2022-11-30
11
Activity Closed
2022-11-30
56
Continuing Obligation(s) Applied
2022-11-30
222
Continuing Obligation - Maintain Cap Over Contaminated Area
2022-11-30
226
Continuing Obligation - Vapor Intrusion Response
2022-11-30
232
Continuing Obligation - Residual Soil Contamination
2022-11-30
236
Continuing Obligation - Residual GW Contamination
2022-11-30
334
Monitoring Well Transferred to Another Site
MONITORING WELLS BEING RETAINED FOR BRRTS #02-45-587658
2022-11-30
66
Continuing Obligations (COs) Apply at Off-site Property(ies)
714 E HANCOCK STREET, APPLETON, WI
2022-11-30
46
Impacted Right-of-Way (ROW) Notification
MEADE ST ROW
2022-10-28
43
Site Activity Status Update Received
CONFIRMATION OF INVESTIGATIVE WASTE DISPOSAL
2022-10-25
199
Additional Information Received (Fee-Based or Closure)
CLOSURE PACKET REVISIONS RECEIVED
2022-10-20
198
Request for Additional Information (Fee-Based or Closure)
CLOSURE PACKET MODIFICATIONS REQUESTED
2022-07-22
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2022 - 6/30/2022
+
2022-07-07
79
Case Closure Review Request Received
AUTO-ENTERED
20220707_79_Closure_Submit.zip
Final_Revisions.zip
2022-07-05
779
Case Closure Review Fee Received
2022-07-05
700
Database Fee Paid for Groundwater Continuing Obligation(s)
2022-07-05
710
Database Fee Paid for Soil Continuing Obligation(s)
2022-03-11
99
Miscellaneous
CLARIFICATION ON CAP REQUIREMENTS FOR CLOSURE
2022-03-02
43
Site Activity Status Update Received
SEMI-ANNUAL GW MONITORING STATUS UPDATE
2022-01-25
43
Site Activity Status Update Received
OFF-SITE GROUNDWATER ANALYTICAL RESULTS (LUVATA)
2022-01-25
43
Site Activity Status Update Received
OFF-SITE GROUNDWATER ANALYTICAL RESULTS (APPVION)
2022-01-14
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2021 - 12/31/2021
2021-10-19
43
Site Activity Status Update Received
POST-REMEDIAL GROUNDWATER SAMPLING ANALYTICAL UPDATE
2021-08-24
43
Site Activity Status Update Received
SEMI-ANNUAL REMEDIAL PERFORMANCE GROUNDWATER MONITORING REPORT
2021-07-16
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2021 - 6/30/2021
2021-04-07
99
Miscellaneous
APPROVAL TO REPLACE SOIL EXCAVATED FROM UTILITY TRENCH
2021-04-06
130
DNR Regulatory Reminder Sent
VAPOR INTRUSION AND TCE REMINDER LETTER
2021-04-01
43
Site Activity Status Update Received
PFAS ANALYTICAL RESULTS FROM UTILITY TRENCH EXCAVATION
2021-03-02
43
Site Activity Status Update Received
2020 SEMI-ANNUAL GROUNDWATER SAMPLING RESULTS FOR CHROMIUM & PFAS
2021-02-23
43
Site Activity Status Update Received
LUVATA - OFF-SITE PROPERTY NOTIFICATION
2021-02-23
43
Site Activity Status Update Received
APPVION - OFF-SITE PROPERTY NOTIFICATION
2021-02-17
43
Site Activity Status Update Received
ADDITIONAL PFAS GROUNDWATER DATA
2021-01-28
99
Miscellaneous
PFAS CHARACTERIZATION REQUIRED FOR SOIL IN UTILITY TRENCH EXCAVATION
2021-01-05
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2020 - 12/31/2020
2020-10-27
43
Site Activity Status Update Received
POST-REMEDIAL GW ANALYTICAL RESULTS
2020-10-01
43
Site Activity Status Update Received
GROUNDWATER & VAPOR SAMPLING RESULTS (PFAS)
2020-08-20
92
Operation & Maintenance (O&M) Report Received (non-fee)
GROUNDWATER CHROMIUM ANALYTICAL DATA
2020-08-17
130
DNR Regulatory Reminder Sent
EMERGING CONTAMINANTS REMINDER LETTER
2020-07-17
43
Site Activity Status Update Received
POST REMEDIATION GW SAMPLE RESULTS
2020-07-08
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2020 - 6/30/2020
2020-06-19
36
Site Investigation Workplan (SIWP) Approved
PFAS SIWP APPROVAL
2020-06-19
43
Site Activity Status Update Received
SOIL AND GROUNDWATER SAMPLING RESULTS TO LUVATA APPLETON, LLC
2020-06-19
43
Site Activity Status Update Received
SOIL AND GROUNDWATER SAMPLING RESULTS TO APPVION HOLDING CORP
2020-06-19
118
PFAS Sampling Not Required At This Time
PFAS INVESTIGATION BEING CONDUCTED UNDER SEPARATE CASE, BRRTS #02-45-587658
2020-04-03
30
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
NTP VIA EMAIL
2020-03-31
35
Site Investigation Workplan (SIWP) Received (non-fee)
SIWP FOR CVOCS IN SOIL & GW W/ TEMP WELLS; HPV VI SI FROM 2018 SIWP & POST-RA GW CR MONITORING SCHED
2020-03-30
135
Site Investigation Workplan (SIWP) Received (fee)
PFAS SI WORKPLAN IN GROUNDWATER
2020-03-30
114
PFAS Scoping Statement Received
PFAS INVESTIGATED UNDER SEPARATE CASE, BRRTS #02-45-587658
2020-02-03
151
Remedial Action (RA) Documentation Report Received (non-fee)
INJECTION OF REDUCING AGENT; SOIL BLEND W/ ZVI
2020-02-03
856
Materials Management Final Documentation Received w/o Fee
SEE AC 151 OF SAME DATE FOR DOCUMENTATION
2020-01-03
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2019 - 12/31/2019
2019-07-31
99
Miscellaneous
INJECTION MODIFICATION REQUEST APPROVAL
2019-07-29
43
Site Activity Status Update Received
REMEDIAL INJECTION REQUEST AMEND #2; INJECTION SOLUTION TO USE 3DME AND S-MICRO ZVI IN LEIU OF ABC+
2019-07-16
43
Site Activity Status Update Received
REVISED PUBLIC PARTICIPATION PLAN FOR REMEDIAL ACTION
2019-07-01
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2019 - 6/30/2019
2019-06-24
99
Miscellaneous
CONF CALL W/ STAKEHOLDERS FOR CHROME REMEDIATION- LOGISTICS & PLANNING
2019-05-29
149
Remedial Action (RA) Design Report Approved
INJ REDUCING AGENT; SOIL BLEND W/ ZVI; DECOMMISSION GWPT; BACKFILL BASEMENT W/ TREATED SOIL W/IN AOC
2019-05-29
857
Materials Management Plan Approved
BACKFILL BASEMENT W/ TREATED SOIL (UP TO 325 CY); SEE AC 149 OF SAME DATE FOR DOC
2019-05-28
43
Site Activity Status Update Received
CONCRETE WITHIN WAREHOUSE PASSED TCLP - NON-HAZARDOUS WASTE
2019-05-23
43
Site Activity Status Update Received
LUVATA RESPONSE TO LOGISTICAL ITEMS
2019-05-22
64
Inject/Infiltrate Request Approved
2019-05-21
99
Miscellaneous
INFO FROM DNR AS FOLLOW-UP FROM 05/20/2019 MEETING
2019-05-21
99
Miscellaneous
DNR COMMENTS ON INITIAL PUBLIC PARTICIPATION PLAN
2019-05-20
99
Miscellaneous
LOGISTICAL MEETING HELD AT SITE W/ LUVATA, ALBANY, DNR & CONSULTANTS
2019-05-17
43
Site Activity Status Update Received
MEETING AGENDA FOR 05/20/2019 W/ LUVATA, ALBANY, DNR & ENVIROFORENSICS
2019-05-17
43
Site Activity Status Update Received
AMENDMENT TO INJ REQUEST TO INCL SOIL BLENDING WITH ZERO VALENT IRON
2019-05-03
43
Site Activity Status Update Received
REVISED REMEDIATION INJECTION REQUEST
2019-05-03
43
Site Activity Status Update Received
AMENDMENT TO THE REMEDIAL ACTION PLAN INITIALLY SUBMITTED APRIL 2019
2019-04-26
43
Site Activity Status Update Received
PUBLIC PARTICIPATION PLAN FOR REMEDIAL ACTION
2019-04-15
63
Inject/Infiltrate Request Received (fee)
ANAEROBIC BIOCHEM & ZERO-VALENT IRON PROPOSED TO BEGIN JULY 2019
2019-04-15
148
Remedial Action Design Report Received (fee)
INJ REDUCING REAGENT BELOW WT; SOIL BLENDING; DECOMMISSION GWPT; BACKFILL BASEMENT W/ TREATED SOIL
2019-04-15
854
Materials Management Plan Request Recvd with Fee
SOIL MANAGEMENT PLAN FOR ON-SITE REUSE OF SOIL WITHIN BASEMENT COMBINED WITH RAP; SEE AC 148 FOR DOC
2019-03-14
98
Technical Assistance Provided
TECH ASSIST MTG W/ DNR NER CLOSURE/PEER COMMITTEE, RP & CONSULTANT IN ADV OF RAP
2019-02-27
99
Miscellaneous
TECH ASSIST MTG RESCHEDULED FOR 03/14/2019
2019-02-26
97
Technical Assistance Request Received (fee)
2019-01-02
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2018 - 12/31/2018
2018-12-13
99
Miscellaneous
APPROVAL TO MAINTAIN TEMP WELLS (TW-1 - TW-6) THROUGH 2019
2018-10-26
37
Site Investigation Report (SIR) Received (non-fee)
SUPPLEMENTAL SIR INCLUDING VOC SI
2018-08-17
43
Site Activity Status Update Received
NR 716.14 WAC NOTICE OF RESULTS TO LUVATA - JULY 2018 GW DATA
2018-08-02
99
Miscellaneous
DNR INTERPRETATION OF MAY 2018 SOIL DATA FOR HEXAVALENT CHROMIUM
2018-07-02
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2018 - 6/30/2018
2018-06-26
43
Site Activity Status Update Received
NR716.14 WAC NOTICE OF RESULTS TO PROPERTY OWNER, OFF-SITE OWNER & CITY - MAY 2018 SOIL DATA
2018-05-23
43
Site Activity Status Update Received
RESPONSE TO DNR QUESTIONS/COMMENTS TO RAOR
2018-05-15
99
Miscellaneous
PHONE LOG FOR INJECTION PILOT STUDY DISCUSSION
2018-04-20
30
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
NTP VIA EMAIL; NR 141.29 TEMP WELL APPROVAL FOR TW-1 THRU TW-6
2018-04-18
35
Site Investigation Workplan (SIWP) Received (non-fee)
GP-29 THRU GP-41, TW-1 THRU TW-6, UB-3 & UB-4 SCHEDULED FOR APRIL 2018
2018-04-12
82
Remedial Action Options Report (RAOR) Not Approved
AREA OF CONTAMINATION & REMEDY BY REDUCTION CONDITIONALLY APPROVED; SUPP INFO REQ BY 6/29/2018
2018-02-09
64
Inject/Infiltrate Request Approved
2018-01-30
59
Environmental Enforcement Action Completed
2018-01-29
63
Inject/Infiltrate Request Received (fee)
PILOT INJECTION WITH 3DME & CRS & PILOT WITH PROVECTIRM
2018-01-24
140
Site Investigation Report (SIR) Not Approved
ADDT'L SOIL SI NEEDED FOR HEX CHROME & SOIL, GW & VAPOR SI NEEDED FOR CVOCS; LTMP APPROVED
2018-01-24
27
Long Term Monitoring Plan Approved
LTMP APPROVAL COMBINED W/RESPONSE TO SIR
2018-01-24
140
Site Investigation Report (SIR) Not Approved
SEE AC 140 ABOVE FOR DOCUMENTATION
2018-01-22
143
Remedial Action Options Report (RAOR) Received (fee)
ABANDON BASEMENT/GWP&T, EXCAVATE UNSAT SOIL, APPLY REDUCING AGENT & IN-SITU TREATMENT VIA INJECTION
2018-01-18
99
Miscellaneous
DNR PEER REVIEW OF SIR W/FEE
2018-01-05
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2017 - 12/31/2017
2017-10-27
137
Site Investigation Report (SIR) Received (fee)
SIR - 1 OF 2
2017-10-27
25
Long Term Monitoring Plan Received (fee)
FEE COMBINED IN CODE 137 OF SAME DATE (10/27/2017)
2017-10-27
137
Site Investigation Report (SIR) Received (fee)
SIR - 2 OF 2
2017-08-23
43
Site Activity Status Update Received
REQUEST FOR EXTENSION TO SUBMIT SIR & GW MONITORING PLAN BY 10/26/2017
2017-08-23
99
Miscellaneous
SIR SUBMITTAL EXTENSION APPROVED
2017-08-21
92
Operation & Maintenance (O&M) Report Received (non-fee)
JAN - JUNE 2017
2017-07-24
43
Site Activity Status Update Received
NR716.14 WAC NOTICE OF RESULTS TO PROPERTY OWNERS - SOIL-GW MAY & JUNE 2017
2017-07-05
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2017 - 6/30/2017
2017-05-12
36
Site Investigation Workplan (SIWP) Approved
CONDITIONAL APPROVAL OF SIWP & ADDENDUM
2017-05-05
99
Miscellaneous
DNR PROVIDED VERBAL NOTICE TO PROCEED W/INVESTIGATION ACTIVITIES SCHEDULED TO BEGIN 05/08/2017
2017-05-03
43
Site Activity Status Update Received
APRIL 2017 GW VOC DATA
2017-05-03
199
Additional Information Received (Fee-Based or Closure)
SIWP ADDENDUM REC'D
2017-05-03
35
Site Investigation Workplan (SIWP) Received (non-fee)
ADDENDUM TO FEB 2017 SIWP
2017-04-13
99
Miscellaneous
DNR REQUEST FOR SI WORKPLAN & ADDENDUM
2017-04-03
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY - DEC 2016
2017-03-23
198
Request for Additional Information (Fee-Based or Closure)
DNR CONFERENCE CALL W/CONSULTANT & ALBANY (RP) - ADDT'L INFORMATION NEEDED FOR SIWP
2017-02-01
135
Site Investigation Workplan (SIWP) Received (fee)
SUPPLEMENTAL SITE INVESTIGATION & DOCUMENTATION
2017-01-09
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2016 - 12/31/2016
2016-11-10
43
Site Activity Status Update Received
WORK PLAN WILL BE SUBMITTED BY 02/06/2017 PER RP/CONSULTANT
2016-11-08
4
Enforcement Conference Held
SCHEDULED ENFORCEMENT VIA PHONE W/DNR, ALBANY & ENVIROFORENSICS - SUMMARY LETTER DATED 11/14/16
2016-11-07
7
Environmental Consultant Hired
ENVIROFORENSICS
2016-10-17
140
Site Investigation Report (SIR) Not Approved
ADDT'L INVESTIGATION NEEDED; COMBINED SSIR/RAOR RESPONSE
2016-10-17
82
Remedial Action Options Report (RAOR) Not Approved
ADDT'L EVALUATION NEEDED; COMBINED SSIR'SAOR RESPONSE
2016-08-29
92
Operation & Maintenance (O&M) Report Received (non-fee)
JAN - JUNE 2016
2016-07-29
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2016 - 6/30/2016
2016-07-29
137
Site Investigation Report (SIR) Received (fee)
2016-07-29
39
Remedial Action Options Report (RAOR) Received (non-fee)
REVIEW FEE PAID UNDER SSIR
2016-07-21
99
Miscellaneous
DNR CONVERSATION WITH ALBANY & CONSULTANT RE: NR 716, 722, 724 & 726
2016-07-20
4
Enforcement Conference Held
ALBANY INTERNATIONAL, BADGER LABS & CHEMREPORT (APPLETON LUVATA) - SUMMARY LETTER DATED 07/25/16
2016-07-13
140
Site Investigation Report (SIR) Not Approved
DNR INFORMED RP VIA EMAIL SSIR INCOMPLETE & SITE REMAINS OUT OF COMPLIANCE
2016-07-13
99
Miscellaneous
ENFORCEMENT CONFERENCE RESCHEDULED FOR 07/20/2016
2016-07-12
37
Site Investigation Report (SIR) Received (non-fee)
SUPPLEMENTAL SIR (MAY 2014 SOIL AND GROUNDWATER)
2016-06-23
92
Operation & Maintenance (O&M) Report Received (non-fee)
JUL - DEC 2015
2016-06-21
39
Remedial Action Options Report (RAOR) Received (non-fee)
RAOR HARD COPY RECEIVED 06/21/2016; E-COPY RECEIVED 04/13/2016
2016-06-21
82
Remedial Action Options Report (RAOR) Not Approved
DNR INFORMED RP RAOR INCOMPLETE & SITE REMAINS OUT OF COMPLIANCE VIA EMAIL 04/21/2016
2016-06-17
99
Miscellaneous
ENFORCEMENT CONFERENCE RESCHEDULED FOR 07/14/2016
2016-06-08
14
Notice of Violation (NOV) Issued
ALBANY INTERNATIONAL
2016-05-26
2
Responsible Party (RP) letter sent
LUVATA APPLETON, LLC (PROPERTY OWNER)
2016-05-26
43
Site Activity Status Update Received
1983 INDEMNIFICATION AGREEMENT BETWEEN ALBANY & LAWE
2016-03-18
43
Site Activity Status Update Received
JP HAMMERTON REPLACED RON BUCK AS CONTACT AT ALBANY INTERNATIONAL ON FEB 1, 2016
2016-03-17
3
Notice of Noncompliance (NON) Issued
SSIR/RAOR DUE 04/01/2016 PER DNR
2016-01-29
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2015 - 12/31/2015
2015-09-09
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY-DEC 2014
2015-09-03
92
Operation & Maintenance (O&M) Report Received (non-fee)
JAN - JUNE 2015
2015-07-30
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2015 - 6/30/2015
2015-07-30
99
Miscellaneous
JULY 2014-JULY 2015 O&M REPORT DUE 8/31/15; SSIR/RAOR DUE 9/30/15 PER DNR
2015-02-02
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2014 - 12/31/2014
2014-09-22
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2014 - 6/30/2014
2014-08-05
92
Operation & Maintenance (O&M) Report Received (non-fee)
JAN - JUNE 2014
2014-05-06
35
Site Investigation Workplan (SIWP) Received (non-fee)
EXPANDING SOIL AND GROUNDWATER INVESTIGATION
2014-04-01
43
Site Activity Status Update Received
ADDT'L INVESTIGATION SCHEDULED FOR WEEK OF MAY 12, 2014; WORKPLAN FORTHCOMING
2014-03-12
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY - DEC 2013
2014-03-12
99
Miscellaneous
DNR REQUESTED WORKPLAN FOR ADDITIONAL WELL INSTALLATION BY MAY 12, 2014
2013-09-10
92
Operation & Maintenance (O&M) Report Received (non-fee)
JAN - JUNE 2013
2013-03-12
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY - DECEMBER 2012
2012-08-15
92
Operation & Maintenance (O&M) Report Received (non-fee)
JAN - JUNE 2012
2012-03-01
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY - DEC 2011
2011-09-08
130
DNR Regulatory Reminder Sent
Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-02-28
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY - DECEMBER 2010
2010-08-31
92
Operation & Maintenance (O&M) Report Received (non-fee)
JAN - JUNE 2010
2010-03-05
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY - DECEMBER 2009
2009-11-04
39
Remedial Action Options Report (RAOR) Received (non-fee)
2009-08-28
92
Operation & Maintenance (O&M) Report Received (non-fee)
JAN - JUNE 2009
2009-08-27
43
Site Activity Status Update Received
MODIFICATIONS FOR PREVIOUSLY SUBMITTED REPORTS
2009-08-06
43
Site Activity Status Update Received
TWO WELLS INSTALLED AND TWO ROUNDS GROUNDWATER DATA COLLECTED - DATA TO FOLLOW
2009-06-16
99
Miscellaneous
LETTER TO RP & PROPERTY OWNERS RE: CHANGE IN ADDRESS FROM 831 N MEADE ST TO 908 N LAWE ST
2009-06-01
99
Miscellaneous
DNR RESPONSE TO COMPLIANCE AGREEMENT DOCUMENTS
2009-05-04
43
Site Activity Status Update Received
FINAL RESPONSE TO NOV FROM ALBANY/BADGER LABS
2009-04-23
99
Miscellaneous
SIGNED COMPLIANCE AGREEMENT WITH ALBANY INTERNATIONAL
2009-04-13
43
Site Activity Status Update Received
ALBANY'S WRITTEN PRELIMINARY RESPONSE TO 3/6/09 NOV
2009-03-31
4
Enforcement Conference Held
INVESTIGATION, REMEDIAL ACTION EVAL & REPORTING REQUIREMENTS DISCUSSED, COMPLIANCE AGREEMENT DRAFTED
2009-03-27
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY 2008 GROUNDWATER DATA, JAN 1, 2008 - JUNE 30, 2008
2009-03-27
92
Operation & Maintenance (O&M) Report Received (non-fee)
JAN 1, 2008 - DEC 31, 2008
2009-03-27
43
Site Activity Status Update Received
GEOPROBE MONITORING WELL SUMMARY REPORT (MC MAHON GMW01-GMW11)
2009-03-06
14
Notice of Violation (NOV) Issued
S 292.11 WIS STATUS, CH NR 724, WIS ADM CODE
2008-05-19
92
Operation & Maintenance (O&M) Report Received (non-fee)
ANNUAL O&M 2007
2008-05-09
43
Site Activity Status Update Received
O&M CONTINUES; NO PLANS TO MODIFY OR ENHANCE COLLECTION SYSTEM
2008-04-22
3
Notice of Noncompliance (NON) Issued
FAILURE TO SUBMIT SEMI-ANNUAL O&M REPORTS; O&M DUE 05/16/08; UPDATE ON REM ACT OPTIONS DUE 05/09/08
2008-04-22
2
Responsible Party (RP) letter sent
REITERATION OF SPILLS LAW REQUIREMENTS - INITIALLY COMMUNICATED IN 1986
2007-06-28
99
Miscellaneous
DNR MTING W/ALBANY INTERNAT'L ON SITE STATUS, REPORTING, PLUME DELINEATION & REMEDIAL ACTION OPTIONS
2007-03-08
43
Site Activity Status Update Received
JANUARY 2007 GROUNDWATER DATA
2007-03-08
92
Operation & Maintenance (O&M) Report Received (non-fee)
01/01/2006 - 12/31/2006
2006-12-28
43
Site Activity Status Update Received
OCTOBER 2006 GROUNDWATER DATA
2006-12-28
92
Operation & Maintenance (O&M) Report Received (non-fee)
01/01/06 - 06/30/06
2006-09-22
43
Site Activity Status Update Received
JULY 2006 GW DATA
2006-07-14
43
Site Activity Status Update Received
APRIL 2006 GW DATA
2006-03-29
43
Site Activity Status Update Received
JAN 2006 GROUNDWATER DATA
2006-03-29
92
Operation & Maintenance (O&M) Report Received (non-fee)
ANNUAL O&M FOR 2005
2006-01-17
43
Site Activity Status Update Received
OCT 2005 GW DATA
2005-10-20
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY 2006 GW DATA & 6/30/05-7/1/05 ACTIONS
2005-06-15
43
Site Activity Status Update Received
APRIL 2005 GW DATA
2005-04-08
92
Operation & Maintenance (O&M) Report Received (non-fee)
2004 ANNUAL REPORT
2005-03-11
43
Site Activity Status Update Received
JAN 2005 GW DATA
2005-02-16
37
Site Investigation Report (SIR) Received (non-fee)
EXTENS & CAPTURE ZONE EVALUATION
2004-12-06
43
Site Activity Status Update Received
OCTOBER 2004 GW DATA
2004-11-04
92
Operation & Maintenance (O&M) Report Received (non-fee)
1/1 - 6/30 O&M & JULY 2004 GW DATA
2004-06-07
43
Site Activity Status Update Received
APRIL 2004 GW DATA
2004-04-05
43
Site Activity Status Update Received
JAN 2004 GW DATA
2004-03-23
92
Operation & Maintenance (O&M) Report Received (non-fee)
1/1/03 -12/31/03
2004-02-10
43
Site Activity Status Update Received
NEW CONSULTANT
2003-11-10
43
Site Activity Status Update Received
2003-10-15
43
Site Activity Status Update Received
JULY 2003 GW DATA
2003-08-01
30
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
2003-06-25
43
Site Activity Status Update Received
APRIL 2003 GW RESULTS
2003-06-09
35
Site Investigation Workplan (SIWP) Received (non-fee)
ADDITIONAL INVESTIGATION
2003-04-16
94
Operation & Maintenance (O & M) Report Not Approved
EVALUATE VERTICAL EXTENT AND CAPTURE ZONE
2003-01-27
43
Site Activity Status Update Received
OCTOBER 2002 GW RESULTS
2002-11-19
93
Operation & Maintenance (O&M) Report Approved
2002-10-21
92
Operation & Maintenance (O&M) Report Received (non-fee)
2002-07-23
43
Site Activity Status Update Received
APRIL 2002 GW DATA
2002-06-06
35
Site Investigation Workplan (SIWP) Received (non-fee)
PROPOSED WELL NEST LOCATION
2002-06-06
30
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
2002-05-29
99
Miscellaneous
WDNR REQUEST FOR STATUS UPDATE
2002-04-15
99
Miscellaneous
SI NOT COMPLETE - REQUEST ADDITIONAL WELLS
2002-03-20
99
Miscellaneous
SITE VISIT
2002-03-20
43
Site Activity Status Update Received
HISTORICAL SUMMARY FROM WINGERT
2002-03-20
93
Operation & Maintenance (O&M) Report Approved
REQUESTED CLARIFICATION ON TABLES
2002-03-15
92
Operation & Maintenance (O&M) Report Received (non-fee)
2002-01-08
99
Miscellaneous
REQUEST FOR SITE VISIT
2001-12-27
99
Miscellaneous
REQUEST FOR O&M REPORTS SEMI-ANNUALLY & PROGRESS REPORTS
2001-11-29
43
Site Activity Status Update Received
GW UPDATE
2001-09-24
43
Site Activity Status Update Received
QUARTERLY GW RESULTS
2001-09-20
43
Site Activity Status Update Received
CITY OF APPLETON OUTFALL RESULTS
2001-05-21
43
Site Activity Status Update Received
QUARTERLY GW MONITORING RESULTS
2001-02-26
43
Site Activity Status Update Received
QUARTERLY GW RESULTS
2000-11-13
43
Site Activity Status Update Received
QUARTERLY GW RESULTS
2000-08-15
43
Site Activity Status Update Received
QUARTERLY GW RESULTS
2000-05-12
43
Site Activity Status Update Received
QUARTERLY GW RESULTS
2000-02-15
43
Site Activity Status Update Received
1999-09-20
43
Site Activity Status Update Received
1999-05-21
43
Site Activity Status Update Received
1999-03-01
43
Site Activity Status Update Received
1998-12-16
43
Site Activity Status Update Received
1993-06-01
43
Site Activity Status Update Received
LONG TERM MONITORING
1993-03-01
43
Site Activity Status Update Received
LONG TERM MONITORING\GW SAMPLES
1988-09-01
43
Site Activity Status Update Received
QUARTERLY GW MONITORING
1986-11-18
2
Responsible Party (RP) letter sent
ALBANY INTERNATIONAL, ALBANY WIRE DIVISION
1985-10-10
1
Notification of Hazardous Substance Discharge
1985-09-20
1
Notification of Hazardous Substance Discharge
CHROMIUM CONTAMINATED GROUNDWATER SEEPING IN THROUGH BASEMENT WALLS
1985-05-29
1
Notification of Hazardous Substance Discharge