2024-02-01
|
805
|
Historic Waste Site
|
|
FILLED RAVINE; WASTE CONSISTS OF GRAVEL, ASH, CLINKERS, WOOD FIBERS, MISC CONSTRUCTION DEBRIS
|
|
2024-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2023-09-22
|
856
|
Materials Management Final Documentation Received w/o Fee
|
|
UPDATED CAP MAINTENANCE AND MATERIAL MANAGEMENT PLAN
|
|
2023-07-27
|
43
|
Site Activity Status Update Received
|
|
MW-09 GROUNDWATER MONITORING RESULTS AND WELL ABANDONMENT FORM
|
|
2023-07-12
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-06-13
|
99
|
Miscellaneous
|
|
MW-09 WELL ABANDONMENT APPROVAL
|
|
2023-06-13
|
99
|
Miscellaneous
|
|
REQUEST FOR STATUS UPDATE ON MMP DOCUMENTATION & UPDATED COVER MAINTENANCE PLAN
|
|
2023-06-12
|
43
|
Site Activity Status Update Received
|
|
REQUEST TO ABANDON MW-09
|
|
2023-05-23
|
43
|
Site Activity Status Update Received
|
|
APRIL 2023 GROUNDWATER MONITORING RESULTS: OFF-SITE
|
|
2023-03-03
|
43
|
Site Activity Status Update Received
|
|
2022 ANNUAL GROUNDWATER MONITORING REPORT
|
|
2023-01-10
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-07-15
|
99
|
Miscellaneous
|
|
PATH FORWARD; LAWRENCE UNIV. MW-3 TO BE INCLUDED IN FUTURE SUBMITTALS AND ABANDONED
|
|
2022-07-11
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-06-24
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER FORENSIC SAMPLING RESULTS
|
|
2022-05-27
|
43
|
Site Activity Status Update Received
|
|
SEMI-ANNUAL GROUNDWATER RESULTS NOTIFICATION APRIL 2022
|
|
2022-05-27
|
43
|
Site Activity Status Update Received
|
|
OFF-SITE GROUNDWATER RESULTS NOTIFICATION; FORENSIC ANALYSIS
|
|
2022-01-18
|
99
|
Miscellaneous
|
|
RESPONSE TO VI ASSESSMENT REQUEST FROM 1/6/2016 TECH ASSISTANCE REQUEST & 6/7/2016 RESULTS
|
|
2022-01-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2021-11-30
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
FORENSIC EVALUATION OF GROUNDWATER
|
|
2021-11-15
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
PROPOSAL FOR FORENSIC ANALYSIS OF GROUNDWATER @ APPLETON MGP & LAWRENCE ACADEMY OF MUSIC SITES
|
|
2021-10-11
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
2020-2021 ANNUAL GROUNDWATER MONITORING REPORT
|
|
2021-09-22
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO NOTIFICATION OF RELATED GROUNDWATER DATA
|
|
2021-08-09
|
99
|
Miscellaneous
|
|
LETTER INFORMING WEC OF GW DATA THAT IS CONSIDERED RELATED TO THE FORMER MGP
|
|
2021-07-26
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2021 - 6/30/2021
|
|
2021-06-24
|
43
|
Site Activity Status Update Received
|
|
REQUEST TO PERMANENTLY ABANDON MW-10
|
|
2021-06-24
|
99
|
Miscellaneous
|
|
APPROVAL TO ABANDON MW-10 FOLLOWING ONE FINAL ROUND OF SAMPLING
|
|
2021-05-24
|
43
|
Site Activity Status Update Received
|
|
GW MONITORING APRIL 2021
|
|
2021-04-06
|
130
|
DNR Regulatory Reminder Sent
|
|
VAPOR INTRUSION AND TCE REMINDER LETTER
|
|
2021-01-20
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2020 - 12/31/2020
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-08-07
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
2019 ANNUAL GW MONITORING REPORT; MONITORING EVENTS IN APRIL AND OCTOBER 2019
|
|
2020-07-30
|
857
|
Materials Management Plan Approved
|
|
MATERIALS MOVED ON-SITE
|
|
2020-07-30
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2020-07-30
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
|
|
2020-07-30
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2020-07-24
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2020 - 6/30/2020
|
|
2020-06-30
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
INFORMATION RECEIVED FROM WPS & CITY OF APPLETON
|
|
2020-05-21
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS PROPERTIES - APRIL 2020 GW DATA
|
|
2020-05-21
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS PROPERTIES - OCTOBER 2019 GW DATA
|
|
2020-05-07
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
ADDITIONAL INFORMATIONAL NEEDED REGARDING MATERIALS MANAGEMENT & PARCEL OWNERSHIP
|
|
2020-04-07
|
99
|
Miscellaneous
|
|
NOV 2019 OTA REQ ASSIGNED DNR PM - SARAH KRUEGER; BORSKI REMAINS SITE CONTACT
|
|
2020-01-17
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2019 - 12/31/2019
|
|
2019-11-26
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2019-11-26
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
MATERIAL MOVED ON-SITE
|
|
2019-07-23
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2019 - 6/30/2019
|
|
2019-06-26
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS PROPERTIES - APRIL 2019 GW DATA
|
|
2019-04-08
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
2018 ANNUAL REPORT
|
|
2019-01-23
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2018 - 12/31/2018
|
|
2018-08-22
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS APTS - JULY 2018 GW DATA
|
|
2018-07-19
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2018 - 6/30/2018
|
|
2018-06-06
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
2017 ANNUAL LREPORT
|
|
2018-06-06
|
43
|
Site Activity Status Update Received
|
|
NR716.14 WAC NOTICE OF RESULTS TO CITY - 2017 ANNUAL REPORT
|
|
2018-05-11
|
43
|
Site Activity Status Update Received
|
|
NR716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS - APR 2018 GW DATA
|
|
2018-02-23
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS APTS - JAN 2018 GW DATA
|
|
2018-02-15
|
99
|
Miscellaneous
|
|
DNR RESPONSE TO PROCESS & FEE QUESTIONS FOR CAP MAINTENANCE PLAN PRIOR TO CLOSURE
|
|
2018-01-25
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2017 - 12/31/2017
|
|
2017-11-22
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS - OCT 2017 GW DATA
|
|
2017-08-21
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS - JULY 2017 GW DATA
|
|
2017-07-21
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2017 - 6/30/2017
|
|
2017-05-19
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS - APRIL 2017 GROUNDWATER DATA
|
|
2017-04-24
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
2016 ANNUAL REPORT
|
|
2017-02-17
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS APPT - JAN 2017 GW DATA
|
|
2017-01-11
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2016 - 12/31/2016
|
|
2016-11-14
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS - OCT 2016 GROUNDWATER DATA
|
|
2016-08-16
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS - JULY 2016 GW DATA
|
|
2016-07-28
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2016 - 6/30/2016
|
|
2016-06-07
|
43
|
Site Activity Status Update Received
|
|
MARCH 2016 SVI RESULTS
|
|
2016-05-25
|
43
|
Site Activity Status Update Received
|
|
NR 716.14 WAC NOTICE OF RESULTS TO FOX RIVER MILLS - APRIL 2016 GW DATA
|
|
2016-04-25
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
2015 ANNUAL REPORT - JAN-DEC 2015 SOIL VAPOR & GROUNDWATER DATA
|
|
2016-04-22
|
43
|
Site Activity Status Update Received
|
|
NR716.14 WAC NOTICE OF RESULTS TO PROPERTY OWNER - MAR 2016 SUB-SLAB AIR DATA (HIGH-PURGE VOLUME)
|
|
2016-04-12
|
43
|
Site Activity Status Update Received
|
|
EMAIL UPDATE - HIGH PURGE VOLUME TESTING PERFORMED 03/30/2016
|
|
2016-04-04
|
99
|
Miscellaneous
|
|
DNR REQUEST FOR UPDATE ON SVI WORKPLAN & TIMING BY 04/12/2016
|
|
2016-02-05
|
43
|
Site Activity Status Update Received
|
|
JANUARY 2016 GROUNDWATER DATA
|
|
2016-01-20
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2015 - 12/31/2015
|
|
2016-01-15
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
ADDITIONAL VERBAL INFORMATION PROVIDED BY RP
|
|
2016-01-15
|
98
|
Technical Assistance Provided
|
|
VERBAL INFORMATION PROVIDED BY DNR TO RP REGARDING HIGH-PURGE VOLUME TESTING REQUIREMENTS
|
|
2016-01-14
|
99
|
Miscellaneous
|
|
DNR MEETING WITH WE ENERGIES & CONSULTANT ON SOIL VAPOR INTRUSION ASSESSMENT
|
|
2016-01-14
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
ADDITIONAL SUBSURFACE INFORMATION REQUESTED OF RP; PROPOSED SVI WILL BE AMENDED
|
|
2016-01-06
|
97
|
Technical Assistance Request Received (fee)
|
|
SVI ASSESSMENT & REQUEST FOR MEETING BY 1/15/16
|
|
2015-12-21
|
43
|
Site Activity Status Update Received
|
|
OCT 2015 GROUNDWATER & SOIL VAPOR DATA
|
|
2015-08-12
|
43
|
Site Activity Status Update Received
|
|
PROPERTY OWNER NOTIFICATION FOR AIR & GROUNDWATER DATA COLLECTED JULY 2015
|
|
2015-07-27
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2015 - 6/30/2015
|
|
2015-05-29
|
43
|
Site Activity Status Update Received
|
|
PROPERTY OWNER NOTIFICATION FOR AIR, SOIL & GROUDWATER DATA COLLECTED IN APRIL 2015
|
|
2015-05-06
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
2014 ANNUAL GROUNDWATER MONITORING REPORT - JAN-DEC 2014
|
|
2015-03-20
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
CONDITIONAL APPROVAL OF SUPPLEMENTAL SITE INVESTIGATION WORKPLAN
|
|
2015-03-11
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
FEE ONLY; WORKPLAN REC'D 2/17/2015
|
|
2015-03-10
|
43
|
Site Activity Status Update Received
|
|
ADDT'L INFORMATION FOR SIWP REC'D 2/17/2015
|
|
2015-03-06
|
99
|
Miscellaneous
|
|
PRELIMINARY DNR EMAIL COMMENTS ON SUPPLEMENTAL SITE INVESTIGATION WORK PLAN, REC'D 2/17/2015
|
|
2015-02-17
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
OFF-SITE DRILLING & SOIL GAS SAMPLING PLANNED FOR MARCH 2015; REVIEW FEE WILL BE SUBMITTED
|
|
2014-12-03
|
97
|
Technical Assistance Request Received (fee)
|
|
MEETING - 11/25/2014
|
|
2014-12-03
|
99
|
Miscellaneous
|
|
DNR (WATER & RR) MTG W/WE ENERGIES, NRT, NEENAH PAPER & EAGLE CREEK RENEWABLE ENERGY-DNAPL IN CANAL
|
|
2014-12-03
|
43
|
Site Activity Status Update Received
|
|
TECH MEMO-ASSESSMENT OF FOX RIVER CANAL DEWATERING & POTENTIAL FOR DNAPL MOBILIZATION
|
|
2014-12-03
|
98
|
Technical Assistance Provided
|
|
MEETING HELD 11/25/2014
|
|
2014-11-25
|
99
|
Miscellaneous
|
|
OTHER TECHNICAL ASSISTANCE MTG W/WE ENERGIES & NRT - FEE TO BE PAID
|
|
2014-11-14
|
43
|
Site Activity Status Update Received
|
|
OCTOBER 2014 GROUNDWATER DATA
|
|
2014-11-08
|
98
|
Technical Assistance Provided
|
|
DOCUMENTATION OF INTERNAL DNR DISCUSSIONS BETWEEN RR PROGRAM & WATER DIVISION IN NOV 2013
|
|
2014-10-10
|
43
|
Site Activity Status Update Received
|
|
WE ENERGIES MINUTES FROM 9/26/14 MEETING
|
|
2014-09-26
|
99
|
Miscellaneous
|
|
MTG W/DNR, WE ENERGIES & NEENAH PAPER RE: FUTURE FOX RIVER DRAWDOWNS (DRAWDOWNS & COMMUNICATION PLAN
|
|
2014-09-11
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2014 - 6/30/2014
|
|
2014-09-08
|
97
|
Technical Assistance Request Received (fee)
|
|
REQUEST FOR SUMMARY OF NOV 2013 INTERNAL DNR MEETING
|
|
2014-08-14
|
43
|
Site Activity Status Update Received
|
|
PZ-23 & PZ-26 GROUNDWATER DATA
|
|
2014-07-10
|
43
|
Site Activity Status Update Received
|
|
APRIL 2014 QUARTERLY GROUNDWATER DATA
|
|
2014-07-08
|
43
|
Site Activity Status Update Received
|
|
WE ENERGIES PM CHANGED FROM TIFFANY GOEBEL TO FRANK DOMBROWSKI JULY 2014
|
|
2014-05-27
|
43
|
Site Activity Status Update Received
|
|
APRIL 2014 PZ-23 AND PZ-26 GROUNDWATER DATA (FOX RIVER MILLS APTS)
|
|
2014-03-24
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
2013 ANNUAL REPORT (JAN-OCT 2013 GW DATA) & PROPOSED LOCATION FOR PZ-26
|
|
2013-11-08
|
43
|
Site Activity Status Update Received
|
|
OCTOBER 2013 GROUNDWATER DATA
|
|
2013-11-07
|
99
|
Miscellaneous
|
|
INTERNAL DNR MEETING BETWEEN RR PROGRAM & WATER DIVISION
|
|
2013-11-05
|
43
|
Site Activity Status Update Received
|
|
JULY AND OCT 2013 GROUNDWATER DATA
|
|
2013-06-24
|
43
|
Site Activity Status Update Received
|
|
UPDATED MAP, MW-24 & MW-25 SB LOGS & MW CONSTRUCTION FORMS SUBMITTED ELECTRONICALLY PER DNR REQUEST
|
|
2013-06-17
|
43
|
Site Activity Status Update Received
|
|
APRIL 2013 GW DATA
|
|
2013-06-13
|
43
|
Site Activity Status Update Received
|
|
REVISED GW SAMPLING MATRIX - ELECTRONIC
|
|
2013-04-15
|
43
|
Site Activity Status Update Received
|
|
JAN 2013 GROUNDWATER DATA, 1ST EVENT AT MW-24 AND MW-25
|
|
2013-03-29
|
43
|
Site Activity Status Update Received
|
|
REVISED CONCEPTUAL SITE MODEL (PRE & POST-CONSTRUCTION)
|
|
2013-03-26
|
99
|
Miscellaneous
|
|
DNR LETTER DOCUMENTING MARCH 23, 2013 TECHNICAL ASSISTANCE MTG ON 2011 ANNUAL REPORT
|
|
2012-12-18
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
OCT 2011 - SEPT 2012 POST-RA GW MONITORING & ACTIVITIES
|
|
2012-10-22
|
43
|
Site Activity Status Update Received
|
|
