WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-36-000268 MANITOWOC CITY / FORMER NEWTON TN GRAVEL PIT
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
MANITOWOC CTY/FORMER NEWTON TN GRAVEL PIT MANITOWOC NORTHEAST
Address Municipality
3130 HECKER RD MANITOWOC
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the NW 1/4 of Sec 02, T18N, R23E 44.0604311 -87.7211455 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
436104020 1991-07-02
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  PFAS flag
Actions and Documents
Date Code Name File Comment
2024-07-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2024 - 6/30/2024
2024-04-18 147 Remedial Action (RA) Design Report Received (non-fee) Download PDF file AMMENDMENT TO 2017 REVISED REMEDIAL ACTION OPTIONS REPORT & CONCEPTUAL DESIGN RPT
2024-01-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-12-12 43 Site Activity Status Update Received Download PDF file ANNUAL REPORT FOR THE PUBLIC SERVICE COMMISSION OF WISCONSIN
2023-11-02 101 Continuing Obligation Modification Approval Download PDF file CAP MODIFICATION COMPLETE, CONTINUING OBLIGATIONS FROM 2017 RAP APPROVAL LTR CONTINUE TO APPLY
2023-11-01 43 Site Activity Status Update Received Download PDF file JUNE 2023 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
2023-10-17 194 CO Modification Final Documentation Received Download PDF file CONSTRUCTION DOCUMENTATION, PROPOSED ENGINEERED TREAMENT SYSTEM - EXTRACTION WELL INSTALLATION
2023-09-14 43 Site Activity Status Update Received Download PDF file DOCUMENTATION FROM US FORESTRY SERVICES SITE VISIT FOR ONGOING PHYTOREMEDIATION
2023-08-28 43 Site Activity Status Update Received Download PDF file JUNE 2023 POTABLE WELL TESTING RESULTS FOR VOCS
2023-08-21 43 Site Activity Status Update Received Download PDF file NOVEMBER 2022 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
2023-08-21 43 Site Activity Status Update Received Download PDF file POTABLE WELL ABANDONMENT STATUS UPDATE FROM AECOM
2023-08-18 43 Site Activity Status Update Received Download PDF file JUNE 2022 VOC SEMI-ANNUAL POTABLE WELL MONITORING
2023-08-15 43 Site Activity Status Update Received Download PDF file 2021 ANNUAL VOC GROUNDWATER MONITORING REPORT
2023-07-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-06-02 24 Long Term Monitoring Plan Received (non-Fee) Download PDF file 2023 AREA WIDE VOC FIVE YEAR POTABLE WELL MONITORING SAMPLING PLAN
2023-05-23 198 Request for Additional Information (Fee-Based or Closure) Download PDF file REVISIONS NEEDED FOR CAP MAINTENANCE PLAN AND DEED RESTRICTION INCLUDED IN RADR
2023-05-08 193 CO Modification Notice to Proceed (NTP) Download PDF file
2023-04-25 43 Site Activity Status Update Received Download PDF file DECEMBER 2021 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
2023-04-25 191 CO Modification Notification Received (non-fee) Download PDF file
2023-04-05 152 Remedial Action Documentation Report Received (fee) Download PDF file
2023-03-20 43 Site Activity Status Update Received Download PDF file RESEARCH PAPERS FOR PHYTOREMEDIATION SURROUNDING TREATMENT POND
2023-03-14 43 Site Activity Status Update Received Download PDF file INFORMATION AND CLARIFICATIONS ON PROPOSED SOLAR PANEL PROJECT ON EAST SIDE OF SITE
2023-03-03 43 Site Activity Status Update Received Download PDF file MEETING AGENDA FOR 3/6/2023 SITE UPDATE CALL
2023-02-28 43 Site Activity Status Update Received Download PDF file NOVEMBER 2022 POTABLE WELL TESTING RESULTS
2023-01-25 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-11-08 43 Site Activity Status Update Received Download PDF file WATER MAIN, SITE VISIT, & MONITORING UPDATES; REQUESTS FOR SAMPLING REDUCTION; & DNR CONCURRENCE
2022-09-01 59 Environmental Enforcement Action Completed Download PDF file COST SHARING AGREEMENT IN PLACE WITH CITY OF MANITOWOC
2022-08-31 43 Site Activity Status Update Received Download PDF file 2021 EMERGING CONTAMINANT GROUNDWATER MONITORING REPORT
2022-08-29 43 Site Activity Status Update Received Download PDF file DECEMBER 2021 PFAS UP-GRADIENT POTABLE WELL MONITORING LETTER REPORT
2022-08-19 43 Site Activity Status Update Received Download PDF file AUGUST COST SHARING AGREEMENT UPDATE, DETAILED PROCESS AND SCHEDULE FOR FUTURE COST REIMBURSEMENTS
2022-07-18 43 Site Activity Status Update Received Download PDF file JULY COST SHARING AGREEMENT UPDATE AND SUMMARY OF CALL WITH NOC REPRESENTATIVES
2022-07-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-06-30 43 Site Activity Status Update Received Download PDF file 2021 SILVER CREEK EMERGING CONTAMINANTS SAMPLING LETTER REPORT
2022-06-29 43 Site Activity Status Update Received Download PDF file JUNE 2021 PFAS POTABLE WELL MONITORING LETTER REPORT
2022-06-20 43 Site Activity Status Update Received Download PDF file JUNE 2021 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
2022-05-31 43 Site Activity Status Update Received Download PDF file COST SHARING AGREEMENT UPDATE FOR JUNE
2022-05-18 43 Site Activity Status Update Received Download PDF file MAY COST SHARING AGREEMENT UPDATE AND NOTIFICATION OF CHANGE FOR ATTORNEY CONTACT
2022-04-04 43 Site Activity Status Update Received Download PDF file APRIL COST SHARING AGREEMENT UPDATE, PORTION OF PAYMENT MADE TO CITY FOR 2020 COSTS
2022-03-30 43 Site Activity Status Update Received Download PDF file FORMER DRYING PONDS PFAS SITE INVESTIGATION, TECHNICAL MEMO
2022-03-18 43 Site Activity Status Update Received Download PDF file MARCH COST SHARING AGREEMENT UPDATE
2022-02-22 43 Site Activity Status Update Received Download PDF file CITY PLANNING TO USE ARPA FUNDS FOR WATER MAIN PROJECT INSTEAD OF SDWLP FUNDS
2022-02-04 43 Site Activity Status Update Received Download PDF file 2019-2021 EXPANDED DOWNGRADIENT POTABLE WELL VOC SAMPLING AND TOP OF BEDROCK MAPPING LETTER REPORT
2022-02-02 43 Site Activity Status Update Received Download PDF file JANUARY AND FEBRUARY COST SHARING AGREEMENT UPDATE
2022-01-20 43 Site Activity Status Update Received Download PDF file POTABLE WELL SAMPLING RESULTS AND UPDATE TO DEPT OF HEALTH SERVICES
