02-67-000801
JACOBUS OIL CO
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / CLOSED | DNR RR |
Location Name | County | DNR Region |
---|---|---|
JACOBUS OIL CO | WASHINGTON | SOUTHEAST |
Address | Municipality |
---|---|
N116 W16261 MAIN ST | GERMANTOWN |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
NW 1/4 of the SE 1/4 of Sec 22, T09N, R20E | 43.2276841 | -88.1113422 |
![]() |
![]() |
Additional Activity Details | Acres |
---|---|
1 |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
267054920 | 53022-2541-11 | 1980-01-01 | 2013-03-04 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
Name | File |
---|---|
SITE FILE DOCUMENTATION FOR ACTIVITY | ![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2023-06-13 | 99 | Miscellaneous |
![]() |
ANNUAL COVER INSPECTION FORM | |
2021-07-01 | 99 | Miscellaneous |
![]() |
ANNUAL CAP INSPECTION | |
2020-06-16 | 99 | Miscellaneous |
![]() |
CAP INSPECTION LOG | |
2018-08-06 | 99 | Miscellaneous |
![]() |
CASE CLOSURE ADDENDUM LETTER | |
2018-08-06 | 227 | Continuing Obligation Removed - Vapor Intrusion Response | FUTURE USE CO REPLACED BY VAPOR MITIGATION MAINTENANCE REQUIREMENT | ||
2018-08-06 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | MAINTAIN COVER | ||
2018-08-06 | 226 | Continuing Obligation - Vapor Intrusion Response | GARAGE VENTILATION SYSTEM MAINTENANCE REQUIRED SEE VI OPTIONS SECTION FOR DETAILS. | ||
2018-06-21 | 99 | Miscellaneous |
![]() |
REVISED CMP | |
2018-05-14 | 99 | Miscellaneous |
![]() |
POST CONSTRUCTION SUMP SAMPLE RESULTS | |
2018-03-22 | 99 | Miscellaneous |
![]() |
POST CONSTRUCTION CAP MAINTENANCE PLAN | |
2018-01-26 | 43 | Site Activity Status Update Received |
![]() |
POST CONSTRUCTION 718 SOIL MANAGEMENT PLAN REPORT | |
2016-09-14 | 193 | CO Modification Notice to Proceed (NTP) |
![]() |
SOILS MANAGEMENT PLAN APPROVED | |
2016-09-09 | 199 | Additional Information Received (Fee-Based or Closure) |
![]() |
FINAL SOILS MANAGEMENT PLAN | |
2016-08-03 | 99 | Miscellaneous |
![]() |
GAVE GO-AHEAD WITH CAVEAT TO REVISED SMP SAMPLING PLAN | |
2016-03-31 | 99 | Miscellaneous |
![]() |
EMAIL RESPONSE | |
2016-03-08 | 198 | Request for Additional Information (Fee-Based or Closure) |
![]() |
ASKED FOR MORE SITE INVESTIGATION AND MORE INFORMATION | |
2016-01-21 | 181 | Continuing Obligation Modification Request Received (fee) |
![]() |
REC'D CK # 44156 $1050.00 | |
2016-01-21 | 700 | Database Fee Paid for Groundwater Continuing Obligation(s) | REC'D CK # 44156 $350.00 | ||
2016-01-21 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | REC'D CK # 44156 $300.00 | ||
2013-03-04 | 11 | Activity Closed | |||
2013-03-04 | 226 | Continuing Obligation - Vapor Intrusion Response | |||
2013-03-04 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2013-03-04 | 236 | Continuing Obligation - Residual GW Contamination | |||
2013-03-04 | 56 | Continuing Obligation(s) Applied |
![]() |
||
2013-03-04 | 46 | Impacted Right-of-Way (ROW) Notification | AUTO-POPULATED 2018-03-20 | ||
2013-03-04 | 66 | Continuing Obligations (COs) Apply at Off-site Property(ies) | auto-populated on 08/01/2019 per activity relationship to off-site(s) | ||
2013-01-24 | 190 | Remaining Actions Needed Requirements Met or Docs Received | REC'D WELL ABANDONMENT DOCS | ||
2012-12-06 | 84 | Remaining Actions Needed | CONDITIONAL CLOSURE PENDING WELL ABANDONMENT | ||
2012-11-09 | 79 | Case Closure Review Request Received | REC'D CK# 62138 $750.00 | ||
2012-11-09 | 700 | Database Fee Paid for Groundwater Continuing Obligation(s) | REC'D CK# 2139 $200.00 | ||
2012-11-09 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | 5REC'D CK# 62139 $250.00 | ||
2012-04-25 | 99 | Miscellaneous | COPY OF PECFA PUBLIC BID DEFERRED - COAST CAP APPROVED | ||
2012-02-06 | 43 | Site Activity Status Update Received | REC'D COPY PECFA COST APPROVAL REQ-ADD'L SAMPLING | ||
2012-01-23 | 153 | Remedial Action (RA) Documentation Report Approved |
![]() |
REM ACTION PLN CONDITIONALL APPROVED - REQT 2 MORE PVOC SAMPLES FROM JMW-6D & VAPOR ASSESS | |
2012-01-03 | 99 | Miscellaneous | PM CHANGE LETTER SENT (CHRISTINE LILEK) | ||
2012-01-03 | 99 | Miscellaneous | PM CHANGE LETTER SENT (CHRISTINE LILEK) | ||
2011-11-17 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) | |||
2011-02-04 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) | |||
2010-09-07 | 501 | PECFA Bidding to Establish Cost Cap |
![]() |
||
2010-05-07 | 99 | Miscellaneous | REC'D DERF SI BID | ||
2009-05-08 | 501 | PECFA Bidding to Establish Cost Cap | REC'D PUBLIC BID RD 55 WORKSCOPE | ||
2008-12-01 | 99 | Miscellaneous | REC'D COST CAP MODIFICATION REQT | ||
2008-03-17 | 501 | PECFA Bidding to Establish Cost Cap |
![]() |
ROUND 55 | |
2007-11-30 | 91 | SER First In/First Out (FIFO) Review Process Complete | PROVIDED COMMENTS RE: ADD'L INVESTIGATIVE WORK | ||
2007-10-17 | 43 | Site Activity Status Update Received | |||
2007-07-13 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) | BID DEFERMENT, WORKPLAN APPROVED | ||
2007-04-06 | 90 | SER First In/First Out (FIFO) Review Process Started | REC'D LTR RE ADD'L WORK FOR CLOSURE | ||
2007-01-19 | 42 | Remedial Action Report Approved | ADD'L WORK NEEDED TO MOVE CASE TO CLOSURE | ||
2006-11-20 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) | |||
2005-04-07 | 501 | PECFA Bidding to Establish Cost Cap |
![]() |
BID ROUND 37 | |
2005-03-31 | 90 | SER First In/First Out (FIFO) Review Process Started | FREE PRODUCT MEASUREMENTS | ||
2005-02-09 | 99 | Miscellaneous | BB. TECHNICAL ASSISTANCE LETTER SENT | ||
2004-11-16 | 97 | Technical Assistance Request Received (fee) | REC'D CK# 42322 $500.00 WITH STATUS REPORT | ||
2004-11-16 | 98 | Technical Assistance Provided | REC'D CK# 42322 $500.00 WITH STATUS REPORT | ||
2001-05-10 | 152 | Remedial Action Documentation Report Received (fee) | JD | ||
2001-05-10 | 153 | Remedial Action (RA) Documentation Report Approved | JD | ||
2000-08-17 | 40 | Remedial Action Options Report (RAOR) Approved | |||
1998-07-13 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) | |||
1997-07-22 | 99 | Miscellaneous | TECH ASSISTANCE ON ALTERNATIVES | ||
1997-06-27 | 206 | Site Investigation End - State Lead | |||
1997-06-27 | 207 | Remedial Design Start - State Lead | |||
1980-01-01 | 1 | Notification of Hazardous Substance Discharge |
Type | Related Activity |
---|---|
Property Affected -> | 13-67-575419 SQUIRE DR PARCEL |
Property Affected -> | 13-67-575729 N116 W16257 MAIN ST |
Property Affected -> | 13-67-575730 STONEWOOD HOMES & CONDOS |
Substance | Type | Amt Released | Units |
---|---|---|---|
Gasoline - Unleaded and Leaded | Petroleum | ||
Petroleum - Unknown Type | Petroleum |
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR. |
(A) Exceedence of Vapor Risk Levels - Vapor Mitigation Required: Vapor mitigation is required due to sub-slab or nearby soil vapor concentrations exceeding vapor risk screening levels. |
PECFA Site Name: | Jacobus Co |
Max. Reimbursement: | $1,000,000 | Total Amount Paid: | $941,977.39 |
Occ No | Claim No | Audit Date | Paid Date | Amt Submitted | Amt Ineligible | Amt Paid |
A | 1 | 1997-06-09 | 1999-06-22 | $437,453.47 | $26,589.64 | $406,646.55 |
A | 1 | 1997-06-09 | 2000-04-21 | $.00 | $.00 | $2,884.63 |
A | 2 | 2004-11-18 | 2005-01-12 | $118,170.34 | $243.53 | $115,568.27 |
A | 3 | 2006-05-31 | 2006-10-10 | $233,068.61 | $.00 | $228,407.24 |
A | 4 | 2008-06-25 | 2008-08-13 | $18,921.50 | $480.06 | $17,772.61 |
A | 5 | 2009-07-15 | 2009-08-12 | $11,775.45 | $.00 | $11,539.94 |
A | 6 | 2011-01-24 | 2011-02-23 | $5,755.63 | $.00 | $5,640.52 |
A | 7 | 2011-05-18 | 2011-06-27 | $99,792.45 | $.00 | $97,796.60 |
A | 8 | 2011-11-10 | 2011-12-14 | $49,981.11 | $.00 | $48,981.49 |
A | 9 | 2013-05-03 | 2013-06-14 | $6,877.08 | $.00 | $6,739.54 |
JACOBUS ENERGY INC K 11815 W BRADLEY RD, MILWAUKEE, WI 53224 |
Southeast Region Contact: Jenny Meyer jennifer.meyer1@wisconsin.gov |