JUNE 2012 GROUNDWATER DATA AND PROPOSED MONITORING WELL LOCATIONS
|
|
2012-07-16
|
43
|
Site Activity Status Update Received
|
|
CANAL DEWATERING REPORT (OCT-NOV 2011 DEWATERING EVENT BY NEENAH PAPER)
|
|
2012-05-16
|
43
|
Site Activity Status Update Received
|
|
JAN 2012 GW DATA SUBMITTED ELECTRONICALLY
|
|
2012-03-23
|
98
|
Technical Assistance Provided
|
|
DNR MEETING WITH WE ENERGIES AND NRT
|
|
2012-02-23
|
97
|
Technical Assistance Request Received (fee)
|
|
$500 CK 2212158, MTG REQUEST FOR 2010/2011 POST REMEDIATION GW MONITORING REPORT
|
|
2012-01-24
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
OCTOBER 2010 - JULY 2011 POST-REMEDIATION GROUNDWATER MONITORING REPORT
|
|
2011-11-07
|
43
|
Site Activity Status Update Received
|
|
PHOTOS FROM DEWATERED CANAL ADJACENT TO SITE
|
|
2011-10-31
|
99
|
Miscellaneous
|
|
DNR SITE VISIT FOR SHEEN ON CANAL REVERBED
|
|
2011-10-03
|
99
|
Miscellaneous
|
|
POWER CANAL DEWATERED BY NEENAH PAPER FOR DAM REPAIR
|
|
2011-09-08
|
130
|
DNR Regulatory Reminder Sent
|
|
Vapor Intrusion (VI) Assessment Notification Ltr Sent
|
|
2010-12-01
|
99
|
Miscellaneous
|
|
DNR ATTENDED PRE-DEMO MEETING WITH CITY AND CONTRACTOR FOR FORMER WASTEWATER TREATMENT PLANT
|
|
2010-07-12
|
43
|
Site Activity Status Update Received
|
|
2010 UPDATE - POST-REMEDIAL ACTION MONITORING 4/1/09 - 4/30/10
|
|
2009-12-08
|
43
|
Site Activity Status Update Received
|
|
MW-23 AND PZ-23 NOVEMBER 2009 GROUNDWATER DATA
|
|
2009-10-05
|
99
|
Miscellaneous
|
|
DNR SITE VISIT FOR INSTALLATION OF PZ-23
|
|
2009-07-29
|
99
|
Miscellaneous
|
|
DNR WRITTEN RESPONSE TO 2009 GW UPDATE & CLOSURE CRITERIA ASSESSMENT - MORE SI NEEDED
|
|
2009-07-20
|
99
|
Miscellaneous
|
|
DNR RESPONSE TO 2009 GW UPDATE - MORE INVESTIGATION NEEDED
|
|
2009-06-10
|
97
|
Technical Assistance Request Received (fee)
|
|
REVIEW AND MEETING RE 2009 (3RD YEAR) GW POST-REMEDIATION MONITORING REPORT
|
|
2009-06-10
|
98
|
Technical Assistance Provided
|
|
REVIEW AND MEETING RE 2009 (3RD YEAR) GW POST-REMEDIATION MONITORING REPORT
|
|
2009-05-21
|
43
|
Site Activity Status Update Received
|
|
THIRD YEAR POST-REMEDIAL ACTION MONITORING & CLOSURE CRITERIA ASSESSMENT
|
|
2009-05-14
|
99
|
Miscellaneous
|
|
DNR REQUEST FOR WRITTEN UPDATE AND THREE-YEAR POST REMEDIAL MONITORING REPORT BY JUNE 8, 2009
|
|
2008-08-28
|
43
|
Site Activity Status Update Received
|
|
OFF-SITE ACCESS GRANTED; OFF-SITE WELL TO BE INSTALLED 09/11/08
|
|
2007-05-16
|
99
|
Miscellaneous
|
|
REFERENCE TO FILE INFORMATION SENT TO CITY
|
|
2007-05-10
|
99
|
Miscellaneous
|
|
MEETING WITH DNR & CITY OF APPLETON RE PARK DEVELOPMENT
|
|
2006-11-14
|
43
|
Site Activity Status Update Received
|
|
FIRST YEAR POST REMEDIATION GROUNDWATER MONITORING REPORT
|
|
2006-02-08
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
FIRST YEAR POST REMEDIATION GROUNDWATER MONITORING REPORT (10/04 - 09/05)
|
|
2005-07-29
|
43
|
Site Activity Status Update Received
|
|
AMENDED POST-REMEDIATION MONITORING PLAN
|
|
2005-06-23
|
99
|
Miscellaneous
|
|
NEIGHBOR APPRECIATION PICNIC - 7/21/05
|
|
2005-05-27
|
43
|
Site Activity Status Update Received
|
|
PERIMETER AIR MONITORING REPORT
|
|
2005-02-08
|
153
|
Remedial Action (RA) Documentation Report Approved
|
|
|
|
2005-01-27
|
99
|
Miscellaneous
|
|
RESPONSE TO SAMPLING PLAN
|
|
2005-01-11
|
43
|
Site Activity Status Update Received
|
|
OCT & NOV 2004 GW DATA
|
|
2004-12-29
|
152
|
Remedial Action Documentation Report Received (fee)
|
|
PHASE II CONSTRUCTION DOCUMENTATION - ISS
|
|
2004-08-10
|
43
|
Site Activity Status Update Received
|
|
REVISED WELL LOCATIONS
|
|
2004-07-30
|
43
|
Site Activity Status Update Received
|
|
QUARTER 4 REPORT (4/1/04 - 6/30/04)
|
|
2004-07-26
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 7/12/04 - 7/23/04
|
|
2004-07-08
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 7/5/04 - 7/9/04 - ISS COMPLETE
|
|
2004-07-06
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 6/28/04 - 7/2/04
|
|
2004-06-25
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 6/21/04 - 6/25/04
|
|
2004-06-18
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 6/14/04 - 6/18/04
|
|
2004-06-11
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 6/7/04 - 6/11/04
|
|
2004-06-07
|
99
|
Miscellaneous
|
|
REQUESTED UPDATED TABLES FOR CONST. DOCUMENT
|
|
2004-05-28
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 5/24/04 - 5/28/04
|
|
2004-05-20
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 5/17/04 - 5/21/04
|
|
2004-05-17
|
43
|
Site Activity Status Update Received
|
|
MISTING SYSTEM PERFORMANCE
|
|
2004-05-11
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 5/3/04 - 5/7/04
|
|
2004-05-06
|
99
|
Miscellaneous
|
|
SITE VISIT
|
|
2004-05-04
|
152
|
Remedial Action Documentation Report Received (fee)
|
|
PHASE I - EXCAVATION WORK
|
|
2004-04-23
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 4/19/04 - 4/23/04
|
|
2004-04-22
|
99
|
Miscellaneous
|
|
SITE VISIT - ISS
|
|
2004-04-08
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 4/5/04-4/9/04 & ISS STARTED
|
|
2004-03-23
|
99
|
Miscellaneous
|
|
RESPONSE TO AMENDED AMP
|
|
2004-03-17
|
43
|
Site Activity Status Update Received
|
|
REQUEST TO AMMEND APPROVED AIR MONITORING PLAN
|
|
2004-03-15
|
43
|
Site Activity Status Update Received
|
|
COAL TAR FROM ROCK ANCHOR HOLES - 10/17/03 MEMO
|
|
2004-03-11
|
99
|
Miscellaneous
|
|
HAZ WASTE MANIFESTS FOR COAL TAR
|
|
2004-03-05
|
43
|
Site Activity Status Update Received
|
|
UPDATED POST- RA WELL & SAMPLING PLAN
|
|
2004-02-19
|
43
|
Site Activity Status Update Received
|
|
PRESS RELEASE FROM WE TO MEDIA
|
|
2004-02-17
|
43
|
Site Activity Status Update Received
|
|
QTLY PROGRESS REPORT #2
|
|
2004-02-03
|
43
|
Site Activity Status Update Received
|
|
ISS 90-DAY LEACH LAB RESULTS
|
|
2004-01-22
|
99
|
Miscellaneous
|
|
MEETING WITH NRT AND WE
|
|
2004-01-22
|
43
|
Site Activity Status Update Received
|
|
NEW WELL & MONITORING PLAN PROPOSAL
|
|
2004-01-07
|
99
|
Miscellaneous
|
|
AUG-DEC 2003 PHOTOS BY APPLETON HEALTH DEPT
|
|
2004-01-04
|
99
|
Miscellaneous
|
|
MEMO RE: CANAL EXCAVATION BY OLDE ONEIDA BRIDGE
|
|
2003-12-16
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 12/8/03 - 12/12/03
|
|
2003-12-10
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 12/1/03 - 12/5/03
|
|
2003-12-09
|
99
|
Miscellaneous
|
|
FINAL TDU SITE VISIT
|
|
2003-12-03
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 11/24/03 - 11/28/03
|
|
2003-11-26
|
99
|
Miscellaneous
|
|
TDU SITE VISIT
|
|
2003-11-21
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 11/17/03-11/21/03
|
|
2003-11-14
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 11/10/03 - 11/14/03
|
|
2003-11-10
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 11/3/03 - 11/7/03
|
|
2003-11-05
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT #1
|
|
2003-11-05
|
99
|
Miscellaneous
|
|
TECHNICAL SPECIFICATIONS FOR EARTHWORK AND ISS
|
|
2003-10-31
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 10/27/03 - 10/31/03
|
|
2003-10-24
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 10/20 - 10/24/03
|
|
2003-10-10
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 10/6/03 - 10/10/03
|
|
2003-10-03
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 9/29/03 - 10/03/03
|
|
2003-09-30
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 9/22 - 9/26/03
|
|
2003-09-24
|
99
|
Miscellaneous
|
|
SITE VISIT
|
|
2003-09-12
|
43
|
Site Activity Status Update Received
|
|
LETTER TO WASTE RE: GGBFS
|
|
2003-09-12
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 9/8 - 9/11/03
|
|
2003-09-11
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO DNR AUG. 12, 2003 LETTER
|
|
2003-09-04
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 9/2 - 9/4/03
|
|
2003-08-28
|
43
|
Site Activity Status Update Received
|
|
ACTIVITIES FOR 8/25 - 8/28/03
|
|
2003-08-12
|
149
|
Remedial Action (RA) Design Report Approved
|
|
DESIGN REPORT APPROVED WITH CONDITIONS
|
|
2003-08-12
|
99
|
Miscellaneous
|
|
AIR MONITORING PLAN APPROVED WITH CONDITIONS
|
|
2003-08-12
|
99
|
Miscellaneous
|
|
PUBLIC MEETING
|
|
2003-08-12
|
43
|
Site Activity Status Update Received
|
|
CHARACTERIZATION OF CANAL & UNSAT SOILS
|
|
2003-08-08
|
97
|
Technical Assistance Request Received (fee)
|
|
|
|
2003-08-08
|
99
|
Miscellaneous
|
|
EARTHWORK & THERMAL TREATMENT SCHEDULE
|
|
2003-08-08
|
98
|
Technical Assistance Provided
|
|
|
|
2003-07-29
|
99
|
Miscellaneous
|
|
MEETING WITH WE AND NRT ON DESIGN REPORT
|
|
2003-07-25
|
99
|
Miscellaneous
|
|
PLAN OF OPERATION MOD - 2ND UNIT ADDED FOR DCI
|
|
2003-07-24
|
99
|
Miscellaneous
|
|
LETTER SENT TO RESIDENT BY CITY HEALTH
|
|
2003-07-23
|
43
|
Site Activity Status Update Received
|
|
GZA RESPONSE TO DHFS COMMENTS ON AIR MONITORING PLAN
|
|
2003-07-21
|
99
|
Miscellaneous
|
|
NOTICE OF INTENT - STORMWATER DISCHARGE APPLICATIONS (3)
|
|
2003-07-18
|
99
|
Miscellaneous
|
|
DHFS MEMO REGARDING AIR MONITORING PLAN
|
|
2003-07-16
|
150
|
Remedial Action (RA) Design Report Not Approved
|
|
AIR MONITORING PLAN NOT APPROVED
|
|
2003-07-16
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
RESPONSE TO REMEDIAL DESIGN REPORT REVIEW COMMENTS
|
|
2003-07-02
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
ADDENDUM - AIR MONITORING PLAN
|
|
2003-06-04
|
43
|
Site Activity Status Update Received
|
|
COMMUNICATION PLAN FOR RA
|
|
2003-06-04
|
43
|
Site Activity Status Update Received
|
|
PROGRESS REPORT #5 (05/01-05/17/03)
|
|
2003-05-29
|
150
|
Remedial Action (RA) Design Report Not Approved
|
|
SSRCL'S DENIED, AIR MONITORING AND COMMUNICATIONS PLAN NEEDED
|
|
2003-05-09
|
43
|
Site Activity Status Update Received
|
|
PROGRESS REPORT #4 (04/07-04/25/03)
|
|
2003-05-02
|
148
|
Remedial Action Design Report Received (fee)
|
|
|
|
2003-04-28
|
99
|
Miscellaneous
|
|
SITE VISIT WITH CITY HEALTH & DHFS
|
|
2003-04-10
|
99
|
Miscellaneous
|
|
APPLICATION FOR GRADING, STREAM DREDGING, RIPRAP PROJECTS & WATERWAY PERMITS
|
|
2003-03-28
|
43
|
Site Activity Status Update Received
|
|
PROGRESS REPORT (03/09-03/22/03)
|
|
2003-03-26
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO VINYL CHLORIDE IN GW
|
|
2003-02-11
|
99
|
Miscellaneous
|
|
MEETING REGARDING RA DESIGN STATUS
|
|
2003-02-06
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
AUG 2002 INTERIM ACTION IN FOX RIVER CANAL
|
|
2003-02-06
|
43
|
Site Activity Status Update Received
|
|
PRE-REMEDIAL DESIGN DATA REPORT
|
|
2003-02-06
|
43
|
Site Activity Status Update Received
|
|
BENCH SCALE TREATABILITY STUDY & DESIGN PROGRESS REPORT
|
|
2002-11-12
|
99
|
Miscellaneous
|
|
MEETING - WE ENERGIES & NRT
|
|
2002-11-01
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
|
|
2002-09-16
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO 07/18/2002 MEMO & ADDITIONAL INFO FOR SIR
|
|
2002-08-20
|
99
|
Miscellaneous
|
|
MEETING AND SITE VISIT
|
|
2002-08-20
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
ADDITIONAL DOCUMENTATION AND INVESTIGATION NEEDED
|
|
2002-07-11
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL INFO FOR SIR
|
|
2002-07-10
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
FOX RIVER CANAL RA
|
|
2002-04-10
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
URS CORP SI
|
|
2002-01-28
|
43
|
Site Activity Status Update Received
|
|
TEMPORARY COVER CONSTRUCTION REPORT
|
|
2001-11-07
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL INFO FOR SIWP
|
|
2001-10-03
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
|
|
2001-09-27
|
99
|
Miscellaneous
|
|
SITE VISIT
|
|
2001-09-27
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
URS CORP
|
|
2001-03-20
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
REMEDIAL ACTION ALTERNATIVES ANALYSIS REPORT - STS
|
|
2001-01-22
|
43
|
Site Activity Status Update Received
|
|
WISDOT PHASE 4; CANAL EXCAVATION BY OLDE ONEIDA BRIDGE - SEE 1/7/04 MEMO; WISDOT #: 4984-00-99
|
|
1991-08-01
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
1991-08-01
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
|
|
1991-05-01
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
1558 TONS EXCAVATED
|
|
1991-05-01
|
152
|
Remedial Action Documentation Report Received (fee)
|
|
1558 TONS EXCAVATED
|
|
1990-11-02
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
1990-10-12
|
1
|
Notification of Hazardous Substance Discharge
|
|
|