ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-05-514372 1404 S WEBSTER AVE
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
ECONO-CARE CLEANERS BROWN NORTHEAST
Address Municipality
1404 S WEBSTER AVE ALLOUEZ VIL
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NW 1/4 of the SE 1/4 of Sec 01, T23N, R20E 44.4933399 -88.0164177 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
Electronic Only - No Hard File UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
405008340 2003-04-14
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag  
Site Files
Name File
SITE_FILE_2003_Thru_Jan_2013 Download PDF Document
Actions and Documents
Date Code Name File Comment
2024-08-19 36 Site Investigation Workplan (SIWP) Approved Download PDF file APPROVAL OF SUPPLEMENTAL SI FOR ADDITIONAL SOIL AND GW INVESTIGATION; COMMENTS ON VAPOR AND PFAS
2024-07-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2024 - 6/30/2024
2024-07-23 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file WORKPLAN FOR FURTHER SOIL AND GW DELINEATION AND GW MONITORING
2024-02-19 99 Miscellaneous Download PDF file RECOMMEND ADDITIONAL SOIL AND GW DELINEATION, CREATE CSM & SUBMIT EC SCOPING
2024-01-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-10-12 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2023-07-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-06-09 99 Miscellaneous Download PDF file RECOMMEND ADDITIONAL SOIL AND GROUNDWATER DELINEATION
2023-06-02 43 Site Activity Status Update Received Download PDF file APRIL 2023 ON-SITE AND OFF-SITE GROUNDWATER MONITORING RESULTS
2023-04-25 43 Site Activity Status Update Received Download PDF file UPDATE FROM THE CONSULTANT THAT THEY WILL BE PERFORMING GROUNDWATER MONITORING THIS WEEK
2023-01-26 43 Site Activity Status Update Received Download PDF file PASSIVE SAMPLING RESULTS SENT TO OFF-SITE RESIDENCES & ON-SITE BUSINESS; NO VAL OR VRSL EXCEEDANCE
2023-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-11-14 99 Miscellaneous Download PDF file CONSULTANT REQUESTING ACCESS TO 1410 S WEBSTER FOR A SECOND ROUND OF VAPOR SAMPLING
2022-11-14 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) VERBAL CONVERSATION WITH CONSULTANT PROVIDING DNR'S NOTICE TO PROCEED WITH VAPOR SAMPLING
2022-11-08 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file PLAN TO PASSIVE SAMPLE IN HOMES AND SANITARY; SOURCE FOR TCE FOUND IN BASEMENT OF 930 DERBY
2022-11-07 43 Site Activity Status Update Received Download PDF file AUGUST 2022 SOIL SAMPLING RESULTS AND SEPTEMBER 2022 GW SAMPLING RESULTS AND DRAFT FIGURES
2022-11-02 99 Miscellaneous Download PDF file DNR REQUESTING RESAMPLING OF 930 S DERBY AND SUBMITTAL OF WORKPLAN ASAP
2022-09-19 99 Miscellaneous Download PDF file RECOMMENDED NEXT STEPS FOR VAPOR SAMPLING WITHIN BUILDINGS AND SANITARY SEWER
2022-09-12 43 Site Activity Status Update Received Download PDF file VAPOR SAMPLING RESULTS NOTIFICATION FOR 930 DERBY LN; INDOOR AIR IN BASEMENT ABOVE VAL FOR TCE
2022-08-24 43 Site Activity Status Update Received Download PDF file NOTIFICATION OF VI SAMPLING RESULTS FOR 1404 S WEBSTER & 926 DERBY - BELOW VALS AND VRSLS
2022-08-01 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file NOTICE TO PROCEED WITH COMMENTS FOR DELINEATION IN ADDITIONAL DIRECTIONS AS GW MAY FLOW RADIALLY
2022-07-22 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file WORKPLAN TO INSTALL SOIL BORING AND MONITORING WELLS TO FURTHER DELINEATE SOIL & GW ON & OFF-SITE
2022-07-18 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-05-26 43 Site Activity Status Update Received Download PDF file 926 DERBY LANE VAPOR SAMPLING RESULTS; NO SUB-SLAB VRSL OR INDOOR AIR VAL EXCEEDANCES
