ACTIVITY DETAILS

 
02-36-544601 SKANA (K&V) (SUMPS)
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
SKANA ALUMINUM CO MANITOWOC NORTHEAST
Address Municipality
2009 MIRRO DR MANITOWOC CITY
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the SE 1/4 of Sec 09, T19N, R24E 44.1271494 -87.627989 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
Electronic Only - No Hard File gt;100
Facility ID PECFA No. EPA ID Start Date End Date
436106110 2005-12-12 2012-01-20
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Site Files
Name File
SITE FILE DOCUMENTATION FOR YEARS 2003 THRU 2007. Download PDF Document
SITE FILE DOCUMENTATION FOR YEARS JUN 2011 THRU 2012. Download PDF Document
SITE FILE DOCUMENTATION FOR YEARS 2008 THRU MAY 2011. Download PDF Document
Actions and Documents
Date Code Name File Comment
2023-07-17 43 Site Activity Status Update Received Download PDF file 2023 ANNUAL INSPECTION OF COVER
2022-07-21 43 Site Activity Status Update Received Download PDF file 2022 ANNUAL INSPECTION OF COVER
2021-08-02 43 Site Activity Status Update Received Download PDF file 2021 ANNUAL INSPECTION OF COVER
2020-06-25 43 Site Activity Status Update Received Download PDF file 2020 ANNUAL INSPECTION OF COVER
2019-05-22 43 Site Activity Status Update Received Download PDF file 2019 ANNUAL INSPECTION OF COVER
2014-05-13 43 Site Activity Status Update Received ANNUAL BARRIER CAP MAINTENANCE REPORT REC'D
2013-08-28 43 Site Activity Status Update Received ANNUAL BARRIER CAP MAINTENNCE REPORT RECEIVED
2012-01-26 43 Site Activity Status Update Received Download PDF file WELL STATUS REPORT
2012-01-20 11 Activity Closed
2012-01-20 222 Continuing Obligation - Maintain Cap Over Contaminated Area CAP OVER CVOC AREA BUILDING 5C + SURROUNDINGS
2012-01-20 236 Continuing Obligation - Residual GW Contamination CVOC >ES IN WELLS MW06.4, MW06.08, MW08.26 BLDG 5C AREA
2012-01-20 56 Continuing Obligation(s) Applied Download PDF file CAP OVER CVOC AREA BUILDING 5C + SURROUNDINGS
2012-01-20 50 Groundwater Use Restriction Potentially Filed
2012-01-20 232 Continuing Obligation - Residual Soil Contamination
2012-01-20 226 Continuing Obligation - Vapor Intrusion Response
2012-01-20 220 Continuing Obligation - Soil at Industrial Levels
2012-01-09 190 Remaining Actions Needed Requirements Met or Docs Received
2011-12-06 84 Remaining Actions Needed NEED WELL ABANDONMENT FORMS AND CAP MAINTENANCE PLAN (FOR BUILDING 5C)
2011-12-02 99 Miscellaneous CLOSURE COMMITTEE MEETING
2011-11-17 99 Miscellaneous CLOSURE FEES RETURNED - ASSOCIATED WITH VPLE, NO FEE REQUIRED
2011-11-15 179 Case Closure Review Request Received (non-fee) CLOSURE REQUEST AND FEES RECEIVED
2011-11-15 43 Site Activity Status Update Received REPORT ON SITE ASSESSMENT OF BUILDINGS AND SURROUNDING PROEPRTY
2011-10-06 99 Miscellaneous DNR EMAIL TO SKANA; EXPECTED SCHEDULE OF EVENTS
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-09-08 36 Site Investigation Workplan (SIWP) Approved ROUND 3 WORK PLAN APPROVAL
2011-08-24 43 Site Activity Status Update Received SUBSLAB SAMPLING COMPLETED
2011-08-22 35 Site Investigation Workplan (SIWP) Received (non-fee) ROUND 3 SUPPLEMENTAL SI WORKPLAN RECEIVED
2011-06-29 38 Site Investigation Report (SIR) Approved ANALYTICAL DATA AND BORING LOGS RECEIVED
2011-06-21 38 Site Investigation Report (SIR) Approved ROUND 2 SUPPLEMENTAL SI COMMENT LETTER
2011-05-12 37 Site Investigation Report (SIR) Received (non-fee) REPORT ON SITE ASSESSMENT OF THE BUILDINGS & SURROUNDING PROPERTY
2011-03-24 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) APPROVAL SI WP ROUND 2
2011-03-11 35 Site Investigation Workplan (SIWP) Received (non-fee) SUPPLEMENTAL SI WP ROUND 2 RECEIVED
2011-02-23 99 Miscellaneous MEETING WITH BOLGER TO DISCUSS ADDITIONAL SI WORKPLAN
2011-01-24 99 Miscellaneous VPLE SI ADDITIONAL WORK NEEDED
2011-01-11 37 Site Investigation Report (SIR) Received (non-fee) SUPPLEMENTAL SITE INVESTIGATION RECEIVED
2010-11-17 35 Site Investigation Workplan (SIWP) Received (non-fee) SUPPLEMENTAL SI WORK PLAN, PHASE I AND II RECEIVED
2010-11-17 29 Phase II Environmental Site Assessment (ESA) Rpt Received AUTOPOPULATED FROM 28 ENTRY
2010-11-17 28 Phase I Environmental Site Assessment (ESA) Rpt Received
2010-10-14 99 Miscellaneous MEETING WITH CONSULTANT TO DISCUSS SIWP AND VPLE APPLICATION
2010-08-10 43 Site Activity Status Update Received CARDINAL HIRED AS CONSULTANT
2010-06-28 99 Miscellaneous TELCON WITH TESTWUIDE, HIRING CONSULTANT, STARTUP END OF JULY
2010-06-14 99 Miscellaneous BEBR GRANT AWARDED ($650K)
2010-06-02 2 Responsible Party (RP) letter sent NEW RP
2010-03-24 43 Site Activity Status Update Received HEARING TO ACCEPT SALE TO SKANA ALUMINUM
2010-03-23 43 Site Activity Status Update Received AUCTION TO SELL PLANT
2010-01-19 99 Miscellaneous MEETING TO DISCUSS CONTINUED WORK AT SITE
2009-10-26 43 Site Activity Status Update Received BANK HAS FORECLOSED ON PROPERTY AND ASSETS
2009-07-07 43 Site Activity Status Update Received PLANT STILL SHUT DOWN, HOPEFUL TO RESUME WORK IN THIRD OR FOURTH QUARTER
2009-05-08 43 Site Activity Status Update Received PLANT CLOSED, SUSPENDING OPERATIONS
2009-03-18 99 Miscellaneous KOENIG & VITS TO LAY OFF 86 WORKERS
2009-02-13 43 Site Activity Status Update Received NOT ABLE TO PROCEED WITH SI, NO FINANCIAL RESOURCES
2009-01-26 3 Notice of Noncompliance (NON) Issued FAILURE TO CONTINUE SUPPLEMENTAL SI
2008-12-03 99 Miscellaneous STATUS UPDATE REQUESTED
2008-07-29 36 Site Investigation Workplan (SIWP) Approved SUPPLEMENTAL SITE INVESTIGATION WORKPLAN APPROVED
2008-07-23 35 Site Investigation Workplan (SIWP) Received (non-fee) REVISED FIGURE 4 AND TABLE 4 OF SIR RECEIVED
2008-07-14 35 Site Investigation Workplan (SIWP) Received (non-fee) SUPPLEMENTAL SITE INVESTIGATION WORKPLAN
2008-05-29 97 Technical Assistance Request Received (fee) MEETING WITH LETTER ON WORKPLAN
2008-05-29 98 Technical Assistance Provided MEETING WITH LETTER ON WORKPLAN
2008-05-06 99 Miscellaneous TECHNICAL ASSISTANCE MEETING TO DISCUSS PENDING WP FOR ADDITIONAL SITE WORK
2008-02-25 43 Site Activity Status Update Received TELCON TO DISCUSS SUPPLEMENT SI, MEETING PLANNED 04/16/08
2008-02-04 43 Site Activity Status Update Received SUPPLEMENTAL SI RESPONSE TABLES/FIGURES RECEIVED
2007-11-19 43 Site Activity Status Update Received K&V RESPONSE LETTER TO DNR SEPTEMBER 10 TECHNICAL ASSISTANCE LETTER
2007-09-10 99 Miscellaneous SI REPORTS COMMENTS, ADDITIONAL MONITORING & INVESTIGATION REQUIRED
2007-08-14 97 Technical Assistance Request Received (fee) SITE INVESTIGATION REVIEW
2007-08-14 98 Technical Assistance Provided SITE INVESTIGATION REVIEW
2007-08-08 37 Site Investigation Report (SIR) Received (non-fee) FINAL - SITE INVESTIGATION REPORT
2007-06-26 37 Site Investigation Report (SIR) Received (non-fee) DRAFT - SITE INVESTIGATION REPORT
2007-03-12 43 Site Activity Status Update Received SITE INVESTIGATION REPORT BY END OF MONTH
2007-01-16 43 Site Activity Status Update Received TELECON WITH CONSULTANT RE. HAZ WASTE DETERMINATION
2006-09-19 37 Site Investigation Report (SIR) Received (non-fee) INTERIM REPORT
2006-08-08 43 Site Activity Status Update Received E-MAILED UPDATE: CONTINUED PROGRESS ON SITE INVESTIGATION
2006-06-26 43 Site Activity Status Update Received INITIAL SI COMPLETED, ADDT'L WELLS T/BE INSTALLED IN JULY
2006-03-20 36 Site Investigation Workplan (SIWP) Approved
2006-03-06 135 Site Investigation Workplan (SIWP) Received (fee)
2006-01-26 37 Site Investigation Report (SIR) Received (non-fee) CARDINAL HIRED AS CONSULTANT
2005-12-15 2 Responsible Party (RP) letter sent
2005-12-12 1 Notification of Hazardous Substance Discharge ANALYTCAL RECEIVED - SITE ASSESSMENT 11/28/2005
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
ERP to VPLE (On Property) 06-36-556282 SKANA ALUMINUM CO (VPLE)
Substances
Substance Type Amt Released Units
Arsenic Metals
Chlorinated Solvents VOC
Chromium Metals
Metals (SILVER) Metals
Polynuclear Aromatic Hydrocarbons Petroleum
Trichloroethylene Industrial Chem
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
Responsible Party
SKANA ALUMINUM CO 2009 MIRRO DR, MANITOWOC, WI 54220
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov
544601 | 02-36-544601