WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-13-583171 BEST WAY CLEANERS
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
BEST WAY CLEANERS DANE STH CNTRL
Address Municipality
5914 STH 51 MCFARLAND
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the NW 1/4 of Sec 03, T06N, R10E 43.0142851 -89.3031991 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Location Description
5906 STH 51
Additional Activity Details Acres
1
Facility ID PECFA No. EPA ID Start Date End Date
2019-02-25 2021-04-12
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag   Underground Storage Tank Flag
Actions and Documents
Date Code Name File Comment
2023-10-31 187 Continuing Obligation(s) Compliance Audit Follow-up Complete Download PDF file DOCUMENTATION OF VMS REPAIRS
2023-09-08 185 Continuing Obligation(s) Compliance Audit Complete Download PDF file
2023-09-08 186 Continuing Obligation(s) Compliance Audit Follow-up Needed REPAIR VAPOR MITIGATION
2021-04-12 11 Activity Closed Download PDF file
2021-04-12 56 Continuing Obligation(s) Applied Download PDF file
2021-04-12 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2021-04-12 224 Continuing Obligation - Structural Impediment to Cleanup
2021-04-12 226 Continuing Obligation - Vapor Intrusion Response
2021-04-12 232 Continuing Obligation - Residual Soil Contamination
2021-04-12 236 Continuing Obligation - Residual GW Contamination
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-04-05 190 Remaining Actions Needed Requirements Met or Docs Received
2021-03-16 43 Site Activity Status Update Received WELL REPORT
2021-03-12 84 Remaining Actions Needed Download PDF file MONITORING WELL FILLING AND SEALING
2021-01-25 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2021-01-13 114 PFAS Scoping Statement Received
2021-01-07 179 Case Closure Review Request Received (non-fee) CLOSURE RESUBMITTAL
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-14 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-01-27 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-12-10 80 Closure Not Recommended Download PDF file NEED TO DEFINE THE DEGREE AND EXTENT OF CONTAMINATION
2019-11-08 79 Case Closure Review Request Received Download PDF file AUTO-ENTERED
2019-11-04 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2019-11-04 710 Database Fee Paid for Soil Continuing Obligation(s)
2019-11-04 779 Case Closure Review Fee Received
2019-07-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-06-11 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2019-03-29 7 Environmental Consultant Hired SEYMOUR
2019-03-25 43 Site Activity Status Update Received Download PDF file APPROACH LETTER
2019-02-27 2 Responsible Party (RP) letter sent Download PDF file
2019-02-27 2 Responsible Party (RP) letter sent Download PDF file LANDOWNER LETTER
2019-02-15 1 Notification of Hazardous Substance Discharge
Vapor Intrusion Continuing Obligation(s)
(D) Site Specific Exposure Assumptions Used - Commercial/Industrial Restriction: Property use restricted to commercial or industrial. Specific vapor inhalation exposure assumptions used (including commercial or industrial use). Notification of DNR required for change in property use. Vapor evaluation is required. Further cleanup may be required.
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
(A) Exceedence of Vapor Risk Levels - Vapor Mitigation Required: Vapor mitigation is required due to sub-slab or nearby soil vapor concentrations exceeding vapor risk screening levels.
Responsible Party
ONE COMMUNITY BANK 733 NORTH MAIN ST, OREGON, WI 53575
For More Information on this Activity
South Central Region Contact: Danielle Keller  danielle.keller@wisconsin.gov
583171 | 02-13-583171
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages