02-50-000298 JUDGES DRY CLEANERS STEVENS POINT
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
JUDGES CLEANERS PORTAGE WEST CNTRL
Address Municipality
257 DIVISION ST STEVENS POINT
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SE 1/4 of Sec 29, T24N, R08E 44.5321497 -89.5743334 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
.1
Facility ID PECFA No. EPA ID Start Date End Date
750010360 1992-12-15
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag  
Site Files
Name File
SITE FILE 1992 THROUGH 2006 Download PDF Document
SITE FILE 2007 THROUGH 2018 Download PDF Document
Actions and Documents
Date Code Name File Comment
2024-06-18 99 Miscellaneous Download PDF file SI CO APPROVED: $12,399.00
2024-05-31 112 DERF - Change Order Received Download PDF file SI CHANGE ORDER FOR SUB-SLAB POINT AND TABLE UPDATES
2024-02-05 43 Site Activity Status Update Received Download PDF file GROUNDWATER SAMPLING RESULTS
2024-01-22 364 VAL and/or VRSL Exceeded
2024-01-22 366 VAL and/or VRSL Exceeded at Off-Site Property or ROW
2023-11-20 99 Miscellaneous Download PDF file CHANGE ORDER FOR MW ABONDOMENT APPROVED
2023-11-09 112 DERF - Change Order Received Download PDF file CHANGE ORDER REQUEST FOR MW ABANDONMENT
2023-09-25 99 Miscellaneous Download PDF file CHANGE ORDER APPROVED FOR SI
2023-09-06 112 DERF - Change Order Received Download PDF file CHANGE ORDER REQUEST FOR SI
2023-01-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2023-01-06 99 Miscellaneous Download PDF file PROPOSAL FOR GROUNDWATER AND VAPOR SAMPLING
2022-07-13 43 Site Activity Status Update Received Download PDF file STATUS UPDATE REPORT
2022-07-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2021-05-24 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER RESENT TO STEPHANIE JUDGE WITH UPDATED ADDRESS
2021-05-11 99 Miscellaneous Download PDF file CHANGE ORDER APPROVED $16026
2021-04-26 43 Site Activity Status Update Received Download PDF file GROUNDWATER SAMPLING PLAN
2021-04-26 112 DERF - Change Order Received Download PDF file
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2020-10-27 130 DNR Regulatory Reminder Sent Download PDF file DERF FUNDING STATUS LTR
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER; LETTER TO STEPHANIE JUDGE RETURNED UNDELIVERABLE
2020-07-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-01-09 43 Site Activity Status Update Received Download PDF file NOVEMBER 2019 GROUNDWATER SAMPLING RESULTS
2020-01-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-11-13 99 Miscellaneous Download PDF file CHANGE ORDER APPROVED: $6016.00, CONSULTANT RATE INCREASE APPROVED
2019-10-14 112 DERF - Change Order Received Download PDF file CHANGE ORDER REQUEST: $7285.00
2019-09-30 99 Miscellaneous Download PDF file AGREEMENT EXECUTED BY JUDGES
2019-09-30 99 Miscellaneous Download PDF file JUDGE EXECUTED AFFIDAVIT
2019-07-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-01-04 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-07-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-01-15 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2017-07-19 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-01-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-07-18 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-07-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-01-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2014-09-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-04-14 99 Miscellaneous SYSTEM TURNED OFF
2014-01-30 130 DNR Regulatory Reminder Sent DERF FUNDING STATUS LTR
2013-02-13 112 DERF - Change Order Received FROM NEW CONSULTANT (MSA) USING APPROVED UNIT RATES
2013-01-25 99 Miscellaneous MET WITH RP REPRESENTATIVE TO DISCUSS SITE STATUS AND POTENTIAL CONSULTANT CHANGE.
2012-07-10 218 DERF - Cost Reimbursement Application Approved DC-455 APPROVED, CHECK BEING PROCESSED
2012-04-13 217 DERF - Cost Reimbursement Application Received JUDGES
2011-09-07 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-07-07 99 Miscellaneous JL&DC OWNERSHIP AND SALE INFORMATION
2010-11-22 99 Miscellaneous REQUEST FOR CONSULTANT HOURLY RATE INCREASE.
2010-10-22 99 Miscellaneous MEETING TO DISCUSS PRIORITIES AT THE SITE.
2010-06-17 43 Site Activity Status Update Received GW SAMPLING REPORT
2010-03-25 99 Miscellaneous CHANGE ORDER APPROVAL LETTER SENT.
2010-03-24 112 DERF - Change Order Received GW SAMPLING
2010-03-18 99 Miscellaneous MEETING TO DISCUSS STATUS & DIRECTION OF SITE INVESTIGATION AND CLEAN UP.
2009-11-06 43 Site Activity Status Update Received REPORT SUMMARY & RESPONSE TO DNR SITE INVESTIGATION COMMENTS.
2009-09-16 99 Miscellaneous CHECK FOR 4TH SI CLAIM (DC-279, RCVD AUG 2008) MAILED 9/16/09
2009-06-08 99 Miscellaneous PHONE CONVERSATION WITH ATTORNEY CLARIFYING DNR'S APPROVAL LETTER.
2009-06-08 99 Miscellaneous PHONE CONVERSATION BETWEEN DNR & ATTORNEY CLARIFYING DNR'S APPROVAL LETTER.
2009-06-02 99 Miscellaneous LETTER FROM ATTORNY REQUESTING CLARIFICATION OF DNR LETTER.
2009-06-02 99 Miscellaneous LETTER FROM ATTORNEY REQUESTING CLARIFICATION OF DNR LETTER.
2009-05-27 99 Miscellaneous CHANGE ORDER APPROVED WITH ONE ADDITION.
2009-03-05 99 Miscellaneous MET W/ATTORNEY FOR ESTATE REGARDING SITE. NEED 60 DAYS TO PROVIDE STATUS UPDATE.
2009-01-20 218 DERF - Cost Reimbursement Application Approved AUDIT OF AUG '08 CLAIM COMPLETE. REIMB CHECK NOT YET SENT, NO FUNDS AVAILABLE. WILL BE ISSUED ASAP
2008-10-28 99 Miscellaneous DERF REIMBURSEMENT PACKAGE RESUBMITTED.
2008-10-21 140 Site Investigation Report (SIR) Not Approved
2008-08-15 217 DERF - Cost Reimbursement Application Received
2008-07-11 43 Site Activity Status Update Received ADDENDUM TO SITE INVESTIGATION SUBMITTED.
2008-04-29 99 Miscellaneous HAZARDOUS WASTE DETERMINATION SUBMITTED FOR SOILS.
2007-11-02 99 Miscellaneous INDOOR AIR SAMPLING RESULTS SUBMITTED.
2007-10-31 99 Miscellaneous REIMBURSEMENT CHECK FOR PREVIOUSLY AUDITED CLAIM SENT.
2007-09-21 218 DERF - Cost Reimbursement Application Approved AUDIT COMPLETE, REIMB CHECK NOT YET SENT DUE TO FUNDING AVAILABILITY ISSUE. CHECK WILL BE SENT ASAP
2007-09-21 218 DERF - Cost Reimbursement Application Approved APPROVED REIMBURSEMENT $43,575.68.
2007-09-11 43 Site Activity Status Update Received PROPERTY OWNER CLOSED BUSINESS. BLDG IS VACANT AT THIS TIME. GW SAMPLING THIS WEEK.
2007-07-20 36 Site Investigation Workplan (SIWP) Approved
2007-06-21 35 Site Investigation Workplan (SIWP) Received (non-fee) WORKPLAN FOR ADD'L SOIL GW & AIR SAMPLING SUBMITTED.
2007-04-06 99 Miscellaneous MET TO DISCUSS ADD'L SITE INVESTIGATION ACTIVITIES INCLUDING SOIL VAPOR STUDY.
2007-02-14 43 Site Activity Status Update Received STATUS REPORT FOR INDOOR AIR MITIGATION SYSTEM INSTALLATION.
2007-02-06 43 Site Activity Status Update Received SUPPLEMENTAL GW INVESTIVATION & AIR MONITORING REPORT SUBMITTED.
2007-01-03 43 Site Activity Status Update Received VACUUM PILOT TEST - AIR SAMPLE RESULTS SUBMITTED. SYSTEM RUNNING.
2006-07-05 99 Miscellaneous APPROVAL OF ADD'L COST FOR ELECTRIC METER $3000
2006-06-16 214 DERF - Interim Action Workplan Approved
2006-06-14 213 DERF - Interim Action Workplan Received REVISED INTERIM REMEDIATION SYSTEM PLANS & COSTS
2006-05-14 112 DERF - Change Order Received COLLECTED BACKGROUND DATA.
2006-04-07 43 Site Activity Status Update Received UPDATE ON MITIGATION SYSTEM PROPOSAL & GW SAMPLING DONE IN SEPT 2005.
2006-02-06 213 DERF - Interim Action Workplan Received WORKPLAN FOR INDOOR AIR MITIGATION SYSTEM
2005-12-08 99 Miscellaneous FORMER JUDGE'S CLEANERS AIR SAMPLING RESULTS RECEIVED
2005-12-07 218 DERF - Cost Reimbursement Application Approved FORMER JUDGE'S CLEANERS
2005-12-07 218 DERF - Cost Reimbursement Application Approved JUDGE'S REIMBURSEMENT APPROVED FOR $63,718.45.
2005-10-26 99 Miscellaneous CHANGE ORDER APPROVAL
2005-10-24 112 DERF - Change Order Received AIR SAMPLING AND MEETING
2005-10-17 99 Miscellaneous ON-SITE MEETING WITH DHFS, DNR, CURRENT AND PREVIOUS OWNERS AND CONSULTANT. AIR QUALITY ISSUES.
2005-09-26 99 Miscellaneous AIR SAMPLE RESULTS AND GROUNDWATER SAMPLING LOCATIONS SUBMITTED
2005-08-17 217 DERF - Cost Reimbursement Application Received PARTIAL SI REQUEST
2005-08-08 35 Site Investigation Workplan (SIWP) Received (non-fee) SIWP PAPER COPY SUBMITTED.
2005-08-04 112 DERF - Change Order Received ADDITIONAL SITE INVESTIGATION
2005-08-02 140 Site Investigation Report (SIR) Not Approved GW EXTENT NOT DETERMINED
2005-08-02 99 Miscellaneous LETTER SENT REQUESTING ADD'L SITE INVESTIGATION
2005-05-04 99 Miscellaneous MTG WITH TOM JUDGE & URS RE SOIL VAPOR ISSUE
2005-02-25 37 Site Investigation Report (SIR) Received (non-fee)
2004-11-01 99 Miscellaneous APPROVAL OF COST OVERRUNS
2004-08-27 112 DERF - Change Order Received FOR SI RPT AND HAZ WASTE DETERMINATION
2004-03-16 43 Site Activity Status Update Received FIELD WORK SCHEDULED FOR APRIL 5, 2004. WELL INSTALLATION AND SAMPLING.
2003-11-24 36 Site Investigation Workplan (SIWP) Approved SIWP ADDENDUM
2003-11-21 35 Site Investigation Workplan (SIWP) Received (non-fee) SIWP ADDENDUM
2003-09-18 43 Site Activity Status Update Received GEOPROBE GW RESULTS
2003-08-19 35 Site Investigation Workplan (SIWP) Received (non-fee) FAXED ON 8/18/03
2003-08-19 36 Site Investigation Workplan (SIWP) Approved VERBAL APPROVAL ON 8/18/03
2003-08-12 43 Site Activity Status Update Received GEOPROBE STATUS RPT
2003-08-12 99 Miscellaneous DISCUSS ADD'L WORK. WILL PROVIDE PLAN FOR ADD'L GEOPROBES
2003-07-15 36 Site Investigation Workplan (SIWP) Approved
2003-07-14 35 Site Investigation Workplan (SIWP) Received (non-fee) WORK PLAN ADDENDUM
2003-06-30 99 Miscellaneous ADD'L SI WP INFO
2003-06-19 36 Site Investigation Workplan (SIWP) Approved APPROVED INITIAL WORK PLAN
2003-06-18 35 Site Investigation Workplan (SIWP) Received (non-fee)
2003-05-22 99 Miscellaneous REQUEST ADD'L SITE INVESTIGATION
2003-05-21 99 Miscellaneous MTG TO DISCUSS SI
2003-04-25 43 Site Activity Status Update Received GW MONITORING UPDATE
2003-01-09 43 Site Activity Status Update Received
2002-11-12 36 Site Investigation Workplan (SIWP) Approved INSTALLATION OF WELL AND GW SAMPLING.
2002-10-21 35 Site Investigation Workplan (SIWP) Received (non-fee) WORK PLAN FOR ADDITIONAL SI
2002-09-10 99 Miscellaneous GW SAMPLING PROPOSAL SUBMITTED.
2002-08-15 99 Miscellaneous DNR REQUEST SIWP FOR COMPLETION OF THE SI
2002-06-10 43 Site Activity Status Update Received GW QUALITY RESULTS
2001-10-18 218 DERF - Cost Reimbursement Application Approved AUTO-POPULATED BY CAOS
2000-05-26 99 Miscellaneous PROJECT MANAGEMENT TRANSFERRED TO LISA GUTKNECHT.
2000-03-28 110 DERF - Potential Claim Form Approved FORMED 210 SIGNED BY T. HVIZDAK BUT NO LETTER SENT
2000-02-07 140 Site Investigation Report (SIR) Not Approved EXTENT UNDEFINED
1999-12-20 37 Site Investigation Report (SIR) Received (non-fee)
1999-09-29 99 Miscellaneous CONSULTANT REQUESTS ASSISTANCE FOR GAINING PROPERTY ACCESS FOR MW INSTALLATION.
1999-03-31 99 Miscellaneous PHONE LOG TO CONSULTANT REQUIRING ADD'L SI
1999-02-12 43 Site Activity Status Update Received
1999-02-12 43 Site Activity Status Update Received GW RESULTS SUBMITTED.
1998-08-05 35 Site Investigation Workplan (SIWP) Received (non-fee) WORKPLAN FOR ADD'L SI & GW SAMPLING.
1998-07-20 99 Miscellaneous REPLY TO PROD. WORK PLAN REQUIRED BY 8/24/98
1998-07-14 99 Miscellaneous REPLY TO PROD
1998-07-06 99 Miscellaneous PROD. REPLY BY 8/10/98
1997-03-25 43 Site Activity Status Update Received CONFIRMATION SOIL SAMPLING RPT
1996-12-11 36 Site Investigation Workplan (SIWP) Approved SOIL SAMPLING
1996-10-31 43 Site Activity Status Update Received SOIL EXCAVATION AND DISPOSAL RPT
1996-05-23 36 Site Investigation Workplan (SIWP) Approved APPROVE SOIL REMEDIATION
1996-05-08 43 Site Activity Status Update Received SITE UPDATE
1996-05-08 35 Site Investigation Workplan (SIWP) Received (non-fee)
1996-03-20 28 Phase I Environmental Site Assessment (ESA) Rpt Received PHASE I SUBMITTED FOR 249 DIVISION
1996-03-20 29 Phase II Environmental Site Assessment (ESA) Rpt Received PHASE II SUBMITTED FOR 249 DIVISION
1995-12-22 99 Miscellaneous DNR APPROVES RECOMMENDATIONS IN SIR
1995-12-21 99 Miscellaneous WATER CONTOUR MAP
1995-12-12 99 Miscellaneous REQUEST ADD'L WORK
1995-11-10 99 Miscellaneous POTENTIAL SOURCES REVIEW
1995-11-05 37 Site Investigation Report (SIR) Received (non-fee) PARTIAL SI
1995-08-01 36 Site Investigation Workplan (SIWP) Approved
1995-07-28 35 Site Investigation Workplan (SIWP) Received (non-fee) REVISED WORK PLAN
1995-07-24 35 Site Investigation Workplan (SIWP) Received (non-fee)
1995-07-21 99 Miscellaneous COPIES OF SITE ACCESS REQUEST LETTERS
1995-05-30 99 Miscellaneous DNR REQUEST SIWP
1995-04-07 29 Phase II Environmental Site Assessment (ESA) Rpt Received PHASE II SUBMITTED FOR 325 DIVISION ST
1995-04-07 28 Phase I Environmental Site Assessment (ESA) Rpt Received PHASE I SUBMITTED FOR 325 DIVISION ST
1994-02-15 2 Responsible Party (RP) letter sent
1993-05-20 43 Site Activity Status Update Received INSTALLATION OF TWO MONITORING WELLS
1992-12-15 1 Notification of Hazardous Substance Discharge
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
ERP to General Property 07-50-579981 JUDGES CLEANERS
Substances
Substance Type Amt Released Units
Tetrachloroethene (Perchloroethylene) (PCE (TETRACHLOROETHENE)) VOC
Trichloroethylene Industrial Chem
Financial
Category Fiscal Year Amount
DERF Reimbursements:Grant 2002 $8,523
DERF Reimbursements:Grant 2002 $11,873
DERF Reimbursements:Grant 2006 $63,718
DERF Reimbursements:Grant 2008 $43,576
DERF Reimbursements:Grant 2009 $40,593
DERF Reimbursements:Grant 2013 $12,430
Responsible Party
THE THOMAS J JUDGE REMEDIATION TRUST 1115 MOHICAN PASS, MADISON, WI 53711
DNR Project Manager
MATT THOMPSON  matthewa.thompson@wisconsin.gov
33863 | 02-50-000298
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages