02-60-001045
VINYL PLASTICS (FORMER)
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / CLOSED | DNR RR |
Location Name | County | DNR Region |
---|---|---|
VPI CORP | SHEBOYGAN | SOUTHEAST |
Address | Municipality |
---|---|
3123 S 9TH ST | SHEBOYGAN |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
SE 1/4 of the SW 1/4 of Sec 35, T15N, R23E | 43.7197784 | -87.7138405 |
![]() |
![]() |
Additional Activity Details | Acres |
---|---|
Electronic Only - No Hard File | 10.3 |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
460041560 | 1980-01-01 | 2024-05-29 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
Name | File |
---|---|
0416527017_Site_File.pdf | ![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-05-29 | 11 | Activity Closed | |||
2024-05-29 | 56 | Continuing Obligation(s) Applied |
![]() |
||
2024-05-29 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | ASPHALT PAVEMENT AND CONCRETE BUILDING FOUNDATIONS | ||
2024-05-29 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2024-05-29 | 236 | Continuing Obligation - Residual GW Contamination | |||
2024-01-10 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2023 - 12/31/2023 | |
2024-01-02 | 190 | Remaining Actions Needed Requirements Met or Docs Received |
![]() |
MONITORING WELL ABANDONMENT LOGS AND CLOSURE FORM REVISIONS RECEIVED | |
2023-12-07 | 84 | Remaining Actions Needed |
![]() |
MONITORING WELL ABANDONMENT AND CLOSURE FORM REVISIONS | |
2023-08-10 | 279 | Case Closure Review Request Rcvd - Resubmittal Fee Required |
![]() |
||
2023-07-10 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 01/01/2023 - 06/30/2023 | |
2023-04-10 | 43 | Site Activity Status Update Received |
![]() |
SURFACE WATER SAMPLE RESULTS AND DNR CONCURRENCE FOR CLOSURE SUBMITTAL | |
2023-03-10 | 153 | Remedial Action (RA) Documentation Report Approved |
![]() |
REQUESTING SURFACE WATER SAMPLE & ASSESSMENT OF SWALE | |
2023-01-13 | 152 | Remedial Action Documentation Report Received (fee) |
![]() |
||
2023-01-07 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2022 - 12/31/2022 | |
2022-07-06 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-03-25 | 40 | Remedial Action Options Report (RAOR) Approved |
![]() |
APPROVED, RECOMMEND SOURCE REMOVAL WITH CAPPING | |
2022-03-25 | 118 | PFAS Sampling Not Required At This Time | SEE AC 40 OF SAME DATE FOR DOCUMENTATION; PFAS SAMPLING NOT REQUIRED | ||
2022-03-25 | 38 | Site Investigation Report (SIR) Approved | SEE AC 40 OF SAME DATE FOR DOCUMENTATION; APPROVED, SS INVESTIGATION | ||
2022-01-07 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2021 - 12/31/2021 | |
2021-09-24 | 143 | Remedial Action Options Report (RAOR) Received (fee) |
![]() |
||
2021-09-24 | 137 | Site Investigation Report (SIR) Received (fee) | SEE AC 143 OF SAME DATE FOR DOCUMENTATION | ||
2021-09-24 | 114 | PFAS Scoping Statement Received | SEE AC 143 OF SAME DATE FOR DOCUMENTATION | ||
2021-07-28 | 99 | Miscellaneous |
![]() |
RESPONSE FOR NEXT STEPS ON SUBMITTAL & MEETING | |
2021-07-13 | 43 | Site Activity Status Update Received |
![]() |
SI SAMPLE RESULTS MAY 2021 | |
2021-07-12 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2021 - 6/30/2021 | |
2021-04-19 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) |
![]() |
||
2021-04-14 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
BRIEF SIWP | |
2021-04-06 | 130 | DNR Regulatory Reminder Sent |
![]() |
VAPOR INTRUSION AND TCE REMINDER LETTER | |
2021-02-16 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER MONITORING RESULTS (FEB 2021) | |
2021-01-06 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2020 - 12/31/2020 | |
2020-12-22 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER SAMPLING RESULTS (OCT - NOV 2020) | |
2020-09-30 | 80 | Closure Not Recommended |
![]() |
VOCS & SVOCS IN GW NEED FURTHER ASSESSMENT | |
2020-08-17 | 130 | DNR Regulatory Reminder Sent |
![]() |
EMERGING CONTAMINANTS REMINDER LETTER | |
2020-08-12 | 43 | Site Activity Status Update Received |
![]() |
CLARIFICATIONS FOR GROUNDWATER CONTAMINATION AND GROUNDWATER FLOW FROM CONSULTANT | |
2020-07-23 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2020 - 6/30/2020 | |
2020-07-22 | 79 | Case Closure Review Request Received | AUTO-ENTERED | ||
2020-07-10 | 779 | Case Closure Review Fee Received | |||
2020-07-10 | 700 | Database Fee Paid for Groundwater Continuing Obligation(s) | CHECK #2515 | ||
2020-07-10 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | |||
2020-06-19 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
||
2020-02-19 | 2 | Responsible Party (RP) letter sent |
![]() |
||
2020-02-06 | 13 | Activity Reopened |
![]() |
||
1997-06-24 | 12 | Activity Previous Case Closure Date |
![]() |
||
1997-03-10 | 210 | Remedial Construction End - State Lead | |||
1996-02-28 | 37 | Site Investigation Report (SIR) Received (non-fee) | |||
1995-04-28 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | |||
1994-02-28 | 2 | Responsible Party (RP) letter sent | |||
1980-01-01 | 1 | Notification of Hazardous Substance Discharge |
Substance | Type | Amt Released | Units |
---|---|---|---|
Asphalt (crude oil) | Petroleum | 20 | Gal |
ENBRIDGE ENERGY 2800 E 21ST ST, SUPERIOR, WI 54880 |
Northeast Region Contact: Denise Danelski denise.danelski@wisconsin.gov |