2024-02-16
|
43
|
Site Activity Status Update Received
|
|
AGENCY REVIEW OF SEDIMENT SAMPLING REPORT
|
|
2024-02-14
|
43
|
Site Activity Status Update Received
|
|
AGENCY REVIEW OF 2022 BARRIER WALL ANNUAL GROUNDWATER MONITORING REPORT
|
|
2024-01-05
|
43
|
Site Activity Status Update Received
|
|
APPROVAL OF NO ANCHORING SIGN DESIGN
|
|
2024-01-03
|
43
|
Site Activity Status Update Received
|
|
AGENCY REVIEW OF FRENCH DRAIN CONSTRUCTION MEMO
|
|
2024-01-03
|
43
|
Site Activity Status Update Received
|
|
UPDATED NO ANCHORING SIGNS
|
|
2023-12-20
|
43
|
Site Activity Status Update Received
|
|
AGENCY REVIEW OF VAPOR INTRUSION WORKPLAN
|
|
2023-12-20
|
43
|
Site Activity Status Update Received
|
|
AGENCY REVIEW OF 2023 Q3 PROGRESS REPORT
|
|
2023-12-15
|
43
|
Site Activity Status Update Received
|
|
EPA APPROVAL OF 90-DAY EXTENSION (FIVE-YEAR TECHNICAL REVIEW REPORT)
|
|
2023-12-06
|
43
|
Site Activity Status Update Received
|
|
FRENCH DRAIN CONSTRUCTION DOCUMENTATION
|
|
2023-12-04
|
43
|
Site Activity Status Update Received
|
|
2023 SEDIMENT SAMPLING REPORT
|
|
2023-11-14
|
43
|
Site Activity Status Update Received
|
|
AGENCY COMMENTS ON NEW ANCHORING SIGNS
|
|
2023-10-31
|
99
|
Miscellaneous
|
|
NEW DNR PROJECT MANAGER NOTIFICATION
|
|
2023-10-20
|
43
|
Site Activity Status Update Received
|
|
AGENCY COMMENTS ON THE REVISED SOIL MANAGEMENT PLAN
|
|
2023-10-17
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (JULY 1 THROUGH SEPTEMBER 30, 2023)
|
|
2023-10-05
|
43
|
Site Activity Status Update Received
|
|
AGENCY SWAC METHODOLOGY PROPOSAL RESPONSE TO COMMENTS REVIEW
|
|
2023-10-03
|
43
|
Site Activity Status Update Received
|
|
REVISED FIRST QUARTER 2023 PROGRESS REPORT APPROVAL
|
|
2023-10-02
|
857
|
Materials Management Plan Approved
|
|
DNR REVIEW OF NR718 SOIL MANAGEMENT PLAN & APPROVAL OF LOCATIONAL CRITERIA EXEMPTION
|
|
2023-09-15
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
ON-SITE; MATERIAL MANAGEMENT AND LOCATIONAL CRITERIA EXEMPTION REQUEST FOR STORM-WATER MANAGEMENT
|
|
2023-09-12
|
43
|
Site Activity Status Update Received
|
|
AGENCY APPROVAL OF REVISED CHEMDESIGN BUILDING 67 EXPANSION MEMO
|
|
2023-09-07
|
99
|
Miscellaneous
|
|
MONTHLY CONFERENCE CALL WITH JCI, JACOBS, EPA, DNR
|
|
2023-09-01
|
43
|
Site Activity Status Update Received
|
|
SEDIMENT SAMPLING DATA REQUESTED 8/29/2023 AND 8/30/2023
|
|
2023-08-30
|
99
|
Miscellaneous
|
|
DNR REQUEST FOR LAB DATA SHEETS FROM 2023 SEDIMENT SAMPLING
|
|
2023-08-29
|
43
|
Site Activity Status Update Received
|
|
PA REQUEST FOR SEDIMENT SAMPLING DATA (LOCATION, DEPTH, BORING LOGS, FIGURE, ETC)
|
|
2023-08-24
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO COMMENTS AND REVISED CHEMDESIGN BUILDING 67 EXPANSION MEMO
|
|
2023-08-04
|
99
|
Miscellaneous
|
|
MONTHLY CONFERENCE CALL WITH JCI, JACOBS, EPA, DNR
|
|
2023-08-04
|
43
|
Site Activity Status Update Received
|
|
AGENCY REVIEW OF CHEMDESIGN BUILDING 67 EXPANSION MEMO
|
|
2023-08-03
|
43
|
Site Activity Status Update Received
|
|
AGENCY APPROVAL OF UPDATED FRENCH DRAIN INSTALLATION MEMO
|
|
2023-08-02
|
43
|
Site Activity Status Update Received
|
|
REVISED DRAFT SOIL MANAGEMENT PLAN
|
|
2023-08-01
|
43
|
Site Activity Status Update Received
|
|
TYCO RTC ON Q1 PROGRESS REPORT
|
|
2023-07-17
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (APR-JUNE 2023)
|
|
2023-07-06
|
99
|
Miscellaneous
|
|
MONTHLY CONFERENCE CALL WITH JCI, JACOBS, EPA, DNR
|
|
2023-06-30
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON Q1 PROGRESS REPORT
|
|
2023-06-30
|
99
|
Miscellaneous
|
|
DRAFT SOIL MANAGEMENT PLAN NOT APPROVED
|
|
2023-06-30
|
861
|
Materials Management Plan Not Approved
|
|
NOT APPROVED
|
|
2023-06-14
|
99
|
Miscellaneous
|
|
SITE VISIT
|
|
2023-06-06
|
99
|
Miscellaneous
|
|
APPROVAL OF ALTERNATE SITE SPECIFIC GROUT MIXTURE
|
|
2023-06-05
|
99
|
Miscellaneous
|
|
FOLLOW UP SEDIMENT WP CONFERENCE CALL
|
|
2023-06-01
|
99
|
Miscellaneous
|
|
SEDIMENT WP CONFERENCE CALL
|
|
2023-05-26
|
43
|
Site Activity Status Update Received
|
|
REQUEST FOR ALTERNATE SITE SPECIFIC GROUT MIXTURE
|
|
2023-05-24
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON DRAFT SEDIMENT WP
|
|
2023-05-19
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
MOVED ON-SITE
|
|
2023-05-15
|
43
|
Site Activity Status Update Received
|
|
DRAFT SOIL MANAGMENT PLAN
|
|
2023-04-25
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JAN-MAR 2023)
|
|
2023-04-25
|
43
|
Site Activity Status Update Received
|
|
DRAFT 2022 BWGWM ANNUAL REPORT
|
|
2023-01-19
|
857
|
Materials Management Plan Approved
|
|
MATERIALS MANAGEMENT FROM LUDINGTON ST ROW (SEE BRRTS # 02-38-591174 FOR DOCUMENT)
|
|
2023-01-17
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (OCT-DEC 2022)
|
|
2022-12-28
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
MATERIALS MANAGEMENT FROM LUDINGTON ST ROW (SEE BRRTS # 02-38-591174 FOR DOCUMENT)
|
|
2022-12-09
|
43
|
Site Activity Status Update Received
|
|
DRAFT 2023 SEDIMENT SAMPLING WP FOR FIVE YEAR REVIEW
|
|
2022-11-17
|
43
|
Site Activity Status Update Received
|
|
MW013 NEST ABANDONMENT AND REINSTALLATION ACTIVITIES
|
|
2022-10-17
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JULY-SEPT 2022)
|
|
2022-07-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (APR-JUNE 2022)
|
|
2022-07-11
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF INTENT TO ABANDON MW NEST 105
|
|
2022-06-09
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF GWCTS CONSTRUCTION ACTIVITIES 06/27
|
|
2022-05-17
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF SEMI-ANNUAL GW SAMPLING 06/06
|
|
2022-04-28
|
43
|
Site Activity Status Update Received
|
|
DRAFT 2021 BWGWM ANNUAL REPORT
|
|
2022-04-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JAN-MARCH 2022)
|
|
2022-02-24
|
43
|
Site Activity Status Update Received
|
|
RECEIVED HW01-02 CONSTGRUCTION SPECS/LOGS
|
|
2022-02-15
|
43
|
Site Activity Status Update Received
|
|
PDP MONITORING SYSTEM UPGRADES IMPLEMENTED TO SUPPORT QTLY REPORTING
|
|
2022-02-04
|
99
|
Miscellaneous
|
|
REQUEST FOR HW01-02 CONSTRUCTION SPECS/LOGS
|
|
2022-01-31
|
43
|
Site Activity Status Update Received
|
|
GWTS DESIGN; FORM 3400-205
|
|
2022-01-26
|
43
|
Site Activity Status Update Received
|
|
SITE STATUS UPDATE MEETING; JCI/TYCO, EPA DNR, JACOBS
|
|
2022-01-14
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (OCT-DEC 2021)
|
|
2022-01-13
|
43
|
Site Activity Status Update Received
|
|
SOIL & GW TESTING LUDINGTON ROW RECONSTRUCTION PROJECT MARINETTE
|
|
2022-01-04
|
43
|
Site Activity Status Update Received
|
|
JCY/TYCO PM CHANGE NOTIFICATION
|
|
2021-12-01
|
99
|
Miscellaneous
|
|
CALL WITH JCI/TYCO, JACOBS & EPA TO DISCUSS REQUESTED CHANGED TO PDP REPORTING SCHEDULE
|
|
2021-11-16
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL INFO FOR MODIFICATION REQUEST
|
|
2021-11-11
|
43
|
Site Activity Status Update Received
|
|
REQUEST TO MODIFY PDP REPORTING FREQUENCY
|
|
2021-10-27
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-10-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JULY-SEPT 2021)
|
|
2021-10-14
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-09-29
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-09-14
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PFP STATUS REPORT
|
|
2021-08-31
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-08-18
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-08-04
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-07-20
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-07-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (APRIL - JUNE 2021)
|
|
2021-07-08
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-06-24
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-06-09
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-05-27
|
43
|
Site Activity Status Update Received
|
|
OUTFALL 1 STORMWATER SEPARATION PERMIT APPLICATION
|
|
2021-05-26
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-05-26
|
43
|
Site Activity Status Update Received
|
|
WW COND APPR PDP CONVEYANCE SYSTEM DESIGN
|
|
2021-05-13
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-04-27
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-04-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JAN-MARCH)
|
|
2021-04-13
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-04-06
|
130
|
DNR Regulatory Reminder Sent
|
|
VAPOR INTRUSION AND TCE REMINDER LETTER
|
|
2021-04-02
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-03-19
|
43
|
Site Activity Status Update Received
|
|
RECEIVED DRAFT 2020 BWGWM ANNUAL REPORT
|
|
2021-03-19
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-03-19
|
99
|
Miscellaneous
|
|
DNR RESPONSE TO NR 141 MW ABANDONMENT EXEMPTION RQUEST FOR MW043S
|
|
2021-03-17
|
43
|
Site Activity Status Update Received
|
|
RECEIVED 3RD DRAFT VI ASSESSMENT & WORKPLAN
|
|
2021-03-05
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-02-19
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-02-05
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-01-19
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2021-01-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (OCT-DEC)
|
|
2021-01-08
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-12-23
|
99
|
Miscellaneous
|
|
REISSUANCE OF WPDES PERMIT #WI-0001040-08-0 INCLUDE AS & HG VARIANCES
|
|
2020-12-23
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-12-08
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-12-08
|
43
|
Site Activity Status Update Received
|
|
EPA/DYCO UPDATE MEETING
|
|
2020-11-25
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-11-13
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-10-30
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO AGENCY COMMENTS 2019 BWGWM ANNUAL REPORT
|
|
2020-10-30
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO AGENCY COMMENTS ARSENIC MIGRATION PATHWAYS REPORT
|
|
2020-10-29
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-10-15
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-10-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JULY-SEPT)
|
|
2020-10-09
|
99
|
Miscellaneous
|
|
REQUEST FOR ADDITIONAL INFO - PSN
|
|
2020-10-02
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-10-01
|
43
|
Site Activity Status Update Received
|
|
REV PDP CONVEYANCE SYSTEM DESIGN PLANS
|
|
2020-09-30
|
99
|
Miscellaneous
|
|
AGENDY COMMENTS ON 2019 BWGWM ANNUAL REPORT
|
|
2020-09-30
|
99
|
Miscellaneous
|
|
AGENCY COMENT ON ARSENIC MIGRATION PATHWAYS REPORT
|
|
2020-09-16
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-09-09
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-08-27
|
43
|
Site Activity Status Update Received
|
|
EPA/TYCO UPDATE MEETING
|
|
2020-08-26
|
43
|
Site Activity Status Update Received
|
|
PROPERTY SALE NOTIFICATION
|
|
2020-08-19
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-08-12
|
99
|
Miscellaneous
|
|
DHS PFAS NOTIFICATION PROTOCOLS
|
|
2020-08-05
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-07-29
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-07-28
|
99
|
Miscellaneous
|
|
7/26/2020 SIGNIFICANT SPILL ID 20200726NE38-1
|
|
2020-07-14
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (APRIL-JUNE)
|
|
2020-07-09
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-06-24
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-06-11
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-05-28
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-05-20
|
43
|
Site Activity Status Update Received
|
|
EPA NON-RES INDOOR AIR FORM BLDG 14
|
|
2020-05-13
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-05-04
|
43
|
Site Activity Status Update Received
|
|
BLDG 14 VI RESULTS OF 04/09/2020
|
|
2020-04-29
|
43
|
Site Activity Status Update Received
|
|
AGENCY COMMENTS ON DRAFT VI WORKPLAN
|
|
2020-04-29
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-04-15
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-04-15
|
43
|
Site Activity Status Update Received
|
|
MW043S ABANDONMENT EXEMPTION REQUEST
|
|
2020-04-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JAN-MARCH)
|
|
2020-04-01
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-03-27
|
43
|
Site Activity Status Update Received
|
|
END OF WORK STOPPAGE DUE TO COVID-19
|
|
2020-03-26
|
99
|
Miscellaneous
|
|
EPA REQUEST FOR INFO ON WORK STOPAGE DUE TO COVID-19
|
|
2020-03-23
|
43
|
Site Activity Status Update Received
|
|
2019 BWGWM ANNUAL REPORT
|
|
2020-03-23
|
43
|
Site Activity Status Update Received
|
|
ARSENIC MIGRATION PATHWAYS EVAL REPORT
|
|
2020-03-19
|
43
|
Site Activity Status Update Received
|
|
WORK STOPPAGE DUE TO COVID-19
|
|
2020-03-12
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-03-03
|
43
|
Site Activity Status Update Received
|
|
BLDG 14 VI RESULTS
|
|
2020-02-25
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-02-18
|
43
|
Site Activity Status Update Received
|
|
TYCO RESP TO AGENCY COMMENTS ON VI WORKPLAN
|
|
2020-02-13
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2020-02-06
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE ON VI ASSESSMENT & SAMPLING IN BLDG 14
|
|
2020-02-05
|
99
|
Miscellaneous
|
|
EPA REQUEST FOR UPDATE ON VI ASSESSMENT & SAMPLING IN BLDG 14
|
|
2020-02-04
|
99
|
Miscellaneous
|
|
2020 FINANCIAL ASSURANCE COST ESTIMATE
|
|
2020-01-17
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO REQUEST FOR PROGRESS UPDATE ON ARSENIC MIGRATION PATHWAYS MEMO
|
|
2020-01-16
|
99
|
Miscellaneous
|
|
AGENCY REQUEST FOR ADDL INFO ON FLOODING
|
|
2020-01-15
|
99
|
Miscellaneous
|
|
AGENCY REQUEST FOR PROGRESS UPDATE ON ARSENIC MIGRATION PATHWAYS EVALUATION MEMO
|
|
2020-01-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (OCT-DEC)
|
|
2020-01-15
|
43
|
Site Activity Status Update Received
|
|
JUNE 2019 WELL INSTALLATION & REPAIR FIELD ACTIVITIES MEMO
|
|
2019-12-19
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON VI ASSESSMENT & WORKPLAN
|
|
2019-12-02
|
99
|
Miscellaneous
|
|
APPROVAL OF JULY 2019 REV FIVE YEAR TECHNICAL REVIEW REPORT
|
|
2019-11-15
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-10-31
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO REQUEST FOR UPDATE ON DRILLING ACTIVITIES
|
|
2019-10-30
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY STATUS REPORT
|
|
2019-10-28
|
99
|
Miscellaneous
|
|
EPA REQUEST FOR UPDATE ON DRILLING ACTIVITIES
|
|
2019-10-21
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON DRILLING UPDATE & PROPOSED CHANGES MEMO
|
|
2019-10-18
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-10-18
|
43
|
Site Activity Status Update Received
|
|
ARSENIC MIGRATION PATHWAY EVALUATION WORKPLAN-DRILLING UPDATE & PROPOSED CHANGES MEMO
|
|
2019-10-14
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JULY-SEPT)
|
|
2019-10-03
|
43
|
Site Activity Status Update Received
|
|
REC'D DRAFT STORMWATER IMPROVEMENT CCR
|
|
2019-10-03
|
43
|
Site Activity Status Update Received
|
|
REC'D DRAFT VAPOR INTRUSION ASSESSMENT WP
|
|
2019-10-02
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-10-02
|
43
|
Site Activity Status Update Received
|
|
REC'D SOPS FOR ARSENIC MIGRATION PATHWAYS EVAL WP
|
|
2019-09-20
|
99
|
Miscellaneous
|
|
CLARIFICATION REGARDING ADMINISTRATION OF REMEDIATION ACTIVITIES
|
|
2019-09-18
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-09-11
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-09-04
|
99
|
Miscellaneous
|
|
AGENCIES COND APPROVAL OF 06/24/2019 ADDENDUM TO 2015 BWGMP UPDATE
|
|
2019-09-03
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO COND APPR OF ARSENIC MIGRATION PATHWAYS EVAL WP
|
|
2019-08-22
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-08-20
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO REQUEST FOR ADDT'L INFO ON QTLY PROGRESS REPORT (APRIL-JUNE)
|
|
2019-08-15
|
99
|
Miscellaneous
|
|
SECOND REQUEST FOR ADDT'L INFO ON QTLY PROGRESS REPORT (APRIL-JUNE)
|
|
2019-08-07
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-07-29
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON QTLY PROGRESS REPORT (APRIL-JUNE)
|
|
2019-07-25
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-07-17
|
99
|
Miscellaneous
|
|
COND APPR OF AS MIGRATION PATHWAYS EVAL WP
|
|
2019-07-16
|
99
|
Miscellaneous
|
|
REQUEST FOR ADDT'L INFO ON QTLY PROGRESS REPORT (APRIL-JUNE)
|
|
2019-07-15
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (APRIL-JUNE)
|
|
2019-07-15
|
99
|
Miscellaneous
|
|
HIGH RIVER STAGE & FLOODING UPDATE
|
|
2019-07-13
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-07-12
|
43
|
Site Activity Status Update Received
|
|
REC'D REVISED 2018 FIVE-YEAR TECHNICAL REVIEW
|
|
2019-07-03
|
43
|
Site Activity Status Update Received
|
|
HIGH RIVER STAGE - SITE FLOODING REPORTED
|
|
2019-06-27
|
99
|
Miscellaneous
|
|
AGENCY APPROVAL OF CHANGES TO RCRA COMPONENTS RELATED TO CHEMDESIGN CONSTRUCTION ACTIVITIES
|
|
2019-06-26
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-06-24
|
43
|
Site Activity Status Update Received
|
|
REC'D REVISED DRAFT ADDENDUM TO 2015 BWGMPU
|
|
2019-06-24
|
43
|
Site Activity Status Update Received
|
|
REC'D AS MIGRATION PATHWAYS EVAL WP
|
|
2019-06-14
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-06-04
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON STATUS UPDATE/SCHEDULE
|
|
2019-05-31
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF DRILLING ACTIVITIES
|
|
2019-05-29
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-05-28
|
43
|
Site Activity Status Update Received
|
|
RCRA REQUIREMENTS & PROPOSED CHEMDESIGN CONSTRUCTION ACTIVITIES
|
|
2019-05-24
|
43
|
Site Activity Status Update Received
|
|
05/13/2019 STATUS UPDATE/SCHEDULE
|
|
2019-05-17
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-05-13
|
43
|
Site Activity Status Update Received
|
|
AGENCY-TYCO 05/23 MEETING AGENDA
|
|
2019-05-06
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2019-04-30
|
99
|
Miscellaneous
|
|
GINAL GWCTS - EWCS PHASE I DESIGN APPROVED
|
|
2019-04-17
|
43
|
Site Activity Status Update Received
|
|
REC'D MISSING WATER LEVEL DATA FOR QTLY REPORT
|
|
2019-04-16
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JAN-MARCH 2019)
|
|
2019-04-15
|
43
|
Site Activity Status Update Received
|
|
PDP BEGAN 04/15/2019
|
|
2019-04-08
|
43
|
Site Activity Status Update Received
|
|
REC'D FINAL GWCTS - EWCS PHASE I DESIGN
|
|
2019-03-25
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON DRAFT 2015 GWGMPU ADDENDUM
|
|
2019-03-14
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON DRAFT FIVE YEAR REVIEW
|
|
2019-02-20
|
43
|
Site Activity Status Update Received
|
|
REC'D DRAFT 2015 BWGMPU ADDENDUM
|
|
2019-01-16
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (OCT-DEC 2018)
|
|
2019-01-03
|
43
|
Site Activity Status Update Received
|
|
REC'D DRAFT 2018 FIVE-YEAR TECHNICAL REVIEW
|
|
2018-11-29
|
99
|
Miscellaneous
|
|
DNR COMMENTS ON DRAFT ALTERNATIVES ANALYSIS TABLES
|
|
2018-11-14
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-11-07
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON 10/22/2018 MEETING NOTES
|
|
2018-11-05
|
99
|
Miscellaneous
|
|
PDP SHUTDOWN
|
|
2018-11-01
|
43
|
Site Activity Status Update Received
|
|
10/22/18 MEETING NOTES
|
|
2018-10-24
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-10-17
|
43
|
Site Activity Status Update Received
|
|
AGENCY-TYCO 10/22 MEETING AGENDA
|
|
2018-10-16
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JULY-SEPT 2018)
|
|
2018-10-10
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-10-08
|
99
|
Miscellaneous
|
|
GWCTS-EWCS PLAN APPROVAL
|
|
2018-09-28
|
43
|
Site Activity Status Update Received
|
|
2018 SEDIMENT MONITORING REPORT
|
|
2018-09-28
|
43
|
Site Activity Status Update Received
|
|
FINAL GWCTS-EWCS DESIGN RECV'D
|
|
2018-09-26
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-09-20
|
43
|
Site Activity Status Update Received
|
|
EW CLEANOUT IN SALT VAULT COMPLETE
|
|
2018-09-12
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PFP STATUS REPORT
|
|
2018-09-10
|
43
|
Site Activity Status Update Received
|
|
MW 118-D ABANDONMENT FORMS
|
|
2018-09-04
|
99
|
Miscellaneous
|
|
AGENCY APPROVAL 2017 BWGWM ANNUAL REPORT
|
|
2018-08-29
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-08-27
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO AGENCY COMMENTS ON BWGWM REPORT
|
|
2018-08-15
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-08-01
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-08-01
|
43
|
Site Activity Status Update Received
|
|
AGENCY-TYCO CONFERENCE CALL RE: VBW MONITORING & EVALUATION
|
|
2018-07-30
|
99
|
Miscellaneous
|
|
AGENCY COMMENTS ON BWGWM ANNUAL REPORT
|
|
2018-07-19
|
43
|
Site Activity Status Update Received
|
|
MISSING INFO FROM QTLY PROGRESS REPORT (APR-JUNE 2018)
|
|
2018-07-18
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-07-18
|
99
|
Miscellaneous
|
|
GWCTS-EWCS MOD CONDITIONAL PLAN APPROVAL
|
|
2018-07-16
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (APRIL-JUNE 2018)
|
|
2018-07-12
|
43
|
Site Activity Status Update Received
|
|
PRELIMINARY DESIGN PHASE I GWCTS-EWCS MOD REC'D
|
|
2018-07-06
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF COVER AREA MODIFICATIONS
|
|
2018-07-05
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-07-05
|
43
|
Site Activity Status Update Received
|
|
DRAFT 2017 BARRIER WALL GW MONITORING ANNUAL REPORT REC'D
|
|
2018-06-26
|
99
|
Miscellaneous
|
|
EPA RESPONSE TO TYCO COMMENTS ON RCRA 3007 REQUEST FOR INFORMATION
|
|
2018-06-20
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-06-05
|
43
|
Site Activity Status Update Received
|
|
05/16/2018 MEETING SUMMARY
|
|
2018-06-05
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-06-04
|
99
|
Miscellaneous
|
|
DRAFT PASSIVE ARSENIC SAMPLING PILOT TEST WP & ALTERNATIVES ANALYSIS NOT APPROVED
|
|
2018-05-24
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-05-16
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO AGENCY COMMENTS ON DRAFT PASSIVE SAMPLING PILOT TEST WP & ALTERNATIVES ANALYSIS
|
|
2018-05-11
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO EPA RCRA 3007 REQUEST FOR INFORMATION
|
|
2018-05-10
|
99
|
Miscellaneous
|
|
ADDT'L COMMENT ON DGT PILOT TEST WORK PLAN & ALTERNATIVES EVALUATION
|
|
2018-05-09
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY PDP STATUS REPORT
|
|
2018-05-09
|
43
|
Site Activity Status Update Received
|
|
05/16/2018 MEETING AGENDA
|
|
2018-04-27
|
99
|
Miscellaneous
|
|
UPCOMING ACTIVITIES AMENDED TO INCLUDE STORM WATER IMPROVEMENTS PERFORMANCE SAMPLING
|
|
2018-04-26
|
99
|
Miscellaneous
|
|
AGENCY COMMENT ON DGT PILOT TEST WORK PLAN & ALTERNATIVES EVALUATION
|
|
2018-04-20
|
43
|
Site Activity Status Update Received
|
|
PDP RECOMMENCES
|
|
2018-04-19
|
99
|
Miscellaneous
|
|
RCRA 3007 REQUEST FOR INFORMATION ON PFAS
|
|
2018-04-17
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JAN-MARCH 2018)
|
|
2018-04-12
|
99
|
Miscellaneous
|
|
EPA APPROVAL OF DELAY OF PDP START UP & GROUNDWATER SAMPLING DUE TO WEATHER
|
|
2018-04-10
|
99
|
Miscellaneous
|
|
EPA RESPONSE TO TYCO REQUEST TO REMOVE ICS IN THE MENOMINEE RIVER & REMEDY REVIEW
|
|
2018-04-06
|
43
|
Site Activity Status Update Received
|
|
RESULT OF ADDT'L COVANTA TRATMENT TESTS REC'D
|
|
2018-04-05
|
99
|
Miscellaneous
|
|
APPROVAL OF PFAS SCREENING SAMPLING PROCEDURES & LOCATIONS
|
|
2018-04-04
|
43
|
Site Activity Status Update Received
|
|
DRAFT PASSIVE ARSENIC SAMPLING PILOT TEST WORK PLAN & ALTERNATIVES EVALUATION REC'D
|
|
2018-04-02
|
99
|
Miscellaneous
|
|
REPORTING SCHEDULE FOR FIVE YEAR TECHNICAL REVIEW & ANNUAL BARRIER WALL GW MONITORING REPORT
|
|
2018-03-29
|
43
|
Site Activity Status Update Received
|
|
RESULTS OF COVANTA TREATMENT TEST REC'D
|
|
2018-03-28
|
99
|
Miscellaneous
|
|
ADDT'L INFORMATION ON PFAS SCREENING SAMPLING PROCEDURES & LOCATIONS REC'D
|
|
2018-03-21
|
43
|
Site Activity Status Update Received
|
|
TYCO CLARIFICATION TO RESPONSE TO REQUEST REMOVAL OF INSTITUTIONAL CONTROLS IN THE MENOMINEE RIVER
|
|
2018-03-15
|
99
|
Miscellaneous
|
|
EPA RESPONSE TO REQUEST REMOVAL OF INSTITUTIONAL CONTROLS IN THE MENOMINEE RIVER
|
|
2018-03-14
|
99
|
Miscellaneous
|
|
EPA APPROVAL OF EXTENSION REQUEST FOR DYE TEST ALTERNATIVE PILOT WORK PLAN
|
|
2018-03-02
|
43
|
Site Activity Status Update Received
|
|
PROPOSED PFAS SCREENING SAMPLING PROCEDURES & LOCATIONS
|
|
2018-02-20
|
43
|
Site Activity Status Update Received
|
|
TYCO REQUEST TO REMOVE INSTITUTIONAL CONTROLS IN THE MENOMINEE RIVER
|
|
2018-02-15
|
99
|
Miscellaneous
|
|
PDP ALTERNATIVE OPTION APPROVAL
|
|
2018-02-08
|
99
|
Miscellaneous
|
|
02/14/2018 MEETING AGENDA
|
|
2018-01-31
|
43
|
Site Activity Status Update Received
|
|
PRELIMINARY DRAFT PDP FOCUSED ALTERNATIVES EVALUATION
|
|
2018-01-16
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (OCT-DEC 2017)
|
|
2018-01-12
|
43
|
Site Activity Status Update Received
|
|
PUMP DOWN PROGRAM WORK PLAN
|
|
2018-01-09
|
99
|
Miscellaneous
|
|
12/20/2017 MEETING SUMMARY
|
|
2018-01-08
|
99
|
Miscellaneous
|
|
DYE TEST ALTERNATIVE SCHEDULE CORRESPONDENCE
|
|
2017-12-22
|
99
|
Miscellaneous
|
|
LETTER TO EPA: WINTER OPERATION & OPTIMIZATION
|
|
2017-12-21
|
43
|
Site Activity Status Update Received
|
|
2017 PILOT DYE TEST RESULTS
|
|
2017-12-21
|
99
|
Miscellaneous
|
|
EXTENSION REQUEST FOR ROOT CAUSE ANALYSIS & PDP WORK PLAN
|
|
2017-12-19
|
43
|
Site Activity Status Update Received
|
|
DECEMBER 20, 2017 MEETING AGENDA
|
|
2017-12-12
|
43
|
Site Activity Status Update Received
|
|
2018 FINANCIAL ASSURANCE COST ESTIMATE
|
|
2017-12-06
|
43
|
Site Activity Status Update Received
|
|
2017 PUMP DOWN PROGRAM SUMMARY REPORT
|
|
2017-11-28
|
43
|
Site Activity Status Update Received
|
|
SEPT 2017 PILOT DYE TEST RESULTS TECH MEMO & MEETING REQUEST
|
|
2017-11-28
|
99
|
Miscellaneous
|
|
EPA RESPONSE TO RP REGARDING TECHNICAL IMPRACTICABILITY REQUEST FOR PUMP DOWN PROGRAM
|
|
2017-11-14
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JULY - SEPT 2017)
|
|
2017-11-09
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY STATUS REPORT
|
|
2017-10-20
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY SUMMARY REPORT FOR PUMP DOWN PROGRAM
|
|
2017-10-05
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY STATUS REPORT
|
|
2017-10-05
|
99
|
Miscellaneous
|
|
EPA CONTRACTOR OVERSIGHT REPORTS FOR THE PILOT DYE TEST COMPLETED SEPT 18-20, 2017
|
|
2017-09-15
|
43
|
Site Activity Status Update Received
|
|
BI-WEEKLY STATUS REPORT UPDATE
|
|
2017-09-12
|
43
|
Site Activity Status Update Received
|
|
TECHNICAL IMPRACTICABILITY REQUEST - PUMP DOWN PROGRAM
|
|
2017-09-01
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA & DNR COMMENTS REGARDING PILOT DYE TEST WORK PLAN
|
|
2017-08-28
|
99
|
Miscellaneous
|
|
ADDT'L ITEMS FOR FUTURE QTLY PROGRESS REPORTS
|
|
2017-08-28
|
43
|
Site Activity Status Update Received
|
|
RP AGREES TO PROVIDE ADDT'L ITEMS IN FUTURE QTLY PROGRESS REPORTS
|
|
2017-08-22
|
99
|
Miscellaneous
|
|
DNR COMMENTS TO EPA REGARDING PILOT DYE TEST PROPOSAL
|
|
2017-08-22
|
99
|
Miscellaneous
|
|
EPA COMMENTS TO TYCO REGARDING PILOT DYE TEST PROPOSAL
|
|
2017-08-21
|
43
|
Site Activity Status Update Received
|
|
PILOT DYE TEST WORK PLAN - FINAL
|
|
2017-08-10
|
99
|
Miscellaneous
|
|
EPA LETTER TO RP - JULY 25, 2017 MEETING FOLLOW-UP
|
|
2017-08-10
|
43
|
Site Activity Status Update Received
|
|
RP IN THE PROCESS OF DRAFTING A RESPONSE TO JULY 25, 2017 MEETING
|
|
2017-08-09
|
99
|
Miscellaneous
|
|
EPA RESPONSE TO TYCO COMMENTS ON USEPA SEMI-ANNUAL SAMPLING REQUIREMENTS
|
|
2017-08-07
|
43
|
Site Activity Status Update Received
|
|
PUMP DOWN PROGRAM ON HOLD DUE TO SUBCONTRACTOR ACCEPTING LIMITED QUANTITIES OF WASTEWATER
|
|
2017-08-02
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (APRIL THROUGH JUNE 2017)
|
|
2017-07-24
|
43
|
Site Activity Status Update Received
|
|
JULY 25, 2017 MEETING AGENDA
|
|
2017-07-21
|
43
|
Site Activity Status Update Received
|
|
CEREMONY FOR MENEKAUNEE HARBOR & AOC
|
|
2017-07-07
|
99
|
Miscellaneous
|
|
DNR WASTEWATER COMMENTS REGARDING DRAFT DYE PILOT TEST DRAFT SCOPE, 06/22/2017
|
|
2017-07-07
|
99
|
Miscellaneous
|
|
DNR COMMENTS TO EPA REGARDING PILOT DYE TEST
|
|
2017-07-05
|
43
|
Site Activity Status Update Received
|
|
DRAFT DYE PILOT TEST DRAFT SCOPE, 06/22/2017
|
|
2017-06-26
|
99
|
Miscellaneous
|
|
ADDITIVE USE APPROVAL LETTER FOR KEYACID RHODAMINE WT LIQUID FOR DYE TESTING PURPOSES
|
|
2017-06-26
|
99
|
Miscellaneous
|
|
EPA LETTER TO TYCO REGARDING PUMP DOWN PROGRAM
|
|
2017-06-26
|
99
|
Miscellaneous
|
|
DNR APPROVAL LETTER AUTHORIZING GW TRMT SYS TESTING (ALSO SEE TYCOS 06/20/2017 SUBMITTAL)
|
|
2017-06-22
|
99
|
Miscellaneous
|
|
COMMENTS REGARDING SOP FOR SURFACE WATER SAMPLING
|
|
2017-06-22
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO DNR COMMENTS REGARDING SOP FOR SURFACE WATER SAMPLING
|
|
2017-06-20
|
99
|
Miscellaneous
|
|
EPA COMMENTS TO TYCO REGARDING 2016 BARRIER WALL GROUNDWATER MONITORING ANNUAL REPORT
|
|
2017-06-20
|
43
|
Site Activity Status Update Received
|
|
PLANNED OPERATING PROCEDURE FOR GW TRTMT SYS TESTING PUMP DOWN PROGRAM OPTIMIZATION
|
|
2017-06-06
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PUMP DOWN WATER LEVELS COLLECTED. ELEVATION SURVEY IN PROGRESS. WELL EXTENSIONS ADDED.
|
|
2017-05-19
|
43
|
Site Activity Status Update Received
|
|
REVISED MEETING AGENDA
|
|
2017-05-18
|
99
|
Miscellaneous
|
|
EPA COMMENTS REGARDING DRAFT MEETING AGENDA
|
|
2017-05-16
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO DNRS 04/24/2017 EMAIL
|
|
2017-05-15
|
43
|
Site Activity Status Update Received
|
|
DRAFT MEETING AGENDA
|
|
2017-05-11
|
43
|
Site Activity Status Update Received
|
|
2016 BARRIER WALL GROUNDWATER MONITORING ANNUAL REPORT
|
|
2017-05-08
|
99
|
Miscellaneous
|
|
EPA APPROVAL FOR DYE TEST EXTENSION
|
|
2017-04-21
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JANUARY THROUGH MARCH 2017)
|
|
2017-04-14
|
99
|
Miscellaneous
|
|
DNR COMMENTS TO EPA REGARDING DYE TEST
|
|
2017-02-20
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO DNR COMMENTS: BLDG 59 DECONTAMINATION DOCUMENTATION
|
|
2017-01-31
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO DNR QUESTIONS REGARDING SUBSURFACE INJECTION OF TRACER DYE SCOPE OF WORK (ELEC RCPT)
|
|
2017-01-17
|
43
|
Site Activity Status Update Received
|
|
DYE TEST PROPOSAL TO BE SUBMITTED TO AGENCIES BY END OF JANUARY 2017
|
|
2017-01-17
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (OCTOBER THROUGH DECEMBER 2016)
|
|
2017-01-10
|
99
|
Miscellaneous
|
|
EPA REQUEST FOR CASE STATUS UPDATE WITH RESPECT TO DYE TEST
|
|
2016-11-04
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO EPA COMMENTS REGARDING STANTON ST STORM WATER IMPROVEMENT PLAN DATED 9/7/2016
|
|
2016-10-31
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY REPORT (JULY THROUGH SEPTEMBER 2016)
|
|
2016-10-14
|
99
|
Miscellaneous
|
|
EPA COMMENTS REGARDING STORM WATER IMPROVEMENT PLAN DATED SEPT 7, 2016
|
|
2016-10-03
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO 09/07/2016 WASTEWATER NOTICE OF NONCOMPLIANCE
|
|
2016-09-29
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA REVIEW OF TYCO OUTFALL INVESTIGATION REPORT
|
|
2016-09-29
|
43
|
Site Activity Status Update Received
|
|
FINAL DRAFT STANTON STREET STORMWATER IMPROVEMENT PLAN, SEPT 2016
|
|
2016-09-13
|
43
|
Site Activity Status Update Received
|
|
WELL INSTALLATION, ABANDONMENT & REPAIR FIELD ACTIVITIES-NOV 2- DEC 2, 2015
|
|
2016-09-07
|
99
|
Miscellaneous
|
|
WASTEWATER NOTICE OF NONCOMPLIANCE
|
|
2016-08-09
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (APRIL - JUNE 2016)
|
|
2016-07-11
|
43
|
Site Activity Status Update Received
|
|
2015 BARRIER WALL GROUNDWATER MONITORING ANNUAL REPORT
|
|
2016-07-11
|
43
|
Site Activity Status Update Received
|
|
2015 BARRIER WALL GROUNDWATER MONITORING ANNUAL REPORT
|
|
2016-07-06
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY REPORT FOR PUMP DOWN PROGRAM - SYSTEM START-UP JUNE 23-24, 2016
|
|
2016-06-16
|
99
|
Miscellaneous
|
|
EPA COMMENTS TO RP REGARDING 06/10/2016 PDP H&SP & ERP
|
|
2016-06-16
|
99
|
Miscellaneous
|
|
EPA COMMENTS TO RP REGARDING 06/10/2016 PDP PROJECT WP
|
|
2016-06-10
|
99
|
Miscellaneous
|
|
HIGH CAPACITY WELL APPROVAL & OPERATIONAL PROCEDURES
|
|
2016-06-10
|
43
|
Site Activity Status Update Received
|
|
PUMP DOWN PROGRAM HEALTH & SAFETY PLAN & EMERGENCY RESPONSE PLAN
|
|
2016-06-10
|
43
|
Site Activity Status Update Received
|
|
PUMP DOWN PROGRAM PROJECT WORK PLAN
|
|
2016-06-06
|
99
|
Miscellaneous
|
|
DNR COMMENTS TO RP REGARDING 04/07/2016 CONTRACTOR DOCUMENT: SUBSURFACE INJECTION OF TRACER DYE SOW
|
|
2016-05-23
|
43
|
Site Activity Status Update Received
|
|
ELECTRONIC COPY OF HIGH CAPACITY DEWATERING WELL APPLICATION SUBMITTED
|
|
2016-05-10
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (JANUARY THROUGH MARCH 2106)
|
|
2016-04-21
|
43
|
Site Activity Status Update Received
|
|
EXTENSION REQUEST - RESPONSETO COMMENTS TO EPA REVIEW OF TYCO OUTFALL INVESTIGATION REPORT
|
|
2016-04-15
|
43
|
Site Activity Status Update Received
|
|
DYE TEST - EMAIL 1 OF 2 & 2 OF 2
|
|
2016-04-11
|
43
|
Site Activity Status Update Received
|
|
TYCO PROVIDED COMMENTS REGARDING EPAS 04/08/2016 EMAIL REGARDING THE PUMP DOWN PROGRAM SOW
|
|
2016-04-08
|
99
|
Miscellaneous
|
|
EPA PROVIDED COMMENTS TO RP REGARDING SOW FOR PUMP DOWN PROGRAM
|
|
2016-04-07
|
43
|
Site Activity Status Update Received
|
|
CONTRACTOR DOC - PUMP DOWN PROGRAM SOW
|
|
2016-04-07
|
43
|
Site Activity Status Update Received
|
|
CONTRACTOR DOC - SUBSURFACE INJECTION OF TRACER DYE SOW
|
|
2016-03-25
|
99
|
Miscellaneous
|
|
DNR PROVIDED COMMENTS REGARDING DYE TEST & RE-INJECTION OF WATER FROM THE GW EXTRACTION SYSTEM
|
|
2016-03-21
|
99
|
Miscellaneous
|
|
EPA PROVIDED COMMENTS TO TYCO REGARDING 11/09/2015 OUTFALL ARSENIC INVESTIGATION: 2015 SAMPLING
|
|
2016-02-29
|
99
|
Miscellaneous
|
|
DNR PROVIDED COMMENTS TO EPA REGARDING 11-09-15 OUTFALL ARSENIC INVESTIGATION: 2015 SAMPLING
|
|
2016-02-26
|
99
|
Miscellaneous
|
|
EPA APPROVAL OF ADDENDUM TO CONSTRUCTION COMPLETION REPORT
|
|
2016-02-18
|
99
|
Miscellaneous
|
|
NO DNR COMMENTS RELATED TO 02-09-2016 ADDENDUM TO CONSTRUCTION COMPLETION REPORT
|
|
2016-02-09
|
43
|
Site Activity Status Update Received
|
|
ADDENDUM TO CONSTRUCTION COMPLETION REPORT
|
|
2016-01-26
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (OCTOBER THROUGH DECEMBER 2015)
|
|
2016-01-14
|
99
|
Miscellaneous
|
|
REQUEST FOR ADDT'L INFORMATION REGARDING BUILDING 59 DECONTAMINATION REPORT
|
|
2016-01-04
|
43
|
Site Activity Status Update Received
|
|
LEGACY - RA COMPLETION REPORT - FINAL
|
|
2016-01-04
|
43
|
Site Activity Status Update Received
|
|
WW TREATMENT SYSTEM MODIFICATIONS
|
|
2016-01-04
|
43
|
Site Activity Status Update Received
|
|
RESPONSES TO 11-06-15 EPA DOC "EPA 2014 BARRIER WALL GW MONITORING ANNUAL RPT OCT OBSERVATIONS"
|
|
2015-11-23
|
43
|
Site Activity Status Update Received
|
|
BUILDING 59 DECONTAMINATION REPORT
|
|
2015-11-16
|
43
|
Site Activity Status Update Received
|
|
LEGACY: SAMPLING SUMMARY REPORT - FINAL - REV 0
|
|
2015-11-09
|
43
|
Site Activity Status Update Received
|
|
OUTFALL ARSENIC INVESTIGATION: 2015 SAMPLING
|
|
2015-11-09
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JULY THROUGH SEPTEMBER 2015)
|
|
2015-10-23
|
43
|
Site Activity Status Update Received
|
|
EXHIBIT A: STATEMENT OF WORK - DRILLING SERVICES, MW INSTALLATION, ABANDONMENT & REPAIR
|
|
2015-10-13
|
43
|
Site Activity Status Update Received
|
|
2015 BARRIER WALL GROUNDWATER MONITORING ANNUAL REPORT - REV 0
|
|
2015-09-29
|
43
|
Site Activity Status Update Received
|
|
MONITORING WELLS MW007S, MW007M, MW020S & MW020M CANNOT BE ABANDONED - LOST
|
|
2015-09-29
|
99
|
Miscellaneous
|
|
DNR ACKNOWLEDGMENT THAT LOST MONITORING WELLS MW007S, MW007M, MW202S & MW020M CANNOT BE ABANDONED
|
|
2015-08-05
|
99
|
Miscellaneous
|
|
EPA APPROVAL & MODIFICATION-TYCO REVISED BARRIER WALL GROUNDWATER MONITORING PLAN UPDATE 06/15
|
|
2015-08-03
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (APRIL- JUNE)
|
|
2015-08-03
|
43
|
Site Activity Status Update Received
|
|
PROPOSED MODIFICATIONS TO THE GROUNDWATER COLLECTION & TRETMENT SYSTEM
|
|
2015-07-06
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO 4/16/15 EPA CMMTS "TYCO UPDATED DYE INJECT INFO & ESTIMATES PROPOSAL CH2MHILL TECH MEMO
|
|
2015-07-06
|
43
|
Site Activity Status Update Received
|
|
REVISED RESPONSES TO 10/10/15 EPA COMMENTS ON "TYCO BARRIER WALL GW MONITORING PLAN UPDATE"-6/30/14
|
|
2015-07-06
|
43
|
Site Activity Status Update Received
|
|
REVISED BARRIER WALL GROUNDWATER MONITORING PLAN UPDATE
|
|
2015-05-11
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JANUARY THROUGH MARCH 2015)
|
|
2015-04-27
|
43
|
Site Activity Status Update Received
|
|
SAND COVER - CHEMICAL ANALYSIS PRIOR TO PLACEMENT
|
|
2015-04-17
|
99
|
Miscellaneous
|
|
DNR NOTICE TO PROCEED W/EXTRACTION WELL #3 CLEANOUT PROPOSAL
|
|
2015-04-17
|
43
|
Site Activity Status Update Received
|
|
CONSTRUCTION SITE PERMIT APPROACH FOR TYCO INFILTRATION STORMWATER REDUCTION PLAN
|
|
2015-04-16
|
99
|
Miscellaneous
|
|
EPA APPROVAL W/MODIFICATIONS &/OR CONDITIONS OF TYCO UPDATED OUTFALL INVEST CH2MHILL TECH MEMO-3/15
|
|
2015-04-16
|
99
|
Miscellaneous
|
|
EPA RESPONSE TO TYCO UPDATED DYE INJECTION INFO & ESTIMATES PROPOSAL DATED 3/13/2015
|
|
2015-04-08
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO 2/23/15 EPA COMMENTS ON TYCO FIRE PRODUCTS OUTFALL ARSENIC INVEST TECH MEMO OF 2/3/15
|
|
2015-04-08
|
99
|
Miscellaneous
|
|
DNR COMMENTS TO EPA REGARDING TYCOS 4/8/15 SUBMITTAL
|
|
2015-04-01
|
43
|
Site Activity Status Update Received
|
|
VARIOUS BARRIER WALL MNTRING PLAN UPDATE OPEN ITEMS-EPA PRPSED WELL, SEDIMENT SAMPLING & PARAMETERS
|
|
2015-03-26
|
99
|
Miscellaneous
|
|
DNR COMMENTS TO EPA RE: TYCOS UPDATED DYE INJECTION INFO & ESTIMATES DATED 3/24/2015
|
|
2015-03-26
|
99
|
Miscellaneous
|
|
REQUEST FOR ADDT'L PARAMETER MONITORING
|
|
2015-03-24
|
43
|
Site Activity Status Update Received
|
|
UPDATED DYE INJECTION INFORMATION & ESTIMATES
|
|
2015-03-23
|
43
|
Site Activity Status Update Received
|
|
RESPONSES TO 2/23/2015 EPA COMMENTS ON "TYCO FIRE PRODUCTS OUTFALL INVESTIGATION TECHNICAL MEMO"
|
|
2015-03-10
|
99
|
Miscellaneous
|
|
SUBMITTAL OF ADDT'L FIGURES FOR QTLY PROGRESS REPORT (OCT-DECEMBER 2014)
|
|
2015-03-09
|
43
|
Site Activity Status Update Received
|
|
CHAPTER 30 AMENDMENT REQUEST - SAND COVER
|
|
2015-03-06
|
43
|
Site Activity Status Update Received
|
|
STORM WATER MANAGEMENT VARIANCE REQUEST
|
|
2015-03-04
|
43
|
Site Activity Status Update Received
|
|
EXTRACTION WELL #3 CLEANOUT PROPOSAL
|
|
2015-03-02
|
99
|
Miscellaneous
|
|
USACE 408 APPROVAL LETTER
|
|
2015-02-23
|
99
|
Miscellaneous
|
|
EPA COMMENTS SENT TO TYCO REGARDING CH2MHILLS 02/03/15 OUTFALL ARSENIC INVESTIGATION PROPOSAL
|
|
2015-02-18
|
99
|
Miscellaneous
|
|
DNR COMMENTS ON EPA REGARDING CH2MHILLS 02/03/2015 OUTFALL ARSENIC INVESTIGATION PROPOSAL
|
|
2015-02-03
|
43
|
Site Activity Status Update Received
|
|
OUTFALL ARSENIC INVESTIGATION PROPOSAL
|
|
2015-01-29
|
99
|
Miscellaneous
|
|
REQUEST TO INSERT ADDT'L FIGURES INTO QTLY PROGRESS REPORT (OCT-DECEMBER 2014)
|
|
2015-01-21
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS ERPORT (OCTOBER THROUGH DECEMBER 2014)
|
|
2015-01-09
|
43
|
Site Activity Status Update Received
|
|
FINAL QAPP - REVISION O, GREAT LAKES LEGACY ACT, LOWER MENOMINEE RIVER TYCO SITE
|
|
2014-10-30
|
99
|
Miscellaneous
|
|
EPA COMMENTS SENT TO TYCO RE: 08/04/2014 SUPPLEMENTAL EVALUATION SUBMITTAL
|
|
2014-10-29
|
99
|
Miscellaneous
|
|
DNR COMMENTS REGARDING 8/4/2014 SUPPLEMENTAL EVALUATION SUBMITTED TO EPA
|
|
2014-10-20
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JULY THRU SEPT 2014)
|
|
2014-10-10
|
99
|
Miscellaneous
|
|
EPA COMMENTS & REQUEST FOR REVISION OF BARRIER WALL & GW MONITORING PLAN UPDATE DATED 6/30/2014
|
|
2014-10-01
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA SEPT 5, 2014 EMAIL INFORMATION REQUEST - OUTFALLS & DYE TESTING RADIUS OF INFLUENCE
|
|
2014-08-25
|
43
|
Site Activity Status Update Received
|
|
SUMMER 2014 DREDGED MATERIAL TREATABILITY STUDY RESULTS
|
|
2014-08-15
|
99
|
Miscellaneous
|
|
DNR COMMENTS REGARDING 7/2/14 BARRIER WALL GW MONITORING PLAN UPDATE SENT TO EPA
|
|
2014-08-05
|
43
|
Site Activity Status Update Received
|
|
AQUIFER TESTING FIELD ACTIVITIES & RESULTS: APRIL & MAY 2014
|
|
2014-08-04
|
43
|
Site Activity Status Update Received
|
|
SUPPLMNTL EVAL: POTENTIAL FOR RECONTAMINATION OF MENOMINEE RVR SEDIMENTS DUE TO GW MIGRATE-MAIN PLT
|
|
2014-07-29
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA COMMENTS-7/2/14 FIVE YR TECH REVIEW RPT DATED 12/30/13 & ADDENDUM DATED 5/30/14
|
|
2014-07-16
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (APRIL THRU JUNE, 2014)
|
|
2014-07-02
|
43
|
Site Activity Status Update Received
|
|
VERTICAL BARRIER WALL INSPECTION FOLLOW-UP
|
|
2014-07-02
|
43
|
Site Activity Status Update Received
|
|
BARRIER WALL GROUNDWATER MONITORING PLAN UPDATE
|
|
2014-06-30
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA COMMENTS ON THE 5/7/2014 TYCO REVISION TO THE CCR DATED MARCH 2014
|
|
2014-06-23
|
99
|
Miscellaneous
|
|
DNR PROVIDED COMMENTS TO EPA REGARDING ADDENDUM TO THE FIVE YR TECH REVIEW DOC DATED DEC 30, 2013
|
|
2014-06-03
|
43
|
Site Activity Status Update Received
|
|
ADDENDUM TO THE FIVE YR TECHNICAL REVIEW DOCUMENT DATED DECEMBER 30, 2013
|
|
2014-05-23
|
43
|
Site Activity Status Update Received
|
|
EPA CONTRACTOR OVERSIGHT REPORT ON SHEET PILE WALL INSPECTION
|
|
2014-05-21
|
99
|
Miscellaneous
|
|
LEGACY ACT PROJECT AGREEMENT EXECUTED.
|
|
2014-05-14
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA COMMENTS ON "EPA REVIEW OF TYCO SEDIMENT REMOVAL CONSTRUCTION COMPLETION REPORT"
|
|
2014-05-05
|
43
|
Site Activity Status Update Received
|
|
STATUS REPORT FOR TEST WELL INSTALLATION FIELD ACTIVITIES, JANUARY 21 - MARCH 6, 2014
|
|
2014-04-21
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS (JANUARY TO MARCH 2014)
|
|
2014-03-24
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA'S 03-12-2014 EMAIL CONCERNING THE FOLLOW-UP TO BARRIER WALL INSPECTION REPORTS
|
|
2014-02-03
|
99
|
Miscellaneous
|
|
EPA COMMENTS REGARDING FIVE YEAR TECHNICAL REVIEW
|
|
2014-01-16
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (OCTOBER TO DECEMBER 2013)
|
|
2013-12-30
|
43
|
Site Activity Status Update Received
|
|
FIVE YEAR TECHNICAL REVIEW
|
|
2013-10-17
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (JULY TO SEPTEMBER 2013)
|
|
2013-09-18
|
43
|
Site Activity Status Update Received
|
|
TYCO RESPONSE TO EPAS COMMENTS REGARDING BATHYMETRIC SURVEY
|
|
2013-09-13
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO 08-21-2013 NON ISSUED BY DNR WASTEWATER FOR 6TH ST SLIP WW TREATMENT PLANT
|
|
2013-09-12
|
99
|
Miscellaneous
|
|
EPA COMMENTS TO BATHYMETRIC SURVEY & ADJUSTMENTS TO THE ESTIMATED QUANTITY OF DREDGED SEDIMENT
|
|
2013-09-05
|
99
|
Miscellaneous
|
|
RESPONSE TO TYCO'S 08-26-13 EMAIL REGARDING 08-30-13 HW VARIANCE MODIFICATION REQUEST
|
|
2013-08-28
|
43
|
Site Activity Status Update Received
|
|
QAPP - ADDENDUM 1
|
|
2013-08-28
|
99
|
Miscellaneous
|
|
QAPP - ADDENDUM 1
|
|
2013-08-27
|
43
|
Site Activity Status Update Received
|
|
BATHOMETRIC SURVEY & ADJUSTMENTS TO THE ESTIMATED QUANTITY OF DREDGED SEDIMENTS
|
|
2013-08-27
|
99
|
Miscellaneous
|
|
EPA APPROVAL (WITH CONDITIONS) OF PROPOSED TOE AREA DMUS FOR CONFIRMATION SAMPLING
|
|
2013-08-26
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO DNR'S 08-22-13 EMAIL REGARDING 08-20-13 HW VARIANCE MODIFICATION REQUEST
|
|
2013-08-23
|
43
|
Site Activity Status Update Received
|
|
PROPOSED TOE AREA DMUS FOR CONFIRMATION SAMPLING
|
|
2013-08-22
|
99
|
Miscellaneous
|
|
RESPONSE TO 08-20-13 HW VARIANCE MODIFICATION REQUEST
|
|
2013-08-21
|
99
|
Miscellaneous
|
|
NOTICE OF NONCOMPLIANCE ISSUED BY WASTEWATER FOR 6TH ST SLIP WW TREATMENT PLANT
|
|
2013-08-20
|
43
|
Site Activity Status Update Received
|
|
HW VARIANCE MODIFICATION REQUEST
|
|
2013-08-08
|
43
|
Site Activity Status Update Received
|
|
MAP - VERTICAL BARRIER WALL DESIGN; EXTENT OF TOE PROTECTION
|
|
2013-08-02
|
43
|
Site Activity Status Update Received
|
|
SPRING 2013 DREDGED MATERIAL TREATABILITY STUDY RESULTS
|
|
2013-08-02
|
43
|
Site Activity Status Update Received
|
|
SPRING 2013 DREDGED MATERIAL TREATABILITY STUDY RESULTS
|
|
2013-07-27
|
43
|
Site Activity Status Update Received
|
|
TILL ARSENIC CONCENTRATION TABLE
|
|
2013-07-26
|
43
|
Site Activity Status Update Received
|
|
2013 TSS & IN-SITU TURBIDITY CORRELATION FOR SCM - RIVER WATER QUALITY MONITORING
|
|
2013-07-24
|
43
|
Site Activity Status Update Received
|
|
TILL SURFACE SAMPLE LOCATIONS (20 - 50 PPM LIMITS)
|
|
2013-07-23
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (APRIL TO JUNE 2013)
|
|
2013-07-23
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (APRIL TO JUNE 2013)
|
|
2013-07-18
|
99
|
Miscellaneous
|
|
RESPONSE TO TYCO'S 07-10-13 EMAIL REGARDING 06-13-13 HW VARIANCE MODIFICATION REQUEST
|
|
2013-07-10
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO DNR'S 07-03-13 EMAIL REGARDING 06-13-13 HW VARIANCE MODIFICATION REQUEST
|
|
2013-07-08
|
99
|
Miscellaneous
|
|
RESPONSE TO 06-13-13 HW VARIANCE MODIFICATION REQUEST
|
|
2013-06-18
|
43
|
Site Activity Status Update Received
|
|
SOP FOR DUST SUPPRESSION & UPDATED SPILL RESPONSE PLAN (SATISFIES A PORTION OF 06-10-13 DNR REQUEST)
|
|
2013-06-13
|
43
|
Site Activity Status Update Received
|
|
HAZARDOUS WASTE VARIANCE MODIFICATION REQUEST
|
|
2013-06-13
|
43
|
Site Activity Status Update Received
|
|
UPDATED SITE LAYOUT MAP (SATISFIES A PORTION OF 06-10-13 DNR REQUEST)
|
|
2013-06-10
|
99
|
Miscellaneous
|
|
REQUEST FOR ITEMS ON 05-09-13 HW VARIANCE - CLASS 1 PLAN MOD DETERMINATION
|
|
2013-05-31
|
99
|
Miscellaneous
|
|
CPATER 30 MODIFICATION LETTER
|
|
2013-05-21
|
43
|
Site Activity Status Update Received
|
|
RESPONSES TO EPA AND DNR COMMENTS ON "TYCO QAPP ADDENDUM 4"
|
|
2013-05-10
|
43
|
Site Activity Status Update Received
|
|
RESPONSES TO EPA COMMENTS ON "EPA COMMENTS ON TYCO RESPONSE TO COMMENTS & REVISED DREDGED MATL TREAT
|
|
2013-05-09
|
99
|
Miscellaneous
|
|
HAZARDOUS WASTE REMEDIATION VARIANCE - CLASS 1 PLAN MODIFICATION
|
|
2013-05-03
|
43
|
Site Activity Status Update Received
|
|
SOP - TREATED SEDIMENT BIN SAMPLING
|
|
2013-04-29
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO COMMENTS ON HAZARDOUS WASTE VARIANCE MODIFICATION REQUEST
|
|
2013-04-17
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JAN TO MAR 2013)
|
|
2013-04-11
|
43
|
Site Activity Status Update Received
|
|
QUALLITY ASSURANCE PROJECT PLAN - ADDENDUM 4
|
|
2013-04-11
|
43
|
Site Activity Status Update Received
|
|
RESPONSES TO USEPA COMMENTS ON "DREDGED MATERIAL TREATABILITY STUDY RESULTS"
|
|
2013-03-21
|
43
|
Site Activity Status Update Received
|
|
HAZARDOUS WASTE VARIANCE MODIFICATION REQUEST
|
|
2013-03-19
|
43
|
Site Activity Status Update Received
|
|
FINAL CONFIRMATION SAMPLING PLAN
|
|
2013-03-14
|
99
|
Miscellaneous
|
|
EPA COMMENTS ON DREDGED MATERIAL TREATABILITY STUDY RESULTS
|
|
2013-02-22
|
99
|
Miscellaneous
|
|
EPA APPROVAL WITH CONDITIONS OF FINAL CONFIRMATION SAMPLING PLAN
|
|
2013-02-19
|
99
|
Miscellaneous
|
|
EPA APPROVAL WITH CONDITIONS OF FINAL CONF SAMP PLAN (ALSO SEE 02-21 EPA EMAIL)
|
|
2013-02-15
|
99
|
Miscellaneous
|
|
DNR PROVIDED COMMENTS TO EPA REGARDING CONFIRMATION SAMPLING PLAN DATED JULY 2012
|
|
2013-02-04
|
43
|
Site Activity Status Update Received
|
|
DREDGED MATERIAL TREATABILITY STUDY RESULTS
|
|
2012-10-22
|
3
|
Notice of Noncompliance (NON) Issued
|
|
NON FOR HAZARDOUS WASTE REMEMDIATION VARIANCE
|
|
2012-10-16
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (JULY - SEPTEMBER 2012)
|
|
2012-10-11
|
43
|
Site Activity Status Update Received
|
|
CD - TYCO MENOMINEE RIVER BULKHEAD STABILITY DESIGN
|
|
2012-09-13
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY GROUNDWATER EXTRACTION AND MONITORING REPORT - MAY THROUGH JULY 2012
|
|
2012-08-27
|
43
|
Site Activity Status Update Received
|
|
QUALITY ASSURANCE PROJECT PLAN - ADDENDUM 3
|
|
2012-08-27
|
43
|
Site Activity Status Update Received
|
|
TSS AND IN-SITU TURBIDITY CORRELATION - RIVER WATER QUALITY MONITORING - SEDIMENT REMOVAL
|
|
2012-08-20
|
43
|
Site Activity Status Update Received
|
|
TURNING BASIN SOFT SEDIMENT TREATMENT STARTUP REPORT, JULY 2012 - SEDIMENT REMOVAL
|
|
2012-08-15
|
43
|
Site Activity Status Update Received
|
|
CONSTRUCTION REPORT - SEDIMENT REMOVAL
|
|
2012-08-07
|
43
|
Site Activity Status Update Received
|
|
DRAFT FINAL DESIGN REPORT - SEDIMENT REMOVAL
|
|
2012-08-06
|
43
|
Site Activity Status Update Received
|
|
FINAL CONFIROMATION SAMPLING PLAN - SEDIMENT REMOVAL
|
|
2012-07-30
|
43
|
Site Activity Status Update Received
|
|
FINAL QUALITY ASSURANCE PROJECT PLAN - SEDIMENT REMOVAL
|
|
2012-07-17
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (APRIL - JUNE 2012)
|
|
2012-07-02
|
43
|
Site Activity Status Update Received
|
|
WEEKLY CONSTRUCTION OBSERVATION REPORT (06/25/2012)
|
|
2012-06-20
|
43
|
Site Activity Status Update Received
|
|
QAPP - ADDENDUM NO 1 (ON CD)
|
|
2012-06-14
|
43
|
Site Activity Status Update Received
|
|
FINAL CONFIRMATION SAMPLING PLAN
|
|
2012-06-05
|
43
|
Site Activity Status Update Received
|
|
MONTHLY GROUNDWATER EXTRACTION AND MONITORING REPORT - APRIL 2012
|
|
2012-05-29
|
43
|
Site Activity Status Update Received
|
|
BARRIER WALL GROUNDWATER MONITORING ANNUAL REPORT
|
|
2012-05-25
|
43
|
Site Activity Status Update Received
|
|
SCHEDULE FOR SEDIMENT REMOVAL
|
|
2012-05-24
|
99
|
Miscellaneous
|
|
CONSTRUCTION SITE STORM WATER RUNOFF - PARTIAL PREMIT COVERAGE ONLY
|
|
2012-05-16
|
43
|
Site Activity Status Update Received
|
|
EROSION CONTROL PLAN - SEDIMENT REMOVAL
|
|
2012-05-03
|
99
|
Miscellaneous
|
|
DREDGING OPERATION WASTEWATER DISCHARGES - GENERAL WPDES PERMIT ISSUED
|
|
2012-05-03
|
43
|
Site Activity Status Update Received
|
|
CORRECTIVE MEASURES IMPLEMENTATION PROGRAM MANAGEMENT PLAN - SEDIMENT REMOVAL
|
|
2012-05-03
|
43
|
Site Activity Status Update Received
|
|
CONSTRUCTION QUALITY ASSURANCE PLAN - SEDIMENT REMOVAL
|
|
2012-05-03
|
43
|
Site Activity Status Update Received
|
|
QUALITY ASSURANCE PROJECT PLAN - ADDENDUM 2
|
|
2012-04-30
|
43
|
Site Activity Status Update Received
|
|
CONFIRMATION SAMPLING PLAN EXTENSION REQUEST
|
|
2012-04-30
|
99
|
Miscellaneous
|
|
EPA APPROVAL OF CONFIRMATION SAMPLING PLAN EXTENSION REQUEST
|
|
2012-04-25
|
43
|
Site Activity Status Update Received
|
|
BID SOLICITATION FOR WATER TREATMENT SERVICES
|
|
2012-04-25
|
43
|
Site Activity Status Update Received
|
|
BID SOLICITATION FOR DREDGING, STABILIZATION & DISPOSAL SERVICES
|
|
2012-04-25
|
43
|
Site Activity Status Update Received
|
|
SEDIMENT REMOVAL PROJECT ISSUED FOR BIDDING - APRIL 2012
|
|
2012-04-25
|
43
|
Site Activity Status Update Received
|
|
MONTHLY GROUNDWATER EXTRACTION AND MONITORING REPORT - MARCH 2012
|
|
2012-04-25
|
43
|
Site Activity Status Update Received
|
|
VERTICAL BARRIER WALL SHEET PILE STABILIZATION EVALUATION
|
|
2012-04-16
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (JAN - MAR 2012)
|
|
2012-04-10
|
99
|
Miscellaneous
|
|
EPA RESPONSE LETTER - APPROVAL TO DREDGE VS EXCAVATE SOUTH CHANNEL
|
|
2012-04-10
|
99
|
Miscellaneous
|
|
EPA RESPONSE LTR-APPROVAL OF PROPOSED SURFACE WEIGHTED AVERAGE CONCENT METHODOLOGY WITH CONDITIONS
|
|
2012-04-02
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO DNR COMMENTS ON SECTION 401 WATER QUALITY CERTIFICATION AND CHAPTER 30 PERMIT APPLICATIO
|
|
2012-04-02
|
43
|
Site Activity Status Update Received
|
|
GRADIENT TESTING AND MONITORING PLAN
|
|
2012-03-29
|
43
|
Site Activity Status Update Received
|
|
COPY OF PUBLIC NOTICE FOR HAZARDOUS WASTE REMEDIATION VARIANCE
|
|
2012-03-12
|
43
|
Site Activity Status Update Received
|
|
HAZARDOUS WASTE REMEDIATION VARIANCE REQUEST
|
|
2012-03-12
|
43
|
Site Activity Status Update Received
|
|
ARSENIC WATER QUALITY ANALYSIS FOR TYCO SEDIMENT REMOVAL FROM MENOMINEE RIVER
|
|
2012-03-12
|
43
|
Site Activity Status Update Received
|
|
NER WATERSHED MGMT COMMENTS & RESPONSE ON THE SUMMARY OF INTERNAL ANSUL WATER QUALITY VARIANCE DISC
|
|
2012-03-12
|
43
|
Site Activity Status Update Received
|
|
HAZARDOUS WASTE REMEDIATION VARIANCE REQUEST
|
|
2012-02-16
|
43
|
Site Activity Status Update Received
|
|
HYDRAULIC GRADIENT AND MODELING EVALUATION
|
|
2012-02-01
|
43
|
Site Activity Status Update Received
|
|
VIBRATING WIRE PIEZOMETER - PRELIMINARY DATA
|
|
2012-02-01
|
43
|
Site Activity Status Update Received
|
|
PRELIMINARY VIBRATING WIRE PIEZOMETER RESULTS
|
|
2012-01-27
|
43
|
Site Activity Status Update Received
|
|
MODEL BASED EST OF GW DISCHARGE DURING DEWATERING FOR RIVER-BED SEDIMENT EXCAVATION
|
|
2012-01-23
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
DRAFT FINAL DESIGN REPORT DATED JANUARY 2012
|
|
2012-01-17
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (OCTOBER TO DECEMBER 2011)
|
|
2011-12-21
|
149
|
Remedial Action (RA) Design Report Approved
|
|
50% DESIGN CONDITIONALLY APPROVED BY EPA
|
|
2011-10-17
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (JULY - SEPTEMBER 2011)
|
|
2011-10-14
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
50% DESIGN PLAN AND SPECIFICATIONS PRELIMINARY BASIS OF DESIGN
|
|
2011-10-13
|
43
|
Site Activity Status Update Received
|
|
CASE STUDY COMPARISONS OF SIMILAR SEDIMENT ARSENIC CAPPING SITES
|
|
2011-10-06
|
43
|
Site Activity Status Update Received
|
|
TWO SIGNIFICANT ENHANCEMENTS TO TYCO'S ESRP
|
|
2011-09-14
|
43
|
Site Activity Status Update Received
|
|
ENHANCED SEDIMENT REMOVAL PLAN APPROACH
|
|
2011-09-14
|
43
|
Site Activity Status Update Received
|
|
TYCO ENHANCED SEDIMENT REMOVAL PLAN (ESRP) APPROACH
|
|
2011-09-08
|
130
|
DNR Regulatory Reminder Sent
|
|
Vapor Intrusion (VI) Assessment Notification Ltr Sent
|
|
2011-08-17
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
MENOMINEE RIVER GROUNDWATER INVESTIGATION WP
|
|
2011-08-03
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF WORK START - 2011 RIVER GROUNDWATER INVESTIGATION ACTIVITIES
|
|
2011-07-18
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT APRIL-JUNE 2011. INCLUDES WELL CONSTRUCTION REPORTS FOR THE BARRIER WALLS MWS
|
|
2011-04-20
|
43
|
Site Activity Status Update Received
|
|
CONSTRUCTION COMPLETION REPORT - PHYTO-PUMPING SYSTEM INSTALLATION
|
|
2011-04-20
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT (JAN - MAR 2011)
|
|
2011-04-20
|
43
|
Site Activity Status Update Received
|
|
CONSTRUCTION COMPLETION REPORT - CONTAINMENT BARRIER WALL INSTALLATION
|
|
2011-04-20
|
43
|
Site Activity Status Update Received
|
|
CONSTRUCTION COMPLETION REPORT - GW COLLECTION & TREATMENT SYSTEM INSTALLATION
|
|
2011-04-20
|
43
|
Site Activity Status Update Received
|
|
CONSTRUCTION COMPLETION REPORT - APPENDIX A - GW COLLECTION & TREATMENT SYSTEM RECORD DRAWINGS
|
|
2011-02-09
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO USEPA COMMENTS PROVIDED FOR THE FINAL BARRIER WALL GW MONITORING PLAN
|
|
2011-01-31
|
43
|
Site Activity Status Update Received
|
|
RIVER/SEDIMENT CROSS SECTIONS
|
|
2011-01-05
|
43
|
Site Activity Status Update Received
|
|
PHYTO-PUMPING SAP FLOW MONITORING
|
|
2010-12-28
|
43
|
Site Activity Status Update Received
|
|
REVISED CONSTRUCTION COMPLETION REPORT & COVER MAINTENANCE PLAN SUBMITTALS FOR THE ONSITE SOIL AREAS
|
|
2010-12-28
|
43
|
Site Activity Status Update Received
|
|
FINAL CONSTRUCTION COMPLETION REPORT - REVISION 1, ON-SITE & OFF-SITE SOIL AREAS
|
|
2010-12-28
|
43
|
Site Activity Status Update Received
|
|
DRAFT COVER MAINTENANCE PLAN - REVISION 1, ON-SITE SOIL AREAS
|
|
2010-12-06
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
SEDIMENT REMOVAL WORKPLAN-DRAFT ALTERNATIVE MENOMINEE RVR SEDI REMOV PLAN-DRAFT, SEDI REM WRKPL EVAL
|
|
2010-10-22
|
99
|
Miscellaneous
|
|
AUTHORIZATION TO COMMENCE OUTFALL 003 DISCHARGE - WI-0001040-07
|
|
2010-10-06
|
43
|
Site Activity Status Update Received
|
|
O&M PLAN - REVISION 1, ONSITE GROUNDWATER MANAGEMENT
|
|
2010-08-24
|
43
|
Site Activity Status Update Received
|
|
DRAFT DRAINAGE PLAN - POST BARRIER WALL CONSTRUCTION
|
|
2010-08-03
|
43
|
Site Activity Status Update Received
|
|
BARRIER WALL GW MONITORING PLAN
|
|
2010-07-19
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (APRIL - JUNE 2010) INCLUDES SOME MW ABAND FORMS
|
|
2010-07-06
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF FACT SHEET DISTRIBUTION
|
|
2010-06-29
|
43
|
Site Activity Status Update Received
|
|
INSTITUTIONAL CONTROLS IMPLEMENTATION COMPLETION NOTIFICATION
|
|
2010-06-15
|
43
|
Site Activity Status Update Received
|
|
ON-SITE GROUNDWATER MANGEMENT MECHANICAL PUMPING SYSTEM DESIGN AND CONST QUALITY ASSURANCE PLAN
|
|
2010-06-01
|
43
|
Site Activity Status Update Received
|
|
BASIS OF ESTIMATE REVIEW AND COMMENT
|
|
2010-06-01
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA COMMENTS ON SEDIMENT & SEMI-CONSOLIDATED SUBSOILS INVESTIGATION WP DATED APRIL 2010
|
|
2010-06-01
|
43
|
Site Activity Status Update Received
|
|
ONSITE GROUNDWATER MANAGEMENT - BARRIER WALL, GROUNDWATER TREATMENT AND PHYTOPUMPING
|
|
2010-05-18
|
99
|
Miscellaneous
|
|
EPA RESPONSE TO CAMU
|
|
2010-05-05
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER COLLECTION AND TREATMENT SYSTEM GROUNDWATER COLLECTION DESIGN
|
|
2010-04-22
|
43
|
Site Activity Status Update Received
|
|
2009 BASELINE GROUNDWATER AND SOIL STOCKPILE SAMPLING RESULTS
|
|
2010-04-19
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (JANUARY - MARCH 2010)
|
|
2010-04-09
|
43
|
Site Activity Status Update Received
|
|
SEDIMENT AND SEMI-CONSOLIDATED SUBSOILS INVESTIGATION WORKPLAN
|
|
2010-03-30
|
43
|
Site Activity Status Update Received
|
|
MARCH 2010 - PHYTOREMEDIATION PLAN, CQAP, DESIGN SPECS AND DRAWINGS
|
|
2010-03-29
|
43
|
Site Activity Status Update Received
|
|
MARCH 2010 - CQAP - STEEL PILE WALL INSTALLATION
|
|
2010-03-01
|
43
|
Site Activity Status Update Received
|
|
INSTITUTIONAL CONTROLS IMPLEMENTATION PLAN
|
|
2010-02-24
|
43
|
Site Activity Status Update Received
|
|
DEED RESTRICTION
|
|
2010-02-23
|
43
|
Site Activity Status Update Received
|
|
PROJECT MANUAL FOR CONTRACT "A" INSTALLATION OF A STEEL SHEET PILE VERTICAL BARRIER WALL
|
|
2010-02-23
|
43
|
Site Activity Status Update Received
|
|
TYCO SAFETY PRODUCTS ANSUL PHASE I VERTICAL BARRIER WALL
|
|
2010-02-23
|
43
|
Site Activity Status Update Received
|
|
PROPOSED NO ANCHORING ORDINANCE
|
|
2010-02-15
|
43
|
Site Activity Status Update Received
|
|
MEETING MINUTES FOR FEB 4, 2010 MEETING
|
|
2010-02-01
|
43
|
Site Activity Status Update Received
|
|
SUSTAINABLE SOLUTIONS
|
|
2010-01-21
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (OCTOBER - DECEMBER 2009)
|
|
2010-01-21
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER COLLECTION AND TREATMENT SYSTEM BASIS OF DESIGN - FINAL
|
|
2009-12-30
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA COMMENT LETTER DATED JUNE 17, 2009
|
|
2009-12-30
|
43
|
Site Activity Status Update Received
|
|
DRAFT FINAL CONSTRUCTION COMPLETION REPORT - 2009 ONSITE & OFFSITE SOIL AREAS
|
|
2009-10-28
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO OCT 15, 2009 EPA COMMENTS ON THE 2009 BASELINE GW SAMPLING PLAN
|
|
2009-10-28
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA OCT 16, 2009 COMMENTS ON THE COVER DESIGN FOR ONSITE & OFFSITE SOIL AREAS
|
|
2009-10-14
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (JULY - SEPTEMBER 2009)
|
|
2009-10-14
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO USEPA COMMENTS ON COVER DESIGN FOR ON-SITE AND OFF-SITE SOIL AREAS
|
|
2009-10-14
|
43
|
Site Activity Status Update Received
|
|
ADDENDUM TO THE COVER DESIGN FOR OFF-SITE SOIL AREAS
|
|
2009-10-09
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY OF CONSTRUCTION ACTIVITIES 09-28-09 TO 10-03-09
|
|
2009-10-09
|
43
|
Site Activity Status Update Received
|
|
2009 BASELINE GROUNDWATER SAMPLING PLAN
|
|
2009-10-02
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY OF CONSTRUCTION ACTIVITIES 09-21-09 TO 09-27-09
|
|
2009-09-29
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO USEPA COMMENTS ON THE COVER DESIGN FOR ON-SITE AND OFF-SITE SOIL AREAS
|
|
2009-09-25
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY OF CONSTRUCTION ACTIVITIES 09-14-09 TO 09-20-09
|
|
2009-09-18
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY OF CONSTRUCTION ACTIVITIES 09-08-09 TO 09-13-09
|
|
2009-09-11
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMRY OF CONSTRUCTION ACTIVITIES 08-31-09 TO 09-04-09
|
|
2009-09-09
|
99
|
Miscellaneous
|
|
DNR PROVIDED COMMENTS TO EPA REGARDING 09-04-09 COVER DESIGN SUBMITTAL
|
|
2009-09-04
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY OF CONSTRUCTION ACTIVITIES 08-24-09 TO 08-29-09
|
|
2009-09-04
|
43
|
Site Activity Status Update Received
|
|
COVER DESIGN FOR ONSITE AND OFFSITE SOIL AREAS AT THE ANSUL FACILITY
|
|
2009-08-31
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY OF CONSTRUCTION ACTIVITIES 08-16-09 TO 08-22-09
|
|
2009-08-24
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY OF CONSTRUCTION ACTIVITIES 08-10-09 TO 08-15-09
|
|
2009-08-17
|
43
|
Site Activity Status Update Received
|
|
DOC OF WELL ABANDONMENT (MW055S & MW056S) NEAR BUILDING 59/FORMER INTERCEPTOR TRENCH
|
|
2009-08-13
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY OF CONSTRUCTION ACTIVITIES 08-03-09 TO 08-07-09
|
|
2009-08-06
|
43
|
Site Activity Status Update Received
|
|
WEEKLY CONSTRUCTION SUMMARY FOR JULY 27, 2009
|
|
2009-08-03
|
43
|
Site Activity Status Update Received
|
|
WEEKLY CONSTRUCTION SUMMARY FOR JULY 20, 2009
|
|
2009-07-24
|
43
|
Site Activity Status Update Received
|
|
WEEKLY SUMMARY FOR JULY 13 - 17, 2009
|
|
2009-07-22
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT (APRIL - JUNE 2009)
|
|
2009-06-22
|
99
|
Miscellaneous
|
|
WPDES PERMIT NO WI-S067831-3: CONSTRUCTION SITE STORM WATER RUNOFF VALID 06-22-2009 TO 06-21-2012
|
|
2009-06-22
|
43
|
Site Activity Status Update Received
|
|
NOTIFICATION OF WORK START - INSTALLATION OF VIBRATING BEAM SLURRY WALL TO BEGIN JULY 8, 2009
|
|
2009-06-01
|
43
|
Site Activity Status Update Received
|
|
PHASE I VERTICAL BARRIER WALL INSTALLATION - CORRECTIVE MEASURES IMPLEMENTATION PROG MANAGEMENT PLAN
|
|
2009-06-01
|
43
|
Site Activity Status Update Received
|
|
PHASE I VERTICAL BARRIER WALL INSTALLATION - CONSTRUCTION QUALITY ASSURANCE PLAN
|
|
2009-05-18
|
43
|
Site Activity Status Update Received
|
|
ADDENDUM TO QUARTERLY REPORT (FEB 2009 - MARCH 2009)
|
|
2009-04-15
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY REPORT (FEB 2009 AND MARCH 2009)
|
|
2009-03-12
|
43
|
Site Activity Status Update Received
|
|
ADMINISTRATIVE ORDER ON CONSENT BETWEEN EPA & TYCO
|
|
2008-12-23
|
43
|
Site Activity Status Update Received
|
|
RCRA CORRECTIVE ACTION PROGRAM MEETING MINUTES - OCTOBER 8, 2008
|
|
2008-12-16
|
43
|
Site Activity Status Update Received
|
|
BIMONTHLY PROGRESS REPORT (OCTOBER 2008 & NOVEMBER 2008)
|
|
2008-11-24
|
43
|
Site Activity Status Update Received
|
|
ABANDONMENT FORMS FOR TEMP WELLS OB-1 THROUGH OB-6
|
|
2008-11-17
|
99
|
Miscellaneous
|
|
DNR FISHERIES ISSUED NOTICE TO PROCEED WITH PROPOSAL RECEIVED ON 10/29/08
|
|
2008-10-24
|
43
|
Site Activity Status Update Received
|
|
PROPOSAL TO WAIVE POTENTIAL PHASE I CORRECTIVE MEASURES CONSTRUCTION WORK RESTRICTIONS
|
|
2008-10-17
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT (AUG 2008 & SEPT 2008)
|
|
2008-08-22
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2008-08-13
|
43
|
Site Activity Status Update Received
|
|
OFF-SITE SOIL SAMPLING & ANALYSIS WORKPLAN - ESCANABA & LAKE SUPERIOR RR
|
|
2008-08-13
|
43
|
Site Activity Status Update Received
|
|
EPA APPRIVAL OFFSITE SAMPLING & ANALYSIS WORK PLAN - ESCANABA & LAKE SUPERIOR RR
|
|
2008-07-28
|
43
|
Site Activity Status Update Received
|
|
MW ABANDONMENT FORMS - 502 PLANT WELL, RESEARCH WELL, B-29 & DOCK WELL
|
|
2008-06-12
|
99
|
Miscellaneous
|
|
RETAINING WALL BARRIER PERMIT
|
|
2008-06-10
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2008-05-02
|
99
|
Miscellaneous
|
|
EPA FINAL DECISION & RESPONSE TO COMMENTS
|
|
2008-04-14
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY REPORT (FEB - MARCH 2008)
|
|
2008-04-01
|
99
|
Miscellaneous
|
|
DNR APPROVAL OF SLURRY WALL
|
|
2008-02-27
|
43
|
Site Activity Status Update Received
|
|
PHASE I CMI WP - REVISED ERRATA PAGES
|
|
2008-02-18
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY REPORT
|
|
2008-02-15
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO EPA & DNR COMMENTS ON THE PHASE I CMI WP DATED 12-18-07
|
|
2008-01-18
|
43
|
Site Activity Status Update Received
|
|
PHASE I CORRECTIVE MEASURES WORK PLAN - EPA APPROVED
|
|
2007-12-19
|
43
|
Site Activity Status Update Received
|
|
BI MONTHLY REPORT
|
|
2007-12-19
|
43
|
Site Activity Status Update Received
|
|
PHASE I WORK PLAN
|
|
2007-12-12
|
43
|
Site Activity Status Update Received
|
|
APPLICATION FOR CHAPTER 30, SECTION 10 & SECTION 404 PERMITS
|
|
2007-12-11
|
43
|
Site Activity Status Update Received
|
|
TCLP ANALYSIS OF POPLAR LEAVES
|
|
2007-12-05
|
43
|
Site Activity Status Update Received
|
|
BEDROCK WELL ABANDONMENT & REPLACEMENT REPORT
|
|
2007-11-27
|
99
|
Miscellaneous
|
|
DNR RESPONSE TO EPA REGARDING EARTH TECH'S STATEMENT OF BASIS COMMENTS.
|
|
2007-10-18
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2007-09-27
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER DATA FROM EX-001 (FOR PILOT STUDY)
|
|
2007-09-25
|
43
|
Site Activity Status Update Received
|
|
EPA COMMENTS REGARDING WETLAND DELINEATION
|
|
2007-09-24
|
43
|
Site Activity Status Update Received
|
|
EARTHTECH WETLAND DELINEATION REPORT
|
|
2007-09-05
|
43
|
Site Activity Status Update Received
|
|
ADDENDUM 01 TO THE CORRECTIVE MEASURES STUDY - REVISION 01
|
|
2007-09-05
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO US EPA & DNR COMMENTS ON ADDENDUM 01 TO THE CMS
|
|
2007-08-23
|
99
|
Miscellaneous
|
|
FINAL VERSION OF EPA STATEMENT OF BASIS
|
|
2007-08-21
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2007-07-19
|
43
|
Site Activity Status Update Received
|
|
BEDROCK WELL ABANDONMENT & REPLACEMENT WORK PLAN
|
|
2007-06-18
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT (APRIL 2007 - MAY 2007)
|
|
2007-05-30
|
43
|
Site Activity Status Update Received
|
|
DEPT OF INTERIOR LETTER ENDANGERED RESOURCES
|
|
2007-05-29
|
99
|
Miscellaneous
|
|
EPA/DNR APPROVAL OF BEDROCK WELL ABANDONMENT & REPLACEMENT
|
|
2007-05-11
|
43
|
Site Activity Status Update Received
|
|
PROPOSAL FOR BEDROCK WELL ABANDONMENT & REPLACEMENT
|
|
2007-04-24
|
43
|
Site Activity Status Update Received
|
|
2006 BARRIER MONITORING REPORT
|
|
2007-04-17
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT (FEB 2007-MAR 2007)
|
|
2007-04-17
|
43
|
Site Activity Status Update Received
|
|
MARCH 21, 2007 MEETING MINUTES
|
|
2007-04-10
|
99
|
Miscellaneous
|
|
REQUEST FOR REVISED SOIL EXTENT MAP
|
|
2007-03-20
|
43
|
Site Activity Status Update Received
|
|
PRE-DESIGN REMEDIAL ENGINEERING REPORT
|
|
2007-02-22
|
99
|
Miscellaneous
|
|
EPA APPROVAL LTR FOR ADDENDUM 01 TO THE CORRECTIVE MEASURES STUDY DATED JANUARY 2007
|
|
2007-02-20
|
99
|
Miscellaneous
|
|
DNR SEDIMENT MANAGEMENT & WATER EVALUATIONS SECTIONS MEMO
|
|
2007-02-19
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2007-02-09
|
43
|
Site Activity Status Update Received
|
|
SURFACE SOIL SAMPLING & ANALYSIS REPORT - OFF-SITE FOOTBALL FIELD
|
|
2007-01-11
|
43
|
Site Activity Status Update Received
|
|
ADDENDUM 01 TO THE CORRECTIVE MEASURES STUDY (URS, 2003)
|
|
2007-01-03
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL FOOTBALL FIELD SAMPLING TO TAKE PLACE 01-06-2007
|
|
2006-12-15
|
43
|
Site Activity Status Update Received
|
|
FACILITY FACT SHEET
|
|
2006-12-11
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT (OCT & NOV 2006)
|
|
2006-12-06
|
43
|
Site Activity Status Update Received
|
|
SURFACE SOIL SAMPLING & ANALYSIS WP - OFF-SITE FOOTBALL FIELD
|
|
2006-12-06
|
99
|
Miscellaneous
|
|
EPA APPROVAL OF SURFACE SOIL SAMPLING & ANALYSIS WP - OFF-SITE FOOTBALL FIELD
|
|
2006-12-06
|
43
|
Site Activity Status Update Received
|
|
AUGUST 8, 2006 & OCTOBER 24, 2006 MEETING MINUTES
|
|
2006-11-13
|
43
|
Site Activity Status Update Received
|
|
PRE-DESIGN REMEDIAL WORK PLAN - REVISION 1
|
|
2006-11-13
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO SECONDARY COMMENTS FROM EPA ON PRE-DESIGN REMEDIAL WORK PLAN (DATED FEB 2006)
|
|
2006-11-13
|
43
|
Site Activity Status Update Received
|
|
RESPONSE FROM EPA ON PRE-DESIGN REMEDIAL WORK PLAN RESPONSE TO COMMENTS (DATED MAY 2006)
|
|
2006-10-31
|
99
|
Miscellaneous
|
|
EPA LETTER STATING RFI SATISFIED
|
|
2006-10-23
|
43
|
Site Activity Status Update Received
|
|
DRUM BURIAL - RESPONSE TO EPA COMMENTS & ERRATA PAGES
|
|
2006-10-18
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT (AUGUST 2006 & SEPTEMBER 2006)
|
|
2006-10-18
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2006-10-16
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO WDNR 07-28-05 MEMO RE: ARSENIC CLEANUP LEVEL FOR MENOMINEE RIVER TURNING BASIN SEDIMENTS
|
|
2006-10-11
|
99
|
Miscellaneous
|
|
EPA APPROVAL OF PRE-DESIGN REMEDIAL WORK PLAN WITH MODIFICATIONS
|
|
2006-09-20
|
99
|
Miscellaneous
|
|
DRUM BURIAL REPORT - EPA SAPPROVAL W/MODIFICATIONS
|
|
2006-09-06
|
43
|
Site Activity Status Update Received
|
|
REVISED QUALITY ASSURANCE PROJECT PLAN (QAPP)
|
|
2006-08-22
|
43
|
Site Activity Status Update Received
|
|
COPY OF AUGUST 8, 2006 PRESENTATION
|
|
2006-08-18
|
43
|
Site Activity Status Update Received
|
|
UPDATE 2006 PRE-DESIGN SCHEDULE
|
|
2006-08-10
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2006-07-06
|
43
|
Site Activity Status Update Received
|
|
2005 BARRIER MONITORING REPORT
|
|
2006-06-14
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2006-05-15
|
99
|
Miscellaneous
|
|
DHFS PUBLIC HEALTH CONSULTATION
|
|
2006-04-10
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2006-03-16
|
43
|
Site Activity Status Update Received
|
|
DRUM BURIAL AREA SUPPLEMENTAL SITE INVESTIGATION REPORT
|
|
2006-03-08
|
43
|
Site Activity Status Update Received
|
|
MEETING MINUTES FROM FEBRUARY 22, 2006 MEETING
|
|
2006-02-27
|
43
|
Site Activity Status Update Received
|
|
PRE-DESIGN REMEDIAL WORK PLAN
|
|
2006-02-13
|
43
|
Site Activity Status Update Received
|
|
BIMONTHLY PROGRESS REPORT
|
|
2006-01-12
|
43
|
Site Activity Status Update Received
|
|
PRB MEDIA OPTIMIZATION STUDY REPORT
|
|
2005-12-21
|
43
|
Site Activity Status Update Received
|
|
DNR NOTIFIED OF SUBMITTAL DATES FOR REPORTS
|
|
2005-12-09
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY STATUS REPORT
|
|
2005-11-21
|
43
|
Site Activity Status Update Received
|
|
SUMMARY OF 11/17/04 MEETING
|
|
2005-11-03
|
43
|
Site Activity Status Update Received
|
|
PRB BENCH SCALE STUDY REVIEW REPORT
|
|
2005-10-18
|
43
|
Site Activity Status Update Received
|
|
FORMER INTERCEPTOR TRENCH ABANDONMENT REPORT
|
|
2005-10-17
|
43
|
Site Activity Status Update Received
|
|
BIMONTHLY PROGRESS REPORT
|
|
2005-08-10
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT (JUNE 2005 & JULY 2005)
|
|
2005-08-05
|
43
|
Site Activity Status Update Received
|
|
EI 725
|
|
2005-06-30
|
43
|
Site Activity Status Update Received
|
|
ENVIRONMENTAL INDICATOR 725 APPROACH
|
|
2005-06-13
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2005-06-09
|
43
|
Site Activity Status Update Received
|
|
QUESTION REGARDING APPENDIX IX VS REVISED APPENDIX IX SAMPLING
|
|
2005-06-09
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
NOTICE TO PROCEED WITH CONDITONS
|
|
2005-05-23
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
NOTICE TO PROCEED WITH CONDITONS
|
|
2005-05-18
|
805
|
Historic Waste Site
|
|
WASTE REGISTRY SCREENING WORKSHEET COMPLETED
|
|
2005-05-18
|
807
|
Registry of Waste Disposal Site - SHWIMS Listing
|
|
|
|
2005-05-16
|
43
|
Site Activity Status Update Received
|
|
2004 RCRA BARRIER MONITORING REPORT
|
|
2005-05-16
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
SUPPLEMENTAL INVESTIGATION WORK PLAN FOR THE DRUM BURIAL AREA
|
|
2005-05-05
|
99
|
Miscellaneous
|
|
REQUESTED A COPY OF PAGE 2 OF MARCH 29, 2005 MEETING SUMMARY
|
|
2005-05-04
|
43
|
Site Activity Status Update Received
|
|
SUMMARY OF MARCH 29, 2005 MEETING
|
|
2005-04-11
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2005-02-01
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY REPORT
|
|
2004-12-16
|
99
|
Miscellaneous
|
|
NTP W/CONDITIONS - DRUM BURIAL AREA
|
|
2004-12-13
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT (OCT & NOV 2004)
|
|
2004-11-17
|
43
|
Site Activity Status Update Received
|
|
WETLAND BOUNDARY DELINEATION
|
|
2004-10-12
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2004-09-24
|
43
|
Site Activity Status Update Received
|
|
2004 RESOURCE CONSERVATION RECOVERY ACT FACILITY INVESTIGATION ADDENDUM #4
|
|
2004-08-23
|
43
|
Site Activity Status Update Received
|
|
DRUM BURIAL AREA SAMPLING RESULTS
|
|
2004-08-11
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2004-07-28
|
43
|
Site Activity Status Update Received
|
|
FORMER INTERCEPTOR TRENCH CAPPING WORK PLAN
|
|
2004-04-09
|
43
|
Site Activity Status Update Received
|
|
BIMONTHLY PROGRESS REPORT
|
|
2004-02-11
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2004-02-03
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
RFI ADDENDUM #3- CONNECTOR DITCH & BACKGROUND SAMPLING
|
|
2004-01-29
|
43
|
Site Activity Status Update Received
|
|
SEMI-ANNUAL LONG TERM MONITORING REPORT
|
|
2004-01-15
|
43
|
Site Activity Status Update Received
|
|
BARRIER MONITORING REPORT
|
|
2003-12-08
|
43
|
Site Activity Status Update Received
|
|
BIMONTHLY PROGRESS REPORT (OCT/NOV)
|
|
2003-12-01
|
43
|
Site Activity Status Update Received
|
|
REMEDIAL OPTIONS COST EVAULATION
|
|
2003-10-10
|
43
|
Site Activity Status Update Received
|
|
BI-MONTHLY PROGRESS REPORT
|
|
2003-10-06
|
43
|
Site Activity Status Update Received
|
|
FIELD SAMPLING PLAN - ADDENDUM #3
|
|
2003-08-29
|
43
|
Site Activity Status Update Received
|
|
ADDT'L WORK FOR RFI
|
|
2003-06-18
|
43
|
Site Activity Status Update Received
|
|
LONG TERM MONITORING PLAN REPORT FOR 8TH ST SLIP CAP
|
|
2003-03-05
|
43
|
Site Activity Status Update Received
|
|
RISK ASSESSMENT REPORT
|
|
2003-02-11
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT TO EPA
|
|
2003-01-30
|
43
|
Site Activity Status Update Received
|
|
ISOCONCENTRATION MAPS
|
|
2003-01-10
|
43
|
Site Activity Status Update Received
|
|
SEMI-ANNUAL MONITORING REPORT
|
|
2003-01-09
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT TO EPA
|
|
2002-12-11
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT TO EPA
|
|
2002-12-10
|
151
|
Remedial Action (RA) Documentation Report Received (non-fee)
|
|
ENG CERT REPORT & QA DOCUMENTATION
|
|
2002-11-12
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT TO EPA
|
|
2002-10-10
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT TO EPA
|
|
2002-09-10
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT TO EPA
|
|
2002-08-12
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT
|
|
2002-08-05
|
99
|
Miscellaneous
|
|
WDNR OK'S CONSTRUCTION SEQUENCE MODIFICATIONS
|
|
2002-07-12
|
43
|
Site Activity Status Update Received
|
|
JUNE PROGRESS REPORT TO EPA
|
|
2002-06-18
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT TO EPA
|
|
2002-05-29
|
43
|
Site Activity Status Update Received
|
|
MODIFICATION TO WATER TREATMENT (VERBAL)
|
|
2002-05-20
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT TO EPA
|
|
2002-04-15
|
43
|
Site Activity Status Update Received
|
|
APRIL PROGRESS REPORT TO EPA
|
|
2002-03-14
|
43
|
Site Activity Status Update Received
|
|
MARCH 2002 MONTHLY PROGRESS REPORT TO EPA
|
|
2002-02-13
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT 02/2002
|
|
2002-01-22
|
43
|
Site Activity Status Update Received
|
|
SEMI-ANNUAL SAMPLING REPORT
|
|
2002-01-14
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT TO EPA
|
|
2001-12-10
|
43
|
Site Activity Status Update Received
|
|
DEC 2001 PROGRESS REPORT TO EPA
|
|
2001-11-28
|
43
|
Site Activity Status Update Received
|
|
SCHEDULE UPDATE FROM URS CONSULTANTS
|
|
2001-11-15
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT NOV, 2001
|
|
2001-10-24
|
43
|
Site Activity Status Update Received
|
|
EPA CONCURRENCE ON 8TH STREET SLIP WORK EXTENSION
|
|
2001-10-17
|
99
|
Miscellaneous
|
|
M. NETZER APPROVAL OF DEADLINE EXTENTION ON SLIP
|
|
2001-10-15
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT OCT, 2001
|
|
2001-09-11
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT SEPT, 2001
|
|
2001-08-10
|
43
|
Site Activity Status Update Received
|
|
CONTRACT SPECS & PLANS FROM CONSULTANT
|
|
2001-08-09
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT 08/01 TO EPA FROM ANSUL
|
|
2001-07-16
|
43
|
Site Activity Status Update Received
|
|
MASS BALANCE CALCULATIONS & CONTRACT SPECS FROM CONSULTANT
|
|
2001-07-12
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS RPT TO EPA & INTERIM MEASURES AGREEMENT
|
|
2001-07-12
|
99
|
Miscellaneous
|
|
RESPONSE TO EPA COMMENTS BY CONSULTANT
|
|
1981-06-18
|
43
|
Site Activity Status Update Received
|
|
GEOHYDROLOGIC STUDY & GROUNDWATER QUALITY ASSESSMENT
|
|
1978-12-07
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
|
1976-01-29
|
43
|
Site Activity Status Update Received
|
|
INVESTIGATION OF HYDROLOGY & POTENTIAL GROUNDWATER CONTAMINATION IN BEDROCK AQUIFERS
|