2022-03-23 43 Site Activity Status Update Received Download PDF file VAPOR SAMPLING RESULTS FOR RESIDENCES & ON-SITE BUILDING; DNR RESPONSE
2022-01-21 99 Miscellaneous Download PDF file ACCESS AGREEMENTS SENT FOR VAPOR SAMPLING @ 1324, 1404 & 1410 S WEBSTER; 926 930 DERBY LN
2022-01-19 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file WORKPLAN FOR ON-SITE & OFF-SITE VAPOR SAMPLING, SANITORY VAPOR INVESTIGATION & GW MONITORING
2022-01-19 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) SEE AC 35 OF SAME DATE FOR NOTICE TO PROCEED
2022-01-11 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2021-11-09 43 Site Activity Status Update Received Download PDF file RESPONSE UPCOMING TO THE INITIAL SCOPE; NO WORK PERFORMED YET
2021-09-30 7 Environmental Consultant Hired Download PDF file ENVIRONFORENSICS HIRED; INSURANCE IS FUNDING WORK
2021-09-21 43 Site Activity Status Update Received Download PDF file DHS 5-DAY PASSIVE VAPOR SAMPLING RESULTS FROM 1324S WEBSTER; NON DETECT FOR PCE & TCE
2021-09-02 43 Site Activity Status Update Received Download PDF file 1324 S WEBSTER YOU ARE MY SUNSHINE DAY CARE VAPOR SAMPLING RESULTS BELOW STANDARDS
2021-08-23 99 Miscellaneous Download PDF file L AMUNDSON (RP) NOT ALLOWING ACCESS FOR DHS TO SAMPLE INDOOR AIR AT ON-SITE BUILDING AT THIS TIME
2021-08-17 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file ABBREVIATED WORKPLAN FOR VAPOR SAMPLING @ 1324 S WEBSTER
2021-08-17 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) DNR NOTICE TO PROCEED WITH COMMENTS FOR VAPOR SAMPLING @ 1324 S WEBSTER (SEE AC 35 FOR DOCUMENT)
2021-07-27 99 Miscellaneous Download PDF file DNR RESPONSE TO VAPOR SAMPLING QUESTIONS FOR DAYCARE @ 1324 S WEBSTER
2021-07-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-06-07 99 Miscellaneous Download PDF file DNR REQUESTS UPDATE;RESPONSE WITH INSURANCE UPDATE & ADDITIONAL INFO
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-01-07 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2020-10-27 130 DNR Regulatory Reminder Sent Download PDF file DERF FUNDING STATUS LTR
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-05-07 99 Miscellaneous Download PDF file LETTERS TO 1404, 1410 & 1320 S WEBSTER AVE & 930 & 926 DERBY LN FOR SCREENING DEMOGRAPHICS
2020-05-07 99 Miscellaneous Download PDF file COMPLIANCE ASSISTANCE RESPONSE
2020-05-04 99 Miscellaneous Download PDF file CONSULTATION WITH DHS FOR COVID-19 COMPLIANCE ASSISTANCE RQUEST
2020-04-30 99 Miscellaneous Download PDF file COMPLIANCE ASSISTANCE REQUESTED
2020-03-30 43 Site Activity Status Update Received Download PDF file ADDITIONAL SOIL BORINGS DID NOT CONFIRM SHALLOW SOIL CONTAMINATION @ 1324 S WEBSTER
2020-03-13 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file PHASE II FOR 1324 S WEBSTER USING WAM GRANT FUNDS; CONTAMINATION IN SOIL & GROUNDWATER
2020-02-14 99 Miscellaneous Download PDF file EXTENSION TO DEADLINE TO SUBMIT VI SIWP
2020-01-17 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2020-01-14 99 Miscellaneous REQUEST FOR VAPOR SAMPLING ON-SITE & AT ADJACENT PROPERTIES
2020-01-14 99 Miscellaneous Download PDF file REQUEST FOR VAPOR INVESTIGATION
2019-11-11 43 Site Activity Status Update Received DRAFT GW & SOIL SAMPLING RESULTS FROM WAM FUNDING PHASE II PERFORMED @ 1324 S WEBSTER
2019-10-14 99 Miscellaneous Download PDF file VI INVESTIGATION RECOMMENDATIONS FOR REDEVELOPMENT @ AFFECTED OFF-SITE - 1324 S WEBSTER AVE
2019-07-24 99 Miscellaneous Download PDF file OFF-SITE CONTAMINATION CLOSURE NOTIFICATIONS SENT IN ERROR.
2019-07-18 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file PHASE I FOR 1324 S WEBSTER USING WAM GRANT FUNDS
2019-07-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-04-12 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SIR ASSOCIATED WITH LUST CASE @ SAME PROPERTY, INCLUDES CVOC SAMPLING DATA
2019-02-11 99 Miscellaneous Download PDF file CHANGE IN PROJECT MANAGER (SCHULTZ)
2019-01-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-08-07 99 Miscellaneous Download PDF file RESPONSE TO SAMPLING REQUEST
2018-07-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-07-03 43 Site Activity Status Update Received Download PDF file GROUNDWATER REQUEST
2015-07-07 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-01-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2014-09-22 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-04-28 99 Miscellaneous DISCUSSED PECFA AND DERF OPTIONS WITH RP
2014-01-30 130 DNR Regulatory Reminder Sent DERF FUNDING STATUS LTR
2013-01-23 38 Site Investigation Report (SIR) Approved
2013-01-22 37 Site Investigation Report (SIR) Received (non-fee)
2012-09-13 99 Miscellaneous LETTER SENT - NEW PROJECT MANAGER WILL BE BOB KLAUK
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-07-06 43 Site Activity Status Update Received RP WRITTEN RESPONSE - UPDATE
2010-05-18 99 Miscellaneous REQUEST FOR CASE STATUS
2010-05-18 43 Site Activity Status Update Received NOT ABLE TO TO THE WORK
2008-08-29 110 DERF - Potential Claim Form Approved
2008-06-10 200 Push Action Taken REQUEST FOR STATUS UPDATE
2004-04-21 43 Site Activity Status Update Received DATA FROM ADJACENT #03-05-002199
2004-04-02 99 Miscellaneous DNR LTR REQUESTING STATUS OF INVESTIGATION
2004-01-12 43 Site Activity Status Update Received LTR FROM RP - NO MONEY - CHECKING W/CONSULTANT ON OPTIONS
2003-12-12 99 Miscellaneous DNR LTR CONFIRMING TELEPHONE CONVERSATION OF 12/11/2003
2003-12-11 43 Site Activity Status Update Received TEL. CONVERSATION WITH RP, WIFE SHOULD HAVE RP LETTER AT HOME.
2003-12-08 43 Site Activity Status Update Received CERT. MAIL RP LETTER SIGNED FOR
2003-12-01 2 Responsible Party (RP) letter sent 2ND RP LETTER SENT VIA CERTIFIED MAIL
2003-10-20 2 Responsible Party (RP) letter sent
2003-06-19 43 Site Activity Status Update Received OWNERSHIP & PROPERTY USE HISTORY
2003-05-08 99 Miscellaneous 2ND PRP LETTER - CERTIFIED MAIL
2003-04-15 20 Potential Responsible Party (PRP) Letter Sent
2003-04-14 1 Notification of Hazardous Substance Discharge PRP LETTER SENT 4/15/03
Substances
Substance Type Amt Released Units
Chlorinated Solvents VOC
Trichloroethylene Industrial Chem
Responsible Party
LEE AMUNDSON 6426 NERO RD, SOBIESKI, WI 54171
MARK AMUNDSON 6426 NERO ROAD, SOBIESKI, WI 54171
DNR Project Manager
JOSIE SCHULTZ  josie.schultz@wisconsin.gov
514372 | 02-05-514372