2018-06-12
|
285
|
CO Compliance Audit Complete - Vapor Only
|
|
|
|
2017-12-01
|
99
|
Miscellaneous
|
|
VAPOR MITIGATION AUDIT EXPLANATION
|
|
2016-04-05
|
99
|
Miscellaneous
|
|
BUILDING VACANT AND FOR SALE PER DNR PROJ MGR (DRIVE BY)
|
|
2013-08-29
|
185
|
Continuing Obligation(s) Compliance Audit Complete
|
|
|
|
2011-04-05
|
43
|
Site Activity Status Update Received
|
|
DOCUMENTATION OF EXCAVATION OF CONTAMINATED SOIL IN ROW IN FRONT OF SITE. ORIGINAL REPORT 2-45-56986
|
|
2010-11-18
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
ASPHALT PARKING LOT AND BUILDING
|
|
2010-11-18
|
228
|
Continuing Obligation - Site Specific Condition
|
|
OPERATE DRAIN TILE & SUMP SYSTEM; OWNER SHOULD MAINTAIN WW DISCHARGE PERMIT W/CITY UNTIL NO VOCS
|
|
2010-11-18
|
236
|
Continuing Obligation - Residual GW Contamination
|
|
|
|
2010-11-18
|
56
|
Continuing Obligation(s) Applied
|
|
CAP, VAPOR MITIGATION, SITE SPECIFIC, SOIL & GROUNDWATER
|
|
2010-11-18
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2010-11-18
|
11
|
Activity Closed
|
|
OFF-SITE IMPACTS AT 1303 E AMELIA & 1322 E WISCONSIN AVE
|
|
2010-11-18
|
226
|
Continuing Obligation - Vapor Intrusion Response
|
|
VAPOR MITIGATION SYSTEM REQUIRED; VAPORS>VAPOR RISK SCREENING LEVELS; HYDROGEOLOGIC CONCERNS
|
|
2010-11-18
|
46
|
Impacted Right-of-Way (ROW) Notification
|
|
AUTO-POPULATED 2018-03-20
|
|
2010-11-18
|
66
|
Continuing Obligations (COs) Apply at Off-site Property(ies)
|
|
auto-populated on 08/01/2019 per activity relationship to off-site(s)
|
|
2010-11-09
|
190
|
Remaining Actions Needed Requirements Met or Docs Received
|
|
|
|
2010-10-28
|
99
|
Miscellaneous
|
|
DNR ELECTRONIC REQUEST FOR STATUS UPDATE
|
|
2010-10-28
|
43
|
Site Activity Status Update Received
|
|
REMAINING CLOSURE ITEMS WILL BE SUBMITTED AS SOON AS POSSIBLE
|
|
2010-06-18
|
84
|
Remaining Actions Needed
|
|
SUBMIT OFF-SITE DEEDS, ABANDON WELLS, UPDATE FIGURES AND TABLES, UPDATE CAP MAINTENANCE PLAN
|
|
2010-06-18
|
86
|
Activity Closed with site specific conditions.
|
|
SANITARY SEWER DISCHARGE PERMIT, DRAIN TILE & SUMP PUMP SYS, VAPOR EXTRACTION SYSTEM TO BE MAINTAIND
|
|
2010-06-15
|
99
|
Miscellaneous
|
|
CLOSURE COMMITTEE REVIEW
|
|
2010-04-30
|
179
|
Case Closure Review Request Received (non-fee)
|
|
|
|
2010-04-09
|
43
|
Site Activity Status Update Received
|
|
ROW LETTER TO CITY OF APPLETON FOR WISCONSIN AVE AND OWAISSA ST
|
|
2010-04-06
|
43
|
Site Activity Status Update Received
|
|
REQUEST FOR CLOSURE EXPECTED BY 04/20/2010
|
|
2010-03-10
|
43
|
Site Activity Status Update Received
|
|
REQUEST FOR CLOSURE ANTICIPATED BY 3/19/2010
|
|
2010-03-04
|
99
|
Miscellaneous
|
|
DNR ELECTRONIC REQUEST FOR STATUS UPDATE
|
|
2009-06-17
|
43
|
Site Activity Status Update Received
|
|
CLOSURE DENIAL ACTIONS UNDER REVIEW BY ARC NATIONAL OFFICE
|
|
2009-06-15
|
80
|
Closure Not Recommended
|
|
SAMPLE SOIL OFF-SITE, SEND NR726 APPENDIX A LETTER, SUBMIT OFF-SITE DEEDS, UPDATE FIGURES & TABLES
|
|
2009-06-09
|
99
|
Miscellaneous
|
|
CLOSURE COMMITTEE REVIEW
|
|
2009-04-23
|
43
|
Site Activity Status Update Received
|
|
INDOOR AIR SAMPLE RESULTS FROM DHS
|
|
2009-04-14
|
79
|
Case Closure Review Request Received
|
|
SECOND CLOSURE FEE REQUIRED DUE TO NEW INFORMATION (RE VAPOR PATHWAY) SINCE 2006 REVIEW
|
|
2009-03-31
|
99
|
Miscellaneous
|
|
WASTEWATER DISCHARGE PERMIT NO. 2009-02 TO CITY OF APPLETON EFF. 04/01/2009 - 12/31/2012
|
|
2009-03-24
|
179
|
Case Closure Review Request Received (non-fee)
|
|
$750 FEE REQUESTED BY DNR 4/2/09
|
|
2009-02-02
|
43
|
Site Activity Status Update Received
|
|
INVESTIGATION SUMMARY & PLANS FOR CLOSURE
|
|
2008-11-24
|
43
|
Site Activity Status Update Received
|
|
WRITTEN UPDATE WILL BE SUBMITTED BY 12/8/08
|
|
2008-11-14
|
43
|
Site Activity Status Update Received
|
|
PRE AND POST MITIGATION AIR SAMPLES FROM DHS, 1/08, 5/08 & 8/08
|
|
2008-11-11
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUEST LETTER SENT
|
|
2008-04-09
|
43
|
Site Activity Status Update Received
|
|
RADON MITIGATION INSTALL SCHEDULED FOR 04/30/08; DHFS AIR SAMPLING SCHEDULED FOR 05/07/08
|
|
2008-03-20
|
43
|
Site Activity Status Update Received
|
|
RADON MITIGATION BID FOR ADDRESSING VAPOR INTRUSION
|
|
2008-02-21
|
43
|
Site Activity Status Update Received
|
|
DHFS LETTER TO ARC WITH JANUARY 24, 2008 AIR SAMPLE RESULTS
|
|
2008-01-24
|
43
|
Site Activity Status Update Received
|
|
DHFS COLLECTS SUMP AIR SAMPLES
|
|
2007-08-02
|
43
|
Site Activity Status Update Received
|
|
OCTOBER 2006 AND APRIL 2007 GROUNDWATER DATA
|
|
2007-07-20
|
3
|
Notice of Noncompliance (NON) Issued
|
|
|
|
2006-10-06
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL SAMPLING BEGINS WEEK OF 10/09/06
|
|
2006-08-02
|
80
|
Closure Not Recommended
|
|
INVESTIGATE VAPOR PATHWAY, LEAD IN SOURCE AREA AND MONITOR TO SHOW STABLE/REDUCING TREND
|
|
2006-06-12
|
79
|
Case Closure Review Request Received
|
|
ORIGINAL CHECK RECEIVED 02/07/2006 - CLOSURE PACKET RECEIVED 06/12/2006
|
|
2006-06-12
|
700
|
Database Fee Paid for Groundwater Continuing Obligation(s)
|
|
|
|
2006-06-12
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2006-02-07
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SITE INVESTIGATION, GROUNDWATER MONITORING & SITE CLOSURE REPORT
|
|
2005-06-06
|
43
|
Site Activity Status Update Received
|
|
CLOSURE REQUEST COMING 8/05
|
|
2005-05-27
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUEST LETTER SENT
|
|
2004-11-16
|
43
|
Site Activity Status Update Received
|
|
CLOSURE REQUEST COMING IN 4-6 WEEKS
|
|
2004-05-13
|
99
|
Miscellaneous
|
|
FORMER DRY CLEANER OPERATOR WILL NOT SIGN DERP FORMS
|
|
2004-04-07
|
99
|
Miscellaneous
|
|
ARC & FORMER OPERATOR APPLYING FOR DERP
|
|
2004-01-15
|
43
|
Site Activity Status Update Received
|
|
SEPT. 2003 DATA & ARC LOOKING INTO DERP
|
|
2003-04-29
|
43
|
Site Activity Status Update Received
|
|
MARCH 2003 GW DATA
|
|
2003-02-18
|
43
|
Site Activity Status Update Received
|
|
JAN 2003 GW RESULTS
|
|
2002-11-20
|
43
|
Site Activity Status Update Received
|
|
SEPTEMBER 2002 GW RESULTS
|
|
2002-05-30
|
43
|
Site Activity Status Update Received
|
|
NEW WELLS INSTALLED AND SAMPLED
|
|
2002-05-29
|
99
|
Miscellaneous
|
|
WDNR REQUEST FOR STATUS UPDATE
|
|
2002-04-15
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
TEMP WELL RESULTS & PROPOSED WELL LOCATIONS
|
|
2002-04-15
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
INVESTIGATE UTILITIES & MONITOR QUARTERLY
|
|
2001-12-27
|
99
|
Miscellaneous
|
|
OFF-SITE EXEMPTION LETTER ISSUED 07-45-285228
|
|
2001-11-15
|
99
|
Miscellaneous
|
|
DEPARTMENT RESPONSE
|
|
2001-11-14
|
99
|
Miscellaneous
|
|
REQUEST FOR FINANCIAL ASSISTANCE
|
|
2001-10-19
|
43
|
Site Activity Status Update Received
|
|
GW UPDATE
|
|
2000-12-17
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
|
|
2000-02-11
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
|
|
1999-03-04
|
43
|
Site Activity Status Update Received
|
|
|
|
1998-07-20
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
|
1998-07-20
|
2
|
Responsible Party (RP) letter sent
|
|
|