02-20-118383 QUICFREZ - LGU SL
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
WI DNR (FORMER QUIC FREZ) FOND DU LAC NORTHEAST
Address Municipality
105 OAK PLACE FOND DU LAC
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SE 1/4 of the NW 1/4 of Sec 15, T15N, R17E 43.7723719 -88.4518545 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
998314900 WIN000508296 1997-02-13
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  Sediments Flag
Actions and Documents
Date Code Name File Comment
2024-01-17 366 VAL and/or VRSL Exceeded at Off-Site Property or ROW
2021-09-03 315 Superfund Site Assessment Transmittal Memos
2021-06-21 317 Superfund Site Assessment Site Reassessment (SR) Download PDF file
2021-06-21 317 Superfund Site Assessment Site Reassessment (SR) SR REPORT ATTACHMENT
2021-04-07 99 Miscellaneous Download PDF file MEMO TO FILE REGARDING DENIAL OF ACCESS FOR VI INVESTIGATION
2020-12-01 316 Superfund Site Assessment DNR Planning Documentation SR SAMPLING PLAN
2020-12-01 316 Superfund Site Assessment DNR Planning Documentation HEALTH & SAFETY PLAN
2020-04-17 43 Site Activity Status Update Received Download PDF file GROUNDWATER SAMPLING RESULTS
2020-03-25 99 Miscellaneous Download PDF file NOTIFICATION OF RESULTS
2020-03-17 43 Site Activity Status Update Received Download PDF file SANITRAY & SUB-SLAB VAPOR RESULTS
2020-01-14 39 Remedial Action Options Report (RAOR) Received (non-fee) Download PDF file REPLACES RAOR FROM 11/2019
2020-01-14 43 Site Activity Status Update Received SIGNED ACCESS AGREEMENTS FOR CITY, COUNTY & PRIVATE PROPERTY
2019-12-11 99 Miscellaneous Download PDF file REQUEST FOR ACCESS
2019-11-21 99 Miscellaneous PEER REVIEW MEMO REGARDING THE RAOR
2019-11-01 39 Remedial Action Options Report (RAOR) Received (non-fee) Download PDF file DRAFT
2019-10-16 99 Miscellaneous Download PDF file INFORMATION REGARDING POSSIBLE SOURCE OF DEHP IN GROUNDWATER
2018-09-20 43 Site Activity Status Update Received Download PDF file GW MONITORING RESULTS
2018-05-23 99 Miscellaneous PROPERTY STILL OWNED BY CITY OF FDL
2017-06-12 99 Miscellaneous PROPERTY STILL OWNED BY THE CITY OF FOND DU LAC
2016-06-08 43 Site Activity Status Update Received COST ESTIMATE FROM OMNNI FOR RESTORING SITE TO ITS ORIGINAL CONDITION PRE-REMEDIATION (VIA EMAIL)
2015-06-15 99 Miscellaneous NEW WDNR PM - LAURIDSEN (VIA EMAIL)
2015-05-18 43 Site Activity Status Update Received Download PDF file GW MONITORING STATUS REPORT #20
2015-01-06 43 Site Activity Status Update Received QTLY STATUS REPORT #19
2014-10-09 43 Site Activity Status Update Received QTLY STATUS REPORT & GW RESULTS
2014-10-09 43 Site Activity Status Update Received STATUS REPORT #18
2014-07-02 43 Site Activity Status Update Received STATUS REPORT #17
2014-05-05 43 Site Activity Status Update Received GROUNDWATER MONITORING STATUS REPORT - 16 OF 20 SAMPLES WERE DESTROYED IN SHIPPING
2014-01-06 43 Site Activity Status Update Received STATUS REPORT #15 - NOV 2013 GW MONITORING RESULTS
2013-11-01 43 Site Activity Status Update Received REVISIONS TO QUARTERLY GROUNDATER REPORT #14
2013-10-14 43 Site Activity Status Update Received QUARTERLY GROUNDATER REPORT #14
2013-07-11 43 Site Activity Status Update Received QTLY GW MONITORING REPORT #13
2013-03-26 43 Site Activity Status Update Received QUARTERLY GROUNDATER REPORT #12
2013-03-25 43 Site Activity Status Update Received FINAL ROUND OF STATE CONTRACT FOR GROUNDWATER MONITORING
2013-01-07 43 Site Activity Status Update Received QUARTERLY GROUNDATER REPORT #11
2012-10-10 43 Site Activity Status Update Received GROUNDWATER RESULTS FOR AUGUST 2012 SAMPLING EVENT
2012-07-25 43 Site Activity Status Update Received GROUNDWTER MONITORING REPORT #9 RECEIVED
2012-06-11 43 Site Activity Status Update Received INVOICE 3 - 1 RECEIVED AND SENT TO RR/5
2012-03-28 43 Site Activity Status Update Received GW MONITORING REPORT #8
2012-02-16 43 Site Activity Status Update Received INVOICE 2-6 APPROVED
2012-01-17 43 Site Activity Status Update Received QUARTERLY STATUS REPORT #7, GROUNDWATER RESULTS FOR NOVEMBER 2011
2011-10-24 43 Site Activity Status Update Received QUARTERLY GROUNDWATER REPORT #6 RECEIVED
2011-10-05 99 Miscellaneous INVOICE 2-3 RECEIVED
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-07-28 317 Superfund Site Assessment Site Reassessment (SR) SITE REASSESSMENT
2011-07-13 315 Superfund Site Assessment Transmittal Memos
2011-07-07 43 Site Activity Status Update Received QTLY GW RESULTS & PROJECT STATUS
2011-04-27 43 Site Activity Status Update Received INVOICE #8 RECEIVED
2011-04-07 43 Site Activity Status Update Received QUARTERLY STATUS REPORT #4, GROUNDWATER MONITORING
2011-02-23 43 Site Activity Status Update Received INVOICE #6 RECEIVED
2011-01-26 99 Miscellaneous 2010 ANNUAL HW REPORT FILED ON-LINE
2011-01-13 43 Site Activity Status Update Received QTLY STATUS REPORT #3
2010-10-06 43 Site Activity Status Update Received QUARTERLY STATUS REPORT #2
2010-09-20 43 Site Activity Status Update Received PAY REQUEST #3 RECEIVED
2010-07-06 43 Site Activity Status Update Received PAY REQUEST #1 RECEIVED
2010-06-29 43 Site Activity Status Update Received STATUS REPORT #1 - BT2
2010-03-02 92 Operation & Maintenance (O&M) Report Received (non-fee) FINAL O&M REPORT AND REMEDIAL ACTION REPORT
2010-03-02 41 Remedial Action Report Received
2010-03-02 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file FINAL O&M REPORT AND REMEDIAL ACTION REPORT
2009-12-15 43 Site Activity Status Update Received WPDES FINAL REPORT #11
2009-09-15 43 Site Activity Status Update Received 2008 REMEDIATION STATUS REPORT
2009-09-03 99 Miscellaneous VAPOR SAMPLING RESULTS NOTIFICATION
2009-08-04 43 Site Activity Status Update Received HAZARDOUS WASTE CERTIFICATION
2009-07-29 43 Site Activity Status Update Received ABANDONMENT FORMS
2009-03-11 43 Site Activity Status Update Received WPDES REPORT #10
2008-12-18 43 Site Activity Status Update Received WPDES PERMIT REPORT #9
2008-12-02 99 Miscellaneous DISTURBANCE OF SOIL CAP
2008-10-03 43 Site Activity Status Update Received N ANODE REPAIR SUMMARY MEMO
2008-10-02 43 Site Activity Status Update Received CHANGE ORDER #5 (FLOOD EVAL AND N ANODE REPAIR)
2008-10-02 43 Site Activity Status Update Received WPDES REPORT #7
2008-10-02 43 Site Activity Status Update Received WPDES REPORT #8
2008-06-23 43 Site Activity Status Update Received SECOND SOIL PROGRESS SAMPLING PLAN
2008-04-24 43 Site Activity Status Update Received INVOICE DISPUTE RESOLUTION LETTER
2008-03-20 92 Operation & Maintenance (O&M) Report Received (non-fee) O&M STATUS REPORT #5
2008-03-05 92 Operation & Maintenance (O&M) Report Received (non-fee) O&M STATUS REPORT #3
2008-03-05 43 Site Activity Status Update Received WPDES REPORT #6
2007-12-26 43 Site Activity Status Update Received ANODE REPAIR: LASAGNA SYSTEM
2007-12-18 43 Site Activity Status Update Received WPDES REPORT #5
2007-12-18 99 Miscellaneous INVOICE DISPUTE LETTER SENT (FOR INVOICES #9 & #10)
2007-12-13 92 Operation & Maintenance (O&M) Report Received (non-fee) O&M STATUS REPORT #4
2007-12-13 43 Site Activity Status Update Received CONSTRUCTION DOCUMENTATION REPORT: GREENSPACE COVER
2007-11-28 43 Site Activity Status Update Received ANODE REPAIR: LASAGNA SYSTEM
2007-11-16 99 Miscellaneous HAZARDOUS WASTE REPORTING
2007-11-14 99 Miscellaneous TERMINATION OF WPDES PERMIT
2007-11-02 43 Site Activity Status Update Received YEAR 2 MONITORING PLAN
2007-11-01 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file
2007-11-01 153 Remedial Action (RA) Documentation Report Approved
2007-09-12 43 Site Activity Status Update Received REMEDIATION STATUS REPORT #2
2007-09-06 43 Site Activity Status Update Received WPDES REPORT #4
2007-07-18 43 Site Activity Status Update Received WPDES REPORT #3
2007-07-16 43 Site Activity Status Update Received BOREHOLE ABANDONMENT FORMS
2007-07-12 43 Site Activity Status Update Received CPM REPORT
2007-07-10 53 Deed Affidavit for Contamination (NR 728) Recorded RECORDED BY THE CITY OF FOND DU LAC
2007-06-06 92 Operation & Maintenance (O&M) Report Received (non-fee) STATUS REPORT #1
2007-03-22 43 Site Activity Status Update Received WPDES REPORT #2
2007-03-21 211 Operation & Maintenance Start - State Lead
2007-02-21 43 Site Activity Status Update Received LASAGNA CONSTRUCTION REPORT
2007-02-15 43 Site Activity Status Update Received GREENSPACE COVER SPECIFICATIONS
2007-01-22 97 Technical Assistance Request Received (fee) REDEVELOPMENT QUESTION
2007-01-22 98 Technical Assistance Provided Download PDF file
2007-01-15 210 Remedial Construction End - State Lead
2007-01-08 43 Site Activity Status Update Received FIRST WPDES REPORT
2007-01-08 210 Remedial Construction End - State Lead
2006-12-07 43 Site Activity Status Update Received REVISED MONITORING PLAN
2006-11-08 210 Remedial Construction End - State Lead LASAGNA SYSTEM TURNED ON
2006-11-08 43 Site Activity Status Update Received OPERATIONS MANUAL
2006-11-08 43 Site Activity Status Update Received LASAGNA OPERATIONS MANUAL
2006-09-22 43 Site Activity Status Update Received WELL ABANDONMENT FORMS
2006-09-12 211 Operation & Maintenance Start - State Lead O&M CONTRACT STARTED
2006-07-21 43 Site Activity Status Update Received CONSTRUCTION BULLETIN #2, CALCULATIONS AND SURVEY NOTES
2006-06-30 43 Site Activity Status Update Received ELECTRICAL INSPECTOR CORRESPONDENCE
2006-06-27 43 Site Activity Status Update Received TERRAN HEALTH AND SAFETY PLAN
2006-06-27 43 Site Activity Status Update Received LASAGNA DESIGN REPORT
2006-05-30 43 Site Activity Status Update Received GRADING PLAN
2006-05-30 99 Miscellaneous START OF CONSTRUCTION NOTICE
2006-05-13 43 Site Activity Status Update Received CONCRETE DISPOSAL TICKETS
2006-05-12 43 Site Activity Status Update Received PRE-CONSTRUCTION MEETING MINUTES
2006-05-04 99 Miscellaneous POOR PERFORMANCE LETTER TO NORTHSTAR
2006-04-13 209 Remedial Construction Start - State Lead TERRAN CONSTRUCTION CONTRACT BEGINS
2006-04-13 209 Remedial Construction Start - State Lead
2006-03-29 99 Miscellaneous BROWNFIELDS GRANT LETTER
2006-03-03 99 Miscellaneous STORM WATER PERMIT
2006-01-26 99 Miscellaneous APPROVED EXTENSION
2005-12-14 43 Site Activity Status Update Received AIR MONITORING PLAN
2005-12-09 43 Site Activity Status Update Received HEALTH AND SAFETY PLAN
2005-11-30 43 Site Activity Status Update Received FINAL SITE HEALTH AND SAFETY PLAN
2005-11-08 209 Remedial Construction Start - State Lead
2005-11-07 99 Miscellaneous PRE-CONSTRUCTION MEETING
2005-10-27 99 Miscellaneous WPDES STORM WATER PERMIT
2005-10-20 43 Site Activity Status Update Received STORM WATER PERMIT APPLICATION
2005-10-10 208 Remedial Design End - State Lead
2005-10-03 147 Remedial Action (RA) Design Report Received (non-fee) DESIGN REPORT REC'D
2005-10-03 149 Remedial Action (RA) Design Report Approved
2005-10-03 208 Remedial Design End - State Lead
2005-08-01 43 Site Activity Status Update Received DESIGN REPORT AND SPECIFICATIONS AND SITE HEALTH AND SAFETY PLAN
2005-06-07 43 Site Activity Status Update Received DRAFT DESIGN REPORT
2005-06-07 43 Site Activity Status Update Received DRAFT SITE HEALTH AND SAFETY PLAN
2005-06-07 99 Miscellaneous FOLLOW UP LETTER
2005-05-12 99 Miscellaneous MANUAL CODE APPROVAL
2005-05-06 99 Miscellaneous FLOOD ANALYSIS APPROVAL
2005-05-03 99 Miscellaneous 116 (H&H) APPROVAL
2005-03-30 99 Miscellaneous WPDES PERMIT
2005-03-10 99 Miscellaneous INJECTION PERMIT
2005-03-09 43 Site Activity Status Update Received EROSION CONTROL AND STORM WATER MANAGEMENT PLAN
2005-02-18 43 Site Activity Status Update Received WATER PERMIT APPLICATION
2005-02-11 43 Site Activity Status Update Received WPDES PERMIT APPLICATION
2005-02-11 43 Site Activity Status Update Received NON-CONTACT COOLING WATER PERMIT APPLICATION
2005-01-20 99 Miscellaneous REMEDIAL DESIGN CHANGE ORDER #1
2004-12-01 207 Remedial Design Start - State Lead REMEDIAL DESIGN CONTRACT
2004-10-28 43 Site Activity Status Update Received GROUNDWATER DRUM DISPOSAL
2004-09-30 99 Miscellaneous APROVAL FOR REMEDIAL ACTION
2004-08-31 207 Remedial Design Start - State Lead RD PROPOSAL
2004-08-20 43 Site Activity Status Update Received SOIL DISPOSAL DOCUMENTATION
2004-06-30 37 Site Investigation Report (SIR) Received (non-fee)
2004-06-30 206 Site Investigation End - State Lead
2004-06-22 43 Site Activity Status Update Received DRUM DISPOSAL CONTRACT
2004-04-22 37 Site Investigation Report (SIR) Received (non-fee) DRAFT
2004-04-07 43 Site Activity Status Update Received ANALYTICAL DATA
2004-03-22 43 Site Activity Status Update Received UPDATED SITE PLAN, ANALYTICAL DATA, AND DRUM INVENTORY
2004-03-22 99 Miscellaneous SEDIMENT DETERMINATION
2004-03-17 99 Miscellaneous CHAPTER 30 PERMIT
2004-03-10 43 Site Activity Status Update Received FIELD LOGS AND GROUNDWATER ANALYTICAL DATA
2004-02-23 43 Site Activity Status Update Received BORING LOGS
2004-02-10 99 Miscellaneous INVOICE # 1 FOR ADDL' SI
2004-02-06 99 Miscellaneous PUBLIC NOTICE REQUIRED
2004-02-04 43 Site Activity Status Update Received SIGNED ACCESS AGREEMENT
2004-02-04 43 Site Activity Status Update Received ANALYTICAL DATA
2004-02-03 99 Miscellaneous REQUEST FOR PERMISSION TO ACCESS
2004-01-30 43 Site Activity Status Update Received USACE CONFIRMATION LETTER
2004-01-30 43 Site Activity Status Update Received ANALYTICAL DATA
2004-01-22 43 Site Activity Status Update Received WELL ABANDONMENT FORM, PROCEDURES
2004-01-22 43 Site Activity Status Update Received CERTIFICATION OF BIO-REMEDIATION; HICKORY MEADOWS
2004-01-14 611 Local Government Unit (LGU) Liability Exemption Applies
2003-12-18 205 Site Investigation Start - State Lead SI STATE LEAD CONTRACT
2003-12-03 350 Superfund Site Assessment Preliminary Assessment (PA) Download PDF file
2003-12-03 354 Superfund Site Assessment Other Cleanup Authority (OCA) FROM SUPERFUND DATABASE
2003-11-12 43 Site Activity Status Update Received ANALYTICAL DATA
2003-08-07 99 Miscellaneous REMEDIAL ACTION POSTPONED
2003-07-25 37 Site Investigation Report (SIR) Received (non-fee)
2003-07-21 99 Miscellaneous PUBLIC NOTICE INFORMATION MEETING
2003-07-11 99 Miscellaneous INCORRECT EPA # FOR HAZARDOUS WASTE
2003-05-16 99 Miscellaneous RAOR MEMO
2003-05-02 206 Site Investigation End - State Lead
2003-02-04 43 Site Activity Status Update Received TANK EXPLORATION REPORT
2002-12-16 39 Remedial Action Options Report (RAOR) Received (non-fee) RAP FOR STATE LEAD
2002-11-27 43 Site Activity Status Update Received STATE LEAD SECOND INVOICE
2002-10-29 29 Phase II Environmental Site Assessment (ESA) Rpt Received ON SE PARCEL
2002-10-25 43 Site Activity Status Update Received SECOND REIMBURSEMENT REQUEST
2002-08-09 207 Remedial Design Start - State Lead STATE LEAD CONTRACT SIGNED FOR RAOR
2002-08-06 205 Site Investigation Start - State Lead
2002-07-25 43 Site Activity Status Update Received EPA REMOVAL ACTION REPORT - FINAL
2002-07-12 43 Site Activity Status Update Received EPA ACTION MEMO
2002-05-22 356 Superfund Removal Action Taken EPA POLLUTION REPORT
2002-05-03 99 Miscellaneous FIRST SUDZ REIMBURSEMENT REQUEST
2002-05-03 43 Site Activity Status Update Received ANALYTICAL RESULTS AND BORING LOGS
2002-04-15 43 Site Activity Status Update Received EPA LETTER
2002-03-12 99 Miscellaneous DREDGE PERMIT
2002-03-12 43 Site Activity Status Update Received EPA EMERGENCY REMOVAL
2002-03-06 99 Miscellaneous REQUEST FOR EPA REMOVAL ASSISTANCE
2002-02-25 35 Site Investigation Workplan (SIWP) Received (non-fee)
2002-02-22 43 Site Activity Status Update Received GRANTS UPDATE
2002-02-04 99 Miscellaneous RIP RAP PERMIT
2002-01-25 43 Site Activity Status Update Received UPDATE ON GRANTS AND FINANCING
2002-01-03 99 Miscellaneous RIP RAP APPLICATION
2001-12-11 35 Site Investigation Workplan (SIWP) Received (non-fee) ADDITIONAL SIWP FOR RIVER BANK AREA
2001-12-04 99 Miscellaneous LETTER REGARDING SEA/RETAINING WALL FAILURE
2001-09-23 43 Site Activity Status Update Received INVITE TO DEMOLITION OF THE BUILDINGS
2001-06-07 43 Site Activity Status Update Received FDL LETTER TO DNR
2000-05-05 99 Miscellaneous LETTER FROM DCOM ON REMOVAL OF BUILDINGS
1999-11-17 99 Miscellaneous DNR/RP ON-SITE MEETING
1999-10-26 43 Site Activity Status Update Received REVISED COST ESTIMATE
1999-10-08 40 Remedial Action Options Report (RAOR) Approved
1999-10-04 143 Remedial Action Options Report (RAOR) Received (fee)
1999-10-04 37 Site Investigation Report (SIR) Received (non-fee)
1999-07-01 35 Site Investigation Workplan (SIWP) Received (non-fee)
1999-06-29 99 Miscellaneous LETTER TO FDL
1999-06-10 43 Site Activity Status Update Received
1999-06-07 43 Site Activity Status Update Received FDL OFFER OF ASSISTANCE TO RP
1999-05-26 99 Miscellaneous RESPONSE REQUESTED
1999-05-24 43 Site Activity Status Update Received FDL REQUEST FOR INFORMATION
1999-05-11 99 Miscellaneous CALL FROM FDL
1999-05-11 99 Miscellaneous REQUEST FOR STATUS UPDATE
1998-08-10 99 Miscellaneous ELIGIBILITY FOR BROWNFIELDS TAX INCENTIVE
1998-06-30 99 Miscellaneous RESPONSE REQUESTED
1998-05-12 99 Miscellaneous RESPONSE REQUESTED
1998-03-30 99 Miscellaneous RESPONSE REQUESTED
1998-01-21 99 Miscellaneous BEAP APPLICATION - NOT SELECTED
1997-10-27 43 Site Activity Status Update Received LETTER FROM FDL HS PRINCIPAL TO FLD
1997-10-23 43 Site Activity Status Update Received LETTER FROM RP TO FDL
1997-10-23 43 Site Activity Status Update Received LETTER FROM WHEDA TO FDL
1997-10-23 43 Site Activity Status Update Received MEMO FROM FDL FIRE DEPT
1997-10-22 43 Site Activity Status Update Received MEMO FROM FDL POLICE
1997-04-25 43 Site Activity Status Update Received RP HAS NOT YET HIRED A CONSULTANT
1997-02-28 2 Responsible Party (RP) letter sent
1997-02-13 1 Notification of Hazardous Substance Discharge
1996-07-05 43 Site Activity Status Update Received ADAPTIVE REUSE STUDY
1996-02-04 28 Phase I Environmental Site Assessment (ESA) Rpt Received
1996-02-04 29 Phase II Environmental Site Assessment (ESA) Rpt Received
Substances
Substance Type Amt Released Units
Trichloroethylene Industrial Chem
Volatile Organic Compounds VOC
DNR Project Manager
DAVID NESTE  david.neste@wisconsin.gov
118383 | 02-20-118383
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages