ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on
the Web
ACTIVITY DETAILS
*** CONTINUING
OBLIGATIONS APPLY ***
Continuing obligations apply to
one or more properties due to remaining contamination. For
information specific to the continuing obligations, review the
documentation below. Before constructing or reconstructing a
water supply well, you need to contact DNR for approval of
well construction specifications.
|
02-05-210423
MODERN CLEANERS
|
Activity Type / Status |
Jurisdiction |
ERP
/
CLOSED
|
DNR RR |
Address |
Municipality |
119 S ST AUGUSTINE ST |
PULASKI |
PLSS Description |
Latitude (WGS84) |
Longitude (WGS84) |
Google Maps |
RR Sites Map |
NE 1/4 of the NE 1/4 of Sec 01, T25N, R18E
|
44.6718374 |
-88.2425451 |
|
|
Additional Activity Details |
Acres |
|
UNKNOWN
|
Facility ID |
PECFA No. |
EPA ID |
Start Date |
End Date |
405090510
|
|
|
1999-01-13
|
2003-02-11
|
Characteristics
Above Ground Petrol Tank
|
Drycleaner |
EPA NPL Site
|
EPA Superfund
|
PECFA Funds Eligible
|
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank
|
WI DOT Site
|
|
|
|
|
|
|
|
|
|
|
Actions and Documents
Records related to the site are
documents that were available at the time the scanned paper or
electronic file was uploaded. Records withheld by the
department due to confidentiality, attorney-client privilege,
and other sensitive records, as well as lab data, may not be
included. Additional records associated with the site may or
may not be accessible through an open records request through
DNR or another state agency (see Jurisdiction above).
|
|
Date |
Code |
Name |
File |
Comment |
|
2005-08-15
|
185
|
Continuing Obligation(s) Compliance Audit Complete
|
|
|
|
2003-02-11
|
11
|
Activity Closed
|
|
|
|
2003-02-11
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
|
|
2003-02-11
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2003-02-11
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2003-02-11
|
236
|
Continuing Obligation - Residual GW Contamination
|
|
|
|
2003-02-11
|
730
|
CO Packet created for Recorded Groundwater Use Restriction
|
|
AUTO-POPULATED
|
|
2003-01-13
|
43
|
Site Activity Status Update Received
|
|
RESTRICTION - COMPLETE
|
|
2003-01-06
|
43
|
Site Activity Status Update Received
|
|
DEED RESTRICTION - INCOMPLETE
|
|
2002-12-23
|
43
|
Site Activity Status Update Received
|
|
CAP MAINTENANCE PLAN
|
|
2002-11-07
|
52
|
Deed Restriction for Residual Soil Contamination Recorded
|
|
GROUNDWATER, CAP AND SOIL
|
|
2002-10-14
|
43
|
Site Activity Status Update Received
|
|
DEED INFO FOR GWUR
|
|
2002-02-22
|
43
|
Site Activity Status Update Received
|
|
MW ABANDONMENT FORMS
|
|
2001-12-19
|
43
|
Site Activity Status Update Received
|
|
GWUR INFORMATION
|
|
2001-12-10
|
99
|
Miscellaneous
|
|
DNR SENT LTR OUTLINING NR 726 CHANGES
|
|
2001-08-13
|
84
|
Remaining Actions Needed
|
|
SOIL & GW DEED RESTRICTION NEEDED
|
|
2001-07-16
|
43
|
Site Activity Status Update Received
|
|
GW DATA
|
|
2001-07-16
|
179
|
Case Closure Review Request Received (non-fee)
|
|
RESUBMITTAL OF CLOSURE REQUEST
|
|
2000-08-15
|
43
|
Site Activity Status Update Received
|
|
MW DATA
|
|
1999-11-08
|
80
|
Closure Not Recommended
|
|
ADDTIONAL GW MONITORING TO ESTABLISH TREND
|
|
1999-10-04
|
79
|
Case Closure Review Request Received
|
|
|
|
1999-07-27
|
38
|
Site Investigation Report (SIR) Approved
|
|
VERBAL APPROVAL
|
|
1999-07-22
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
|
|
1999-03-22
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
|
|
1999-03-17
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
1999-02-15
|
43
|
Site Activity Status Update Received
|
|
CONSULTANT: NORTHERN ENVIRONMENTAL, GREEN BAY
|
|
1999-01-14
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
1999-01-13
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
Relationships to Other Activities
Click Activity Below to View
Details
Substances
Substance |
Type |
Amt Released |
Units |
Chlorinated Solvents |
VOC |
|
|
Tetrachloroethene (Perchloroethylene) |
VOC |
|
|
Trichloroethylene |
Industrial Chem |
|
|
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR. |
Responsible Party
CITY OF MENASHA 100 MAIN ST, MENASHA, WI 54952 |
For More Information on this Activity
210423
|
02-05-210423