WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-36-593783 RR TURNTABLE (FORMER)
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
RIVER POINT DR MANITOWOC NORTHEAST
Address Municipality
RIVER POINT DR MANITOWOC
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the NE 1/4 of Sec 30, T19N, R24E 44.0927575 -87.6615433 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
2023-12-08
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Actions and Documents
Date Code Name File Comment
2024-07-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2024 - 6/30/2024
2024-01-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-12-08 1 Notification of Hazardous Substance Discharge
2023-10-05 126 Interim Action Report Received (non-fee) Download PDF file CONSTRUCTION DOCUMENTATION FOR INTERIM VEGETATED ENGINEERED BARRIER FOR LOT 3
2023-07-19 122 Interim Action Plan Received (non-fee) Download PDF file PROPOSED CONSTRUCTION OF INTERIM VEGETATED ENGINEERED BARRIER FOR LOT 3 OF RIVER POINT DISTRICT
2023-07-18 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file FOR LOT 3 OF RIVER POINT DISTRICT (INCLUDES FORMER RAILROAD TURNTABLE AREA)
2022-09-26 43 Site Activity Status Update Received Download PDF file LIMITED SITE INVESTIGATION COMPLETED BY AECOM UNDER WAM
2022-03-09 43 Site Activity Status Update Received Download PDF file SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR FMR TURNTABLE AREA - LOT 3 OF RIVERPOINT DISTRICT
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
ERP (Off Property) to General Property 07-36-583000 RAILROAD PROPERTY (FORMER)
DNR Project Manager
TAUREN BEGGS  tauren.beggs@wisconsin.gov
593783 | 02-36-593783
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages