02-37-000007
HOLTZ & KRAUSE
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / CLOSED | DNR RR |
Location Name | County | DNR Region |
---|---|---|
HOLTZ & KRAUSE LANDFILL | MARATHON | WEST CNTRL |
Address | Municipality |
---|---|
E KENT ST/CURLING WAY | WAUSAU |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
NE 1/4 of the SW 1/4 of Sec 06, T28N, R08E | 44.9366423 | -89.6078178 |
![]() |
![]() |
Additional Activity Details | Acres |
---|---|
57 |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
737055880 | 1990-06-01 | 2013-12-26 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-02-19 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN-DEC 2023 | |
2023-06-21 | 99 | Miscellaneous |
![]() |
EMAIL RESPONSE TO 2022 ANNUAL OM&M REPORT-MONITORING PLAN CHANGE APPROVAL | |
2023-01-31 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN-DEC 2022 | |
2022-02-04 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
||
2021-02-12 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN-DEC 2020 | |
2020-01-29 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN - DEC 2019 | |
2019-02-04 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN - DEC 2018 | |
2018-02-12 | 99 | Miscellaneous |
![]() |
EMAIL RESPONSE TO 2017 ANNUAL O&M REPORT - MONITORING PLAN CHANGE APPROVAL | |
2018-02-09 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN - DEC 2017 | |
2017-02-20 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN - DEC 2016 | |
2016-02-04 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
NOV 2014 - DEC 2015 | |
2015-09-09 | 99 | Miscellaneous | COST RECOVERY WAIVER MEMO SENT | ||
2014-12-09 | 43 | Site Activity Status Update Received | ANNUAL RPT REC'D | ||
2014-05-15 | 99 | Miscellaneous | LETTER SENT TO AFFECTED OFF-SITE PROPERTY OWNERS RE: REMOVAL FROM GIS REGISTRY | ||
2014-04-23 | 99 | Miscellaneous | GROUNDWATER CONTAMINANT TREND ANALYSIS RECEIVED FROM CONSULTANT | ||
2014-04-21 | 99 | Miscellaneous | OPEN HOUSE MEETING TO ADDRESS CONCERNS OF AFFECTED OFF-SITE PROPERTY OWNERS | ||
2014-04-16 | 99 | Miscellaneous | CONTINUING OBLIGATION CLARIFICATION LETTER SENT TO AFFECTED OFF-SITE PROPERTY OWNERS | ||
2013-12-26 | 11 | Activity Closed | |||
2013-12-26 | 234 | Continuing Obligation - Monitoring Well Needs Abandonment | MISSING MW, UNABLE TO BE ABANDONED MW-2, MW-15, MW-20 MW WAS NOT ABLE TO BE LOCATED | ||
2013-12-26 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | |||
2013-12-26 | 228 | Continuing Obligation - Site Specific Condition | OPERATION & MTC OF ACTIVE GAS EXTRACTION SYSTEM | ||
2013-12-26 | 56 | Continuing Obligation(s) Applied |
![]() |
||
2013-12-26 | 236 | Continuing Obligation - Residual GW Contamination | |||
2013-12-26 | 228 | Continuing Obligation - Site Specific Condition | CONVERSION OF GAS SYSTEM REQUIRED IF LAND USE CHANGES IN FUTURE | ||
2013-12-26 | 46 | Impacted Right-of-Way (ROW) Notification | AUTO-POPULATED 2018-03-20 | ||
2013-12-23 | 190 | Remaining Actions Needed Requirements Met or Docs Received | MW ABANDONMENT FORMS RECEIVED | ||
2013-11-18 | 84 | Remaining Actions Needed | WM ABANDONMENT | ||
2013-11-17 | 50 | Groundwater Use Restriction Potentially Filed | |||
2013-11-07 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
O&M RPT REC'D | |
2013-11-01 | 179 | Case Closure Review Request Received (non-fee) | CLOSURE REQUEST REC'D; NO FEE VPLE | ||
2013-11-01 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
CONSTUCTION COMPLETION RPT REC'D | |
2013-10-28 | 99 | Miscellaneous | LTR SENT - ADDENDUM TO ASSURANCE LTR DATED 7/25/13 | ||
2013-10-11 | 99 | Miscellaneous | DRAFT CONSTRUCTION COMPLETION RPT REC'D | ||
2013-10-08 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-10-01 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-10-01 | 99 | Miscellaneous | SOURCE PROPERTY & OFF-SITE NOTIFICATION LTRS SENT | ||
2013-09-24 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-09-17 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-09-13 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | SIWP REC'D - SALZMANN BUILDING FLOOR PLAN. VPLE SITE NO-FEE | ||
2013-09-13 | 36 | Site Investigation Workplan (SIWP) Approved | SIWP APPROVED | ||
2013-09-10 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-09-03 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-08-27 | 99 | Miscellaneous | WEEKLY PROGRESS PRT REC'D | ||
2013-08-20 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-08-14 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-08-12 | 99 | Miscellaneous | DESIGN MODIFICAITON APPROVAL - COVER THICKNESS SE CORNER | ||
2013-08-08 | 99 | Miscellaneous | WEEKLY PROGRESS PRT REC'D | ||
2013-07-31 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-07-25 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-07-23 | 99 | Miscellaneous | SITE VISIT | ||
2013-07-18 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-07-10 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-07-05 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-07-03 | 99 | Miscellaneous | DESIGN MODIFICATION APPROVAL - CLAY COMPACTION | ||
2013-06-27 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-06-24 | 99 | Miscellaneous | ABANDONMENT FORMS REC'D (GP9, 12, 13, 14) | ||
2013-06-20 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-06-20 | 402 | Historic Fill Case by Case Exemption Issued | BAL EXEMPTION GRANTED FOR CONCESSION/RESTROOM BLDG & FIELD LIGHTING | ||
2013-06-14 | 199 | Additional Information Received (Fee-Based or Closure) | BAL ADDENDUM REC'D | ||
2013-06-13 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-06-12 | 198 | Request for Additional Information (Fee-Based or Closure) | REQUEST FOR MORE INFORMATION ON BAL APPLICATION | ||
2013-06-05 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-06-03 | 401 | Historic Fill Case by Case Exemption Request (fee) |
![]() |
BAL SUBMITTAL REC'D - CONCESSION BUILDING & FIELD LIGHTING. NO FEE VPLE CASE | |
2013-05-30 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-05-22 | 99 | Miscellaneous | WEEKLY PROGRESS REPORT REC'D | ||
2013-05-16 | 99 | Miscellaneous | WEEKLY PROGRESS RPT REC'D | ||
2013-05-06 | 99 | Miscellaneous | PRE-CONSTRUCTION MEETING | ||
2013-04-29 | 99 | Miscellaneous | LTR SENT CLARIFYING DNR APPROVAL OF LF MODIFICATIONS PER CONSENT DECREE | ||
2013-04-24 | 99 | Miscellaneous | CONSTRUCTION QAP REC'D | ||
2013-04-15 | 99 | Miscellaneous |
![]() |
PROPOSED LANDFILL CAP & GAS REPAIRS (PER CONSENT DECREE) REC'D | |
2013-04-11 | 99 | Miscellaneous | MONTHLY PROGRESS RPT REC'D | ||
2013-03-08 | 99 | Miscellaneous | MONTHLY PROGRESS RPT REC'D | ||
2013-03-06 | 402 | Historic Fill Case by Case Exemption Issued | BAL EXEMPTION GRANTED; FINAL DESIGN RPT APPROVED | ||
2013-02-08 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
FINAL DESIGN RPT REC'D | |
2013-02-08 | 199 | Additional Information Received (Fee-Based or Closure) | FINAL DESIGN RPT REC'D | ||
2013-01-16 | 99 | Miscellaneous | COMMENTS TO CONSULTANT ON DESIGN SUBMITTAL | ||
2012-12-13 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
FINAL DESIGN SUBMITTAL FOR PROPOSED REDEVELOPMENT REC'D | |
2012-10-17 | 99 | Miscellaneous | COPY OF AGREEMENT BETWEEN MARATHON CNTY & CITY OF WAUSAU FOR O&M REQUIREMENTS | ||
2012-10-15 | 99 | Miscellaneous | COMMENTS TO CONSULTANT ON 30% DESIGN | ||
2012-10-12 | 99 | Miscellaneous | PURCHASED BY MARATHON CNTY; MOU BETWEEN CNTY & STEERING COMMIT'E RECD; UPDATED DEEDS, LEGAL DOCS RCD | ||
2012-10-01 | 99 | Miscellaneous | MEETING W/ CONSULANT, RR, WMM TO DISCUSS 30% DESIGN | ||
2012-07-25 | 38 | Site Investigation Report (SIR) Approved | SI RPT APPROVED; ASSURANCE LTR SENT | ||
2012-07-25 | 40 | Remedial Action Options Report (RAOR) Approved | RAP APPROVED; ASSURANCE LTR SENT | ||
2012-07-10 | 99 | Miscellaneous | MEETING W/ STEERING COMMITTEE, CITY & COUNTY TO DISCUSS NEXT STEPS | ||
2012-05-17 | 99 | Miscellaneous | CONF CALL W/ RP CONTACT REGARDING CURRENT STATUS OF VPLE APPL | ||
2012-05-17 | 99 | Miscellaneous | EMAIL TO CITY OF WAUSAU RE: STATUS OF 2011 ANNUAL MONITORING RPT | ||
2012-04-13 | 198 | Request for Additional Information (Fee-Based or Closure) | REQUEST FOR ADDT'L INFO - NEED FINAL DESIGN RPT | ||
2012-04-12 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
PROPOSED MODIFICATIONS TO GAS EXTRACTION SYSTEM | |
2012-04-12 | 99 | Miscellaneous | MEETING W/ RP GROUP, CITY OF WAUSAU, MARATHON COUNTY LEGAL - TO DICUSS REDEVELOPMENT OPTIONS | ||
2012-04-12 | 37 | Site Investigation Report (SIR) Received (non-fee) | |||
2012-04-12 | 401 | Historic Fill Case by Case Exemption Request (fee) | BAL EXEMPTION REQUEST REC'D; NO-FEE VPLE CASE | ||
2012-04-09 | 99 | Miscellaneous |
![]() |
EXPERT OPINION ON GW REC'D FROM CONSULTANT | |
2012-03-15 | 99 | Miscellaneous | SENT LTR TO WAUSAU CURLING CLUB RE: BUILDING NEXT TO AN ABANDONED LANDFILL | ||
2012-03-07 | 99 | Miscellaneous |
![]() |
MEETING W/ RP, CONSULTANT, & WMM PROGRAM TO DISCUSS GAS EXTRACTION SYSTEM | |
2011-12-22 | 43 | Site Activity Status Update Received | FALL 2011 GW MONITORING RESULTS REC'D | ||
2011-12-13 | 28 | Phase I Environmental Site Assessment (ESA) Rpt Received | |||
2011-10-26 | 93 | Operation & Maintenance (O&M) Report Approved | LETTER SENT | ||
2011-10-24 | 99 | Miscellaneous | ACCESS AGREEMENTS W/ WAUSAU CEMETERY & CURLING CLUB REC'D | ||
2011-10-10 | 99 | Miscellaneous | MTG W/ STEERING COMMITTEE & CONSULTANT RE: SITE GOALS | ||
2011-10-04 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
2010 ANNUAL REPORT REC'D | |
2011-06-27 | 99 | Miscellaneous |
![]() |
ROD AMENDMENT LETTER SENT TO HOLTZ & KRAUSE LANDFILL STEERING COMMITTEE | |
2011-06-27 | 99 | Miscellaneous |
![]() |
PUBLIC PARTICIPATION REQUIREMENTS FOR THE ROD AMENDMENT | |
2011-06-22 | 99 | Miscellaneous |
![]() |
ROD AMENDMENT FINALIZED | |
2011-06-13 | 99 | Miscellaneous | PUBLIC MEETING HELD BY STEERING COMMITTEE | ||
2011-06-09 | 99 | Miscellaneous | WRITTEN COMMENT PERIOD COMPLETE (5/9/11-6/9/11) | ||
2011-06-06 | 99 | Miscellaneous | PROPOSED REVISIONS TO ROD AMENDMENT RECEIVED FROM STEERING COMMITTEE | ||
2011-05-26 | 99 | Miscellaneous | MEETING WITH NEW CONSULTANT - CRA | ||
2011-05-17 | 99 | Miscellaneous | CONFERENCE CALL STEERING COMMITTEE - SITE STATUS | ||
2011-05-09 | 99 | Miscellaneous | PUBLIC NOTICE POSTED - WAUSAU DAILY HERALD (5/9,5/11,5/13) | ||
2011-04-05 | 98 | Technical Assistance Provided | DRAFT ROD AMENDMENT COMPLETE | ||
2011-03-14 | 97 | Technical Assistance Request Received (fee) | ROD AMENDMENT. | ||
2011-02-11 | 99 | Miscellaneous |
![]() |
TECHNICAL SUPPORT FOR ROD AMENDMENT REC'D. | |
2010-12-29 | 99 | Miscellaneous | ACCESS AGREEMENTS BETWEEN STEERING COMMITTEE AND WAUSAU CURLING CLUB AND WAUSAU CEMETERY ASSOC. REC' | ||
2010-12-22 | 99 | Miscellaneous | CITY OF WAUSAU LETTER TO SALZMAN RE; CONTINUING OBLIGATIONS RELATED TO LF CAP. | ||
2010-12-16 | 99 | Miscellaneous | CITY OF WAUSAU LETTER TO STEERING COMMITTEE RE; ACCESS RIGHTS TO WELLS ON CITY PROPERTY. | ||
2010-12-15 | 99 | Miscellaneous | EMAIL TO STORM WATER RE; GRADING BEING DONE NEAR LF CAP. | ||
2010-11-03 | 99 | Miscellaneous | SITE VISIT. | ||
2010-08-31 | 50 | Groundwater Use Restriction Potentially Filed | |||
2010-08-31 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | |||
2010-08-31 | 228 | Continuing Obligation - Site Specific Condition | GAS EXTRACTION SYSTEM & LT GW MONITORING | ||
2010-08-31 | 236 | Continuing Obligation - Residual GW Contamination | |||
2010-08-18 | 98 | Technical Assistance Provided | TECH ASSISTANCE PROVIDED; REVIEW OF 5 YR REVIEW REPORT | ||
2010-07-27 | 97 | Technical Assistance Request Received (fee) | TECH ASSISTANCE REGARDING 5 YEAR REVIEW REPORT | ||
2010-07-20 | 99 | Miscellaneous |
![]() |
FIVE YEAR REVIEW REPORT (EMAIL REQUEST FOR REVIEW FEE SENT) | |
2009-01-19 | 99 | Miscellaneous | 2008 GW MONITORING EXCEEDENCE DATA | ||
2009-01-06 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
2007 ANNUAL REPORT | |
2006-06-08 | 43 | Site Activity Status Update Received | UPDATE ON SAMPLING AND REPAIRS | ||
2006-03-06 | 36 | Site Investigation Workplan (SIWP) Approved | ADD'L SI WORK APPROVED. | ||
2006-03-05 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
2005 ANNUAL REPORT REC'D | |
2006-02-27 | 97 | Technical Assistance Request Received (fee) | FEE REC'D TO REVIEW WORK PLAN | ||
2006-02-27 | 98 | Technical Assistance Provided | FEE REC'D TO REVIEW WORK PLAN | ||
2005-03-09 | 99 | Miscellaneous | 2004 ANNUAL REPORT | ||
2005-02-11 | 99 | Miscellaneous | DNR REQUEST FOR FEE TO REVIEW SUBMITTAL | ||
2005-01-27 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
STS RESPONSE TO DNR & WORK PLAN FOR ADDITIONAL INVESTIGATION | |
2003-09-30 | 99 | Miscellaneous | REQUEST FROM ATTORNEY LINDA MAYA FOR DEED RESTRICTION | ||
2003-05-13 | 99 | Miscellaneous | 2001, 2002 REPORT APPROVAL LETTER, IDENTIFIED WORK NEEDED FOR ROD AMENDMENT | ||
2003-05-13 | 99 | Miscellaneous | RESPONSE TO ANNUAL REPORT & TO STS JUSTIFICATION FOR THE ROB AMENDMENT. | ||
2003-04-09 | 99 | Miscellaneous | 2002 ANNUAL MONITORING REPORT | ||
2003-01-21 | 97 | Technical Assistance Request Received (fee) | TECH ASSISTANCE REGARDING JUSTIFICATION FOR ROD AMENDMENT | ||
2003-01-21 | 98 | Technical Assistance Provided | TECH ASSISTANCE PROVIDED REGARDING JUSTIFICATION FOR ROD AMENDMENT | ||
2003-01-21 | 99 | Miscellaneous |
![]() |
JUSTIFICATION FOR ROD AMENDMENT RECEIVED | |
2002-04-12 | 99 | Miscellaneous | O & M FLARE REQUIREMENTS | ||
2002-04-05 | 99 | Miscellaneous | 2001 ANNUAL MONITORING REPORT | ||
2001-04-20 | 170 | Registry of Waste Disposal Site Screening Completed | |||
2001-03-22 | 99 | Miscellaneous | 2000 ANNUAL REPORT APPROVAL | ||
2001-03-19 | 99 | Miscellaneous | 2000 ANNUAL RPT | ||
2000-05-19 | 99 | Miscellaneous | 1999 ANNUAL RPT APPROVAL | ||
2000-03-22 | 99 | Miscellaneous | 1999 ANNUAL RPT | ||
1999-05-27 | 99 | Miscellaneous | 1998 ANNUAL RPT APPROVAL | ||
1999-03-08 | 99 | Miscellaneous | ANNUAL (1998) RPT | ||
1999-02-26 | 99 | Miscellaneous | CLOSURE OF GUSTAFSON OIL #02-37-000507 | ||
1998-11-19 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) | |||
1998-11-18 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | |||
1998-09-04 | 99 | Miscellaneous | 1997 ANNUAL REPORT APPROVAL | ||
1998-06-09 | 99 | Miscellaneous | ANNUAL (1997) RPT | ||
1997-12-04 | 355 | Superfund No Further Remedial Action Planned (NFRAP) | EPA SUPERFUND DATABASE. | ||
1996-01-31 | 99 | Miscellaneous | ANNUAL (1995) REPORT | ||
1995-10-01 | 99 | Miscellaneous | GAS CONTROL REPORT | ||
1995-06-01 | 208 | Remedial Design End - State Lead | |||
1995-06-01 | 210 | Remedial Construction End - State Lead | |||
1995-06-01 | 211 | Operation & Maintenance Start - State Lead | |||
1995-06-01 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
||
1995-06-01 | 93 | Operation & Maintenance (O&M) Report Approved | |||
1995-05-01 | 192 | Operation & Maintenance (O & M) Report Received (fee) | |||
1994-08-26 | 99 | Miscellaneous | CONSENT DECREE | ||
1994-08-26 | 59 | Environmental Enforcement Action Completed | CONSENT DECREE | ||
1994-03-01 | 209 | Remedial Construction Start - State Lead | |||
1993-01-01 | 207 | Remedial Design Start - State Lead | REMEDIAL DESIGN | ||
1992-07-22 | 99 | Miscellaneous | ROD | ||
1992-07-22 | 149 | Remedial Action (RA) Design Report Approved | |||
1992-07-22 | 314 | Superfund Decision Document (ROD or ESD) - See Description | ROD | ||
1992-04-30 | 206 | Site Investigation End - State Lead | |||
1991-06-14 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
REMEDIAL INVESTIGATION REPORT | |
1991-02-12 | 205 | Site Investigation Start - State Lead | |||
1990-06-01 | 1 | Notification of Hazardous Substance Discharge | |||
1989-10-12 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
REMEDIAL INVESTIGATION/FEASIBILITY WORK PLAN | |
1988-12-01 | 99 | Miscellaneous |
![]() |
REMEDIAL INVESTIGATION/FEASIBILITY STUDY | |
1988-05-13 | 23 | Referral to Department of Justice (DOJ) | PCP SITE | ||
1986-11-06 | 351 | Superfund Site Assessment Site Inspection (SI) | EPA SUPERFUND DATABASE. | ||
1985-09-26 | 350 | Superfund Site Assessment Preliminary Assessment (PA) | EPA SUPERFUND DATABASE. | ||
1984-09-01 | 303 | Superfund Site Assessment Action Taken - Not on NPL or SAS | FROM EPA SUPERFUND DATABASE. |
Type | Related Activity |
---|---|
ERP to VPLE (On Property) | 06-37-558392 HOLTZ & KRAUSE CONTRACTOR -1500 NORTHWESTERN |
ERP to VPLE (On Property) | 06-37-558388 WAUSAU CURLING CLUB - 1920 CURLING WAY |
ERP to VPLE (On Property) | 06-37-558391 HOLTZ & KRAUSE CONTRACTOR - 600 E KENT ST |
ERP to VPLE (On Property) | 06-37-558393 HOLTZ & KRAUSE CONTRACTOR - 1237 JUNCTION ST |
ERP to VPLE (On Property) | 06-37-558390 HOLTZ & KRAUSE CONTRACTOR - 602 E KENT ST |
ERP to VPLE (On Property) | 06-37-558389 KRAUSE & HOLTZ REAL ESTATE DEVELOPMENT |
Reasons when Action Code 234 is Present |
---|
MW WAS NOT ABLE TO BE LOCATED |
Substance | Type | Amt Released | Units |
---|---|---|---|
Chlorinated Solvents | VOC | ||
Leachate from landfill runoff | Leachate | ||
Metals | Metals | ||
Non-Chlorinated Solvents | VOC | ||
Tetrachloroethene (Perchloroethylene) | VOC | ||
Trichloroethylene | Industrial Chem | ||
Volatile Organic Compounds | VOC |
HOLTZ KRAUSE STEERING COMMITTEE PO BOX 57, WAUSAU, WI 54402 |
West Central Region Contact: Hayley Schnae hayley.schnae@wisconsin.gov |