02-41-107191
BIOGENESIS ENTERPRISES INC
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / OPEN | DNR RR |
Location Name | County | DNR Region |
---|---|---|
FORMER BIOGENESIS | MILWAUKEE | SOUTHEAST |
Address | Municipality |
---|---|
610 W RAWSON AVE | OAK CREEK |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
SW 1/4 of the SE 1/4 of Sec 05, T05N, R22E | 42.9163949 | -87.9206136 |
![]() |
![]() |
Additional Location Description |
---|
7045 S 6TH ST |
Additional Activity Details | Acres |
---|---|
UNKNOWN |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
241020010 | 53154-1437-10 | 1995-07-10 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-07-05 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2024 - 6/30/2024 | |
2024-06-24 | 99 | Miscellaneous |
![]() |
NEED A REPORT WITH DETAILS ABOUT IMPORTED SOIL USED AS CAPPING MATERIAL | |
2024-06-12 | 99 | Miscellaneous |
![]() |
MTG WITH SIGMA AND ATTORNEY TO DISCUSS DATA GAPS EMAIL LIST. FIGURES AND TABLE PROVIDED BY SIGMA. | |
2024-06-03 | 99 | Miscellaneous |
![]() |
COMMENTS TO 2/15/2024 STATUS REPORT; MTG RESCHEDULED TO LATER DATE | |
2024-06-03 | 99 | Miscellaneous |
![]() |
DATA GAPS IDENTIFIED FOR COMPLETION OF SI; DISCUSSED AT IN-PERSON MTG ON 6/12/24 | |
2024-02-15 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER | |
2024-01-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2023 - 12/31/2023 | |
2023-08-24 | 99 | Miscellaneous |
![]() |
STATUS REQUESTED, SIGMA PREPARING FOR GW SAMPLING | |
2023-07-21 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 01/01/2023 - 06/30/2023 | |
2023-01-23 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2022 - 12/31/2022 | |
2022-07-22 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-01-13 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2021 - 12/31/2021 | |
2021-07-06 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2021 - 6/30/2021 | |
2021-06-03 | 99 | Miscellaneous |
![]() |
RESPONSE TO SIWP TO BE COMPLETED BY SIGMA; ADD'L PFAS SAMPLING MAY BE NEEDED | |
2021-05-20 | 43 | Site Activity Status Update Received |
![]() |
VAPOR SAMPLING COMPLETED; ALSO RESPONSE TO DNR SIWP DENIAL LTR | |
2021-04-06 | 130 | DNR Regulatory Reminder Sent |
![]() |
VAPOR INTRUSION AND TCE REMINDER LETTER | |
2021-03-16 | 81 | Site Investigation Workplan (SIWP) Not Approved |
![]() |
WORK PLAN NOT APPROVED - ADD'L SOIL AND GW SI NEEDED; 1 MORE VAPOR RD OKAY | |
2021-02-17 | 99 | Miscellaneous |
![]() |
STATUS OF PASSIVE VENTING SYSTEM PROVIDED-PORTS SEALED. | |
2021-01-06 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2020 - 12/31/2020 | |
2020-12-28 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
ADDITIONAL SOIL & GW INVESTIGATION ACTIVITIES PROPOSED. VPLE SITE, FEE PAID AT HOURLY RATE. | |
2020-12-17 | 99 | Miscellaneous | WORK PLAN IN CLIENT REVIEW-WILL SUBMIT SOON | ||
2020-12-02 | 99 | Miscellaneous |
![]() |
WORK PLAN DELAYED - EXPECT TO BE SUBMITTED NEXT WEEK | |
2020-10-27 | 99 | Miscellaneous | PHONE CALL STATUS-PROJECT DELAY, SIGMA REQT 1 MONTH EXTENSION FOR WKPN-APPROVED-IN BY 12/2/2020 | ||
2020-09-02 | 81 | Site Investigation Workplan (SIWP) Not Approved |
![]() |
ADD'L SI OF EMERGING CONTAMINANTS NEEDED, EVALUATE MWS FOR PVOC AND VOC PLUMES, VAPOR SMPL IN WINTER | |
2020-08-17 | 130 | DNR Regulatory Reminder Sent |
![]() |
EMERGING CONTAMINANTS REMINDER LETTER | |
2020-08-10 | 99 | Miscellaneous |
![]() |
ADD'L FIGURES PROVIDED FOR REVIEW OF THE 7/7/2020 STATUS REPORT | |
2020-07-15 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2020 - 6/30/2020 | |
2020-07-07 | 43 | Site Activity Status Update Received |
![]() |
POST-REMEDIATION SOIL, GW AND VAPOR SAMPLING RESULTS | |
2020-04-07 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED FOR ADDITIONAL FOOTAGE: $329.41 | |
2020-04-06 | 504 | PECFA Cost Request Received |
![]() |
PECFA COST REQUEST FOR ADDITIONAL FOOTAGE NEEDED: $329.41 ADDED TO 10/4/19 SOW | |
2020-01-23 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA REMINDER LETTER | |
2020-01-07 | 505 | PECFA Cost Request Approved |
![]() |
APPROVED REVISED COSTS FOR MW DRILLING ACTIVITIES: $878.04 FOR SOW APPROVED 10/4/19 | |
2020-01-04 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2019 - 12/31/2019 | |
2019-12-23 | 504 | PECFA Cost Request Received |
![]() |
PECFA COSTS REQUESTED FOR REVISED ACTIVITIES DURING MW DRILLING | |
2019-12-12 | 504 | PECFA Cost Request Received |
![]() |
PECFA COSTS REQUESTED FOR ADDITIONAL SOIL DRUM AND DISPOSAL: $168.17 | |
2019-12-12 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED AS REQUESTED: $168.17 | |
2019-11-07 | 99 | Miscellaneous |
![]() |
EMAILED CONSULTANT THE LIST OF PECFA-ELIGIBLE MWS FOR INSTALLATION & MWS FOR GW MONITORING | |
2019-10-21 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED FOR CLOSURE COSTS INCLUDED IN THE 9/12/19 DOC: $5,363.58 | |
2019-10-21 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED FOR VAPOR SI COSTS INCLUDED IN THE 9/12/19 DOC: $7,676.05 | |
2019-10-15 | 27 | Long Term Monitoring Plan Approved |
![]() |
GW MONITORING PLAN ACCEPTABLE WITH FEW REVISIONS. PFAS SAMPLING OF ALL MEDIA NEEDED TO COMPLETE SI | |
2019-10-15 | 99 | Miscellaneous | PFAS IN GW - NEED DEGREE & EXTENT OF PFAS IN ALL MEDIA | ||
2019-10-04 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED FOR GW SI & MONITORING-2ND REQUEST INCLUDED IN THE 9/12/19 DOC: $24,706.62 | |
2019-10-02 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED FOR A VAPOR BARRIER SYSTEM: $47,492.00 | |
2019-10-02 | 99 | Miscellaneous |
![]() |
DNR REVIEW POINTS FOR 9-12-19 PECFA COST RQT FROM SIGMA FOR 10-2-19 MTG DISCUSSION | |
2019-09-12 | 504 | PECFA Cost Request Received |
![]() |
REQUESTING COSTS GOING FORWARD & RECONSIDERATION OF COSTS PREVIOUSLY DETERMINED NOT PECFA ELIGIBLE | |
2019-08-07 | 25 | Long Term Monitoring Plan Received (fee) |
![]() |
VPLE: POST-REMEDIAL GW MONITORING PLAN. FEE TO BE PAID AT HOURLY RATE. | |
2019-07-25 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA REMINDER LETTER | |
2019-07-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2019 - 6/30/2019 | |
2019-07-02 | 120 | PFAS Sampling Completed - Actionable Levels Detected |
![]() |
REC'D EMERGING CONTAMINANTS ASSESSMENT | |
2019-06-04 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
SOIL EXCAVATION DOCUMENTATION REPORT - 8 EXCAVATIONS, OVER 2,600 TONS TO LANDFILL | |
2019-05-10 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED: $3,165.52, FOR ADDITIONAL TONNAGE REMOVED DUE TO WET SOIL | |
2019-05-09 | 504 | PECFA Cost Request Received |
![]() |
PHONE CALL REQUEST ON THE 9TH FOLLOWED UP WITH EMAIL REQUEST ON THE 10TH | |
2019-04-29 | 857 | Materials Management Plan Approved |
![]() |
ON-SITE SOIL MANAGEMENT PLAN APPROVED | |
2019-04-29 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | |||
2019-04-29 | 228 | Continuing Obligation - Site Specific Condition | FUTURE SOLID WASTE MANAGEMENT | ||
