WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-36-454805 WI DOT FIRST NATIONAL BANK
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
FIRST NATIONAL BANK MANITOWOC NORTHEAST
Address Municipality
1509 WASHINGTON ST TWO RIVERS
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the NE 1/4 of Sec 01, T19N, R24E 44.1470729 -87.5680621 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
.5
Facility ID PECFA No. EPA ID Start Date End Date
2003-05-19 2006-11-28
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag   ROW Impact flag
Actions and Documents
Date Code Name File Comment
2024-04-30 98 Technical Assistance Provided Download PDF file SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN, VAPOR PORTS, AND VAPOR SAMPLING PLAN
2024-04-16 97 Technical Assistance Request Received (fee) Download PDF file SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN, VAPOR PORTS, AND VAPOR SAMPLING PLAN
2024-03-13 193 CO Modification Notice to Proceed (NTP) Download PDF file
2024-02-05 181 Continuing Obligation Modification Request Received (fee) Download PDF file
2024-02-05 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2024-02-05 710 Database Fee Paid for Soil Continuing Obligation(s)
2013-08-29 185 Continuing Obligation(s) Compliance Audit Complete Download PDF file
2006-11-28 11 Activity Closed FINAL CLOSURE LETTER SENT
2006-11-28 56 Continuing Obligation(s) Applied Download PDF file
2006-11-28 86 Activity Closed with site specific conditions. MAINTENANCE PLAN MUST BE FOLLOWED
2006-11-28 85 NR 720.19 Performance Based Closure MAINTAIN PAVED LOT & BUILDING FOR GROUNDWATER PROTECTION
2006-11-28 222 Continuing Obligation - Maintain Cap Over Contaminated Area CAP REQUIRED FOR THE PROTECTION OF GROUNDWATER
2006-11-28 224 Continuing Obligation - Structural Impediment to Cleanup
2006-11-28 236 Continuing Obligation - Residual GW Contamination *** AUTO POPULATED AT FINAL CLOSURE DUE TO 700 ACTION ***
2006-11-28 232 Continuing Obligation - Residual Soil Contamination *** AUTO POPULATED AT FINAL CLOSURE DUE TO 710 ACTION ***
2006-11-28 46 Impacted Right-of-Way (ROW) Notification AUTO-POPULATED 2018-03-20
2006-11-09 43 Site Activity Status Update Received WELL ABANDONMENT FORMS & FINAL CLOSURE DOCUMENTATION RECEIVED
2006-10-18 48 Preventive Action Limit (PAL) NR140 Exemption at Closure PCE AT OFF-SITE WELL MW-5B
2006-10-18 84 Remaining Actions Needed MONITORING WELL BANDONMENT & WASTE REMOVAL INFO NEEDED
2006-08-18 43 Site Activity Status Update Received ADDITIONAL LAB DATA RECEIVED
2006-08-18 179 Case Closure Review Request Received (non-fee) SECOND REQUEST FOR CLOSURE REVIEW
2006-07-06 80 Closure Not Recommended ADDITIONAL GROUNDWATER MONITORING NEEDED
2006-06-16 43 Site Activity Status Update Received ADDT'L LAB DATA REC'D, REQUEST CLOSURE
2005-11-02 80 Closure Not Recommended MORE GROUNDWATER MONITORING IS NEEDED FOR MW-5
2005-10-04 79 Case Closure Review Request Received
2005-10-04 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2005-10-04 710 Database Fee Paid for Soil Continuing Obligation(s)
2005-10-04 35 Site Investigation Workplan (SIWP) Received (non-fee)
2005-02-25 43 Site Activity Status Update Received WELL ABANDONMENT FORMS FOR MW-1, PZ-1A, MW-5
2005-02-11 99 Miscellaneous SENT OFF-SITE ACCESS LETTER TO US BANK
2005-02-11 99 Miscellaneous SENT OFF-SITE ACCESS LETTER TO BOROW GROUP
2005-02-03 43 Site Activity Status Update Received GW RESULTS
2004-10-06 43 Site Activity Status Update Received SEEKING OFF-SITE PROPERTY ACCESS
2004-02-05 43 Site Activity Status Update Received GW AND SOIL RESULTS
2003-12-19 35 Site Investigation Workplan (SIWP) Received (non-fee)
2003-10-29 2 Responsible Party (RP) letter sent
2003-05-19 1 Notification of Hazardous Substance Discharge SITE ASSESSMENT - 5/19/03
Substances
Substance Type Amt Released Units
Chlorinated Solvents VOC
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Responsible Party
FIRST NATIONAL BANK THOMAS BARE, PRESIDENT, TWO RIVERS, WI 54241
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov
454805 | 02-36-454805
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages