02-46-587191
BAY CLEANERS - SW DOOR
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / CLOSED | DNR RR |
Location Name | County | DNR Region |
---|---|---|
PHILLIPS 66 | OZAUKEE | SOUTHEAST |
Address | Municipality |
---|---|
201 S MAIN ST | THIENSVILLE |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
NE 1/4 of the SE 1/4 of Sec 22, T09N, R21E | 43.2275109 | -87.9849766 |
![]() |
![]() |
Additional Location Description |
---|
201-207 S MAIN ST |
Additional Activity Details | Acres |
---|---|
1 |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
246042170 | 2021-01-22 | 2022-07-12 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2022-07-12 | 11 | Activity Closed | |||
2022-07-12 | 56 | Continuing Obligation(s) Applied |
![]() |
||
2022-07-12 | 226 | Continuing Obligation - Vapor Intrusion Response | |||
2022-07-12 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2022-07-12 | 48 | Preventive Action Limit (PAL) NR140 Exemption at Closure | |||
2022-07-12 | 66 | Continuing Obligations (COs) Apply at Off-site Property(ies) | |||
2022-07-05 | 190 | Remaining Actions Needed Requirements Met or Docs Received |
![]() |
||
2022-07-01 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-06-28 | 84 | Remaining Actions Needed |
![]() |
MONITORING WELL OR REMEDIAL SYSTEM PIPING FILLING AND SEALING | |
2022-06-10 | 99 | Miscellaneous | REC'D CLOSURE RESUBMITTAL | ||
2022-05-31 | 43 | Site Activity Status Update Received |
![]() |
FIELD INVESTIGATION GROUNDWATER & SEDIMENT SAMPLING, REVISED FIGURES AND TABLES | |
2022-05-31 | 179 | Case Closure Review Request Received (non-fee) |
![]() |
REC'D CLOSURE REVISIONS | |
2022-05-20 | 80 | Closure Not Recommended |
![]() |
CASE CLOSURE IS NOT RECOMMENDED BECAUSE ADDITIONAL LEGAL REQUIREMENTS MUST BE MET | |
2022-04-05 | 199 | Additional Information Received (Fee-Based or Closure) | AR Restart | ||
2022-03-23 | 99 | Miscellaneous | CLOSURE REVISIONS RCVD | ||
2022-03-17 | 79 | Case Closure Review Request Received |
![]() |
AUTO-ENTERED | |
2022-03-17 | 198 | Request for Additional Information (Fee-Based or Closure) | AR Pause | ||
2022-03-08 | 779 | Case Closure Review Fee Received | REC'D CK #27127 $1050 | ||
2022-03-08 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | REC'D CK #27127 $300 | ||
2022-03-01 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
REC'D SI ADDENDUM LTR RPT | |
2022-02-28 | 99 | Miscellaneous |
![]() |
SI ADDENDUM LTR RPT | |
2022-01-17 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2021 - 12/31/2021 | |
2022-01-05 | 118 | PFAS Sampling Not Required At This Time |
![]() |
||
2021-12-10 | 140 | Site Investigation Report (SIR) Not Approved |
![]() |
||
2021-11-23 | 99 | Miscellaneous |
![]() |
REVISED EMERGING CONTAMINANTS STATEMENT | |
2021-11-18 | 114 | PFAS Scoping Statement Received |
![]() |
||
2021-11-15 | 28 | Phase I Environmental Site Assessment (ESA) Rpt Received |
![]() |
||
2021-10-12 | 137 | Site Investigation Report (SIR) Received (fee) |
![]() |
REC'D CK #27081 $1050.00 | |
2021-07-12 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2021 - 6/30/2021 | |
2021-02-17 | 29 | Phase II Environmental Site Assessment (ESA) Rpt Received |
![]() |
OCTOBER 2019 LIMITED PHASE II ESA | |
2021-02-17 | 99 | Miscellaneous |
![]() |
FIGURE AND TABLES FOR ADDITIONAL SAMPLING SUBMITTED WITH PHASE II | |
2021-02-15 | 2 | Responsible Party (RP) letter sent |
![]() |
||
2021-01-22 | 1 | Notification of Hazardous Substance Discharge |
![]() |
Type | Related Activity |
---|---|
Property Affected -> | 13-46-594613 213 S MAIN ST |
Substance | Type | Amt Released | Units |
---|---|---|---|
Tetrachloroethene (Perchloroethylene) | VOC | ||
Trichloroethylene | Industrial Chem | ||
Volatile Organic Compounds | VOC |
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR. |
JENIOR--BAGNESKI LLC N61W6058 COLUMBIA RD, CEDARBURG, WI 53012 |
Southeast Region Contact: Jenny Meyer jennifer.meyer1@wisconsin.gov |