2024-07-08
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2024 - 6/30/2024
|
|
2024-01-16
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2023-08-31
|
43
|
Site Activity Status Update Received
|
|
SECOND ROUND OF SUB-SLAB VAPOR RESULTS FROM JULY 2023
|
|
2023-06-30
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-04-28
|
43
|
Site Activity Status Update Received
|
|
REDEVELOPMENT STATUS UPDATE
|
|
2023-04-28
|
43
|
Site Activity Status Update Received
|
|
1ST ROUND OF SUB-SLAB VAPOR SAMPLING RESULTS FROM APARTMENT COMPLEX
|
|
2023-04-28
|
151
|
Remedial Action (RA) Documentation Report Received (non-fee)
|
|
INSTALLATION OF SUB-SLAB DEPRESSURIZATION SYSTEM
|
|
2023-04-28
|
151
|
Remedial Action (RA) Documentation Report Received (non-fee)
|
|
REMOVAL OF PETROLEUM IMPACTED SOIL
|
|
2023-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-07-01
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-01-04
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2021-10-22
|
99
|
Miscellaneous
|
|
VAPOR INTRUSION MITIGATION INFORMATION FOR REDEVELOPMENT OR NEW BUILDING CONSTRUCTION
|
|
2021-10-13
|
149
|
Remedial Action (RA) Design Report Approved
|
|
|
|
2021-10-13
|
857
|
Materials Management Plan Approved
|
|
ON-SITE MATERIAL MANAGEMENT, DOCUMENT INCLUDED WITH RAP APPROVAL LETTER OF THE SAME DATE
|
|
2021-09-30
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
2021-09-27
|
99
|
Miscellaneous
|
|
DNR PROVIDED SITE INFORMATION FOR REMEDIAL/REDEVELOPMENT PROJECT TO WEDC
|
|
2021-09-22
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
SUPPLEMENTAL REMEDIAL ACTION PLAN DOCS FOR VAPOR MITIGATION AND PETRO CONTAMINATION EXCAVATION
|
|
2021-09-17
|
148
|
Remedial Action Design Report Received (fee)
|
|
|
|
2021-09-17
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
FEE PAID THROUGH AC 148 OF SAME DATE AND DOCUMENTATION INCLUDED WITH RAP; MATERIAL MOVED ON-SITE
|
|
2021-09-17
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2021-09-17
|
99
|
Miscellaneous
|
|
INITIAL APPROVAL TO START INSTALLING STRUCTURAL PILES & CREATION OF NEW BRRTS #.
|
|
2021-09-16
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SUPPLEMENTAL WORK TO 08/09/2021 SITE INVESTIGATION REPORT DOCUMENTED IN BRRTS # 02-36-585491
|
|
2021-09-08
|
1
|
Notification of Hazardous Substance Discharge
|
|
PARCEL CREATED & HANDLED AS STANDALONE CASE FROM LARGER RIVER POINT DISTRICT, 02-36-585491
|
|
2021-08-23
|
43
|
Site Activity Status Update Received
|
|
REDEVELOPMENT PLANS AND PLANNED PRE-CONSTRUCTION ACTIVITIES
|