2019-04-29 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2019-04-29 | 56 | Continuing Obligation(s) Applied | |||
2019-04-16 | 99 | Miscellaneous |
![]() |
FINAL CUT-FILL MAP C102 RECEIVED | |
2019-04-03 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | REC'D CK# 75952, $300. | ||
2019-04-01 | 99 | Miscellaneous |
![]() |
REVISED MATERIALS MANAGEMENT PLAN RECEIVED | |
2019-04-01 | 199 | Additional Information Received (Fee-Based or Closure) | |||
2019-03-28 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED FOR REMEDIAL EXCAVATIONS WITH PETROLEUM CONTAMINATION: $58,070.12 | |
2019-03-26 | 140 | Site Investigation Report (SIR) Not Approved |
![]() |
SI NOT COMPLETE - PFAS AND 1,4-DIOXANE SAMPLING REQUIRED, SUBMIT WORK PLAN | |
2019-03-26 | 504 | PECFA Cost Request Received |
![]() |
PECFA FUNDING REQUESTED FOR SOIL EXCAVATIONS | |
2019-03-26 | 40 | Remedial Action Options Report (RAOR) Approved |
![]() |
REMEDIAL APPROACH-HOT SPOT EXCAVATIONS & GW MON ACCEPTABLE. SI SOW TO BE DONE. | |
2019-03-26 | 116 | PFAS Sampling Required | PFAS SAMPLING WORKPLAN REQUESTED IN SIR RESPONSE LETTER (AC 140) | ||
2019-03-18 | 99 | Miscellaneous |
![]() |
REVISED NR 718 DOCUMENT. MMP FOR WASTE PROGRAM. MATERIAL TO BE MOVED OFF-PROPERTY. | |
2019-03-13 | 198 | Request for Additional Information (Fee-Based or Closure) | DISCUSSED WITH SIGMA BY PHONE: CANNOT CONSIDER SOIL EXEMPT DUE TO BORING DISTANCES, NEED REVISIONS | ||
2019-03-07 | 504 | PECFA Cost Request Received |
![]() |
PECFA FUNDING REQUEST FOR REMEDIAL EXCAVATIONS | |
2019-03-06 | 98 | Technical Assistance Provided |
![]() |
DNR CONCURRENCE ON CHLORINATED CONTAMINATION HAZ WASTE DETERMINATION | |
2019-02-13 | 854 | Materials Management Plan Request Recvd with Fee |
![]() |
MATERIAL TO BE MANAGED ON-PROPERTY. FEE TO BE PAID AT HOURLY RATE (VPLE) | |
2019-02-08 | 97 | Technical Assistance Request Received (fee) |
![]() |
HAZARDOUS WASTE DETERMINATION FOR DISPOSAL OF HOT-SPOT SOIL. | |
2019-02-01 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
REC'D SIR & REMEDIAL ACTION PLAN | |
2019-02-01 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) | REC'D SIR AND REMEDIAL ACTION PLAN | ||
2019-02-01 | 114 | PFAS Scoping Statement Received | PFAS SCOPING STATEMENT RECEIVED IN 02/01/2019 SIR (AC 37) | ||
2019-01-28 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2018 - 12/31/2018 | |
2019-01-23 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA REMINDER LETTER | |
2019-01-16 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED: $4,312.87 | |
2019-01-15 | 507 | PECFA Cost Request Additional Information Requested | TELEPHONE RQST TO SIGMA-ADD SOIL SAMPLING E-SE OF ASTS, AS RECOMMENDED IN 12/19/18 DNR LTR | ||
2019-01-15 | 504 | PECFA Cost Request Received |
![]() |
REVISIONS TO 1/2/19 RQT RECEIVED | |
2019-01-02 | 504 | PECFA Cost Request Received |
![]() |
COST REQUEST FOR ADDITIONAL SI ACTIVITIES FOR PECFA ELIGIBLE PORTION OF THE RELEASE | |
2018-12-19 | 81 | Site Investigation Workplan (SIWP) Not Approved |
![]() |
REQUESTING REVISED WORK PLAN ITEMS | |
2018-12-19 | 82 | Remedial Action Options Report (RAOR) Not Approved |
![]() |
CONCEPTUAL RAP NOT APPROVED-UNINVESTIGATED SOURCE AREAS MUST BE CONSIDERED SEE 12/19/18 LTR | |
2018-09-18 | 99 | Miscellaneous |
![]() |
DNR NOTIFICATION TO USEPA FOR PCBS DETECTED AT THIS SITE | |
2018-09-18 | 99 | Miscellaneous |
![]() |
PCB NOTIFICATION FORM SENT TO USEPA | |
2018-08-28 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED: $3,766.33 FOR ADDITIONAL SOIL SI | |
2018-08-13 | 504 | PECFA Cost Request Received |
![]() |
PECFA COST REQUEST FOR ADDITIONAL SI ACTIVITIES | |
2018-08-07 | 28 | Phase I Environmental Site Assessment (ESA) Rpt Received |
![]() |
||
2018-08-07 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) | REC'D SUMMARY OF SI, WORK PLAN FOR ADD'L SI & CONCEPTUAL RAP RPT | ||
2018-08-07 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
REC'D SUMMARY OF SI, WORK PLAN FOR ADD'L SI & CONCEPTUAL RAP RPT | |
2018-07-26 | 99 | Miscellaneous |
![]() |
ARTIFICIAL WETLAND DETERMINATION - EXEMPT FROM STATE WETLAND PERMIT REQUIREMENTS | |
2018-07-24 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPROVED TO COMPLETE SI: $11,104.79 | |
2018-07-16 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA REMINDER LETTER | |
2018-07-12 | 504 | PECFA Cost Request Received |
![]() |
PECFA COST REQUEST FOR GW MONITORING | |
2018-01-16 | 130 | DNR Regulatory Reminder Sent | PECFA REMINDER LETTER | ||
2017-12-13 | 99 | Miscellaneous | REC'D EMAIL FROM MORTGAGE HOLDER: UNDER CONTRACT TO SELL NOTE AND MORTGAGE TO BUYER. | ||
2015-12-02 | 200 | Push Action Taken | SENT REQUEST FOR SITE UPDATE LETTER | ||
2015-08-24 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA SUNSET LETTER | |
2014-05-01 | 99 | Miscellaneous | STATUS INQUIRY TO CONSULTANT | ||
2013-07-16 | 99 | Miscellaneous | PECFA TRANSFER NOTIFICATION LETTER SENT | ||
2013-07-02 | 89 | DSPS (formerly Commerce) Transferred Back to DNR | PECFA PROGRAM TRANSFER 2013-2015 STATE BUDGET | ||
2011-05-03 | 76 | Activity Transferred to DSPS (formerly Commerce) | |||
2000-08-25 | 43 | Site Activity Status Update Received | |||
2000-07-17 | 43 | Site Activity Status Update Received | |||
1996-03-01 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) | |||
1995-07-24 | 2 | Responsible Party (RP) letter sent |
![]() |
||
1995-07-10 | 1 | Notification of Hazardous Substance Discharge |
Type | Related Activity |
---|---|
ERP to VPLE (On Property) | 06-41-582006 FORMER BIOGENESIS |
Substance | Type | Amt Released | Units |
---|---|---|---|
Arsenic | Metals | ||
Chlorinated Solvents | VOC | ||
Fuel Oil | Petroleum | ||
Gasoline - Unleaded and Leaded | Petroleum | ||
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120) | Industrial Chem | ||
Petroleum - Unknown Type | Petroleum | ||
Polychlorinated Biphenyl | PCB | ||
Tetrachloroethene (Perchloroethylene) | VOC | ||
Trichloroethylene | Industrial Chem |
PECFA Site Name: | Bioversal USA Inc |
Max. Reimbursement: | $1,000,000 | Total Amount Paid: | $348,415.39 |
Occ No | Claim No | Audit Date | Paid Date | Amt Submitted | Amt Ineligible | Amt Paid |
C | 1 | 1998-02-23 | 2000-03-27 | $182,795.97 | $44,698.24 | $138,097.73 |
C | 1 | 1998-02-23 | 2000-10-03 | $.00 | $153.68 | -$153.68 |
C | 1 | 1998-02-23 | 2000-08-23 | $.00 | $.00 | $59,137.38 |
C | 2 | 2018-10-15 | 2018-10-25 | $11,080.32 | $.00 | $10,858.71 |
C | 3 | 2019-04-11 | 2019-04-30 | $7,813.30 | $72.45 | $7,586.03 |
C | 4 | 2019-09-30 | 2019-10-16 | $60,314.87 | $.00 | $59,108.57 |
C | 5 | 2020-04-29 | 2020-07-30 | $63,836.91 | $.00 | $62,560.17 |
C | 6 | 2020-06-30 | 2020-10-02 | $11,449.47 | $.00 | $11,220.48 |
OAK CREEK RAWSON INDUSTRIAL LLC 100 S WACKER DR STE 950, CHICAGO, IL 60606 |
LINDA MICHALETS linda.michalets@wisconsin.gov |