2022-01-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2021-12-09 43 Site Activity Status Update Received Download PDF file INFORMATION REGARDING APPLICATION TO PUBLIC SERVICE COMMISSION FOR WATER MAIN EXTENSION
2021-11-22 43 Site Activity Status Update Received Download PDF file NOVEMBER COST SHARING AGREEMENT UPDATE
2021-11-02 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file FOR EMERGING CONTAMINANT WORK PLAN UPDATE #4 - 2021 GROUNDWATER AND SURFACE WATER SAMPLING
2021-11-02 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file FOR EMERGING CONTAMINANT WORK PLAN UPDATE #5 - UP-GRADIENT POTABLE WELL INVESTIGATION
2021-10-28 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file EMERGING CONTAMINANT WORK PLAN UPDATE #5 - UP-GRADIENT POTABLE WELL INVESTIGATION
2021-10-27 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file EMERGING CONTAMINANT WORK PLAN UPDATE #4 - 2021 GROUNDWATER AND SURFACE WATER SAMPLING
2021-10-22 43 Site Activity Status Update Received Download PDF file MEETING WITH CITY, AECOM, DHS, AND DNR FOR STATUS UPDATE AND NEXT STEPS FOR INVESTIGATION
2021-09-22 43 Site Activity Status Update Received Download PDF file AUGUST COST SHARING AGREEMENT UPDATE
2021-09-10 99 Miscellaneous Download PDF file DNR, DHS, AECOM, AND CITY OF MANITOWOC CORRESPONDENCE FOR PFAS SAMPLING RESULTS & HAZARD INDEX CALCS
2021-08-25 43 Site Activity Status Update Received Download PDF file PFAS SAMPLING RESULTS FROM POTABLE WELLS
2021-08-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-07-06 43 Site Activity Status Update Received Download PDF file MAY 2021 POTABLE WELL SAMPLING RESULTS
2021-07-06 43 Site Activity Status Update Received Download PDF file CLARIFICATION ON PRIVATE WELL SAMPLE COLLECTED IN OCTOBER 2020 WITH MISSING LAB REPORT
2021-06-17 99 Miscellaneous Download PDF file NR 716.14(3) NOTIFICATION REQUEST DNR CONCURRENCE FOR PRIVATE WELL SAMPLING
2021-06-15 43 Site Activity Status Update Received Download PDF file JUNE COST SHARING AGREEMENT UPDATE
2021-06-01 43 Site Activity Status Update Received Download PDF file NOTIFICATION FROM CITY OF PUBLIC MEETING CANCELLATION
2021-05-03 99 Miscellaneous Download PDF file DNR UPDATE FOR SDWLP LOAN COMPLIANCE COMPLETED
2021-04-30 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file EMERGING CONTAMINANT ON-SITE INVESTIGATION
2021-04-30 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file EMERGING CONTAMINANT AREA WIDE POTABLE WELL INVESTIGATION
2021-04-30 99 Miscellaneous Download PDF file COMMENTS FOR AREA WIDE VOC 5-YEAR POTABLE WELL SAMPLING PLAN
2021-04-30 99 Miscellaneous Download PDF file DNR RESPONSE TO APRIL COST SHARING AGREEMENT UPDATE
2021-04-20 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file EMERGING CONTAMINANT WORK PLAN UPDATE #3 - AREA WIDE POTABLE WELL INVESTIGATION
2021-04-20 99 Miscellaneous Download PDF file NEW DEPT OF HEALTH SERVICES CONTACT AND UPDATES TO DNR PROJECT MANAGER CONTACT INFO
2021-04-19 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file EMERGING CONTAMINANT WORK PLAN UPDATE #2 - CONTINUED ON-SITE INVESTIGATION
2021-04-16 24 Long Term Monitoring Plan Received (non-Fee) Download PDF file AREA WIDE VOC FIVE YEAR POTABLE WELL SAMPLING WORK PLAN
2021-04-15 43 Site Activity Status Update Received Download PDF file APRIL COST SHARING AGREEMENT UPDATE
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-03-18 43 Site Activity Status Update Received Download PDF file NOVEMBER 2020 VOC SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
2021-03-15 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file 2020 SILVER CREEK EMERGING CONTAMINATES SAMPLING LETTER REPORT
2021-03-15 43 Site Activity Status Update Received Download PDF file MARCH COST SHARING AGREEMENT UPDATE
2021-02-26 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file EMERGING CONTAMINANT GROUNDWATER INVESTIGATION UPDATE REPORT, JUNE 2020
2021-02-17 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2021-02-16 43 Site Activity Status Update Received Download PDF file FEBRUARY COST SHARING AGREEMENT UPDATE AND DNR FOLLOWUP
2021-01-29 43 Site Activity Status Update Received Download PDF file ACCESS REQUEST LETTERS SENT FOR CONFIRMATION SAMPLING, NO RESPONSE FROM PROPERTY OWNER
2021-01-23 43 Site Activity Status Update Received Download PDF file JANUARY COST SHARING AGREEMENT UPDATE AND DNR FOLLOWUP
2020-12-30 43 Site Activity Status Update Received Download PDF file JUNE 2020 VOC SEMI-ANNUAL AND PFAS POTABLE WELL MONITORING LETTER REPORT
2020-12-15 43 Site Activity Status Update Received Download PDF file NOVEMBER POTABLE WELL SAMPLING LAB ANALYTICAL RESULTS
2020-12-11 99 Miscellaneous Download PDF file CLARIFICATIONS REGARDING QUESTION ABOUT RETAINING PRIVATE WELLS PER WIS ADM CODE & LOCAL ORDINANCES
2020-11-24 99 Miscellaneous Download PDF file CORRESPONDENCE TO PAUSE ON-SITE SAMPLING TO FOCUS RESOURCES TO EMERGING CONTAMINANTS
2020-11-16 43 Site Activity Status Update Received Download PDF file 2019 VOC ANNUAL GROUNDWATER MONITORING REPORT
2020-11-11 43 Site Activity Status Update Received Download PDF file UPDATE ON POTABLE WELLS WITH EMERGING CONTAMINANTS AFTER CYCLE 11 RELEASE BY DHS
2020-11-10 99 Miscellaneous Download PDF file SUMMARY OF NOVEMBER 5 CALL REGARDING FUTURE COST SHARING AGREEMENT
2020-10-23 43 Site Activity Status Update Received Download PDF file COST SHARING AGREEMENT FOR COSTS UP TO THE END OF 2019
2020-10-19 99 Miscellaneous Download PDF file DNR RESPONSE TO ENFORCEMENT SUBMITTALS UPDATE
2020-10-14 43 Site Activity Status Update Received Download PDF file RESPONSE FOR ENFORCEMENT SUBMITTALS
2020-08-27 43 Site Activity Status Update Received Download PDF file BRIEF UPDATE FROM NEWELL ON FURTHER DISCUSSIONS WITH CITY OF MANITOWOC
2020-08-25 43 Site Activity Status Update Received Download PDF file DEPT OF HEALTH SERVICES RESPONSE TO PFAS RESULTS
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-08-14 99 Miscellaneous Download PDF file ENFORCEMENT CONFERENCE SUMMARY LETTER
2020-08-12 43 Site Activity Status Update Received Download PDF file NOTIFICATION LETTERS FOR POTABLE WELL SAMPLING RESULTS FOR VOCS AND PFAS
2020-07-29 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-07-17 99 Miscellaneous Download PDF file UPDATE TO DEPT OF HEALTH SERVICES (DHS)
2020-07-06 43 Site Activity Status Update Received Download PDF file NEWELL RESPONSE TO 06/16/2020 NOV
2020-07-06 43 Site Activity Status Update Received Download PDF file NOTIFICATION OF RESULTS FROM PRIVATE WELL MONITORING EVENT
2020-06-30 99 Miscellaneous Download PDF file INFORMATION FOR SAFE DRINKING WATER LOAN PROGRAM (SDWLP) APPLICATION
2020-06-29 4 Enforcement Conference Held WITH NEWELL BRANDS INC
2020-06-16 14 Notice of Violation (NOV) Issued Download PDF file SITE INVESTIGATION WORK PLAN NEEDS TO BE SUBMITTED
2020-06-16 99 Miscellaneous Download PDF file ADDITIONAL CORRESPONDENCE FOR THE 3/18/2020 SIWP AND THE 5/13/2020 SIWP NOTICE TO PROCEED
2020-06-09 43 Site Activity Status Update Received Download PDF file OCTOBER 2019 SEMI-ANNUAL POTABLE WELL MONITORING
2020-06-02 99 Miscellaneous Download PDF file COMPLIANCE ASSISTANCE RESPONSE
2020-05-13 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file CONDITIONAL WITH ADDITIONS/REVISIONS TO THE WORK PLAN
2020-04-28 99 Miscellaneous Download PDF file COMPLIANCE ASSISTANCE REQUESTED
2020-03-18 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file REVISED FROM JANUARY 31, 2020 WORK PLAN SUBMITTAL
2020-03-06 99 Miscellaneous Download PDF file CLARIFICATIONS ON LAB ANALTYICAL INFORMATION FOR PFAS SAMPLING
2020-03-05 99 Miscellaneous Download PDF file UPDATE TO COUNTY HEALTH DEPT
2020-02-17 99 Miscellaneous Download PDF file RESPONSE TO EMERGING CONTAMINANT WORK PLAN UPDATE #1
2020-01-31 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file EMERGING CONTAMINANT WORK PLAN UPDATE #1
2020-01-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-12-17 99 Miscellaneous Download PDF file INFO FOR DISCONNECTED PRIVATE WELL USED FOR CONTAMINANT MONITORING PURPOSES
2019-12-17 99 Miscellaneous Download PDF file SITE UPDATE PROVIDED TO MANITOWOC COUNTY HEALTH DEPT
2019-12-16 43 Site Activity Status Update Received Download PDF file EXPANDED PRIVATE WELL SAMPLING RESULTS
2019-12-12 43 Site Activity Status Update Received Download PDF file SAFE WATER DRINKING LOAN PROGRAM (SWDLP) APPLICATION INFO
2019-12-11 99 Miscellaneous Download PDF file CURTIS HEDMAN IS NEW DEPT OF HEALTH SERVICES CONTACT FOR THE SITE
2019-12-10 99 Miscellaneous CITY/AECOM/DNR SITE UPDATES MEETING
2019-11-27 43 Site Activity Status Update Received Download PDF file PRIVATE WELL SAMPING RESULTS NOTIFICATION LETTERS
2019-11-22 43 Site Activity Status Update Received Download PDF file EXPANDED PRIVATE WELL SAMPLING RESULTS
2019-11-04 43 Site Activity Status Update Received Download PDF file EXPANDED PRIVATE WELL SAMPLING RESULTS
2019-10-30 99 Miscellaneous Download PDF file RESPONSE TO WORK PLAN ISSUED TO NEWELL
2019-10-30 99 Miscellaneous Download PDF file UPDATE PROVIDED TO DEPT OF HEALTH SERVICES FOR UPCOMING PRIVATE WELL SAMPLING
2019-10-25 99 Miscellaneous Download PDF file ADDITIONAL COMMENTS FOR PFAS FOR SI WORKPLAN
2019-10-25 116 PFAS Sampling Required PFAS SAMPLING WORKPLAN DUE DATE NOT INCLUDED IN LETTER
2019-09-12 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file
2019-09-11 43 Site Activity Status Update Received Download PDF file JUNE 2019 SEMI-ANNUAL POTABLE WELL MONITORING LETTER RPT
2019-08-08 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file EXPANDED DOWNGRADIENT POTABLE WELL SAMPLING WORK PLAN - VOCS
2019-08-07 99 Miscellaneous Download PDF file COMPILATION OF PFAS INFORMATION PROVIDED TO CITY AND AECOM
2019-07-24 99 Miscellaneous Download PDF file FOLLOWUP WITH PROPERTY OWNER FOR PRIVATE WELL SAMPLING
2019-07-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-06-24 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file NORTH SOURCE AREA, 2018 ANNUAL GW MONITORING, AND INITIAL EMERGING CONTAMINANT SI REPORT
2019-06-24 43 Site Activity Status Update Received Download PDF file WPDES REPORTING, SEPTEMBER 2017 THROUGH MAY 2019
2019-05-15 99 Miscellaneous Download PDF file USE OF POET SYSTEM AS TEMPORARY DRINKING WATER SOLUTION, NEED TO SUBMIT WORKPLAN
2019-02-28 43 Site Activity Status Update Received Download PDF file RESPONSE LETTER TO NON
2019-02-21 43 Site Activity Status Update Received Download PDF file POTABLE WELL MONITORING REPORT
2019-02-20 3 Notice of Noncompliance (NON) Issued Download PDF file SITE INVESTIGATION WORK PLAN NEEDS TO BE SUBMITTED, SERVES AS FIRST REQUIRED NOTICE UNDER 728.11
2019-02-01 99 Miscellaneous Download PDF file UPDATES ON NEWELL COORDINATION WITH CITY AND EXTENSIONS FOR SI WORKPLAN DEADLINE
2019-01-17 43 Site Activity Status Update Received Download PDF file POTABLE WELL RESULT NOTIFICATION LETTERS
2019-01-07 99 Miscellaneous Download PDF file UPDATE PROVIDED TO DEPT OF HEALTH SERVICES
2019-01-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-11-30 99 Miscellaneous Download PDF file PRIVATE WELL COMPLAINT FOLLOWUP
2018-11-28 99 Miscellaneous Download PDF file EXTENSION PROVIDED FOR COORDINATION OF RESPONSIBLE PARTIES
2018-11-08 43 Site Activity Status Update Received Download PDF file UPDATE ON DISCHARGE MONITORING REPORTING (DMR) STATUS
2018-11-06 43 Site Activity Status Update Received Download PDF file POTABLE WELL RESULTS NOTIFICATION LETTERS
2018-10-29 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file EMERGING CONTAMINANT SI WORK PLAN
2018-10-26 43 Site Activity Status Update Received Download PDF file NEWELL RESPONSE TO RP LETTER
2018-10-25 43 Site Activity Status Update Received Download PDF file LIMITED GROUNDWATER ASSESSMENT FOR EMERGING CONTAMINANTS
2018-10-17 99 Miscellaneous Download PDF file CLARIFICATION ON WATER REPLACEMENT IF REFUSED BY PROPERTY OWNER
2018-10-01 43 Site Activity Status Update Received Download PDF file MAY 2018 SEMI-ANNUAL POTABLE WELL MONITORING LETTER REPORT
2018-09-24 43 Site Activity Status Update Received Download PDF file NOTIFICATION OF DISCHARGE FOR PFAS
2018-09-24 2 Responsible Party (RP) letter sent Download PDF file MODIFIED RP LTR TO CITY OF MANITOWOC
2018-09-24 2 Responsible Party (RP) letter sent Download PDF file NEWELL BRANDS, INC.
2018-09-24 120 PFAS Sampling Completed - Actionable Levels Detected SEE AC 43 DATED 9/24/2018 FOR DOCUMENTATION
2018-08-15 43 Site Activity Status Update Received Download PDF file UPDATES FROM LAB FOR PFAS SAMPLES
2018-07-31 43 Site Activity Status Update Received Download PDF file REVISED UMPIRE RECOMMENDATION BASED ON JULY 30, 2018 APPROVAL
2018-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-07-30 99 Miscellaneous Download PDF file APPROVAL OF MODIFIED UMPIRE RECOMMENDATION
2018-07-26 99 Miscellaneous Download PDF file PHYTOREMEDIATION TOUR OF GRAVEL PIT
2018-07-23 43 Site Activity Status Update Received Download PDF file RESPONSE TO REQUEST FOR FURTHER MODIFICATION TO MODIFIED UMPIRE RECOMMENDATION
2018-07-19 99 Miscellaneous Download PDF file REQUEST FOR FURTHER MODIFICATION TO MODIFIED UMPIRE RECOMMENDATION
2018-07-13 43 Site Activity Status Update Received Download PDF file ACCESS AGREEMENT FOR SAMPLING
2018-07-10 43 Site Activity Status Update Received Download PDF file PFAS SAMPLING UPDATES
2018-06-26 43 Site Activity Status Update Received Download PDF file PRIVATE WELL RESULT NOTIFICATION LETTERS FOR MAY/JUNE SAMPLING
2018-06-26 43 Site Activity Status Update Received Download PDF file RESPONSE TO REQUIRED MODIFICATIONS TO UMPIRE RECOMMENDATION
2018-06-25 99 Miscellaneous Download PDF file CORRESPONDENCE FOR PFAS SAMPLING PROPOSAL
2018-06-20 43 Site Activity Status Update Received Download PDF file WORK PLAN FOR INITIAL ASSESSMENT OF EMERGING CONTAMINANTS-PFAS
2018-06-14 99 Miscellaneous Download PDF file APPROVAL OF NEGOTIATION AGREEMENTS FOR LGU COST RECOVERY
2018-06-14 99 Miscellaneous Download PDF file REQUIRED MODIFICATIONS TO UMPIRE RECOMMENDATION
2018-06-08 43 Site Activity Status Update Received Download PDF file PRIVATE WELL RESULTS NOTIFICATION LETTERS FOR MAY 2018 SAMPLING
2018-05-25 43 Site Activity Status Update Received Download PDF file RECOMMENDED PFAS SAMPLE METHOD
2018-05-23 99 Miscellaneous Download PDF file CLARIFICATIONS WITH EPA ON DEED RESTRICTION REQUIREMENTS FOR PCB TYPE B SITE
2018-05-14 99 Miscellaneous Download PDF file REQUEST FOR ACCESS TO THE PROPERTY
2018-05-14 99 Miscellaneous Download PDF file ADDITIONAL INVESTIGATION NEEDED LETTER ISSUED
2018-05-07 43 Site Activity Status Update Received Download PDF file STATE LEAD PROPOSAL UPDATE FOR SITE SAMPLING
2018-05-02 43 Site Activity Status Update Received Download PDF file SUMMARY MEMO FOR NORTHERN SOURCE AREA
2018-04-30 99 Miscellaneous Download PDF file STATUS OF UMPIRE RECOMMENDATION AND SITE INVESTIGATION
2018-04-12 99 Miscellaneous Download PDF file DNR DRINKING & GW PROGRAM CORRESPONDENCE FOR WATER QUALITY ISSUES IN NEW PRIVATE WELLS
2018-04-06 114 PFAS Scoping Statement Received VERBAL FOR SAP PREPARATION
2018-04-03 43 Site Activity Status Update Received Download PDF file CLARIFICATIONS FOR ANALYSIS OF WIS. STAT. 292.35(7) FOR UMPIRE PROCESS
2018-03-29 43 Site Activity Status Update Received Download PDF file 2017 GW MONITORING LETTER REPORT
2018-03-09 99 Miscellaneous Download PDF file CORRESPONDENCE FOR A PRIVATE WELL ON AN UNOCCUPIED PROPERTY
2018-03-08 99 Miscellaneous Download PDF file WRITTEN STATEMENT
2018-03-01 99 Miscellaneous Download PDF file PRIVATE WELL RESULT CORRESPONDENCE
2018-02-26 99 Miscellaneous Download PDF file AESTHETIC WATER QUALITY INFORMATION OF NEW PRIVATE WELLS
2018-02-26 99 Miscellaneous Download PDF file PRIVATE WELL RESULTS SUMMARY OF DNR SAMPLING CONDUCTED END OF 2017/EARLY 2018
2018-02-22 43 Site Activity Status Update Received Download PDF file OCTOBER 2017 SEMI-ANNUAL POTABLE WELL MONITORING
2018-02-19 99 Miscellaneous Download PDF file CORRESPONDENCE ON WRITTEN STATEMENTS
2018-02-17 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2018-02-09 99 Miscellaneous Download PDF file UMPIRE RECOMMENDATION
2018-02-08 99 Miscellaneous Download PDF file DNR PROVIDED UPDATE TO DEPT OF HEALTH SERVICES
2018-01-31 43 Site Activity Status Update Received Download PDF file WGNHS BEDROCK GEOLOGY OF MANITOWOC COUNTY FINAL REPORT
2018-01-26 99 Miscellaneous Download PDF file ADDT'L POTABLE WELL PLUME DELINEATION & REPLACEMENT REQUEST LETTER
2018-01-11 99 Miscellaneous Download PDF file CORRESPONDENCE WITH PRIVATE WELL OWNER
2018-01-10 99 Miscellaneous TELCON W/CITY & AECOM - SITE UPDATES
2018-01-09 99 Miscellaneous Download PDF file PRIVATE WELL SAMPLE RESULT NOTIFICATION LETTERS ISSUED
2018-01-08 43 Site Activity Status Update Received Download PDF file LAB QUALIFIER SUMMARY RECEIVED FROM STATE LAB FOR PRIVATE WELL SAMPLING
2018-01-05 99 Miscellaneous Download PDF file PRIVATE WELL SAMPLING UPDATES
2017-12-19 43 Site Activity Status Update Received Download PDF file SAMPLE RESULTS FOR REPLACEMENT WELL AT 2918 SOUTH 26TH ST
2017-12-19 99 Miscellaneous Download PDF file PRIVATE WELL SAMPLING AND ACCESS UPDATES
2017-12-18 99 Miscellaneous TELCON W/CITY & AECOM - SITE UPDATES
2017-12-15 99 Miscellaneous Download PDF file 2ND SET OF ACCESS REQUEST LETTERS FOR PRIVATE WELL SAMPLING
2017-12-15 99 Miscellaneous Download PDF file PRIVATE WELL SAMPLING UPDATE
2017-12-13 99 Miscellaneous Download PDF file PRIVATE WELL SAMPLE RESULTS FROM 3008 SOUTH 26TH ST
2017-12-06 43 Site Activity Status Update Received Download PDF file NOTICE OF PROJECT COMPLETION FOR CH. 30 PERMIT
2017-11-03 99 Miscellaneous Download PDF file UMPIRE SELECTION FOR COST RECOVERY PROCESS
2017-11-03 99 Miscellaneous Download PDF file ACCESS REQUEST LETTERS FOR PRIVATE WELL SAMPLING
2017-11-01 99 Miscellaneous TELCON W/CITY & AECOM - SITE UPDATES
2017-10-27 99 Miscellaneous Download PDF file CONSTRUCTION DEPTH FOR REPLACEMENT WELL AT 2918 SOUTH 26TH ST
2017-10-23 99 Miscellaneous Download PDF file WELL LOG INFORMATION FOR 2918 SOUTH 26TH ST LOCATION
2017-10-20 43 Site Activity Status Update Received Download PDF file LETTER FROM CITY REGARDING RESPONSE TO NEW PRIVATE WELL CONTAMINATION
2017-10-20 99 Miscellaneous Download PDF file UPDATES ON NEXT STEPS FOR NEW PRIVATE WELL INVESTIGATION AREA
2017-09-28 99 Miscellaneous Download PDF file UPDATE PROVIDED TO OTHER DNR STAFF FOR NEW POTABLE WELL INVESTIGATION AREA
2017-09-27 99 Miscellaneous MEETING W/CITY & AECOM - SITE UPDATES
2017-09-20 43 Site Activity Status Update Received Download PDF file COST RECOVERY PROCESS UPDATE - REQUEST FOR UMPIRE
2017-09-13 43 Site Activity Status Update Received Download PDF file OFFER TO SETTLE WITH CAUSERS
2017-09-13 99 Miscellaneous Download PDF file UPDATE PROVIDED TO HEALTH DEPT FOR NEW IMPACTED WELL
2017-09-05 43 Site Activity Status Update Received Download PDF file RESULTS FOR NEW IMPACTED PRIVATE WELL ON SOUTH 26TH ST
2017-08-31 43 Site Activity Status Update Received Download PDF file MAY 2017 SEMI-ANNUAL POTABLE WELL MONITORING
2017-07-28 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-07-17 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2017-07-17 710 Database Fee Paid for Soil Continuing Obligation(s)
2017-07-07 147 Remedial Action (RA) Design Report Received (non-fee) Download PDF file
2017-07-07 149 Remedial Action (RA) Design Report Approved Download PDF file
2017-07-07 56 Continuing Obligation(s) Applied
2017-07-07 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2017-07-07 226 Continuing Obligation - Vapor Intrusion Response
2017-07-07 228 Continuing Obligation - Site Specific Condition DEED RESTRICTION & SIGNAGE FOR TSCA PCBS-EPA REQUIREMENT
2017-07-07 232 Continuing Obligation - Residual Soil Contamination
2017-07-07 236 Continuing Obligation - Residual GW Contamination
2017-07-03 43 Site Activity Status Update Received Download PDF file SAMPLING RESULTS FOR REPLACEMENT WELLS
2017-06-30 43 Site Activity Status Update Received Download PDF file CITY RESPONSES TO PRPS COMMENTS ON RAOR
2017-06-20 199 Additional Information Received (Fee-Based or Closure) Download PDF file REVISED RAOR
2017-06-19 99 Miscellaneous Download PDF file WASTE WATER DISCHARGE PERMIT PLANS AND SPECS APPROVAL
2017-06-12 43 Site Activity Status Update Received Download PDF file WASTEWATER DISCHARGE PERMIT PLANS AND SPECS
2017-05-10 24 Long Term Monitoring Plan Received (non-Fee) Download PDF file 5 YR POTABLE WELL MONITORING PLAN
2017-05-01 43 Site Activity Status Update Received Download PDF file 2016 GW MONITORING RPT
2017-05-01 43 Site Activity Status Update Received Download PDF file NR 718 SOIL SAMPLING & WASTE DETERMINATION TECHNICAL MEMO
2017-04-27 99 Miscellaneous Download PDF file TELCON W/CITY & AECOM - SITE UPDATES
2017-03-24 43 Site Activity Status Update Received Download PDF file PUBLIC MEETING FOR RAP SUMMARY LETTERS SENT TO PRPS
2017-03-13 99 Miscellaneous PUBLIC MEETING FOR LGU COST RECOVERY PROCESS
2017-03-13 43 Site Activity Status Update Received Download PDF file 2ND INFORMATION REQUEST LETTERS TO IDENTIFIED PRPS
2017-03-10 43 Site Activity Status Update Received Download PDF file OCTOBER 2016 SEMI-ANNUAL POTABLE WELL MONITORING RPT
2017-03-03 99 Miscellaneous Download PDF file CLARIIFCATIONS ON WASTEWATER SYSTEM APPROVAL REQUEST
2017-02-23 99 Miscellaneous Download PDF file MEETING W/CITY & AECOM - SITE UPDATES
2017-02-23 43 Site Activity Status Update Received Download PDF file ARMY CORPS GENERAL PERMIT LETTER
2017-02-15 43 Site Activity Status Update Received Download PDF file SUPPLEMENTAL SUBMITTAL FOR WASTEWATER SYSTEM APPROVAL REQUEST
2017-02-06 99 Miscellaneous Download PDF file CHAPTER 30 PERMIT ISSUED FOR CONSTRUCTION OF A WATERWAY WITH A NON-NAVIGABLE CONNECTION
2017-02-01 43 Site Activity Status Update Received Download PDF file INFORMATION REQUEST LETTERS TO IDENTIFIED RESPONSIBLE PARTIES REC'D
2017-01-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2017-01-09 99 Miscellaneous Download PDF file CONCURRENCE WITH WASTE CHARACTERIZATION SAMPLING APPROACH PRIOR TO FINALIZATION OF RAOR
2017-01-05 43 Site Activity Status Update Received Download PDF file COPY OF WPDES PERMIT APPLICATION-CONTAMINATED GW FROM PROPOSED RA OPERATIONS
2017-01-05 43 Site Activity Status Update Received Download PDF file NOTIFICATION THAT CITY HAS INITIATED COST RECOVERY PROCESS
2016-12-03 99 Miscellaneous Download PDF file 4TH OPEN HOUSE @ NEWTON TOWN HALL
2016-12-02 99 Miscellaneous TCLP & TOTALS SAMPLING DISCUSSION WITH CONSULTANT
2016-12-02 99 Miscellaneous Download PDF file TCLP & TOTALS SAMPLING CONCURRENCE
2016-11-22 43 Site Activity Status Update Received Download PDF file NOVEMBER PRIVATE WELL TESTING RESULT LETTERS
2016-11-15 43 Site Activity Status Update Received Download PDF file PROPOSED APPROACH FOR WASTE CHARACTERIZATION SAMPLING
2016-11-08 99 Miscellaneous Download PDF file MEETING W/CITY & AECOM FOR SITE UPDATES
2016-11-07 43 Site Activity Status Update Received Download PDF file PRIVATE WELL TESTING LETTERS
2016-10-10 198 Request for Additional Information (Fee-Based or Closure) ADDITIONAL MTGS/DISCUSSION NEEDED FOR RAOR
2016-09-20 99 Miscellaneous Download PDF file TELCON TO DISCUSS SAFE DRINKING WATER LOAN PROGRAM LOAN
2016-09-16 99 Miscellaneous Download PDF file COMMENTS/REVISION PROVIDED TO CONSULTANT FOR RAOR RPT
2016-09-07 99 Miscellaneous Download PDF file CONFIRMATION OF TYPE B SITE DESIGNATION FOR PCBS W/EPA UNDER ONE CLEANUP PROGRAM MOA
2016-09-06 99 Miscellaneous MEETING W/DNR PROGRAMS TO DISCUSS REMEDIAL ACTION OPTION RPT
2016-08-26 148 Remedial Action Design Report Received (fee) Download PDF file
2016-08-03 43 Site Activity Status Update Received Download PDF file LNAPL CHARACTERIZATION & CONTAMINANT MASS ANALYSIS TECHICAL MEMO
2016-08-03 43 Site Activity Status Update Received Download PDF file SOIL VAPOR EXTRACTION PILOT STUDY TECHNICAL MEMO
2016-07-18 43 Site Activity Status Update Received Download PDF file MARCH 2016 SEMI-ANNUAL POTABLE WELL MONITORING REPORT
2016-07-12 315 Superfund Site Assessment Transmittal Memos
2016-07-12 350 Superfund Site Assessment Preliminary Assessment (PA) Download PDF file
2016-07-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-06-23 99 Miscellaneous Download PDF file MEETING W/CITY & AECOM FOR UPDATES ON PREPARATIONS FOR REMEDIAL ACTION OPTIONS
2016-06-06 99 Miscellaneous REMEDIAL ACTION ALTERNATIVES DISCUSSION W/AECOM ON ACTIONS THAT CAN BE COMPLETED IN 2016
2016-04-22 43 Site Activity Status Update Received Download PDF file PRIVATE WELL TESTING LETTERS
2016-04-06 43 Site Activity Status Update Received Download PDF file 2015 GW MONITORING
2016-04-06 43 Site Activity Status Update Received Download PDF file GW TREATMENT AREA FEASIBILITY STUDY TECHNICAL MEMO
2016-04-06 99 Miscellaneous Download PDF file MEETING W/CITY & AECOM TO DISCUSS REMEDIAL ACTION OPTIONS
2016-03-28 43 Site Activity Status Update Received WI GEOLOGICAL SURVEY MANITOWOC COUNTY BEDROCK GEOLOGY MAP
2016-01-26 99 Miscellaneous Download PDF file TELCON: REMEDIAL ACTION PLANNING DISCUSSION
2016-01-14 43 Site Activity Status Update Received Download PDF file OCTOBER 2015 SEMI-ANNUAL POTABLE WELL MONITORING
2016-01-14 99 Miscellaneous MEETING W/CITY & AECOM - SITE UPDATES
2016-01-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-12-07 99 Miscellaneous Download PDF file SPECIAL WELL CASING DEPTH AREA APPROVED
2015-12-05 99 Miscellaneous 3RD OPEN HOUSE @ NEWTON TOWN HALL
2015-12-01 99 Miscellaneous NOTICE TO PROCEED FOR 2015-2016 SEMI-ANNUAL POTABLE WELL MONITORING PLAN
2015-11-02 99 Miscellaneous Download PDF file MEETING W/CITY & AECOM - SITE UPDATES
2015-10-09 43 Site Activity Status Update Received Download PDF file STATUS REPORT REC'D: CASE ACTIVITY REPORT OF NEWTON RESIDENT INTERVIEW
2015-09-24 43 Site Activity Status Update Received Download PDF file 2015-2016 POTABLE WELL MONITORING WORK PLAN
2015-09-24 99 Miscellaneous UPDATE MEETING WITH CITY & AECOM
2015-09-24 43 Site Activity Status Update Received Download PDF file STATUS REPORT REC'D: SOURCE AREA/DOWNGRADIENT SOIL WASTE ANALYTICAL DATA
2015-09-11 43 Site Activity Status Update Received Download PDF file CASE ACTIVITY REPORT FOR INTERVIEW
2015-08-27 43 Site Activity Status Update Received Download PDF file UPDATE FOR SITE INVESTIGATION
2015-07-23 43 Site Activity Status Update Received Download PDF file PROPOSED REMEDIAL ACTION SCOPE OF SERVICES LIST
2015-07-23 99 Miscellaneous Download PDF file MTG W/CITY & AECOM: WATER MAIN, POTABLE WELL RESULTS & PROPOSED RA SCOPE OF SERVICES
2015-07-22 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-06-18 43 Site Activity Status Update Received Download PDF file GW MONITORING
2015-05-11 43 Site Activity Status Update Received Download PDF file POTABLE WELL MONITORING
2015-04-27 99 Miscellaneous Download PDF file MTG W/CITY & AECOM: POTABLE WELLS, REPORT & PRELIMINARY RA SOW UPDATED
2015-04-02 43 Site Activity Status Update Received Download PDF file 3RD QTR POTABLE WELL RESULTS & REGIONAL GW FLOW MAP
2015-04-01 99 Miscellaneous Download PDF file TECHNICAL INFORMATION MTG TO DETERMINE 2015 SI & REMEDIAL WORK
2015-03-11 99 Miscellaneous Download PDF file MTG W/CITY & AECOM - POTABLE WELL SAMPLING UPDATE, OFF-SITE INVESTIGATION & REMEDIAL ACTION
2015-02-04 - Site Investigation Download PDF file
2015-02-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2015-01-28 99 Miscellaneous Download PDF file DNR TELCON TO DISCUSS SOURCE REMEDIAL ACTION & OFF-SITE INVESTIGATION
2015-01-14 99 Miscellaneous DNR MTG TO DISCUSS PRPS, POTABLE WELL SAMPLING & INTERIM GIS REGISTRY DOCUMENTATION
2014-12-06 99 Miscellaneous Download PDF file 2ND OPEN HOUSE @ NEWTON TOWN HALL
2014-12-06 43 Site Activity Status Update Received Download PDF file 2014 SECOND QTLY POTABLE WELL MONITORING REPORT REC'D
2014-12-03 43 Site Activity Status Update Received Download PDF file 2014 SILVER CREEK SAMPLING LETTER REPORT REC'D
2014-12-03 99 Miscellaneous Download PDF file TELCON MEETING MINUTES
2014-12-02 43 Site Activity Status Update Received 2014 FIRST QTLY POTABLE WELL MONITORING LETTER REPORT REC'D
2014-11-26 43 Site Activity Status Update Received POTABLE WELL RESULTS REC'D
2014-11-12 43 Site Activity Status Update Received 2ND ROUND POTABLE WELL RESULTS FOR FIVE REPLACEMENT WELLS REC'D
2014-11-05 99 Miscellaneous Download PDF file TELCON MEETING MINUTES
2014-10-28 43 Site Activity Status Update Received 3403 CTH CR NEW POTABLE WELL RESULTS REC'D
2014-10-14 99 Miscellaneous CALL FROM NEWTON RESIDENT REGARDING POTABLE WELL SAMPLING SUMMARY
2014-10-08 99 Miscellaneous Download PDF file TELCON-MONTHLY UPDATE-POTABLE WELL SAMPLING, ADDT'L SITE INVESTIGATION & PREPARATIONS FOR OPEN HOUSE
2014-10-03 99 Miscellaneous Download PDF file SITE PROPERTY DEED REC'D
2014-10-02 99 Miscellaneous TOWN OF NEWTON I-43 SOIL BORING DATA REC'D
2014-10-01 99 Miscellaneous MEETING W/GEOLOGICAL SURVEY TO DISCUSS MANITOWOC COUNTY BEDROCK GEOLOGY & HYDROGEOLOGY
2014-09-24 99 Miscellaneous CALL FROM NEWTON RESIDENT REGARDING POTABLE WELL RESULTS & SAMPLING
2014-09-22 99 Miscellaneous PROPERTY ACCESS MEETING FOR ADDT'L SITE INVESTIGATION - PROPERTY ACCESS ATTAINED
2014-09-16 43 Site Activity Status Update Received REPLACEMENT POTABLE WELL SPECIFICATIONS REC'D
2014-09-15 99 Miscellaneous MEETING W/PROPERTY OWNER FOR PROPERTY ACCESS
2014-09-15 43 Site Activity Status Update Received REC'D REMAINING 2ND ROUND POTABLE WELL SAMPLE RESULTS PER THE 1-YR POTABLE WELL MONITORING PLAN
2014-09-12 99 Miscellaneous Download PDF file FINAL LETTER REQUESTING PROPERTY ACCESS ISSUED
2014-09-12 99 Miscellaneous DNR WATER DIVISION APPROVES SILVER CREEK SAMPLING SURVEY PROPOSAL
2014-09-11 43 Site Activity Status Update Received REPLACEMENT POTABLE WELL DRILLING SCHEDULE REC'D
2014-09-10 99 Miscellaneous Download PDF file TELCON-MONTHLY UPDATE-POTABLE WELL REPLACEMENT INSTALLS & SAMPLING
2014-09-10 99 Miscellaneous SILVER CREEK SAMPLING SURVEY PROPOSAL REC'D
2014-09-10 43 Site Activity Status Update Received REC'D PARTIAL 2ND ROUND POTABLE WELL SAMPLE RESULTS PER THE 1-YR POTABLE WELL MONITORING PLAN
2014-09-05 99 Miscellaneous LETTER REQUESTING PROPERTY ACCESS MEETING ISSUED
2014-09-04 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-09-03 99 Miscellaneous PROPERTY ACCESS UPDATE/DISCUSSION-TELCON
2014-08-29 99 Miscellaneous WARDEN CASE ACTIVITY REPORTS REC'D
2014-08-26 99 Miscellaneous Download PDF file THREE ON-SITE INTERVIEWS CONDUCTED BY DNR WARDEN
2014-08-21 43 Site Activity Status Update Received Download PDF file 2013-2014 POTABLE WELL MONITORING LETTER REPORT REC'D
2014-08-18 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file EXPANDED SI WORKPLAN
2014-08-18 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
2014-08-07 99 Miscellaneous CITY WEBSITE UPDATED
2014-08-05 99 Miscellaneous CONFIRMATION - 3609 HECKER RD POTABLE WELL RESULTS & REMAINING RESULTS REC'D
2014-07-23 99 Miscellaneous Download PDF file TELCON UPDATE MEETING MINUTES
2014-07-02 99 Miscellaneous CONTACTED BY MEDIA - REC'D NOV 24 & DEC 8, 2013 AND JULY 1, 2014 NEWS ARTICLES
2014-06-26 99 Miscellaneous REC'D 1ST ROUND POTABLE WELL SAMPLE RESULTS PER THE 1-YR POTABLE WELL MONITORING PLAN
2014-06-26 99 Miscellaneous Download PDF file PRELIMINARY ASSESSMENT PRE-CERCLIS FORM
2014-06-24 313 Superfund Site Assessment Pre-CERCLA Screening (PCS) Download PDF file
2014-06-17 99 Miscellaneous Download PDF file TELCON TO DISCUSS MAY 2014 POTABLE WELL SAMPLING RESULTS & FUTURE SI & POTABLE WELL ACTIONS
2014-06-17 99 Miscellaneous UPDATE WI DEPT OF HEALTH SERVICES & COUNTY HEALTH DEPT ON POTABLE WELLS STATUS
2014-05-23 99 Miscellaneous NEW DNR PROJECT MANAGER ASSIGNED
2014-05-15 43 Site Activity Status Update Received Download PDF file 2013 GW MONITORING LETTER REPORT REC'D
2014-05-01 43 Site Activity Status Update Received 3518 HECKER RD NEW POTABLE WELL 3RD RD RESULTS RECD
2014-05-01 43 Site Activity Status Update Received STATUS UPDATE RECD FOR 2013 GROUNDWATER MONITORING REPORT
2014-04-16 43 Site Activity Status Update Received 3518 HECKER RD NEW POTABLE WELL 2ND RD RESULTS RECD
2014-04-15 43 Site Activity Status Update Received Download PDF file POTABLE WELL MONITORING WORK PLAN RECD
2014-04-04 99 Miscellaneous TELCON WITH EPA TO DISCUSS PA ONLY OPTION
2014-04-02 99 Miscellaneous TELCON WITH CITY TO DISCUSS RESIDENT AND ATTORNEY REQUESTS
2014-03-26 43 Site Activity Status Update Received STATUS UPDATE RECEIVED: RA OPTIONS AND ADDITIONAL SI WORK DISCUSSION
2014-03-24 43 Site Activity Status Update Received STATUS UPDATE RECEIVED: CITY DECIDES NO EPA REMOVALS ASSISTANCE
2014-03-17 43 Site Activity Status Update Received 3312 CTH CR POTABLE WELL RESULTS RECEIVED
2014-03-13 43 Site Activity Status Update Received 3518 HECKER RD NEW POTABLE WELL RESULTS RECEIVED
2014-03-11 99 Miscellaneous NEW POTABLE WELL INSTALLED AT 3518 HECKER RD
2014-03-10 43 Site Activity Status Update Received CITY POTABLE WELL RESULTS RESIDENT NOTIFICATION LETTERS RECEIVED
2014-03-07 99 Miscellaneous EPA REMOVALS TELCON WITH CITY
2014-02-21 99 Miscellaneous Download PDF file DNR VAPOR INTRUSION CONCURRENCE LETTER MAILED
2014-02-19 99 Miscellaneous DATA GAPS MEETING WITH CITY
2014-02-18 43 Site Activity Status Update Received QA/QC SPLIT POTABLE WELL SAMPLE RESULTS RECEIVED
2014-02-18 43 Site Activity Status Update Received Download PDF file WGNHS GEOPHYSICAL SURVEY REPORT RECEIVED
2014-02-14 99 Miscellaneous Download PDF file OPEN HOUSE FOLLOW UP INFORMATIONAL FLYER MAILED
2014-02-14 99 Miscellaneous CITY PUBLIS OUTREACH WEBSITE ACTIVATED
2014-02-14 43 Site Activity Status Update Received Download PDF file CITY POTABLE WELL RESULTS NOTIFICATION LETTRS TO RESIDENTS RECEIVED
2014-02-12 43 Site Activity Status Update Received FEB 4 POTABLE WELL SAMPLING RESULTS RECEIVED
2014-02-09 99 Miscellaneous Download PDF file DATA GAP MEETING MINUTES
2014-02-04 99 Miscellaneous TELCON WITH CITY AND STROESS TO DISCUSS INTERVIEWS
2014-01-31 43 Site Activity Status Update Received Download PDF file PRIVATE WELL TESTING LETTERS
2014-01-30 99 Miscellaneous Download PDF file CONCURRENCE TO DELAY CAPPING OF NEWTON GRAVEL PIT WESTERN SOURCE AREA LETTER SENT
2014-01-30 43 Site Activity Status Update Received CONTINUING POTABLE WELL SAMPLING WORK PLAN REC'D
2014-01-28 99 Miscellaneous Download PDF file 2ND ADDT'L REQUIREMENTS LETTER SENT
2014-01-24 43 Site Activity Status Update Received Download PDF file REC'D 5/24/1996 WAST GENERATOR AGREEMENT
2014-01-24 43 Site Activity Status Update Received Download PDF file 3518 HECK RD VAPOR INTRUSION REPORT REC'D
2014-01-24 43 Site Activity Status Update Received Download PDF file PERMITTED WELLS WITHIN CITY LIMITS
2014-01-23 99 Miscellaneous TELCON W/CITY TO DISCUSS SHORT TERM & LONG TERM INVESTIGATIVE/REMEDIAL REQUIREMENTS
2014-01-23 43 Site Activity Status Update Received Download PDF file REQUEST TO DELAY CAPPING OF WESTERN SOURCE AREA LETTER REC'D
2014-01-22 43 Site Activity Status Update Received POTABLE WELL SAMPLE RESULTS REC'D FOR CTH CR PROPERTIES, CITY NOTIFIED IMPACTED PROPERTY OWNERS
2014-01-22 43 Site Activity Status Update Received REC'D TABULATED WELL CONSTRUCTION INFO, POTABLE WELL RESULTS & POTABLE WELL SAMPLE LOCATIONS FIGURE
2014-01-14 99 Miscellaneous TELCON W/EPA TO DISCUSS POTENTIAL FOR PA/SI
2014-01-13 43 Site Activity Status Update Received Download PDF file WASTE HAULERS LIST
2014-01-10 43 Site Activity Status Update Received Download PDF file WEISSBACH/HEINEN INTERVIEW W/RETIRED CONSERVATION WARDEN ON HISTORIC DUMPING ACTIVITIES @ SITE
2014-01-10 43 Site Activity Status Update Received Download PDF file REC'D CASE ACTIVITY REPORT FOR 2ND FORMER TRUCK DRIVER INTERVIEW
2014-01-10 99 Miscellaneous TELCON W/EPA TO REVIEW & DISCUSS CASE SUMMARY
2014-01-08 99 Miscellaneous TELCON W/CITY TO DISCUSS CASE STATUS, OUTREACH & POTABLE WELL RESULTS
2014-01-08 99 Miscellaneous Download PDF file 3609 M&M LANE-CLEAN WELL RESULTS NOTIFICATION LETTER SENT
2013-12-30 43 Site Activity Status Update Received POTABLE WELL SAMPLING RESULTS RECEIVED FOR THREE WELLS
2013-12-30 43 Site Activity Status Update Received Download PDF file CASE ACTIVITY REPORT FOR INTERVIEWS RECEIVED
2013-12-30 99 Miscellaneous TELCON W/CITY DISCUSS WELL REPLACEMENT, OPEN HOUSE FOLLOW-UP, INTERVIEWS, WELL SAMPLING, EPA ASSIST
2013-12-30 99 Miscellaneous TELCON W/CITY TO DISCUSS CASE STATUS, OUTREACH & POTABLE WELL RESULTS
2013-12-23 43 Site Activity Status Update Received POTABLE WELL SAMPLE RESULTS RECEIVED. HEINEN - SAMPLE RESULTS LETTER SENT TO RESIDENTS
2013-12-23 43 Site Activity Status Update Received Download PDF file STROESS INTERVIEW W/2ND FORMER TRUCK DRIVER REGARDING HISTORIC DUMPING ACTIVITIES @ SITE
2013-12-20 43 Site Activity Status Update Received BEGGS/STROESS INTERVIEW WITH FORMER DRUCK DRIVER REGARDING HISTORIC DUMPING ACTIVITIES AT SITE
2013-12-20 99 Miscellaneous TELCON WITH EPA TO DISCUSS POTENTIAL FOR EPA ASSISTANCE
2013-12-19 43 Site Activity Status Update Received POTABLE WELL SAMPLING RESULTS RECEIVED FOR 12 ADDITIONAL WELLS
2013-12-19 99 Miscellaneous TELCON WITH CITY TO DISCUSS WELL DRILLING AND POTABLE WELL RESULTS
2013-12-13 99 Miscellaneous MAGNETOMETER SURVEY AT GRAVEL PIT AND ROBERTS
2013-12-13 99 Miscellaneous WCUB RADIO INTERVIEW WITH MC DANIEL AND BEGGS
2013-12-12 43 Site Activity Status Update Received REVISED POTABLE WELL DRILLING SCHEDULE RECEIVED
2013-12-11 99 Miscellaneous TELCON WITH CONSULTANT ABOUT METALS SAMPLING RESULTS IN POTABLE WELLS
2013-12-07 99 Miscellaneous Download PDF file OPEN HOUSE AT NEWTON TOWN HALL
2013-12-05 99 Miscellaneous DNR ISSUES MEDIA ADVISORY ABOUT OPEN HOUSE
2013-12-04 43 Site Activity Status Update Received MEETING AT CITY HALL TO PREP FOR OPEN HOUSE
2013-12-03 99 Miscellaneous TELCON WITH ROBERTS ATTORNEY ABOUT ACCESS AGREEMENT
2013-12-02 43 Site Activity Status Update Received CITY EMAILS QUOTE FOR REPLACEMENT POTABLE WELL (WITH SPECS BY HEINEN)
2013-12-02 43 Site Activity Status Update Received CITY EMAILS LIST OF ADDITIONAL 12 POTABLE WELLS TO BE SAMPLED (LOCATIONS CHOSEN BY HEINEN)
2013-11-27 99 Miscellaneous Download PDF file DNR SENDS SOW FOR MAGNETOMETER SURVEY AND ACCESS AGREEMENT
2013-11-26 99 Miscellaneous OPEN HOUSE POST CARDS MAILED
2013-11-25 99 Miscellaneous HTR NEWSPAPER ARTICLE ABOUT CONTAMINATED WELLS
2013-11-22 43 Site Activity Status Update Received CITY SUGGESTS A POLICY FOR GENERAL REQUESTS FOR ACCESS TO THE GRAVEL PIT
2013-11-20 37 Site Investigation Report (SIR) Received (non-fee) SUBSLAB SAMPLING PLAN RECEIVED
2013-11-19 99 Miscellaneous DNR EMAILS OUTREACH PLAN TO CITY
2013-11-19 99 Miscellaneous TELCON WITH CONSULTANT ABOUT SUBSLAB SAMPLING
2013-11-15 99 Miscellaneous Download PDF file DNR "ADDITIONAL REQUIREMENTS" LETTER SENT
2013-11-14 99 Miscellaneous Download PDF file HEINEN SENDS ADVISORY LETTER TO RESIDENTS SAMPLED BY CITY
2013-11-13 99 Miscellaneous MEETING WITH CITY
2013-11-06 43 Site Activity Status Update Received NOTICE OF POTABLE WELLS IMPACT
2013-11-06 43 Site Activity Status Update Received ADDITIONAL DNR REQUIREMENTS IN RESPONSE TO IMPACTED POTABLE WELLS
2013-10-01 43 Site Activity Status Update Received CITY RESPONSE TO WDNR REVIEW OF 2012 GW MONITORING LETTER REPORT
2013-08-22 24 Long Term Monitoring Plan Received (non-Fee) NEW WELL PZ-12 LOCATION & OCTOBER SAMPLING SCHEDULE
2013-08-22 27 Long Term Monitoring Plan Approved APPROVAL & ADDT'L PARAMETERS, FIGURES REQ'D IN NEXT ANNUAL REPORT
2013-06-25 43 Site Activity Status Update Received WILL SEND RESPONSE LETTER W/HISTORICAL DATA
2013-06-20 99 Miscellaneous STATUS UPDATED REQUESTED
2013-04-08 26 Long Term Monitoring Plan Not Approved ADDITIONAL SAMPLING AND MONITORING WELL REQUIRED
2013-03-27 24 Long Term Monitoring Plan Received (non-Fee) ANNUAL REPORT
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-07-07 43 Site Activity Status Update Received WRITTEN UPDATE COMING
2010-03-03 99 Miscellaneous REQUESTED SITE HISTORY FROM CONSULTANT & RP
2010-02-03 99 Miscellaneous REQUEST FOR CLARIFICATION OF SITE HISTORY
2010-02-03 43 Site Activity Status Update Received CLARIFICATION PROVIDED BY CONSULTANT
2009-08-10 99 Miscellaneous CLARIFICATION OF SI APPROVAL REQUIREMENTS
2009-08-05 38 Site Investigation Report (SIR) Approved
2009-08-03 99 Miscellaneous REQUEST CLARIFICATION OF REPORT
2009-08-03 43 Site Activity Status Update Received INFORMATION SUPPLIED
2009-07-15 99 Miscellaneous ACKNOWLEDGMENT - RECEIPT OF SIR
2009-06-29 137 Site Investigation Report (SIR) Received (fee) Download PDF file
2009-05-20 43 Site Activity Status Update Received CITY COUNCIL APPROVED PROPOSED RAP & BUDGET, RAP COMING WITHIN FEW WEEKS
2009-05-11 43 Site Activity Status Update Received SI & RAP WILL BE SENT TO DNR
2009-05-11 99 Miscellaneous MTG W/CITY STREET & SANITATION COMMITTEE REGARDING PROPOSED RAP
2009-04-13 43 Site Activity Status Update Received GW DATA
2009-04-13 99 Miscellaneous MTG W/CITY & CONSULTANT REGARDING STATUS, PROPOSED WORK
2008-10-07 43 Site Activity Status Update Received UPDATE, SI/RAP COMING
2008-06-05 43 Site Activity Status Update Received UPDATE & SURFACE WATER DATA
2007-12-13 805 Historic Waste Site
2007-12-13 807 Registry of Waste Disposal Site - SHWIMS Listing
2007-11-09 99 Miscellaneous DIRECTION TO PROCEED W/FREE PRODUCT RECOVERY
2007-11-01 43 Site Activity Status Update Received FREE PRODUCT RECOVERY DATA
2007-08-30 43 Site Activity Status Update Received UPDATED ON NEW MONITORING WELL INSTALLATION
2007-08-28 43 Site Activity Status Update Received UPDATED ON ACCESS TO NEIGHBORING PROPERTIES. REQUEST TO ABANDON TWO WELLS.
2007-08-28 99 Miscellaneous APPROVAL TO ABANDON THE TWO WELLS
2007-08-16 43 Site Activity Status Update Received PROPERTY OWNER INFORMATION
2007-08-16 99 Miscellaneous PROVIDED SUMMARY OF DNR CONVERSATION W/PROPERTY OWNER
2007-06-20 36 Site Investigation Workplan (SIWP) Approved
2007-06-19 35 Site Investigation Workplan (SIWP) Received (non-fee)
2005-10-03 43 Site Activity Status Update Received GW SAMPLING EVALUATION
2005-06-10 99 Miscellaneous STATUS INQUIRY
2004-06-21 99 Miscellaneous REQUESTED STATUS UPDATE
2002-11-18 43 Site Activity Status Update Received GW DATA
2002-04-16 43 Site Activity Status Update Received GW DATA
1994-01-07 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file ADDENDUM
1993-08-01 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file FIELD INVEST P2
1993-01-15 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file FIELD INVEST P2
1992-10-01 59 Environmental Enforcement Action Completed ENFORCEMENT CONFERENCE
1991-07-02 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Metals Metals
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120) Industrial Chem
Polychlorinated Biphenyl PCB
Polynuclear Aromatic Hydrocarbons Petroleum
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Volatile Organic Compounds VOC
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
Responsible Party
CITY OF MANITOWOC 900 QUAY ST, MANITOWOC, WI 54220
DNR Project Manager
TAUREN BEGGS  tauren.beggs@wisconsin.gov
33760 | 02-36-000268
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages