02-36-585491
RIVER POINT DISTRICT- LGU
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / OPEN | DNR RR |
Location Name | County | DNR Region |
---|---|---|
RAILROAD PROPERTY (FORMER) | MANITOWOC | NORTHEAST |
Address | Municipality |
---|---|
N 10TH ST & N 11TH ST | MANITOWOC |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
NE 1/4 of the NE 1/4 of Sec 30, T19N, R24E | 44.0938093 | -87.6619525 |
![]() |
![]() |
Additional Location Description |
---|
BUFFALO ST |
Additional Activity Details | Acres |
---|---|
Electronic Only - No Hard File | UNKNOWN |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
2020-03-24 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-05-14 | 149 | Remedial Action (RA) Design Report Approved |
![]() |
APPROVAL INCLUDED CONTAMINATED SOIL IMPORTED FROM N RAPIDS RD ROW, BRRTS # 09-36-594418 | |
2024-05-14 | 857 | Materials Management Plan Approved | SEE AC 149 OF SAME DATE FOR DOC, APPROVAL FOR CONTAMINATED SOIL IMPORTED FROM N RAPIDS RD ROW | ||
2024-05-02 | 43 | Site Activity Status Update Received |
![]() |
SUMMARY OF BUILDING DEMOLITION ACTIVITIES FOR PHASE 3 REDEVELOPMENT AREA | |
2024-05-01 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | |||
2024-05-01 | 148 | Remedial Action Design Report Received (fee) |
![]() |
CONTAMINATED SOIL IMPORTED FROM N RAPIDS RD ROW, BRRTS # 09-36-594418 | |
2024-05-01 | 854 | Materials Management Plan Request Recvd with Fee | SEE AC 148 OF SAME DATE FOR DOCUMENTATION, CONTAMINATED SOIL IMPORTED FROM N RAPIDS RD ROW | ||
2024-04-26 | 43 | Site Activity Status Update Received |
![]() |
CHARACTERIZATION OF SOIL IN US-10 EASTBOUND RIGHT OF WAY (GROVE RD TO STEINBERG LN) FOR USE AT SITE | |
2024-04-15 | 43 | Site Activity Status Update Received |
![]() |
WELL SEALING DOCUMENTATION FOR 8 MONITORING WELLS IN PROPOSED CHICAGO ST ROW | |
2024-04-05 | 99 | Miscellaneous |
![]() |
PRELIMINARY CONCURRENCE WITH MANAGEMENT OF SOIL FROM N RAPIDS ROAD ROW | |
2024-04-04 | 43 | Site Activity Status Update Received |
![]() |
CHARACTERIZATION OF SOIL FOR IMPORT FROM N RAPIDS ROAD ROW | |
2024-01-19 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
CONSTRUCTION DOCUMENTATION REPORT - BUFFALO STREET RIGHTS OF WAY, PHASE II REDEVELOPMENT AREA | |
2024-01-19 | 126 | Interim Action Report Received (non-fee) |
![]() |
INTERIM CONSTRUCTION DOC - RIVER POINT DR ROWS & ADJACENT FUTURE RESIDENTIAL & COMMERCIAL PARCELS | |
2023-12-20 | 99 | Miscellaneous |
![]() |
COMMENTS FOR INTERIM CONSTRUCTION DOCUMENTATION REPORT FOR REMOVAL OF OXIDE BOX WASTE FILL MATERIALS | |
2023-12-01 | 126 | Interim Action Report Received (non-fee) |
![]() |
INTERIM CONSTRUCTION DOCUMENTATION REPORT - REMOVAL OF APPARENT OXIDE BOX WASTE FILL, PHASE 2 AREA | |
2023-12-01 | 43 | Site Activity Status Update Received |
![]() |
CHARACTERIZATION OF SOIL AT AN AGRICULTURAL PARCEL ALONG VIEBAHN ST FOR USE AS FILL IN PHASE 2 AREA | |
2023-11-08 | 99 | Miscellaneous |
![]() |
STATE ACKNOWLEDGEMENT LETTER FOR CITY OF MANITOWOC FY24 EPA COMMUNITY WIDE ASSESSMENT GRANT | |
2023-11-04 | 43 | Site Activity Status Update Received |
![]() |
INFO FOR STATE ACKNOWLEDGEMENT LETTER FOR EPA COMMUNITY WIDE ASSESSMENT GRANT APPLICATION | |
2023-10-20 | 43 | Site Activity Status Update Received |
![]() |
CHARACTERIZATION OF GRANULAR FILL FOR IMPORTING TO SITE | |
2023-10-19 | 43 | Site Activity Status Update Received |
![]() |
TOPSOIL SAMPLING RESULTS FOR SOIL PLANNED TO BE IMPORTED TO THE SITE | |
2023-10-13 | 43 | Site Activity Status Update Received |
![]() |
PLAN TO IMPORT SOIL TO SITE FROM IN-PLACE QUARRY OVERBURDEN | |
2023-10-05 | 126 | Interim Action Report Received (non-fee) |
![]() |
CONSTRUCTION DOCUMENTATION FOR INTERIM VEGETATED ENGINEERED BARRIER FOR LOT 3 | |
2023-07-31 | 99 | Miscellaneous |
![]() |
CLARIFICATION ON HISTORIC FILL APPROVAL REQUESTS NEEDED FOR CITY-OWNED & PRIVATELY OWNED PROPERTIES | |
2023-07-28 | 43 | Site Activity Status Update Received |
![]() |
DATA SUMMARY FOR PFAS SAMPLING IN SOIL IN PHASE 3 REDEVELOPMENT AREA | |
2023-07-21 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) |
![]() |
ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES FOR PHASE 2 REDEVELOPMENT AREA | |
2023-07-21 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
FOR ROAD/UTILITY INFRASTRUCTURE FOR BUFFALO STREET RIGHT OF WAY | |
2023-07-19 | 122 | Interim Action Plan Received (non-fee) |
![]() |
CONSTRUCTION OF INTERIM VEGETATED ENGINEERED BARRIER FOR LOT 3 OF RIVER POINT DISTRICT | |
2023-07-18 | 29 | Phase II Environmental Site Assessment (ESA) Rpt Received |
![]() |
FOR LOT 3 OF RIVER POINT DISTRICT (INCLUDES FORMER RAILROAD TURNTABLE AREA) | |
2023-07-05 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
FOR EXCAVATION IN FORMER JUNKYARD AREA | |
2023-06-12 | 99 | Miscellaneous |
![]() |
DNR SUPPORT LETTERS FOR EPA GRANT DATED JUNE 8, 2023 AND NOVEMBER 17, 2022 | |
2023-06-08 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
FOR REMOVAL OF APPARENT OXIDE BOX WASTE FILL MATERIALS IN PHASE 2 REDEVELOPMENT AREA | |
2023-06-02 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
FOR PHASE 2 REDEVELOPMENT AREA | |
2023-06-02 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
FOR ROAD/UTILITY INFRASTRUCTURE IN PHASE 2 DEVELOPMENT AREA | |
2023-05-31 | 43 | Site Activity Status Update Received |
![]() |
CHARACTERIZATION OF SOIL FOR IMPORT FROM REED AVE ROW | |
2023-05-22 | 43 | Site Activity Status Update Received |
![]() |
CHARACTERIZATION OF SOIL FOR IMPORT FROM 333 REED AVE | |
2023-05-15 | 43 | Site Activity Status Update Received |
![]() |
ADDENDUM TO ROW RAP/MMP, SLIGHT MODIFICATION TO CAP TO FACILITATE FUTURE TOWNHOME REDEVELOPMENT | |
2023-04-28 | 43 | Site Activity Status Update Received |
![]() |
REDEVELOPMENT STATUS UPDATE | |
2023-04-28 | 43 | Site Activity Status Update Received |
![]() |
SOIL SAMPLING PLAN FOR IMPORTED SOIL CHARACTERIZATION AND EPA/DNR CORRESPONDENCE | |
2023-04-17 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
FOR PHASE 3 CONSTRUCTION AREA OF RIVER POINT DISTRICT | |
2023-02-15 | 43 | Site Activity Status Update Received |
![]() |
SAMPLING AND ANALYSIS PLANS TO CHARACTERIZE SOIL FROM DIVISION ST AND REED AVE TO IMPORT TO SITE | |
2023-01-29 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES - FORMER JUNK YARD AREA OF RIVER POINT DISTRICT | |
2022-11-17 | 99 | Miscellaneous |
![]() |
DNR ACKNOWLEDGEMENT LETTER FOR EPA CLEANUP GRANT | |
2022-10-18 | 43 | Site Activity Status Update Received |
![]() |
SITE INVESTIGATION UPDATE FOR PHASE 2 REDEVELOPMENT AREA | |
2022-09-26 | 43 | Site Activity Status Update Received |
![]() |
LIMITED SITE INVESTIGATION COMPLETED BY AECOM UNDER WAM FOR FMR TURNTABLE AREA - LOT 3 RIVER POINT | |
2022-09-16 | 857 | Materials Management Plan Approved |
![]() |
MATERIAL MOVED ON-SITE | |
2022-09-16 | 56 | Continuing Obligation(s) Applied | |||
2022-09-16 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | IMPERVIOUS AND PERVIOUS CAPS FOR DIRECT CONTACT | ||
2022-09-16 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2022-08-10 | 43 | Site Activity Status Update Received |
![]() |
CLARIFICATIONS PROVIDED FOR VOLUMES AND PLACEMENT OF MATERIAL FOR MATERIALS MANAGEMENT PLAN | |
2022-08-08 | 854 | Materials Management Plan Request Recvd with Fee |
![]() |
MATERIAL MOVED ON-SITE | |
2022-08-08 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | |||
2022-04-13 | 43 | Site Activity Status Update Received |
![]() |
TEMPORARY GRADING & GREENSPACE FOR DRAINAGE & REUSE OF LIMESTONE SCREENINGS FOR ROAD CONSTRUCTION | |
2022-04-06 | 98 | Technical Assistance Provided |
![]() |
RESPONSE TO EVALUATION OF IMPORTING CRUSHED EXCESS BASIC STRUCTURAL CONCRETE AS FILL | |
2022-04-04 | 43 | Site Activity Status Update Received |
![]() |
UPDATE ON SHORELINE ENHANCEMENT PLANS FOR AREA OF TILTED SHEET WALL AND WOODEN DOCK WALL | |
2022-03-09 | 43 | Site Activity Status Update Received |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR FMR TURNTABLE AREA - LOT 3 OF RIVERPOINT DISTRICT | |
2022-03-07 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) |
![]() |
FOR 1101, 1110, & 1200 BUFFALO ST (PHASE 2 CONSTRUCTION AREA OF RIVERPOINT DISTRICT) | |
2022-03-07 | 97 | Technical Assistance Request Received (fee) |
![]() |
EVALUATION OF IMPORTING CRUSHED EXCESS BASIC STRUCTURAL CONCRETE AS FILL | |
2022-02-23 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
FOR 1101, 1110, & 1200 BUFFALO ST (PHASE 2 CONSTRUCTION AREA OF RIVERPOINT DISTRICT) | |
2022-01-14 | 43 | Site Activity Status Update Received |
![]() |
POTENTIAL REUSE OF CONCRETE FILL | |
2021-11-23 | 99 | Miscellaneous |
![]() |
STATE ACKNOWLEDGEMENT LETTER FOR EPA SITE-SPECIFIC CLEANUP GRANT | |
2021-09-17 | 140 | Site Investigation Report (SIR) Not Approved |
![]() |
ADDTIONAL SOIL, GROUNDWATER, VAPOR, SEDIMENT AND SURFACE WATER ASSESSMENT AND/OR SAMPLING NEEDED | |
2021-09-17 | 149 | Remedial Action (RA) Design Report Approved |
![]() |
FOR REDEVELOPMENT OF MUNICIPAL INFRASTRUCTURE | |
2021-09-17 | 857 | Materials Management Plan Approved | ON-SITE SOIL MANAGEMENT, DOCUMENTATION INCLUDED IN REMEDIAL ACTION PLAN APPROVAL UNDER THE SAME DATE | ||
2021-09-17 | 118 | PFAS Sampling Not Required At This Time | PFAS FOUND IN GW, NO SOURCE IDENTIFIED IN SCOPING ON-SITE, UNIDENTIFIED SOURCE OF PFAS AT THIS TIME | ||
2021-09-07 | 114 | PFAS Scoping Statement Received |
![]() |
SUPPLEMENTAL DOCUMENTATION - FIRE DEPT RESPONSE DURING EXPLOSIVE DEMO OF A FMR GRAIN ELEVATOR | |
2021-09-03 | 114 | PFAS Scoping Statement Received |
![]() |
||
2021-09-02 | 99 | Miscellaneous |
![]() |
SITE INVESTIGATION AND REMEDIAL ACTION PLAN REVIEW CLARIFICATIONS | |
2021-08-11 | 99 | Miscellaneous |
![]() |
OCP PCB NOTICE #1, NOTIFICATION OF A PCB CONTAMINATION SITE SENT TO EPA | |
2021-08-09 | 137 | Site Investigation Report (SIR) Received (fee) |
![]() |
FOR PHASE 1 REDEVELOPMENT AREA | |
2021-08-09 | 148 | Remedial Action Design Report Received (fee) |
![]() |
||
2021-08-09 | 854 | Materials Management Plan Request Recvd with Fee | MATERIALS TO BE MOVED ON-SITE; DOCUMENTATION AND FEE INCLUDED WITH AC 148 OF THE SAME DATE | ||
2021-08-09 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | |||
2021-08-04 | 43 | Site Activity Status Update Received |
![]() |
CHARACTERIZATION OF SOIL FOR IMPORT FROM CUSTER ST ROAD PROJECT | |
2021-08-03 | 99 | Miscellaneous |
![]() |
CLARIFICATION ON SUBMITTAL TIMING FOR POST CLOSURE MODIFICATION | |
2021-05-26 | 43 | Site Activity Status Update Received |
![]() |
ADDITIONAL TEST PITS TO BE INSTALLED IN OXIDE BOX WASTE AREA TO FURTHER DELINEATE IMPACTS | |
2021-05-25 | 43 | Site Activity Status Update Received |
![]() |
DECISION MEMO FOR SITE 1 AND 3 OF RIVERPOINT DISTRICT FOR REMEDIAL ACTION FOR RLF LOAN | |
2021-05-21 | 43 | Site Activity Status Update Received |
![]() |
CHARACTERIZATION OF SOIL FOR IMPORT FROM 8TH AND MARITIME DRIVE | |
2021-05-07 | 99 | Miscellaneous |
![]() |
PETROLEUM ELIGIBILITY REQUEST, LETTER, AND CORRESPONDENCE FOR SITE 1 AND 3 OF RIVERPOINT DISTRICT | |
2021-05-03 | 43 | Site Activity Status Update Received |
![]() |
PETROLEUM CONTAMINATION ENCOUNTERED BENEATH FORMER WAREHOUSE SLAB | |
2021-04-29 | 43 | Site Activity Status Update Received |
![]() |
REQUIREMENTS FOR WATER MAIN INSTALLATION | |
2021-03-26 | 43 | Site Activity Status Update Received |
![]() |
SOIL SAMPLING FOR IMPORTED SOIL | |
2021-03-25 | 99 | Miscellaneous |
![]() |
VAPOR INTRUSION GUIDANCE AND CLARIFICATIONS FOR NEW DEVELOPMENT | |
2021-02-25 | 43 | Site Activity Status Update Received |
![]() |
SAMPLING CHANGES DUE TO AVOID LIVE LARGE WATER UTILITY | |
2021-02-22 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) |
![]() |
||
2021-02-05 | 43 | Site Activity Status Update Received |
![]() |
EPA DETERMINATION FOR OXIDE BOX WASTE FOUND ON THE PROPERTY | |
2021-01-22 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
||
2021-01-15 | 43 | Site Activity Status Update Received |
![]() |
CONSTRUCTION DOCUMENTATION REPORT FOR DEMO AND REMOVAL OF STRUCTURAL IMPEDIMENTS - SITE 3 | |
2021-01-15 | 29 | Phase II Environmental Site Assessment (ESA) Rpt Received |
![]() |
FOR SITE 3 - 1110 BUFFALO STREET | |
2021-01-15 | 29 | Phase II Environmental Site Assessment (ESA) Rpt Received |
![]() |
FOR SITE 1 - 200 NORTH 10TH STREET | |
2021-01-15 | 43 | Site Activity Status Update Received |
![]() |
CONSTRUCTION DOCUMENTATION REPORT FOR DEMO AND REMOVAL OF STRUCTURAL IMPEDIMENTS - SITE 1 | |
2021-01-06 | 99 | Miscellaneous |
![]() |
CITY PLANS TO DO SITE INVESTIGATION WORK THEN TRANSFER PORTIONS OF THE PROPERTY FOR DEVELOPMENTS | |
2020-12-02 | 43 | Site Activity Status Update Received |
![]() |
PROPOSED PHASES OF REDEVELOPMENT FOR THE SITE | |
2020-10-20 | 99 | Miscellaneous |
![]() |
CLARIFICATIONS ON CONTINUING OBLIGATION MODIFICATION AND GRUBBING & CLEARING SITE | |
2020-10-16 | 99 | Miscellaneous |
![]() |
CLARIFICATIONS ON VPLE PROCESS AND FEES | |
2020-09-09 | 43 | Site Activity Status Update Received |
![]() |
CONTAMINATION FOUND IN TEST TRENCHES ON NORTH PORTION OF SITE | |
2020-08-21 | 43 | Site Activity Status Update Received |
![]() |
SOIL SAMPLING FOR IMPORTED SOIL | |
2020-07-31 | 43 | Site Activity Status Update Received |
![]() |
SOIL SAMPLING FOR IMPORTED SOIL | |
2020-07-10 | 99 | Miscellaneous |
![]() |
BEST PRACTICES FOR TEMPORARY USES ON-SITE | |
2020-06-09 | 611 | Local Government Unit (LGU) Liability Exemption Applies |
![]() |
DOCUMENTATION OF ACQUISITION OF SITE, BLIGHT DETERMINATION PREVIOUSLY PROVIDED | |
2020-05-18 | 99 | Miscellaneous |
![]() |
BEST MANAGEMENT PRACTICES FOR IMPORTING SOIL | |
2020-05-13 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
LIMITED SITE INVESTIGATION THROUGH WAM GRANT | |
2020-05-07 | 43 | Site Activity Status Update Received |
![]() |
SOIL SAMPLING FOR IMPORTED SOIL | |
2020-05-05 | 99 | Miscellaneous |
![]() |
INFORMATION ON WPS SITE CLEANUP FOR CHICAGO STREET | |
2020-05-05 | 43 | Site Activity Status Update Received |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLANS FOR WEDC SITE ASSESSMENT GRANT APPLICATIONS & DNR COMMENTS | |
2020-03-24 | 1 | Notification of Hazardous Substance Discharge | CASE CREATED AFTER DATA FROM PHASE II ESA WAS RECEIVED | ||
2020-03-24 | 120 | PFAS Sampling Completed - Actionable Levels Detected | SEE AC 29 DATED 3/23/2020 FOR DOCUMENTATION | ||
2020-03-23 | 29 | Phase II Environmental Site Assessment (ESA) Rpt Received |
![]() |
||
2020-03-23 | 99 | Miscellaneous |
![]() |
CLARIFICATIONS ON IMPORTING SOIL TO SITE | |
2018-09-04 | 43 | Site Activity Status Update Received |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN - PRE-DEMOLITION SURVEY | |
2018-08-31 | 43 | Site Activity Status Update Received |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 1200 BUFFALO ST PORTION OF THE SITE | |
2018-08-29 | 43 | Site Activity Status Update Received |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 1101 BUFFALO ST PORTION OF THE SITE | |
2018-08-29 | 43 | Site Activity Status Update Received |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 1103 CHICAGO ST PORTION OF THE SITE | |
2018-08-28 | 43 | Site Activity Status Update Received |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 1110 BUFFALO ST PORTION OF THE SITE | |
2018-08-28 | 43 | Site Activity Status Update Received |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR 200 NORTH 1OTH ST PORTION OF THE SITE | |
2018-08-23 | 43 | Site Activity Status Update Received |
![]() |
GEOPHYSICAL SURVEY - SITE SPECIFIC SAMPLING & ANALYSIS PLAN | |
2018-08-21 | 99 | Miscellaneous |
![]() |
PETROLEUM ELIGIBILITY REQUEST, LETTER, AND CORRESPONDENCE FOR 1110 BUFFALO ST PORTION OF THE SITE | |
2018-08-16 | 28 | Phase I Environmental Site Assessment (ESA) Rpt Received |
![]() |
||
2018-08-13 | 43 | Site Activity Status Update Received |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN - GEOPHYSICAL SURVEY | |
2018-08-10 | 99 | Miscellaneous |
![]() |
PETROLEUM ELIGIBILITY REQUEST, LETTER, AND CORRESPONDENCE FOR 200 NORTH 10TH ST PORTION OF THE SITE |
Type | Related Activity |
---|---|
ERP to General Property | 07-36-583000 RAILROAD PROPERTY (FORMER) |
Substance | Type | Amt Released | Units |
---|---|---|---|
Metals | Metals | ||
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120) | Industrial Chem | ||
Polychlorinated Biphenyl | PCB | ||
Polynuclear Aromatic Hydrocarbons | Petroleum | ||
Tetrachloroethene (Perchloroethylene) | VOC | ||
Trichloroethylene | Industrial Chem | ||
Volatile Organic Compounds | VOC |
TAUREN BEGGS tauren.beggs@wisconsin.gov |