WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-20-554881 WI DOT TYNAN PROPERTY - LGU-SL
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
TYNAN PROPERTY FOND DU LAC NORTHEAST
Address Municipality
W998 STH 23 FOREST TN
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NW 1/4 of the NE 1/4 of Sec 15, T15N, R19E 43.7724816 -88.20621 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
Electronic Only - No Hard File; WISDOT #: 1440-15-01; 1440-15-72 UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
420143680 2010-01-20 2020-11-06
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  WI DOT Site Flag
Site Files
Name File
SITE FILE FOR YEARS 2010 THRU 2017 Download PDF Document
Actions and Documents
Date Code Name File Comment
2020-11-06 11 Activity Closed Download PDF file
2020-11-06 83 No Further Action Required per NR 708.09
2020-11-04 118 PFAS Sampling Not Required At This Time Download PDF file
2020-11-04 199 Additional Information Received (Fee-Based or Closure)
2020-11-03 114 PFAS Scoping Statement Received Download PDF file
2020-10-30 99 Miscellaneous Download PDF file DNR REQUESTING NR 716 EMERGING CONTAMINANT SCOPING (VIA EMAIL)
2020-09-29 198 Request for Additional Information (Fee-Based or Closure) DNR REQUESTING NR 716 EMERGING CONTAMINANT SCOPING (VERBAL)
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-08-11 183 No Further Action per NR 708.09 Request (fee) Download PDF file
2020-07-24 99 Miscellaneous Download PDF file NFA WARRANTED. COUNTY MUST SUBMIT 708.09 REQUEST & FEE.
2020-07-08 43 Site Activity Status Update Received Download PDF file WI DOT PERFORMED AN EXCAVATION & TOOK CONFIRMATION SAMPLES
2020-06-30 99 Miscellaneous Download PDF file NEW DNR PROJECT MANAGER - JAMES, UPDATE RECEIVED
2020-02-21 43 Site Activity Status Update Received Download PDF file SCHEDULE OF EXCAVATION & SAMPLING EVENT
2019-10-16 99 Miscellaneous Download PDF file DNR CONCURRENCE
2019-10-11 43 Site Activity Status Update Received Download PDF file SPECIAL PROVISIONS RECVD
2019-09-04 43 Site Activity Status Update Received Download PDF file EXCAVATION MANAGEMENT PLAN
2019-07-03 43 Site Activity Status Update Received Download PDF file SOIL & GROUNDWATER ANALYTICAL RESULTS
2019-07-03 99 Miscellaneous Download PDF file NOTIFICATION OF ANALYTICAL RESULTS TO RP
2019-07-03 43 Site Activity Status Update Received Download PDF file TEMPRORARY WELL ABANDONMENT FORMS
2019-06-17 99 Miscellaneous Download PDF file TEMPORARY WELL CONSTRUCTION APPROVAL
2019-04-03 43 Site Activity Status Update Received SIGNED ACCESS AGREEMENTS
2019-03-27 43 Site Activity Status Update Received Download PDF file SITE PICTURES, POTABLE WELL REMAINS IN PLACE ON SITE
2019-03-21 99 Miscellaneous Download PDF file REQUEST FOR PERMISSION TO ACCESS
2019-02-28 99 Miscellaneous Download PDF file 02/28/2019 MEETING BETWEEN DNR, DOT & FOND DU LAC CNTY
2019-01-15 99 Miscellaneous Download PDF file CHANGE OF PM (KRUEGER)
2018-12-10 43 Site Activity Status Update Received Download PDF file FOND DU LAC COUNTY'S STANCE
2018-05-01 99 Miscellaneous Download PDF file NOTICE OF NEW PROJECT MANAGER - BEGLEY
2018-03-08 99 Miscellaneous Download PDF file INTERIM PM CHANGE - SCHMENK
2017-09-14 99 Miscellaneous Download PDF file CHANGE OF PROJECT MANAGER - NESTE
2017-09-14 43 Site Activity Status Update Received STATUS UPDATE FROM FDL COUNTY (VIA PHONE)
2015-11-13 99 Miscellaneous FDL COUNTY WILL WAIT FOR THE COMPLETION OF DOT WORK ON STH 23 BEFORE MOVING FORWARD
2015-10-05 611 Local Government Unit (LGU) Liability Exemption Applies
2015-08-19 59 Environmental Enforcement Action Completed
2015-08-10 99 Miscellaneous CHANGE OF PROJECT MANAGER NOTIFICATION TO SARAH FREDERICK
2015-08-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-05-26 200 Push Action Taken LETTER REQUESTING LETTER FROM RP
2015-04-23 99 Miscellaneous LETTER REQUESTING RP TO INITIATE SITE INVESTIGATION & DISPOSE OF DRUMMED SOIL
2015-01-29 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2014-09-25 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-09-02 4 Enforcement Conference Held
2014-07-31 14 Notice of Violation (NOV) Issued
2013-10-15 43 Site Activity Status Update Received NOTICE OF NON-COMPLIANCE LETTER REFUSED & RETURNED TO DNR
2013-10-09 99 Miscellaneous NOTICE OF NON-COMPLIANCE CERTIFIED LETTER SENT TO RP
2013-07-18 99 Miscellaneous LETTER TO RP: RP DETERMINED ABLE TO PAY, PROCEED W/INVESTIGATION
2013-05-14 99 Miscellaneous EMAIL TO RP REGARDING STATUS OF ABILITY TO PAY PAPERWORK
2013-04-17 99 Miscellaneous CONTACTED RP: ABILITY TO PAY SUBMITTAL IS STILL INCOMPLETE VIA PHONE CALL
2012-08-08 99 Miscellaneous SENT ABILITY TO PAY PAPERWORK TO RP
2012-06-13 43 Site Activity Status Update Received EMAIL FROM CONSULTANT: RP HAS NOT YET INITIATED SITE INVESTIGATION
2012-02-09 43 Site Activity Status Update Received RESPONSIBLE PARTY HAS OBTAINED COST ESTIMATE AND WILL INITIATE FIELD WORK IN SPRING
2011-10-21 43 Site Activity Status Update Received RECEIVED EMAIL FROM CONSULTANT - RP IS OBTAINING COST ESTIMATE FOR WORK
2011-09-19 43 Site Activity Status Update Received CALL FROM RP: RP WILL OBTAIN ESTIMATES FROM CONSULTANTS
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-08-03 43 Site Activity Status Update Received RECD WIS DOT TO RP WITHDRAWING ASSISTANCE IN INVESTIGATION AND CLEANUP
2011-08-03 99 Miscellaneous LETTER TO RP RE WI DOT LETTER TO RP
2011-07-13 29 Phase II Environmental Site Assessment (ESA) Rpt Received PHASE 4 POTENTIALLY HAZ LIQUID WASTE MANAGEMENT & DISPOSAL REPORT
2010-02-24 2 Responsible Party (RP) letter sent
2010-01-20 1 Notification of Hazardous Substance Discharge SITE ASSESSMENT 12/16/2009
2010-01-20 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file PHASE 3 SITE INVESTIGATION REPORT
Substances
Substance Type Amt Released Units
Petroleum - Unknown Type Petroleum
Responsible Party
FOND DU LAC COUNTY 160 S MACY ST, FOND DU LAC, WI 54936
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov
554881 | 02-20-554881
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages