WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-71-555288 REALTY OPUS PROPERTY
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
URBAN EVOLUTIONS WINNEBAGO NORTHEAST
Address Municipality
867 VALLEY RD MENASHA CTY
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SW 1/4 of Sec 02, T20N, R17E 44.2361927 -88.4348194 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
4
Facility ID PECFA No. EPA ID Start Date End Date
471007130 2010-05-10 2018-05-15
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Actions and Documents
Date Code Name File Comment
2018-10-29 43 Site Activity Status Update Received Download PDF file CO INSPECTION REPORT-SENT VOLUNTARILY
2018-05-15 11 Activity Closed
2018-05-15 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2018-05-15 226 Continuing Obligation - Vapor Intrusion Response
2018-05-15 232 Continuing Obligation - Residual Soil Contamination
2018-05-15 236 Continuing Obligation - Residual GW Contamination
2018-05-15 56 Continuing Obligation(s) Applied Download PDF file
2018-05-01 199 Info. Received or Request Ended (Fee-Based or Closure) UPDATED CLOSURE PACKET REC'D
2018-02-15 198 Request for Additional Information (Fee-Based or Closure) CLOSURE PACKET EDITS NEEDED
2018-02-05 79 Case Closure Review Request Received AUTO-ENTERED
2018-02-05 43 Site Activity Status Update Received Download PDF file MW ABANDONMENT FORMS
2018-01-24 779 Case Closure Review Fee Received VPLE
2018-01-24 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2018-01-24 710 Database Fee Paid for Soil Continuing Obligation(s) VPLE
2018-01-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2017-12-19 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file REVISED SIR
2017-12-19 39 Remedial Action Options Report (RAOR) Received (non-fee) REVISED RAOR; SEE SIR (AC37) FOR DOCUMENTATION
2017-11-21 99 Miscellaneous Download PDF file EMAIL TO DEVELOPER
2017-09-08 99 Miscellaneous Download PDF file EMAIL TO DEVELOPER
2017-09-08 99 Miscellaneous Download PDF file SAMPLING REQUEST
2017-09-05 99 Miscellaneous Download PDF file VPLE COMMITEE SI REVIEW MEMO
2017-08-24 99 Miscellaneous Download PDF file EMAIL TO DEVELOPER
2017-08-16 43 Site Activity Status Update Received Download PDF file SAMPLING RESULTS
2017-08-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-05-23 140 Site Investigation Report (SIR) Not Approved Download PDF file
2017-05-17 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2017-05-17 39 Remedial Action Options Report (RAOR) Received (non-fee)
2017-05-17 99 Miscellaneous Download PDF file VPLE SI MEMO
2017-05-17 82 Remedial Action Options Report (RAOR) Not Approved
2017-05-03 99 Miscellaneous Download PDF file SITE PHOTOS
2017-01-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-07-28 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-01-29 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-07-28 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-02-06 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file COMPLETE PHASE I PERFORMED BY KEY ENGINEERING
2015-02-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2014-08-27 99 Miscellaneous DISCUSSIONS WITH OWNER AND KEY ENG REGARDING SITE SUMMARY-CLOSURE PLANS
2013-02-13 43 Site Activity Status Update Received STATUS UPDATE LETTER
2013-01-31 99 Miscellaneous ENV ENFORCEMENT/REM & REDEVELOPMENT LETTER RESPONSE AND REVIEW COMMENTS FOR SIR
2013-01-31 80 Closure Not Recommended
2013-01-31 38 Site Investigation Report (SIR) Approved
2012-12-27 37 Site Investigation Report (SIR) Received (non-fee)
2012-12-27 199 Info. Received or Request Ended (Fee-Based or Closure)
2012-12-27 59 Environmental Enforcement Action Completed
2012-12-11 79 Case Closure Review Request Received
2012-12-11 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2012-12-11 710 Database Fee Paid for Soil Continuing Obligation(s)
2012-12-11 198 Request for Additional Information (Fee-Based or Closure) CLOSURE FEE RECD - NO CLOSURE PACKET RECD - PENDING ADDITIONAL 2013 MONITORING
2012-11-20 99 Miscellaneous ENFORCEMENT CONFERENCE SUMMARY LETTER SENT
2012-11-15 4 Enforcement Conference Held
2012-06-14 43 Site Activity Status Update Received STATUS OF SITE INVESTIGATION
2012-02-27 37 Site Investigation Report (SIR) Received (non-fee)
2011-10-01 99 Miscellaneous PHONE CALL WITH RP - DISCUSSED STATUS OF SITE INVESTIGATION WORK
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-03-29 43 Site Activity Status Update Received CURRENT SI DATA, AND ADDITIONAL SI WORKPLAN
2010-10-14 28 Phase I Environmental Site Assessment (ESA) Rpt Received RECEIVED PHASE I8 ESA REPORT
2010-09-14 43 Site Activity Status Update Received STATUS REPORT OF INITIAL SI WORK RECEIVED
2010-07-20 35 Site Investigation Workplan (SIWP) Received (non-fee) RECEIVED SITE INVESTIGATION WORKPLAN
2010-06-25 43 Site Activity Status Update Received WRITTEN NOTIFICATION THAT CONSULTANT HAS BEEN RETAINED
2010-05-20 2 Responsible Party (RP) letter sent
2010-05-10 1 Notification of Hazardous Substance Discharge SITE ASSESSMENT APRIL 20, 2010
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
ERP to VPLE (On Property) 06-71-578231 REALTY OPUS PROPERTY - VPLE
Substances
Substance Type Amt Released Units
Chlorinated Solvents VOC
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
Responsible Party
CITY OF MENASHA 100 MAIN ST, MENASHA, WI 54952
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov
555288 | 02-71-555288
BOTW Release 4.14 | 09/17/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages