02-36-000153 PARAGON ELECTRIC CO INC
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
PARAGON ELECTRIC CO INC MANITOWOC NORTHEAST
Address Municipality
606 PARKWAY BLVD TWO RIVERS
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SE 1/4 of the SE 1/4 of Sec 02, T19N, R24E 44.1391714 -87.5847515 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
27
Facility ID PECFA No. EPA ID Start Date End Date
436042310 1989-02-24 2013-06-04
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  ROW Impact flag
Actions and Documents
Date Code Name File Comment
2020-01-13 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file
2014-01-13 99 Miscellaneous OKAY TO CONSTRUCT LOADING BAYS ON SOUTH SIDE OF BUILDING
2013-06-04 11 Activity Closed
2013-06-04 222 Continuing Obligation - Maintain Cap Over Contaminated Area EXISTING CONCRETE FLOOR
2013-06-04 226 Continuing Obligation - Vapor Intrusion Response INDUSTRIAL ZONING DUE TO VAPORS E SIDE OF BLDG: PRESS RM, PAINT RM & FRMR HAZ WASTE STORAGE AREA
2013-06-04 232 Continuing Obligation - Residual Soil Contamination MOSTLY LOW LEVEL TCE, RCL EXCED AT CS2 (PAINT AREA), CS4 (PRESS AREA), CS6 AND CS7 (HAZ WASTE STORAG
2013-06-04 236 Continuing Obligation - Residual GW Contamination PCE, TCE, VC, 12 DCE (ES AT MW4, MW6, PZ7, MW9, PZ13, PZ14R, EXT15 & EXT16)
2013-06-04 56 Continuing Obligation(s) Applied Download PDF file CAP MAINTENANCE, VAPOR CONCERNS, MAINT INDUSTRIAL LAND USE-ZONING, REMAINING SOIL AND GW CONTAMINAT
2013-06-04 190 Remaining Actions Needed Requirements Met or Docs Received
2013-06-04 46 Impacted Right-of-Way (ROW) Notification AUTO-POPULATED 2018-03-20
2013-06-04 66 Continuing Obligations (COs) Apply at Off-site Property(ies) auto-populated on 08/01/2019 per activity relationship to off-site(s)
2013-04-11 84 Remaining Actions Needed MONITORING WELL ABANDONMENT NEEDED
2013-04-10 199 Additional Information Received (Fee-Based or Closure) Administrative Restart
2013-04-05 79 Case Closure Review Request Received
2013-04-05 198 Request for Additional Information (Fee-Based or Closure) ADMIN PAUSE- GEOLOGIC CROSS-SECTION FIGURE, GW ISOCONCENTRATION FIGURE, MW STATUS, OWNER LTR RECEIPT
2013-04-01 779 Case Closure Review Fee Received CLOSURE FEE PAID PREVIOUSLY
2013-03-03 99 Miscellaneous NTP WITH SVE DECOMMISSION AND MW ABANDONMENT
2013-03-01 43 Site Activity Status Update Received SUMMARY OF 2-28-13 PHONE DISCUSSION RECEIVED
2013-02-27 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) PRE-CLOSURE COMMITTEE MTG, OKAY TO ABANDON RA AND MWS
2013-02-04 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) APPROVAL: CLOSURE SAMPLING PLAN UNDER VPLE
2013-01-28 43 Site Activity Status Update Received CLOSURE SAMPLING PLAN UNDER VPLE
2012-11-28 43 Site Activity Status Update Received TELCON W/CONSULTANT ABOUT SITE EVALUATION REQUEST
2012-11-06 43 Site Activity Status Update Received REQUEST FOR SITE EVALUATION
2012-10-25 43 Site Activity Status Update Received EMAIL REPORT RECEIVED: SUMMARY OF SOIL, GROUNDWATER AND VAPOR CONDITIONS
2012-10-25 99 Miscellaneous FORWARDED EMAILED REPORT REVD SUMMARY OF SOIL, GW, AND VAPOR CONDITIONS TO PROPERTY OWNER RABBI WOLF
2012-10-19 99 Miscellaneous STATUS UPDATE REQUESTED
2012-08-16 43 Site Activity Status Update Received TELCON WITH CONSULTANT ABOUT CLOSURE OPTIONS
2012-07-20 43 Site Activity Status Update Received STATUS UPDATE RECEIVED, CONTINUED SVE O&M, TELCON WITH OWNER
2012-01-04 43 Site Activity Status Update Received SUMMARY OF 12/22/11 DISCUSSION/SSRCL CALCULATIONS, SOIL/GW SAMPLE RESULTS
2011-12-12 99 Miscellaneous TELCON WITH CONSULTANT RE SOIL SAMPLING RESULTS
2011-12-09 43 Site Activity Status Update Received SOIL SAMPLING RESULTS RECEIVED
2011-10-26 43 Site Activity Status Update Received ON-SITE MONITORING WELLS SAMPLED
2011-08-24 99 Miscellaneous SVE SHUTDOWN PROCEDURE APPROVED
2011-08-18 43 Site Activity Status Update Received SVE SHUTDOWN PROCEDURE RECEIVED
2011-07-28 149 Remedial Action (RA) Design Report Approved SVE/EXCAVATION/SAMPLING RA APPROVED
2011-07-21 147 Remedial Action (RA) Design Report Received (non-fee) DESIGN FIGURES FOR SVE RECEIVED
2011-07-19 147 Remedial Action (RA) Design Report Received (non-fee) DESIGN PLANS AND SPECS FOR SVE
2011-06-21 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) CONDITIONAL WP APPROVAL, NEED TO SUBMIT NR724 DESIGN AND SPECS
2011-06-03 43 Site Activity Status Update Received HARD COPY OF WORKPLAN FOR REMEDIAL ACTION UNDER VPLE RECEIVED
2011-05-27 99 Miscellaneous WORK PLAN FOR REMEDIAL ACTION REC'D
2010-12-16 38 Site Investigation Report (SIR) Approved PHASE II SI WDNR COMMENTS AND APPROVAL
2010-09-21 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file PHASE II ESA RECEIVED
2010-08-31 99 Miscellaneous SI/VI REPORT SHOULD BE MAILED TO DNR BY 9/3/10
2010-01-13 99 Miscellaneous CONFERENCE CALL TO DISCUSS OCT SAMPLING RESULTS AND NEXT STEPS
2009-12-03 99 Miscellaneous RECEIVED SI DATA AND TELCOM WITH CONSULTANT
2009-10-07 99 Miscellaneous FIELDWORK COMPLETED OCTOBER 7-9
2009-09-01 36 Site Investigation Workplan (SIWP) Approved REVISED WORKPLAN APPROVED, SITE WORK TO BEGIN OCT 6
2009-08-25 43 Site Activity Status Update Received REVISED WORKPLAN RECEIVED
2009-08-25 199 Additional Information Received (Fee-Based or Closure) Download PDF file REVISED/FINAL WORKPLAN
2009-07-29 99 Miscellaneous CONF CALL TO DISCUSS VAPOR INTRUSION SAMPLING
2009-06-30 198 Request for Additional Information (Fee-Based or Closure) COMMENTS ON REVISED WORKPLAN FORWARDED TO CONSULTANT
2009-06-25 43 Site Activity Status Update Received REVISED WP RECEIVED
2009-06-04 43 Site Activity Status Update Received REVISED WP DUE WEEK OF JUNE 8, FIELD WORK START END OF JUNE
2009-03-23 99 Miscellaneous TELCON WITH CONSULTANT REGARDING WORKPLAN
2009-03-19 99 Miscellaneous STATUS UPDATE REQUESTED
2008-12-30 99 Miscellaneous PHASE I & WORKPLAN RESPONSE LETTER - ADDITIONAL WORK NEEDED
2008-12-03 28 Phase I Environmental Site Assessment (ESA) Rpt Received PHASE I & SITE ASSESSMENT WORKPLAN RECEIVED
2008-12-03 35 Site Investigation Workplan (SIWP) Received (non-fee) PHASE I & SITE ASSESSMENT WORKPLAN RECEIVED
2008-09-25 99 Miscellaneous NEED TO EVALUATE VI PATHWAY
2008-08-29 99 Miscellaneous TRANSFER OF PARTNERSHIP DOCUMENTATION RECEIVED
2008-08-27 99 Miscellaneous CONFERENCE CALL WITH NEW PARTNER OWNERS
2008-08-08 43 Site Activity Status Update Received WORKPLAN/PHASE I FOR SITE ASSESSMENT RECEIVED
2008-08-05 43 Site Activity Status Update Received PHASE I AND WORKPLAN SUBMITTED BY END OF WEEK
2008-05-29 99 Miscellaneous VPLE APPLICATION & ADVANCED DEPOSIT SUBMITTED
2008-04-24 43 Site Activity Status Update Received EXPECTS TO ENTER INTO VPLE PROGRAM
2008-03-12 43 Site Activity Status Update Received TELCON WITH POTENTIAL PURCHASER
2008-01-03 99 Miscellaneous Download PDF file LETTER CLARIFYING CLOSURE OPTIONS
2007-11-09 99 Miscellaneous GLC LETTER REQUEST REGARDING OTHER CLOSURE OPTIONS
2007-09-27 43 Site Activity Status Update Received HISTORICAL WELL ABANDONMENT FORMS FOUND/SCHEDULING ABANDONMENT OF EXISTING WELLS FOR OCTOBER
2007-08-31 99 Miscellaneous "PENDING" CLOSURE LETTER (2ND CONDITIONAL CLOSURE)
2007-08-31 40 Remedial Action Options Report (RAOR) Approved ROAR RESULTED IN DECISION TO RESUBMIT FOR CLOSURE
2007-05-25 710 Database Fee Paid for Soil Continuing Obligation(s)
2007-03-30 99 Miscellaneous STATUS UPDATE REQUESTED
2007-03-30 43 Site Activity Status Update Received CLOSURE ADDENDUM REPORT SENT TO INVENSYS FOR REVIEW
2006-09-27 84 Remaining Actions Needed UPDATED MAPS, FIGURES, TABLES, FEE, CAP MAINT PLAN
2006-08-22 85 NR 720.19 Performance Based Closure MAINTAIN EXISTING PERVIOUS SURFACE FOR GW PROTECTION
2006-08-22 99 Miscellaneous UPDATE CLOSURE SUBMITTAL PACKET, ADDT'L FEE NEEDED, CAP PLAN, MW ABANDONMENT
2006-07-27 143 Remedial Action Options Report (RAOR) Received (fee)
2006-07-27 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2006-04-19 99 Miscellaneous E-MAIL WITH CONSULTANT REGARDING CLOSURE REQUEST
2006-02-21 99 Miscellaneous TELEPHONE CONFERENCE WITH CONSULTANT REGARDING CLOSURE SUBMITTAL
2006-01-20 179 Case Closure Review Request Received (non-fee)
2005-05-17 99 Miscellaneous TELCON W/CONSULTANT, WILL SUBMIT FOR CLOSURE
2005-05-10 43 Site Activity Status Update Received MAY '05 GW RESULTS SUBMITTED
2005-03-30 43 Site Activity Status Update Received GW MONITORING RESULTS OCT'04 - JAN'05
2004-11-02 99 Miscellaneous ISSUANCE OF WPDES DISCHARGE PERMIT
2004-10-06 64 Inject/Infiltrate Request Approved INJECTION APPROVAL (EDIBLE OIL SUBSTRATE)
2004-09-30 43 Site Activity Status Update Received STS RESPONSE TO NTP
2004-09-08 149 Remedial Action (RA) Design Report Approved ENHANCED BIOREMEDIATION W/EOS INJECTION NTP
2004-08-25 63 Inject/Infiltrate Request Received (fee) ENHANCED NA WORKPLAN (EOS)
2004-06-21 99 Miscellaneous MTG TO DISCUSS EOS INJECTION APPROVAL
2004-04-30 99 Miscellaneous COMMENTS ON WP
2004-04-23 35 Site Investigation Workplan (SIWP) Received (non-fee) WP FOR ENHANCED NA
2004-04-21 43 Site Activity Status Update Received ADDT'L SAMPLING COMPLETE, WILL SUBMIT WORKPLAN SOON.
2003-12-04 43 Site Activity Status Update Received STATUS UPDATE, WELL SAMPLING: DEC. 15
2003-10-28 99 Miscellaneous TELCON W/CONSULTANT, QTLY MONITORING STARTUP AGAIN
2003-10-09 99 Miscellaneous TELCON W/CONSULTANT, SALE OF PROPERTY & CONTINUED WORK EFFORT
2003-01-27 43 Site Activity Status Update Received TELCON WITH CONSULTANT ABOUT STATUS UPDATE (HAVE PRELIM RAP DONE)
2002-08-06 43 Site Activity Status Update Received GW SAMPLES, REM. SYSTEM RESTARTED 06/2002, EVALUATING OPTIONS
2002-07-02 99 Miscellaneous WDNR REQUESTS STATUS UPDATE
2002-02-05 43 Site Activity Status Update Received QUARTERLY RESULTS AND UPDATE
2001-10-01 80 Closure Not Recommended NEED MORE GW EXTRACTION/POTENTIAL TCE TOO HIGH NEAR WATER INTAKE
2001-06-29 79 Case Closure Review Request Received
2001-01-08 43 Site Activity Status Update Received SUPPLEMENTAL CLOSURE INFO
2000-11-15 94 Operation & Maintenance (O & M) Report Not Approved CLOSURE PLAN REVIEW LETTER - ADDITIONAL WORK REQUIRED
2000-08-01 43 Site Activity Status Update Received ADDITIONAL INFO FOR O&M REPORT
2000-07-31 192 Operation & Maintenance (O & M) Report Received (fee) O & M WITH CLOSURE OPTIONS IDENTIFIED
2000-04-10 43 Site Activity Status Update Received PROJECT STATUS & CLOSURE PLANNING MEETING
1999-10-20 43 Site Activity Status Update Received GW DATA - PUMPING SYSTEM
1999-09-22 92 Operation & Maintenance (O&M) Report Received (non-fee) 10/1996 THROUGH 04/99 PROGRESS REPORT
1997-02-07 92 Operation & Maintenance (O&M) Report Received (non-fee) 1996 PROGRESS REPORT - GROUNDWATER EXTRACTION & TREATMENT SYSTEM
1995-06-26 92 Operation & Maintenance (O&M) Report Received (non-fee) 1995 REPORT AND EXT. 16 CONSTRUCTION
1994-12-23 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SUMMARY OF ADDITIONAL SUBSURFACE EXPLORATION & REMEDIAL DESIGN EFFORTS
1994-06-13 35 Site Investigation Workplan (SIWP) Received (non-fee)
1994-04-29 92 Operation & Maintenance (O&M) Report Received (non-fee) 1993 PROGRESS RPORT & GROUNDWATER EXTRACTION CONSTRUCTION RECORD
1993-08-16 92 Operation & Maintenance (O&M) Report Received (non-fee) PROGRESS REPORT & DOWNGRADIENT GROUNDWATER EXTRACTION WORK PLAN
1993-02-16 92 Operation & Maintenance (O&M) Report Received (non-fee) FOURTH QUARTER 1992 PROGRESS REPORT
1992-09-09 35 Site Investigation Workplan (SIWP) Received (non-fee) WORK PLAN FOR CHARACTERIZING GROUNDWATER QUALITY
1992-06-03 147 Remedial Action (RA) Design Report Received (non-fee) REMEDIAL ACTION P1, VAPOR EMMISIONS
1992-04-28 92 Operation & Maintenance (O&M) Report Received (non-fee) RESULTS OF SITE ASSESSMENT & CORRECTIVE ACTION
1992-02-20 43 Site Activity Status Update Received SITE MEETING
1992-02-11 43 Site Activity Status Update Received PROGRESS REPORT
1992-01-10 43 Site Activity Status Update Received PROGRESS REPORT
1991-10-29 43 Site Activity Status Update Received WPDES APPLICATION
1991-08-27 43 Site Activity Status Update Received PROJECT SCHEDULE FOR TREATMENT SYSTEM
1991-08-26 43 Site Activity Status Update Received SPILL PREVENTIVE ACTION PLAN
1991-06-13 147 Remedial Action (RA) Design Report Received (non-fee) INITIAL DESIGN AND CONSTRUCTION OF SOIL VAPOR & GROUNDWATER EXTRACTION AND TREATMENT SYSTEM
1991-04-24 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SOILS AND GROUNDWATER ASSESSMENT FOR A 550 GAL UST MINERAL SPIRITS STORAGE TANK
1991-02-13 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SUBSURFACE/HYDROGEOLOGIC INVESTIGATION
1990-09-20 2 Responsible Party (RP) letter sent LUST RP LETTER - ASSUMPTION OF PETROLEUM & OTHER RELEASES FROM USTS
1990-06-26 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file REVISED CLOSURE OF 12000 GAL DIESEL UST
1990-05-24 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file CONTAMINATION ASSESSMENT
1990-03-12 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file REVISED REPORT-AST INSTALL & UST CLOSURE (3 TANKS - 550 GAL MINERAL SPIR, 550 & 2000 GAL CUTTING OIL
1989-02-24 1 Notification of Hazardous Substance Discharge EPA NOTIFICATION OF SOLVENT SPILLS IN 1983 & 1984
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
Property Affected -> 13-36-575914 QUALITY STATE OIL CO INC
ERP to VPLE (On Property) 06-36-551669 PARAGON ELECTRIC CO INC (FORMER) (VPLE)
Substances
Substance Type Amt Released Units
Chlorinated Solvents VOC
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Vapor Intrusion Continuing Obligation(s)
(B) Compounds of Concern in Use – Commercial/Industrial Restriction: Property use restricted to commercial or industrial. Notification of DNR required for change in property use to residential use. Vapor evaluation is required. Further cleanup may be required.
Responsible Party
PARAGON ELECTRIC 606 PARKWAY BLVD, TWO RIVERS, WI
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov