WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-11-577057 PORTAGE CANAL SEGMENT 4
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
PORTAGE CANAL SEGMENT 4 COLUMBIA STH CNTRL
Address Municipality
STH 33 TO FOX RIVER PORTAGE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the NW 1/4 of Sec 04, T12N, R09E 43.5551297 -89.4387989 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Location Description
EXTENDS FROM STH 33 TO FORMER FORT WINNEBAGO LOCK
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
2002-09-01
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  Sediments Flag
Actions and Documents
Date Code Name File Comment
2022-11-08 99 Miscellaneous Download PDF file WHERE TO FIND ADDITIONAL INFORMATION
2022-10-19 114 PFAS Scoping Statement Received
2022-10-19 114 PFAS Scoping Statement Received Download PDF file
2019-09-30 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file AUTOPOPULATED FROM 28 ENTRY
2019-09-30 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file
2018-05-29 20 Potential Responsible Party (PRP) Letter Sent Download PDF file
2018-02-13 39 Remedial Action Options Report (RAOR) Received (non-fee) Download PDF file
2018-01-23 20 Potential Responsible Party (PRP) Letter Sent Download PDF file
2018-01-02 20 Potential Responsible Party (PRP) Letter Sent Download PDF file
2017-05-30 39 Remedial Action Options Report (RAOR) Received (non-fee) Download PDF file
2017-03-20 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file COMPLETE REPORT IN PORTAGE CANAL SEGMENT 2
2015-11-18 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file
2015-04-30 39 Remedial Action Options Report (RAOR) Received (non-fee)
2015-04-08 99 Miscellaneous ON SITE BID MEETING
2015-03-10 99 Miscellaneous ON SITE MEETING PRE BID
2015-02-03 209 Remedial Construction Start - State Lead
2014-02-22 99 Miscellaneous Download PDF file SEDIMENT SAMPLING LOGS
2012-06-21 206 Site Investigation End - State Lead
2008-11-21 205 Site Investigation Start - State Lead
2005-07-06 43 Site Activity Status Update Received UPDATE
2002-09-01 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Diesel Fuel (PETROLEUM HYDROCARBON) Petroleum
Lead (Pb) Metals
Mercury Metals
Metals (SILVER) Metals
Polychlorinated Biphenyl PCB
Polynuclear Aromatic Hydrocarbons Petroleum
DNR Project Manager
ISSAC ROSS  issac.ross@wisconsin.gov
577057 | 02-11-577057
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages