Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-41-000023 MILWAUKEE DIE CASTING CO INC FMR
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
FORMER MILWAUKEE DIE CASTING CO FACILITY MILWAUKEE SOUTHEAST
Address Municipality
4132 N HOLTON ST MILWAUKEE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the SW 1/4 of Sec 04, T07N, R22E 43.0920757 -87.9039482 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
4
Facility ID PECFA No. EPA ID Start Date End Date
241228240 WIN000510552 1989-12-04
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
SFR Flag  
Site Files
Name File
SITE FILE FOR YEARS 1996 THRU 2006 Download PDF Document
SITE FILE FOR YEARS 2007 THRU 2012 Download PDF Document
Actions and Document
Date Code Name File Comment
2024-07-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2024 - 6/30/2024
2024-04-08 43 Site Activity Status Update Received Download PDF file GROUNDWATER SAMPLING
2024-03-19 99 Miscellaneous Download PDF file REMEDIAL ACTION CONSTRUCTION DOCUMENTATION REPORT - ENHANCED IN-SITU BIOREMEDIATION (EISB)
2024-01-19 43 Site Activity Status Update Received Download PDF file CAP INSPECTION
2024-01-18 99 Miscellaneous Download PDF file GEOSYNTEC NR 700 SEMI-ANNUAL REPORT FOR RP PHARMACIA: 7/1/2023 - 12/31/2023.
2024-01-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-10-13 99 Miscellaneous Download PDF file REVISED INJECT INFILTRATE
2023-09-22 64 Inject/Infiltrate Request Approved Download PDF file
2023-08-18 149 Remedial Action (RA) Design Report Approved Download PDF file
2023-08-17 63 Inject/Infiltrate Request Received (fee) Download PDF file REC'D CK #2704 $700, INFILTRATION AND INJECTION REQ
2023-07-25 99 Miscellaneous Download PDF file NR 700 SEMI-ANNUAL REPORTING FOR PHARMACIA/GEOSYNTEC 01/01/2023 - 06/30/2023.
2023-07-06 148 Remedial Action Design Report Received (fee) Download PDF file REC'D CK #2702 $1050, RAOR & RAP
2023-07-06 39 Remedial Action Options Report (RAOR) Received (non-fee) REC'D RAOR & RAP
2023-06-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-05-19 43 Site Activity Status Update Received Download PDF file PRE-DESIGN INVESTIGATION REPORT
2023-02-10 99 Miscellaneous Download PDF file PRE-DESIGN INVESTIGATION WORK PLAN
2023-01-27 99 Miscellaneous Download PDF file GEOSYNTEC NR 700 SEMI-ANNUAL REPORT FOR RP PHARMACIA: 7/1/2022 - 12/31/2022
2023-01-09 99 Miscellaneous Download PDF file CONTINUING OBLIGATION INSPECTION AND MAINTENANCE LOG
2023-01-04 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-10-25 98 Technical Assistance Provided TECHNICAL ASSISTANCE WAS PROVIDED IN A PHONE CONFERENCE WITH THE CONSULTANT AND RP ON 10/25/22.
2022-09-27 43 Site Activity Status Update Received Download PDF file GW MONITORING PROGRESS RPT
2022-09-27 97 Technical Assistance Request Received (fee) REQ MEETING - DISCUSS GW MONITORING PROGRESS RPT SEPT 2022
2022-09-16 98 Technical Assistance Provided Download PDF file RESPONSE TO REDEVELOPMENT DESIGN REPORT - PROPOSED SPIKE BREWING.
2022-09-14 199 Additional Information Received (Fee-Based or Closure) REVIEW COMMENTS RECEIVED FOR REDEVELOPMENT DESIGN REPORT - PROPOSED SPIKE BREWING.
2022-09-12 198 Request for Additional Information (Fee-Based or Closure) PAUSED PENDING REVIEW COMMENTS.
2022-08-02 118 PFAS Sampling Not Required At This Time Download PDF file PFAS SAMPLING NOT REQUIRED AT THIS TIME.
2022-07-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-07-05 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #008922 $700, REDEVELOPMENT DESIGN RPT
2022-06-10 40 Remedial Action Options Report (RAOR) Approved Download PDF file WDNR CONCEPTUAL APPROVAL TO MODIFY PROTECTIVE BARRIER FOR SPIKE BREWING REDEVELOPMENT PLAN.
2022-06-10 99 Miscellaneous Download PDF file EMAIL - REQUESTED REVIEW CLARIFICATION FROM USEPA FOR SPIKE BREWING REDEVELOPMENT PLAN.
2022-06-02 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE REGARDING SPIKE BREWING PROPOSED REDEVELOPMENT.
2022-05-19 143 Remedial Action Options Report (RAOR) Received (fee) Download PDF file REC'D CK #008839 $1050
2022-05-11 114 PFAS Scoping Statement Received PFAS SCOPING STATEMENT RECEIVED. ADDITIONAL SCOPING INFORMATION RECEIVED 09/30/2021.
2022-04-28 98 Technical Assistance Provided Download PDF file TECHNICAL ASSISTANCE PROVIDED
2022-04-21 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #008787 $700
2022-04-11 43 Site Activity Status Update Received Download PDF file GROUNDWATER MONITORING PROGRESS REPORT
2022-03-24 98 Technical Assistance Provided TECHNICAL ASSISTANCE PROVIDED
2022-03-11 198 Request for Additional Information (Fee-Based or Closure) REQUEST FOR ADDITIONAL INFORMATION
2022-03-11 199 Additional Information Received (Fee-Based or Closure) ADDITIONAL INFORMATION RECEIVED
2022-01-20 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #008639 $700, POST-REMOVAL SITE CONTROL PLAN MODIFICATION REQ
2022-01-14 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2022-01-12 99 Miscellaneous Download PDF file SEMI ANNUAL CAP INSPECTION DOC
2021-10-13 43 Site Activity Status Update Received Download PDF file GW MONITORING PROGRESS REPORT
2021-10-01 99 Miscellaneous Download PDF file 2019 CONTINUING OBLIGATIONS INSPECTION AND MAINTENANCE LOG (WDNR FORM 4400‐305)
2021-10-01 99 Miscellaneous Download PDF file 2020 CONTINUING OBLIGATIONS INSPECTION AND MAINTENANCE LOG (WDNR FORM 4400‐305)
2021-09-30 99 Miscellaneous Download PDF file RESPONSE TO SIWP APPROVAL AND ADDITIONAL INFORMATION FOR EMERGING CONTAMINANT SCOPING STATEMENT
2021-08-06 36 Site Investigation Workplan (SIWP) Approved Download PDF file
2021-08-06 38 Site Investigation Report (SIR) Approved REFER TO THE 08-06-2021 SIWP APPROVAL LETTER FOR THE SIR APPROVAL
2021-07-22 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-07-07 99 Miscellaneous Download PDF file MONITORING EVENT
2021-07-06 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file REC'D CK #2648 $700.00
2021-05-11 137 Site Investigation Report (SIR) Received (fee) Download PDF file REC'D CK# 2645, $1050
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-03-18 99 Miscellaneous Download PDF file NOTIFICATION OF PLANNED ADDITIONAL GROUNDWATER SAMPLING EVENT
2021-01-25 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2020-12-18 81 Site Investigation Workplan (SIWP) Not Approved Download PDF file SIWP MODIFICATION RESPONSE
2020-12-01 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file SIWP MODIFICATION REQUEST
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-17 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-01-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-12-19 36 Site Investigation Workplan (SIWP) Approved Download PDF file SI WORK PLAN APPROVED
2019-11-18 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file REC'D REVISED SIWP
2019-08-29 99 Miscellaneous Download PDF file DNR EMAIL RESPONSE TO GEOSYNTEC LTR DATED 8/22/19
2019-08-26 99 Miscellaneous Download PDF file RESPONSES TO WDNR SUPPLEMENTAL COMMENTS FOR SIWP
2019-06-28 99 Miscellaneous Download PDF file EMAIL RESPONSE TO CONSULTANT COMMENTS RE SIWP ADDITIONAL INFO REQUEST.
2019-04-04 99 Miscellaneous Download PDF file RESPONSES TO WDNR COMMENTS TO SIWP
2019-02-13 198 Request for Additional Information (Fee-Based or Closure) EMAILED ADDITION INFORMATION REQUEST TO CONSULTANT
2019-02-13 99 Miscellaneous Download PDF file EMAIL REGARDING ADDITIONAL INFO NEEDED FOR SIWP
2019-02-04 99 Miscellaneous Download PDF file REC'D CO INSPECTION/MAINTENANCE LOG FORM 4400-305 (NOT REQUESTED BY DNR)
2018-12-19 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file REC'D CK# 2743, $700
2018-10-16 99 Miscellaneous RESPONSE TO DNR RP LETTER
2018-10-10 7 Environmental Consultant Hired Download PDF file GEOSYNTEC CONSULTANTS
2018-08-10 2 Responsible Party (RP) letter sent Download PDF file
2018-06-07 37 Site Investigation Report (SIR) Received (non-fee) Indicates multiple files are linked to this action APPENDICIES IN DOCUMENTS MODULE
2018-06-01 149 Remedial Action (RA) Design Report Approved Download PDF file
2018-06-01 222 Continuing Obligation - Maintain Cap Over Contaminated Area 3-CAP SYSTEM: TSCA CLAY CAP, SOIL COVER, & TOPSOIL (ONLY) COVER.
2018-06-01 226 Continuing Obligation - Vapor Intrusion Response
2018-06-01 232 Continuing Obligation - Residual Soil Contamination
2018-06-01 236 Continuing Obligation - Residual GW Contamination
2018-06-01 56 Continuing Obligation(s) Applied Download PDF file ONGOING CLEANUP WITH CONTINUING OBLIGATIONS DOCUMENTATION PACKAGE
2018-06-01 220 Continuing Obligation - Soil at Industrial Levels
2018-06-01 66 Continuing Obligations (COs) Apply at Off-site Property(ies)
2013-03-19 315 Superfund Site Assessment Transmittal Memos SSI TRANSMITTAL MEMO
2013-03-06 356 Superfund Removal Action Taken ADMINISTRATIVE SETTLEMENT AGREEMENT & ORDER ON CONSENT FOR REMOVAL ACTION (US EPA)
2012-12-21 351 Superfund Site Assessment Site Inspection (SI) Download PDF file
2012-12-03 99 Miscellaneous ENFORCEMENT ACTION MEMORANDUM REQUESTING TIME-CRITICAL REMOVAL (US EPA)
2012-05-03 99 Miscellaneous WDHS HEALTH CONSULTATION REPORT
2012-02-29 99 Miscellaneous EPA REMOVAL SITE ASSESSMENT REPORT
2012-02-28 315 Superfund Site Assessment Transmittal Memos PA TRANSMITTAL MEMO
2012-02-28 303 Superfund Site Assessment Action Taken - Not on NPL or SAS
2012-02-14 350 Superfund Site Assessment Preliminary Assessment (PA) Download PDF file FINAL DRFT PA REPORT
2011-12-13 316 Superfund Site Assessment DNR Planning Documentation SI HEALTH & SAFETY PLAN (SI HASP)
2011-10-14 316 Superfund Site Assessment DNR Planning Documentation SITE INSPECTION WORK PLAN (SIWP)
2011-09-07 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-09-07 313 Superfund Site Assessment Pre-CERCLA Screening (PCS) Download PDF file PCS FORM
2011-01-21 356 Superfund Removal Action Taken PRP GROUP CONDUCTING REMOVAL UNDER AOC SEE THE EPA OSC WEBSITE FOR REMOVAL INFORMATION
2010-03-15 99 Miscellaneous REC'D 2004 PHASE II ESA
2010-02-12 99 Miscellaneous 2004 SITE DATA REC'D
2009-03-24 43 Site Activity Status Update Received REC'D IMMEDIATE RESPONSE SUMMARY REPT
2008-11-17 43 Site Activity Status Update Received SITE ACTIVTY UPDATE FROM ARCADIS
2008-11-13 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-11-06 99 Miscellaneous SITE VISIT WITH EPA; VIEW INTERIOR/EXTERIOR
2008-10-29 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-10-27 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-10-23 99 Miscellaneous SITE VISIT - VIEW INTERIOR/EXTERIOR CONDITIONS
2008-10-17 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-10-15 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-10-14 43 Site Activity Status Update Received 2 SITE ACTIVITY UPDATES FROM ARCADIS
2008-10-09 43 Site Activity Status Update Received 2 SITE ACTIVITY UPDATES FROM ARCADIS
2008-10-08 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-10-06 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-10-03 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-10-02 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-10-01 43 Site Activity Status Update Received 2 SITE ACTIVITY UPDATES FROM ARCADIS
2008-09-29 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-09-26 43 Site Activity Status Update Received SITE ACTIVITY UPDATE BY ARCADIS
2008-09-25 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-09-25 43 Site Activity Status Update Received SITE ACTIVITY UPDATE BY ARCADIS
2008-09-24 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-09-22 43 Site Activity Status Update Received 2 SITE ACTIVITY UPDATES FROM ARCADIS
2008-09-18 43 Site Activity Status Update Received 2 SITE ACTIVITY UPDATES FROM ARCADIS
2008-09-16 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-09-15 43 Site Activity Status Update Received 2 SITE ACTIVITY UPDATES FROM ARCADIS
2008-09-10 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-09-09 99 Miscellaneous SITE VISIT - CONFIRMED SUMPS HAD BEEN PUMPED
2008-09-09 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-09-08 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-09-05 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-09-03 99 Miscellaneous SITE VISIT - CONFIRMED SUMPS ARE BEING PUMPED OUT
2008-09-03 43 Site Activity Status Update Received SITE ACTIVITY UPDATE FROM ARCADIS
2008-08-29 43 Site Activity Status Update Received CONTRACTOR'S SITE UPDTE
2008-08-28 99 Miscellaneous SITE VISIT - OBSERVED EXTERIOR SUMP
2008-08-28 43 Site Activity Status Update Received RESPONSE TO 08/9/08 RP LTR
2008-08-28 43 Site Activity Status Update Received SAMPLE RESULTS
2008-08-22 99 Miscellaneous SITE VISIT - OBSERVED EXTERIOR SUMP LIQUID LEVEL
2008-08-19 2 Responsible Party (RP) letter sent NEW RP - 10 DAY DEADLINE TO REMOVE LIQUIDS
2008-08-19 99 Miscellaneous SITE VISIT - OBSERVED EXTERIOR SUMP LIQUID LEVEL
2008-08-11 99 Miscellaneous SITE VISIT - OBSERVED EXTERIOR SUMP LIQUID LEVEL
2004-09-17 99 Miscellaneous PM. GREEN TEAM MTG W/ POT. PURCHASER
2004-08-05 140 Site Investigation Report (SIR) Not Approved PM-FILE REVIEW PROVIDED
2004-05-05 137 Site Investigation Report (SIR) Received (fee) REC'D CK# 1154 $750.00
1999-08-09 206 Site Investigation End - State Lead
1998-08-05 99 Miscellaneous DOJ REQUESTS SETTLEMENT/JUDGEMENT
1998-07-30 37 Site Investigation Report (SIR) Received (non-fee) INCL RAO
1998-04-03 99 Miscellaneous INVESTIGATION SUMMARY REPORT RECD
1997-09-10 43 Site Activity Status Update Received
1997-01-03 23 Referral to Department of Justice (DOJ)
1996-08-29 36 Site Investigation Workplan (SIWP) Approved CONDITIONAL
1996-04-10 35 Site Investigation Workplan (SIWP) Received (non-fee)
1996-01-16 14 Notice of Violation (NOV) Issued FAILURE TO NOTIFY
1995-07-11 2 Responsible Party (RP) letter sent Download PDF file
1989-12-04 1 Notification of Hazardous Substance Discharge
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
Property Affected -> 13-43-574200 13815 STH 32
Property Affected -> 13-43-574201 13829 STH 32
Property Affected -> 13-43-574202 14365 CTH W
Substances
Substance Type Amt Released Units
Gasoline - Unleaded and Leaded Petroleum
Methyl Tertiery Butyl Ether (PZ -05 1900 ppb on 07/08/99) Petroleum
Responsible Party
LAVERN KNOLL 15565 MEADOW CIRCLE, MOUNTAIN, WI 54149
32811 | 02-41-000023
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages