
2012-10-19 99 Miscellaneous PUMPING RW'S WEEKLY UNTIL END-DEC. LOTS OF PRODUCT NOTED.
2012-08-16 99 Miscellaneous WELLS TO BE INSTALLED 8/23 & 8/24, PUMPING ON 9/6
2012-06-06 99 Miscellaneous REVIEWED UPDATE RPT
2012-06-01 43 Site Activity Status Update Received
2011-11-17 99 Miscellaneous REVIEWED RAA
2011-11-08 99 Miscellaneous REC'D RAA
2011-10-20 99 Miscellaneous COST SUBMITTALS APPROVED BY DSPS
2011-10-11 99 Miscellaneous REMEDIAL ACTION REPORT TO COME IN NOV
2011-09-07 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2010-11-14 99 Miscellaneous LASER INDUCED FLUORESCENCE REPORT SUBMITTED.
2010-03-15 99 Miscellaneous CHANGE ORDER FOR LASER FLUORESCENSE INVESTIGATION.
2010-02-09 99 Miscellaneous DCOMM REQUEST SITE CHARACTERIZATION INCLUDING LIF
2009-11-15 43 Site Activity Status Update Received STILL FP, RECOMMENDS ADDED SI WORK
2007-07-24 99 Miscellaneous BID WORK FOR ROUND 35 COMPLETE, FREE PRODUCT REMAINING, ADDED WORK NEEDED
2005-02-17 502 PECFA Bidding Completed
2004-12-27 501 PECFA Bidding to Establish Cost Cap Download PDF file * SYSTEM ADDED *
2004-12-08 501 PECFA Bidding to Establish Cost Cap BID ROUND 35 - SCOPE OF WORK
2004-05-19 92 Operation & Maintenance (O & M) Report Received (non-Fee) FREE PRODUCT RECOVERY CONTINUING
2003-06-09 501 PECFA Bidding to Establish Cost Cap Download PDF file * SYSTEM ADDED *
2003-04-14 38 Site Investigation Report (SIR) Approved
2003-04-14 99 Miscellaneous SITE TO BE BID ROUND 26
2003-03-31 37 Site Investigation Report (SIR) Received (non-fee) SI RCVD W/O FEE
2001-11-02 2 Responsible Party (RP) letter sent
2001-08-31 1 Notification of Hazardous Substance Discharge STATUS UPDATE RPT FROM ENVIROGEN ON 03-55-000408
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
Property Affected -> 13-55-591107 FLAMBEAU AUTO EXPO (FORMER)
Substances
Substance Type Amt Released Units
Metals (lead, benzene, napthalane, toluene, xyplenes, ethy) Metals
Polynuclear Aromatic Hydrocarbons Petroleum
PECFA Total Claims Paid
Payments made from the Petroleum Environmental Cleanup Fund Award
PECFA Site Name: Auto Stop
Max. Reimbursement: $1,000,000 Total Amount Paid: $435,685.77
Occ No Claim No Audit Date Paid Date Amt Submitted Amt Ineligible Amt Paid
A 1 2003-06-24 2003-12-05 $52,774.35 $3,352.94 $46,825.34
A 2 2005-04-07 2005-07-13 $12,993.75 $493.50 $11,875.24
A 3 2007-09-17 2007-11-28 $11,519.77 $.00 $10,943.78
A 4 2009-11-19 2009-12-28 $15,151.96 $.00 $14,394.36
A 5 2010-08-30 2010-10-06 $12,923.46 $.00 $12,277.29
A 6 2011-04-25 2011-05-26 $1,814.95 $.00 $1,724.20
A 7 2011-12-15 2012-01-25 $16,896.45 $.00 $16,489.26
A 8 2011-12-15 2012-01-25 $.00 $8,752.70 -$8,752.70
A 9 2012-02-14 2012-05-16 $1,838.23 $.00 $1,746.32
A 10 2012-07-31 2012-09-12 $6,660.90 $.00 $6,541.14
A 11 2012-07-31 2012-09-12 $.00 $4,265.66 -$4,265.66
A 12 2012-09-19 2012-11-07 $8,320.15 $.00 $7,904.14
A 13 2012-12-04 2013-03-22 $16,854.68 $.00 $16,011.95
A 14 2013-02-19 2013-03-22 $12,296.75 $.00 $11,681.91
A 15 2013-06-12 2013-07-12 $1,162.90 $.00 $1,104.75
A 16 2014-01-21 2014-03-07 $1,648.31 $.00 $1,565.89
A 17 2014-07-10 2014-08-04 $3,318.80 $.00 $3,152.86
A 18 2015-06-29 2015-08-10 $57,197.40 $.00 $54,337.53
A 19 2015-10-26 2016-01-19 $6,422.32 $.00 $6,101.20
A 20 2015-12-09 2016-02-09 $24,103.12 $.00 $22,897.96
A 21 2016-02-09 2016-06-23 $10,337.22 $.00 $9,820.36
A 22 2016-03-28 2016-07-01 $16,864.44 $.00 $16,021.22
A 23 2016-06-06 2016-08-01 $6,142.38 $.00 $5,835.26
A 24 2016-07-11 2016-08-25 $5,004.86 $.00 $4,754.62
A 25 2016-10-25 2016-11-23 $6,177.40 $.00 $5,868.53
A 26 2017-01-06 2017-02-09 $4,980.19 $.00 $4,731.18
A 27 2017-03-21 2017-05-02 $5,072.23 $.00 $4,818.62
A 28 2017-06-19 2017-07-13 $5,369.41 $.00 $5,100.94
A 29 2017-09-19 2017-10-06 $4,973.95 $.00 $4,725.25
A 30 2017-11-27 2017-12-15 $3,041.05 $.00 $2,889.00
A 31 2018-01-29 2018-02-09 $5,842.47 $.00 $5,550.35
A 32 2018-04-23 2018-05-03 $8,232.55 $.00 $7,820.92
A 33 2018-06-20 2018-07-06 $5,091.22 $.00 $4,836.66
A 34 2018-08-28 2018-09-04 $6,234.12 $.00 $5,922.41
A 35 2018-11-26 2018-12-17 $3,666.60 $.00 $3,483.27
A 36 2019-01-22 2019-02-12 $3,344.97 $.00 $3,177.72
A 37 2019-03-05 2019-03-21 $2,980.73 $.00 $2,831.69
A 38 2019-06-26 2019-07-10 $5,463.07 $.00 $5,189.92
A 39 2019-08-21 2019-08-30 $8,063.62 $.00 $7,660.44
A 40 2019-10-07 2019-10-22 $7,676.08 $.00 $7,292.28
A 41 2019-12-02 2019-12-09 $11,698.16 $.00 $11,113.25
A 42 2019-12-18 2020-01-13 $3,595.62 $.00 $3,415.84
A 43 2020-02-03 2020-02-13 $5,375.77 $.00 $5,106.98
A 44 2020-03-13 2020-05-14 $2,690.92 $.00 $2,556.37
A 45 2020-05-15 2020-08-06 $18,106.76 $.00 $17,201.42
A 46 2020-05-19 2020-08-06 $7,554.50 $.00 $7,176.77
A 47 2020-06-18 2020-08-13 $24,555.95 $.00 $23,328.15
A 48 2020-06-28 2020-09-18 $3,429.79 $.00 $3,258.30
A 49 2020-06-28 2020-10-09 $8,802.82 $.00 $8,362.68
A 50 2020-06-30 2020-10-02 $1,345.91 $.00 $1,278.61
Responsible Party
STEVEN CLARK PO BOX 429, LADYSMITH, WI 54848
For More Information on this Activity
Northern Region Contact: Kathleen Shafel  kathleen.shafel@wisconsin.gov
282548 | 03-55-282548
BOTW Release 4.5 | 5/07/2025 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages